Free refusal-reasons report2022
Dún Laoghaire–Rathdown planning refusal reasons, 2022
116 Dún Laoghaire–Rathdown planning decisions analysed for 2022, with 13 refusals and the most common planner-cited refusal grounds.Coverage noteThese figures cover decisions whose public planner reports have been indexed and machine-read by PlanIntel. County cuts publish only after the county passes the extraction threshold; national pages show the currently analysed corpus, not every council in Ireland.Included in this page: Dún Laoghaire–Rathdown (116).
116
decisions analysed13
refused11%
refusal rate39
refusal-reason signalsTop refusal grounds
Download chartCategory counts
- Design9
- Other4
- Residential Amenity4
- Visual Amenity3
- Procedure Invalid2
- Traffic Sightlines2
- Density1
- Ecology1
- Premature Services1
- Protected Structure1
Year-by-year trend
- 20251 refused of 10 analysed decisions; 1 reason signals10%
- 20248 refused of 30 analysed decisions; 14 reason signals27%
- 202314 refused of 72 analysed decisions; 36 reason signals19%
- 202213 refused of 116 analysed decisions; 39 reason signals11%
- 202117 refused of 101 analysed decisions; 42 reason signals17%
- 202027 refused of 216 analysed decisions; 71 reason signals13%
Real refused examples
- ABP31234721Unacceptable loss of existing trees and hedgerows on site contrary to tree preservation objectives. Excessive removal of 88 of 161 surveyed trees (54.6%) with replacement planting that do...Decided 22 April 2022Ecology
- D22A/0649Excessive building bulk and floor area relative to the main house; inadequate quantitative provision of rear private open space.Decided 21 October 2022Residential Amenity
- D22A/0438Boundary treatment and vehicular access arrangements materially contravene condition 5(a) of a prior permission, which mandates shared vehicular access.Decided 16 August 2022Other