To construct an alfresco dining area and entrance canopy
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To extend existing private dwelling house at first floor level over attached garage and all associated site works
For the demolition of existing cottage ruins and for the construction of a storey and a half dwelling. the development will also consist of a new wastewater treatment system, site entrance and all associated site works
The development will consist of one two-storey dwelling house, wastewater treatment system, percolation area, new site entrance, driveway and all associated site works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
Of a rear roof dormer box window and retention permission of 2 No. box windows clad in standing seam instead of red cedar
To construct a new dwelling house, private garage, domestic wastewater treatment system, site entrance and all associated site works and services
To demolish a substandard dwelling house, reconstruct a dwelling house and provide sewerage treatment facilities along with all associated works
To construct a two storey dwelling, site entrance, waste water treatment system and all associated site works
For the construction of an extension to existing dwelling house to comprise of Livingroom and walk-in-wardrobe and en-Suite off of existing bedroom with balcony overhead including ancillary site works
For the construction of a private dwelling house, garage, bored well and all ancillary works
For the construction of a private dwelling house, garage, bored well and all ancillary works
To demolish an existing flat roof structure, construct of a new flat roof structure, upgrade of the mechanical heating system and all ancillary services
The development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works
To construct a dwelling house with packaged wastewater treatment system and polishing filter and associated ancillary works
Of modifications to existing private dwelling house/ site along with all associated site works and services
To construct an Agricultural Shed and associated site works
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
Of an existing 80m high lattice type meteorological mast and associated instruments, for a period of two years
To construct a dwelling house, septic tank, horizontal and vertical flow reed beds with distribution area together with all ancillary site development works and services
For (a) modifications to the existing two storey dwelling (b) single storey extension to the existing dwelling (c) conversion of existing sheds to habitable rooms and all ancillary site works
Of the existing kitchen extension to the dwelling house and all ancillary site works
For the demolition of the existing dwelling and permission for the provision of a replacement part one storey, part two storey dwelling, new effluent treatment system and percolation area, new vehicular entrance, connection to auxiliary services and associated site works
For development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 & 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application
For the construction of a new garage to replace the existing garage
For development at Cratloe Railway Station House, Ballymorris, Cratloe, Co. Clare V95 A2F3. Cratloe Railway Station House is a protected structure - RPS Ref. 542. The development will consist of the supply and installation of new wastewater treatment system and percolation area
For the construction of 4 new dwellings, new vehicular entrance, pedestrian access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works.
To extend the existing Sancta Maria Nursing Home, including material alterations to existing building layout, associated material alteration to the existing elevations, revised site layout, close one existing road entrance, replace existing treatment system and percolation area with a new site specific waste water treatment system and percolation area to EPA Guidelines including all ancillary site works at Sancta Maria Nursing Home
For the development which will consist of the demolition of an existing dwelling, stables, external sheds & stores, and the construction of a new single storey split-level dwelling with associated carport, detached garage, sheds & store, the installation of gates to the existing site entrance, provision of a wastewater treatment unit and percolation area, and ancillary site works.
To RETAIN as constructed, domestic garage/store which varies from granted permission P18-604 plus all ancillary site works
Of as constructed domestic garage/store which varies from Planning Refs P18-604 and P20-849, plus all ancillary site works
For the construction of 1.5 storey extension to the south western elevation of the existing single storey dwelling, detached domestic double garage, relocation of existing vehicular entrance together with all associated incidental and site works
To RETAIN existing front porch extension to existing dwelling house and ancillary site works
Of a garage, (x2) sheds and changes to the dwelling house extension previously granted planning permission under (PL Ref. P07/739)
To decommission and remove existing septic tank and percolation area servicing the existing dwelling house and to install a new waste water treatment system
To construct a two bay double slatted shed with creep area
To Extend the Appropriate Period of Planning Permission for P18/178 for the construction of a 44 bedroom two storey over part basement nursing home ( floor area = 3161m2), a standalone single storey services building ( floor area = 40m2 ), a standalone single storey grounds keeping store ( floor area = 22m2), together with the provision a proprietary waste water treatment system and sand polishing filter, 35 no. car parking spaces and all associated site works. permission was previously granted on the site for a two storey nursing home and day care centre development under planning register reference no. P10-358 with permission extended for same under planning register reference P16-98. This application is accompanied by a Natura Impact Statement
For the construction of a multi use games area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary and incidental works
For the Conversion of the Attic to comprise of Landing, 2 Bedrooms with En-Suite‘s and Walk-in-wardrobe with 10 existing roof windows to rear. Retention permission for a Corner window, composite decking and the omissions of a minor ‘A’ roof to front of dwelling. Retention permission for garage as constructed, PERMISSION to Install two roof windows to rear roof of existing dwelling including ancillary site works
To construct a new dwelling house, private garage, site entrance, on-site waste water treatment system and all associated site works
For extension to existing garage building to incorporate an independent single storey living unit (granny flat) and a conservatory / sun room along with associated site works
Of existing detached out building comprising gym / home office and storage area along with all associated ancillary site works
To construct a new dwelling house, private garage, site entrance, access road and on-site wastewater treatment system along with all other associated site works and services
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
To construct a new dwelling house, private garage, site entrance and on-site wastewater treatment system along with all other associated site works
To construct a dwelling house, waste water treatment system, percolation area, entrance and associated site development works
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
To construct a new site entrance, dwelling house, private garage and wastewater treatment system, along with all associated site works
To (a) demolish previously constructed extensions (b) construct new side and rear extensions together with alterations and all associated site works and services