Showing 451-500 of 30,640 public recordsAttic conversion to storage space to include main hipped roof design changed to a continuous A lined roof with a block gable on right side elevation (north east elevation) to include a new window on second floor in proposed new gable wall and three roof lights on the rear elevation.
Removal of hip roof and replace with a full gable with window at attic space level; convert attic space to storage space with rear dormer and 2 rooflights to front roof elevation; enclose existing open porch at ground level with pitched roof over.
Permission is sought for minor revisions to the already permitted residential development consisting of: - Minor reduction in gross floor areas and internal layout reconfiguration of 131no. houses (House Type A, B, C, D, E & F) and 142no. duplex units (Duplex Type J, K, L, M, O & P) including change of Duplex Type L from 2-bed Duplex (2 storey) to 3-bed Duplex (2 storey) and all associated elevational adjustments and adjustments to private / communal open space; Replacement of 4no. House Type D with 5no. House Type G; Replacement of 4no. House Type E with 3no. House Type H; Adjustments to the terrace of houses on Local Road 1 (4no. House: No. 278 - 281) to split the previously permitted terrace into 2no. sets of 2no. semi-detached houses (House No. 278 - 279 and House No. 280 - 281); Minor reduction in height of Apartment Block 1; Localised adjustment to landscaping where building footprints have reduced and adjustments to the landscaping around the perimeter of Apartment Block 1 and 2; Additional changes to the specification of the permitted landscaping / road surface finishes; Adjustments to bicycle stores including the addition of 9no. bicycle spaces; And all associated and ancillary site development works. The proposal is a minor amendment to development already permitted under SDCC Reg. Ref. SDZ23A/0004. The development continues to consist of the 395no. dwellings as already permitted. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and related to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
385 dwelling units (139 houses, 70 Build-to-Rent duplex / apartments, 72 duplex / apartments and 104 apartments), ranging between two to six storeys in height comprising the following: - Total of 139 houses consisting of 102 three bedroom two storey terraced houses (House Type: 0, E & F); 11 four bedroom two storey terraced houses (House Type: C); 26 four bedroom three storey terraced houses (House Type: A & B); Total of 70 Build-to-Rent duplex / apartments units consisting of 35 two bedroom units (House Type: J, L & O); 35 three bedroom units (House Type: K, M & P); Total of 72 duplex / apartment units consisting of: - 36 two bedroom units (House Type: J, L & O); 36 three bedroom units (House Type: K, M & P); Total of 104 apartment units accommodated in 2 blocks ranging from four to six storeys consisting of 48 one bedroom units (House Type: A1 & A2); 56 two bedroom units (House Type: B1 & B2); Private rear gardens are provided for all houses. Private patios / terraces and balconies are provided for all duplexes and apartments; Vehicular access to serve the development is provided off the Clonburris Southern Link Street permitted under SDCC Reg. Ref. SDZ20A/0021 and currently under construction. Pedestrian and cycle access is also provided to the Newcastle Road (R120) and to the Clonburris Southern Link Street; All associated and ancillary site development, infrastructural, hard and soft landscaping and boundary treatment works, including: - A single storey tenant amenity building (c. 170 sq.m); Areas of public open space (1.45Ha); 538 car parking spaces and 878 bicycle parking spaces (660 long-term spaces and 218 visitor spaces); Bin and bicycle stores; Plant provided at undercroft level and additional plant provided at roof level (including solar panels) of the proposed apartment blocks; 3 ESB Sub-stations; Demolition of remaining walls and hardstanding associated with a former agricultural building; The development proposed includes minor revisions to an attenuation pond, connections to water services (wastewater, surface water and water supply) and connections to permitted cycle/ pedestrian paths permitted under SDCC Reg. Ref. SDZ20A/0021 on a site (c. 8.94 Ha) in the townland of Adamstown, within the Clonburris Strategic Development Zone (Adamstown Extension). On lands generally bound by the Dublin-Cork Rail Line to the north; Hayden's Lane, the Griffeen River and the undeveloped lands of Clonburris Strategic Development Zone to the east; Lucan Pitch and Putt to the south; and Newcastle Road (R120) to the west. This site consists of Development Areas AE-Sl and AE-S2 within the Clonburris Strategic Development Zone, as prescribed by the Clonburris Strategic Development Zone Planning Scheme 2019; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and related to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
An attic conversion including change of roof profile from hip to gable, a dormer window to rear and new window to side elevation of existing swelling.
Sub-division of site, provision of a two-storey dwelling, enlarged entrance/driveway with pillars, pedestrian entrance on South-West boundary, connection to mains drainage, removal of existing shed, boundary walls at rear and sides, associated site development works
The extension of an existing telecommunications lattice tower (providing new overall height of 21.5 metres), carrying existing antennas, dishes and associated equipment and additional antennas, dishes and associated equipment, together with new ground equipment cabinets, new fencing and all associated site development works at the Eir Exchange. Revised by Significant Further Information which consists of an amendment to the red line boundary
Alterations to approved planning permission 20/296 as follows: 1. Change GF door to window on side elevation (southeast) 2. New GF window & rooflight to side elevation (northwest),
For the construction of a single-storey, flat-roof structure at the rear of the existing garden, for use as a home-work space ancillary to the main house and associated site works
Increase the number of children attending the preschool from 12 to 16 and remove the afternoon session 12:45pm - 3:45pm from the previous planning grant.
1. Removal of existing roof & chimney to front of house. Construction of new dormer roof with accommodation at first floor level with 4no. dormer windows and 3no. rooflights. 2. Alterations to GF window layout on front elevation (northeast). 3. Alteration to existing GF window to Utility Room to form new external door on side elevation (northwest). 4. Kitchen extension of 2.9m in length with 1 no. new window to side elevation (southeast), and 2no. windows to rear elevation (southwest)
Is sought to amend condition no. 4 of planning ref 21 925 and so increase the number of children accommodated on site to 39 in any one day, ancillary internal alterations to existing childcare facility and all associated site works
To use existing childcare facility from 7.45am - 6.15pm. Permission to amend and increase the number of children accommodated on site to 30 children and all associated site works
Detached single storey pre-school sessional Montessori facility of 20sq.m, Monday to Friday, to converted outbuilding to rear of existing dwelling.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
The proposed development which specifically relates to Building No. 4 located to the northeast of the centre of the site. The development for which retention permission is sought consists of the retention of the mezzanine area (121 sqm) on the first- floor level. This consists of office space, toilets, and a canteen. Retention permission is sought for any associated site works that would have occurred due to the construction of the mezzanine
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Construction of detached, 3 storey detached family dwelling with rooflights; new gate vehicular and boundary treatment and associated works.
1. Extending the existing hip roof across the semi-detached dwelling to create a gable-end roof. 2. The conversion of the attic. 3. The construction of 2 no. dormer windows to the rear. 4. Roof lights to the front & rear of the existing dwelling and all associated site works.
Attic conversion to storeroom complete with installation of new dormer window to rear of house with all associated site works
For alterations and refurbishment of an existing single storey dwelling including demolition of existing flat roofed extensions to the rear; a new single storey extension to the side; the provision of all other associated site excavation, infrastructural and site development works above and below ground
The development includes a single-storey rear extension, an attic conversion for storage purposes, a raised side gable with a Dutch-hipped roof and new side window, a rear dormer roof, roof lights to the front, and all ancillary works necessary to facilitate the development.
Alterations to existing hip roof to create gable roof to side to accommodate attic stairs to allow conversion of attic into non habitable storage with dormer to rear, new window to side gable, roof windows to front roof all with associated ancillary works.
Application for permission to retain the exhaust fuels at rear of the units 1 & 2.
2 bed apartment located over existing ground floor premises (Pizzeria & Roma Take Away); remove existing roof and extending up all external walls; new windows and roof to form apartment with entrance through existing door on Lucan Road which is similar to previously approved Reg. Ref. SD09A/0314.
Construction of a residential development comprising 3 three to five storey blocks of 74 apartments (20 one bed, 48 two bed and 6 three bed) all with associated private balconies/terraces to the north/south/east/west elevations; vehicular and pedestrian access from Hayden's Lane to the north west of the site and closure of the second existing vehicular entrance at south west of site; pedestrian access from Griffeen Park to the south east of the site; provision of car and cycle parking, public and communal spaces, bin stores and all associated site development and clearance works, landscaping, boundary treatments and other servicing works.
A single storey extension to the side and rear of existing dwelling, new porch to the front and an attic conversion (non-habitable status) with flat roof dormer window to rear. The proposed works will include a new kitchen/dining/living area, utility, boot room, bedroom, en-suite, walk in wardrobe, storage area, porch, internal alterations and all associated site works
Installation of a new external ATM and illuminated surround panel adjacent to existing ATM, replacement of existing ATM surround panel with new illuminated surround panel and all associated site works.
Extension of Duration: 20/873: the construction of a logistics warehouse with ancillary office accommodation (total c. 25,268 sqm) to an overall height of 14.86 metres. The warehouse element of the development is principally single storey including an ancillary mezzanine level (554 sqm). The ancillary offices, comprising c. 1,737 sqm, are provided over three storeys and include toilets, change rooms, showers, cafeteria, gym, plant areas and circulation spaces. The proposed development will also include: the provision of a new vehicular access from Barnhall Road roundabout with ancillary associated entry/exit gates, access road and footpath; 179 no. surface car parking spaces including electric vehicle charging stations and 18 no. bicycle parking; solar pv panels on the warehouse roof; hard and soft landscaping; signage; sprinkler storage tanks and pump house; an electrical substation (c. 54 sqm); and all ancillary works including boundary treatments, street lighting, site excavation and development works above and below ground. The site is principally bounded by: Liffey Business Campus to the north; Barnhall Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At this site of c. 8.19 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
A) the construction of a single storey extension on the ground floor to the side and rear that will include the demolition and reconstruction of the existing boundary wall; b) a new pedestrian access gate to the side of the property in the new boundary wall; c) the demolition and reconstruction of the existing shed; d) raising the existing boundary wall at the rear of the property; e) a new front door canopy and; f) the conversion of the attic into a non-habitable room with a proposed dormer window to the rear. All together with all associated site works
A) the construction of a single storey extension on the ground floor to the side and rear incorporating a WC, utility room, a kitchen and living area that will include the demolition and reconstruction of the boundary wall; b) the demolition and reconstruction of the existing shed; c) raising the existing boundary wall at the rear of the property and; d) the conversation of the attic into a non-habitable room with a proposed dormer window. This is together with all associated site works
A) the construction of a single storey extension on the ground floor to the side and rear consisting of a new utility room, a kitchen and living area that will include the demolition and reconstruction of the boundary wall b) the demolition and reconstruction of the existing shed c) raising the existing boundary wall at the rear of the property and d) the conversion of the attic into a non-habitable room with a proposed dormer window. This is together with all associated site works
Amendments to the electrical substation compound and structures permitted under Reg. Ref. SD19A/0042 and ABP Ref. 305948-19 comprising of amendment to the layout and extent of the permitted substation compound, to include an extension of the compound area to c. 0.77 hectares; reorientation of the Gas Insulated Switchgear (GIS) substation building to a northsouth orientation, and associated amendments to the building footprint, layout, and elevations, providing for a two storey building with a gross floor area (GFA) of c. 1,456 sq.m; alterations to the permitted single storey Client Control Building to provide for the substitution of this structure with 5 single storey modular client control units, with a combined total GFA of c. 231 sq.m (GFA of c. 46.2 sq.m per module); associated amendments to the permitted substation access arrangements (3 gated access points provided), transformers, security fencing (to be 2.6 metres high in place of the 2.4 metre high fencing permitted), lighting, services, MV substation, parking, utility cabling, amendments to permitted landscaping and berms adjoining the substation compound and associated and ancillary works.
The construction of a logistics warehouse with ancillary office accommodation (total c. 25,268 sqm) to an overall height of 14.86 metres. The warehouse element of the development is principally single storey including an ancillary mezzanine level (554 sqm). The ancillary offices, comprising c. 1,737 sqm, are provided over three storeys and include toilets, change rooms, showers, cafeteria, gym, plant areas and circulation spaces. The proposed development will also include: the provision of a new vehicular access from Barnhall Road roundabout with ancillary associated entry/exit gates, access road and footpath; 179 no. surface car parking spaces including electric vehicle charging stations and 18 no. bicycle parking; solar pv panels on the warehouse roof; hard and soft landscaping; signage; sprinkler storage tanks and pump house; an electrical substation (c. 54 sqm); and all ancillary works including boundary treatments, street lighting, site excavation and development works above and below ground. The site is principally bounded by: Liffey Business Campus to the north; Barnhall Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At this site of c. 8.19 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
For a single storey garden room building in the side garden of the existing dwelling incorporating a domestic office and all associated site works
The conversion of existing attic space comprising of modifications of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear of the property at 8 Johnsbridge Grove, Esker South, Lucan, Co Dublin
The Construction of a single storey rear and side extension to accommodate a kitchen/dining/living space, utility room and bathroom, plus all associated site works
The construction of a single storey rear and side extension to accommodate a Kitchen/Dining/Living space, Utility Room and Bathroom, plus all associated site works.
Sought to change the position of the existing front door from the shared porch to the new position at the front elevation of the existing dwelling
Planning permission for 1.) the conversion of an existing side garage to a playroom space, 2.) a single storey rear extension incorporating internal modifications, 3.) the conversion of the existing attic space to a new study/storage room which incorporates the change of existing roof profile from hipped roof to a half hipped gable ended profile, with new access stairs and rear dormer roof extension, plus all associated site works.
Construction of a first-floor side extension over the existing ground floor side structure incorporating internal ground and first floor modifications; a single storey rear extension; conversion of existing attic space into a store room with access stairs and 3 rooflights to the rear elevation; all associated site works.
The proposed development specifically relates to Building No. 3 and Building No. 4 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application). The development for which retention permission is sought consists of: the change of use of Building No. 3 from its permitted warehouse use (Reg. Ref. 95/923) to manufacturing use (4,421 sq. m gross floor area including ancillary offices at ground floor and first floor level); and the change of use of part of Building No. 4 from its permitted manufacturing use (Reg. Ref. 95/923) to office use (9,002 sq. m gross floor area ). The development for which retention permission is sought also consists of: the provision of ancillary office space at first floor level within Building No. 4 (246 sq. m gross floor area); and all other associated site development works above and below ground. The site is principally bounded by; Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west
Retention/change of use of existing development and shed/outbuilding; the development was originally built as a welfare facility building but is currently being used as a childcare facility.
Proposed build-up of existing hip roof to side of roof into dutch hip with window in proposed gable wall at attic level. Proposed attic conversion to habitable space with dormer roof window on rear slope of roof and roof light on front slope of roof all attic level.
Retention permission sought for single storey front extension (2.4m²) and planning permission sought to extend the existing front extension with an additional 3m² in floor area with pitched roof and associated site works
Development of 4 No. 20 kV ESB double substations at four sites of c. 591 sqm in total (Site 1, c. 138 sqm adjacent to Building 4; Site 2, c. 138 sqm adjacent to Building 2 and Building 5; Site 3, c. 138 sqm adjacent to Building 5; and Site 4, c. 177 sqm partially within Building 9, at the Kildare Innovation Campus (formerly known as the Hewlett Packard Campus) Barnhall Road, Leixlip, Co. Kildare. The wider Kildare Innovation Campus is c. 80 hectares. The wider Campus is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and grounds associated with Castletown House to the west. The proposed development will consist of: the construction of 3 No. standalone ESB double substations and associated LV switch rooms (Substations No. 1-3) of c. 3m in height, c. 4.8m in depth, and c. 17.8m in width, with an individual gross floor area of 57.5 sqm; and all associated works above and below ground. Substation No. 4 (gross floor area of 57.5 sqm) will include: internal alterations to the existing Campus Building No. 9; associated LV switch rooms; the removal of existing louvre and replacement with substation access doors on the southeast elevation; access path; and all associated works above and below ground. The cumulative gross floor area of the development will be 230 sqm
Conversion of existing attic space comprising of modification of existing roof structure; raising of existing gable c/w window; new access stairs and flat roof dormer to the rear.
For a single storey extension to the front of the existing house and for 2no. new windows to the ground floor gable elevation and for all associated site works
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
Proposed Build-up of existing Hip in roof to side of Roof into Dutch hip at attic level. Extension of existing Attic Conversation & use as Habitable space