The decommissioning and demolition of the existing Avoca Wastewater Treatment Plant, and the construction of a new Wastewater Treatment Plant to include: a new foul pump station, inlet works, storm tank, aeration tank, 2 no. final settlement tanks, sludge drying reed beds, 2 no. RAS/WAS Pump Stations, new administration building, final effluent outfall headwall, emergency flow headwall, surface water drainage settlement pond and outfall, and all ancillary works including pipework, pumps, sumps, chambers, air blowers and tanks;new access off the Tower Avenue: and all associated site development, site excavation and landscaping works, including fencing/boundary treatments, above and below ground
To erect circular slurry storage tank
Detached bungalow with detached garage together with waste water treatment system to current EPA standards, on site bored well, new vehicular entrance onto main road and ancillary works
Amendments to roof design of previously approved house (Planning Ref No. 21/257) and for the inclusion of 2 No. Velux type windows on side elevation over kitchen area
Proposed relocation and upgrading of existing vehicular entrance realignment of part of access road (circa 85 metres) & ancillary works
Extension of appropriate period of 15/1101 (the construction of an 80-bed nursing home (c.4610sqm) together with 34 no. independent (supervised) living units (c.2523sqm), an effluent treatment system, new access road, changes in level and associated landscaping works (c.7133sqm gross floor area). The proposed nursing home is a 2 storey with pitched roof providing bedrooms & communal areas around an internal courtyard. The 34 no. independent (supervised) living units are provided in 4 no. main house types as follows: 12 no. semi-detached 2-bed general needs houses (Type A, 2-storey c.74.7sqm); 4 no. semi-detached 2-bed general needs house (Type B, 2 storey c75.6sqm): 6 no. 2 bed apartments (Type C/C1, 2 storey c.65sqm plus c.92sqm communal/circulation areas). Parking is provided for 67 cars and access from the L2180 Arklow Road is permitted under Reg. Ref. 09/1169 (extended under Reg. Ref. 15/151). The development will also comprise changes in level including cut & fill works, provision of retaining walls, on-site waste water treatment system, hard & soft landscaping works, and all other associated site excavation & site development works above & below ground)
To construct 2No. 340m² industrial storage sheds and all associated site works
Demolition of the existing rear extension and replacement with a new extension to the side and rear of the existing cottage and for decommissioning the existing septic tank and installation of a new effluent treatment system to current EPA standards and all ancillary site works
Erect 14,500.77 m2 of photovoltaic panels on a ground mounted system with all associates site works at Servier (Ireland) Industries Limited. The development will comprise of a 2.0 MWp Solar PV farm on 3.36 hectares of land located to the south of our existing pharmaceutical manufacturing plant. The electricity generated will be used by Servier (Ireland) Industries Limited. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; 1 no. spare parts cabin; using all temporary ways and temporary construction compound / set-down area included on the application
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting business
The demolition of the existing single storey lean-to kitchen side extension and the replacement thereof with a single storey gabled kitchen side extension 31.3sqm, 5.3sqm bootroom, a new dining room rear extension 43.6sqm with patio and all associated external works and landscaping
Side extension as built to main dwelling and rear extension as built to main dwelling and permission for removal of existing septic tank, new wastewater treatment unit & polishing filter and associate works
Proposed development, for which a ten-year permission is sought, consists of the following: Demolition of existing outbuildings on the subject site, along with all site clearance and enabling works; Construction of 3 no. part one storey, part two storey, information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of C. 22,210 sq. m (66,630 sq. m GAF in total), and with a height (to parapet level) of c. 10.4 metres; Each of the 3 no. ICT facility buildings will accommodate ICT equipment rooms, associated electrical and mechanical equipment rooms, loading bays, maintenance and storage space, office administration areas, and staff facilities; Emergency generators (20 no. for each ICT facility building), flue stacks and associated plant are provided in fenced compounds adjacent to each ICT facility; Extension of the existing road serving Kish Business Park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway on its eastern side. The proposed roadway will form part of the inner relief road planned under Objective IT7 of the Arklow Town and Environs LAP 2018-2024; Construction of internal road network and circulation areas, footpaths, provision of 180 no. car parking spaces (60 no. spaces to serve each ICT facility) and 18 no. cycle parking spaces; Landscaping and planting, boundary treatments, lighting, security fencing, gatehouse (with a GFA of 175 sq. m), and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cables, on an application site area measuring c. 24.16 hectares. Site located to the North & Northeast of the existing Kish Business Park
Construct a stable building consisting of 4 no. stables, tack room and storage room, new laneway and yard and all associated site works
Existing extensions to front and rear of existing house and retention of change of use from residential to short-term letting use and associated works
Installation of a walking track with public lighting around the perimeter of the community field encompassing the GAA and soccer pitches (approx. 620m). The track shall be elevated on the easterly side where Irish Rail have erected a boundary fence. This area shall be protected with a handrail/fence so it can be used as a viewing and amenity area for games and accessed one end by a ramped area and the other end by steps and associated site works
(A) Construction of a new home office and garage / storage area, (B) All necessary site ancillary works
Scaffolding
Demolition of existing rear and side extensions to existing dwelling, construction of new rear extension, construction of new domestic garage and associate works
Construction of a single storey detached training room structure, ancillary to the main Club House, with new course WC connected to the existing wastewater treatment facility on site and all associated landscaping works
Steel shed workshop and associated works
Single storey dwelling, wastewater treatment system to EPA standards, garage, entrance and associated works
Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development works
The development will consist of (a) a partial demolition of the existing single-story dwelling, garage and store building, including (b) changes to fenestration and internal layouts, (c) construction of first-floor flat roof extensions to both and (d) single-story link connecting both buildings to create one habitable use (e) construction of a new septic tank and percolation area and all associated site works
1) the construction of single and two storey extensions to the existing house 2) changes to all elevations 3) retention of garage as constructed 4) retention of conversion of part of garage to home office 5) retention of detached sunroom 6) upgrade of effluent system to current EPA standards and all ancillary site works
A) Partial demolition of the existing single-story dwelling, including changes to fenestration and internal layouts and rear extension, b) Construction of a new pitched roof and dormer extension, c) Demolition of the existing garage and construction of a new split-level section connected to the main house via a flat roof link d) Construction of a new septic tank, percolation area, and all associated site works
Construction of 3 no. two & half storey 4 bedroom dwelling houses including the conversion/extension of existing stone outbuilding to a home office/1 bedroom studio to be used by House No. 3 including the extension to access road, driveways, landscaping, drainage, boundary treatment and ancillary works including connecting to existing onsite Sewage Treatment Plant. Planning Permission is also sought to construct a Pumping Station adjacent to the existing Sewage Treatment Plant and pumped mains to connect to Mains Sewer Pipe on Public Road
Construction of 3 no. two storey 4 bedroom dwelling houses including the extension to access road, driveways, landscaping, boundary treatment and ancillary works including connecting to existing onsite Sewage Treatment Plant
Alterations to the development permitted under Reg. Ref. 20/1088, as amended by Reg. Ref. 23/62, and will supersede the permitted information and communications technology (ICT) facility buildings permitted on site. In summary, the development comprises the replacement of the 3 no. part one and part two storey ICT facility buildings permitted on site, with 5 no. part two and part three storey ICT facility buildings with a reduced building footprint, along with an energy centre compound. The Battery Energy Storage System permitted under Reg. Ref. 23/62 and the substation and transmission line connections permitted under ABP Ref. 315200-22 will be unaffected by the proposed alterations. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning Authority with the planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development
Demolition of existing shed, construction of new rear and side extension, internal changes to existing dwelling, removal of existing septic tank, new wastewater treatment unit & soil polishing filter and associate works
Alterations and revisions to the already approved permission granted under PRR 20/632. Retention permission is sought for (1) an additional 275m2 of floor area to the already approved 2,300m2 manufacturing & engineering industrial unit now totalling 2,575m2 with minor alterations and revisions to the elevations and (2) minor alterations and revisions to the elevations, floor plan and internal layout of the connecting office building providing an additional 200m2 of office floor area to the original 2nd floor approved storage area with an additional 60m2 fire escape stairwell to the already approved 440m2 office building, now totalling 700m2. All associated site development works including storage yard, car parking, signage, and connection to the existing services and the same as approved under PRR 20/632
Amendments to the information and communication technology (ICT) facility development permitted under Reg. Ref. 20/1088. The proposed amendments comprise the following: Provision of a three-storey Battery Energy Storage System (BESS) building with a gross floor area (GFA) of c.13,787 sq.m, located to the southeast of the permitted ICT Building 3. The proposed building will accommodate battery storage rooms and circulation areas, with photovoltaic panels at roof level, and with an overall height of c.16.8 metres. Associated buildings including a single storey power trunk building (to accommodate a control room and cable rooms, with a GFA of c.539 sq.m and an overall height of c.5.3 metres), a single storey BESS switch room building (to accommodate control rooms and a relay room, with GFA of c.396 sq.m and an overall height of c.5.3 metres) and a transformer compound area to the southwest of the proposed BESS facility. Provision of a fire water storage area and a single storey fire pump house with a GFA of c.39 sq.m to the northeast of the BESS facility. All associated amendments including new amendments to the internal access routes, landscaping and planting, boundary treatments, lighting, and all associated and ancillary works
To erect a 1,555m² extension to the rear and 720m² extension to the side of the existing 2,575 m² manufacturing & engineering industrial unit & 700m² office building along with all associated site development works
Permission to erect a dwelling with services and domestic garage and all associated site and ancillary works
Amendments to the Battery Energy Storage System (BESS) permitted on site, under WCC Reg. Ref.: 23/62 (an amendment to WCC Reg. Ref.: 20/1088, which was subsequently further amended under WCC Reg. Ref.: 24/ 88). The proposedamendments comprise the following: • The provision of a BESS compound with a total area of c. 1.2 ha which will accommodate self-contained batteries and integral fire suppression equipment, climate control equipment and associated electrical components (in place of the previously permitted three-storey BESS structure and adjacent ancillary structures). • A single storey BESS Switchroom located to the south of the BESS facility with a total gross floor area (GFA) of c. 191 sq.m and total height of c. 5.3m accommodating a control room, relay room, and cable basement. • Water Services Plant and Storage equipment located to the north-east of the BESS comprising a single-storey fire pump house with a total GFA of c. 39 sq.m and total height of c. 3.1m, and 2 no. fire hydrant and water storage tanks with a total height of c. 10.3m. • All associated amendments including amendments to internal access routes, landscaping and planting, boundary treatments, the provision of an acoustic barrier to the south of the BESS compound, lighting, and all associated ancillary works. The operation of the development on site will require an EPA Industrial Emissions Directive (IE) Licence
Erect a 2,300m2 manufacturing & engineering industrial unit with connecting 440m2 office building along with all associated site development works including storage yard, car parking, signage and connect to the existing services
Construction of a 24m multi-user monopole telecommunications support structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets and associated site works including new access track on lands at Kilqueeny, Avoca, Co. Wicklow. The installation with form part of eir Mobile telecommunications network
Saw enclosure(Gross Area 145 Sqm) to end of Unit 2 and all associated site works
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Construction of a 40 bedroom extension to existing hotel as granted under PRR 02/6916 & 03/8031, including associated alterations and additions to existing car park layout and associated works to existing effluent treatment system, together with revisions to site boundaries, all together with associated site works
(A) The erection of an Independent Living Unit (granny flat), (B) Upgrading of existing sewerage treatment facilities to include a Bio-Crete Waste Water Treatment Plant with sand polishing filter to comply with EPA Code of Practice 2021 and (C) Ancillary site works
The construction of a bungalow with garage, new entrance and driveway, new effluent treatment system to EPA current standards and all ancillary site works
Single storey industrial unit (Gross Area 945 Sqm) and all associated site works
Existing single storey pitched roof conservatory extension to the west side of the original house, an existing single storey pitched roof porch extension to the east side of the original house, a single storey pitched roof shed with adjoining glasshouse to the rear, and a single storey pitched roof shed to the rear. All associated landscaping, drainage, ancillary site works and services. Retention permission is also sought for the change of use of dwellinghouse from residential use to commercial short term letting use
(i) Single storey industrial unit (Gross area 3150 Sqm) infill extension between existing buildings. (ii) New car park and timber storage compound (0.7 Ha) and all associated site works
Construction of a single storey dwelling, new vehicular entrance and driveway, new treatment system to current EPA standards and all associated site works
(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site works
Single storey welfare block (Gross Area 200 Sqm) and installation of covered timber storage racks to rear of existing unit 3
Construction of single and two storey extensions to the existing house, alterations to all elevations including the addition of new dormer windows, connecting to existing mains services and all ancillary works