to
to
Researching a specific site? Get a decision-ready site risk brief — €39 incl. VAT, PDF by email.Get a site risk brief

Planning records

Showing 501-550 of 4,240 public records
Page 11 of 20
  1. © OpenStreetMap
    22/5633Granted

    Barnahely Ringaskiddy Co.Cork

    Construction of 18 no. dwelling houses (reconfiguration and change of layout of part of the permitted residential layout granted under Pl. Reg. No. 18/5545 at site no's 13 - 30, to re-orientate and rearrange the layout of 12 no. 3 bed semi-detached houses and 6 no. 3 bed terrace houses), re-location of site entrance, landscaping, public lighting, soakways and all associated development.Decision record indexed
    Decision27 January 2023View record
  2. © OpenStreetMap
    20/6419Granted

    Sicura Buncoille Monkstown Co. Cork

    (i) Retention of the existing boundary wall measuring between 1.20 metres to 1.30 metres in height adjacent to the southern site boundary of the residence, running parallel to the existing access lane to the south; (ii) retention of the existing retaining wall measuring approximately 2.50 metres in height, located within the south-western portion of the subject land-holding which encloses the existing storage area; and (iii) all associated site works.Decision record indexed
    Decision12 January 2021View record
  3. © OpenStreetMap
    21/6890Granted

    25 Hillcrest Pembroke Woods Passage West Co. Cork

    The construction of a single storey flat roofed extension to the rear of existing dwelling, alterations and conversion of existing store and partial conversion of existing car port at ground floor level of dwelling for use as a study, elevational changes, which includes 2 no. new windows to side elevation and associated site works.Decision record indexed
    Decision13 December 2021View record
  4. © OpenStreetMap
    21/6713Granted

    The Boland Pembroke Woods Pembroke Passage West, Co. Cork

    The construction of 18 no. apartments, (i.e. change of plan to that previously permitted pursuant to ABP – 301618-18 and Cork County Council Ref: 17/5739, specifically by the addition of a second fire escape and increasing accessible bathroom sizes).Decision record indexed
    Decision06 April 2022View record
  5. © OpenStreetMap
    25/4550Granted

    St. Cartage Place Barnahely Ringaskiddy Co. Cork

    Permission for construction of dwelling and associated site worksDecision record indexed
    Decision16 July 2025View record
  6. © OpenStreetMap
    22/6675Granted

    Barnahely Ringaskiddy Co. Cork

    Permission for retention and completion of 12 no. dwelling houses originally granted planning permission under Planning Reg. No. 18/5545.Decision record indexed
    Decision03 February 2023View record
  7. © OpenStreetMap
    21/4205Granted

    Barnahely Ringaskiddy Co. Cork

    Construction 2no. two-storey townhouses and all ancillary site development works.Decision record indexed
    Decision07 May 2021View record
  8. © OpenStreetMap
    24/5642Granted

    Barnahely Ringaskiddy Co Cork

    A residential development of 30 no. dwellings and all ancillary site development works. The proposed development consists of 29 no. two-storey townhouses comprising of 4 no. 2 bedroom dwellings and 25 no. 3 bedroom dwellings and 1 no. 2 bedroom bungalow. Vehicular and pedestrian access to the proposed development will be via a new entrance off Warren's Court and makes provision for the upgrade of the existing access road, the provision of a public footpath, public lighting and upgrades to the junction with the N28. Extension of Duration to Permission granted under Pl.Reg.No. 19/4640.Decision record indexed
    Decision21 October 2024View record
  9. © OpenStreetMap
    25/5994Granted

    Warrens Court, Barnahely, Ringaskiddy, Co. Cork

    Retention Permission for alterations to floorplans & elevations of 3 no. dwellings (No's. 13, 23, & 30) and Retention Permission for alterations to elevations of 14 no. dwellings (No's. 1,2,3,7,8,12,17,18,22,24,25,27,28 & 29) as granted Planning Permission under Planning Reg. No's. 19/4640 and 24/5642.Decision record indexed
    Decision17 November 2025View record
  10. © OpenStreetMap
    21/6948Granted

    6 Horsehead Pembroke Passage West

    Construction of a retaining wall and railing on top, the raising and alteration of the existing ground levels, the restoration of the stone walls of the historic bath house - associated with Horsehead House. The development involves all the required site works, including site drainage, landscaping and the construction of a series of planters located to the front of the retaining wall. The development consisted of works to the boundary, and within the curtilage of a Protected Structure RPS-ID511 (Horsehead House), as listed in Volume 2 of the current Cork County Development Plan. The development is also adjacent to the Protected Structure RPS-ID1476 (Abbotts Bridge). The development is also adjacent to Natura 2000 Sites: Special Areas of Conservation (SACs) and Special Protected Areas (SPAs), of The River Lee and tributaries, and Cork Harbour. The application is accompanied by an Appropriate Assessment of the impacts/potential impacts the developent has had, and will have on the conservation objectives of any Natura 2000 sitesDecision record indexed
    Decision17 December 2021View record
  11. © OpenStreetMap
    22/5197Granted

    Lough Ine Parkgarriff Monkstown Co.Cork

    Permission for a single storey side and rear extension to an existing dwelling, the provision of a granny flat accommodation within the overall extended footprint of the dwelling and all other associated site workDecision record indexed
    Decision13 July 2022View record
  12. © OpenStreetMap
    24/4187Granted

    Buncoille Monkstown Co. Cork

    1)Full planning permission for the construction of new dwellinghouse, new domestic garage, new double entrance off public laneway. 2) Permission for the retention of existing mobile home on a temporary basis, together with all other ancillary site works.Decision record indexed
    Decision27 May 2024View record
  13. © OpenStreetMap
    21/7530Granted

    Lands at Ballydaniel More Ballynatra and Corbally (Currabally) Cobh Co. Cork

    The importation of clean and inert soil & stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a new temporary haul road and improvement of an existing site entrance gate. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this applicationDecision record indexed
    Decision08 August 2022View record
  14. © OpenStreetMap
    22/6163Granted

    No.1 Pembroke Park Drive Pembroke Wood Passage West Co.Cork

    Permission for retention of ground floor extension to front elevation of dwellingDecision record indexed
    Decision08 November 2022View record
  15. © OpenStreetMap
    20/5718Granted

    The Cottage Lee Carrow Pembroke Passage West, Co. Cork

    The refurbishment and alteration of an existing dwelling including raising the roof and its conversion to a habitable space along with re-roofing of side extension and two storey rear extension with associated site works. – Extension of duration of permission granted under planning ref: 14/6461Decision record indexed
    Decision28 September 2020View record
  16. © OpenStreetMap
    20/5207Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    The construction of a 1 storey water treatment & electrical building and a 2 storey electrical room extension to the existing finished goods building at the production facility. The site currently operates under an Industrial Emissions (IE) license (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
    Decision31 July 2020View record
  17. © OpenStreetMap
    19/6785Granted

    Barnahely Ringaskiddy Co. Cork

    The construction of 4 no. two-storey townhouses and all ancillary site development works. The proposed development makes provision for the demolition of existing agricultural sheds and comprises 2 no. 2 bedroom houses and 2 no. 3 bedroom houses. Vehicular and pedestrian access to the proposed development will be via Warren's Court, which will be upgraded, with provision for a public footpath and public lighting, as part of the proposed development.Decision record indexed
    Decision27 January 2020View record
  18. © OpenStreetMap
    23/5839Granted

    Ballintaggart Ringaskiddy Co Cork

    Permission for the construction of an extension to the existing roof level platform for 1 no. air handling unit and associated ductwork over the existing organic synthesis plant 1. The construction of a roof level platform for 5 no. air handling units and associated plant and ductwork over the existing organic synthesis plant 3 including 2 no. cladded screens at penthouse level, 2 no. cladded screens with louvres at roof level and all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision06 November 2023View record
  19. © OpenStreetMap
    25/5996Granted

    Warrens Court, Barnahely, Ringaskiddy, Co.Cork

    Permission for Retention of alterations to elevations of 1 no. dwelling (no.4) as granted planning permission under Planning Reg No. 19/6785.Decision record indexed
    Decision17 November 2025View record
  20. © OpenStreetMap
    24/4786Granted

    Ballintaggart Ringaskiddy Co.Cork

    Permission for the construction of a single storey electrical building and all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-06. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision19 June 2024View record
  21. © OpenStreetMap
    23/4491Refused

    2 Pembroke Court Pembroke, Pembroke Woods Passage West co.Cork

    Planning permission for the construction of a 1.5 storey dwelling house with new site entrance and all associated site worksGrounds not yet categorised
    Decision09 May 2023View record
  22. © OpenStreetMap
    22/4747Granted

    Cúlán, Buncoille Monkstown (Castle Farm) Monkstown Co. Cork

    Retention of (a) sun room and entrance porch extension to front of dwellinghouse (b) utility room extension to rear of dwellinghouse (c) detached garden shed structure adjacent to south-western gable wall of dwellinghouse and (d) detached ancillary single-storey granny flat structure to rear of dwellinghouse together with all associated alterations and site works.Decision record indexed
    Decision19 July 2022View record
  23. © OpenStreetMap
    22/6064Refused

    Moontide, Lee Carrow Rockenham, Pembroke Passage West Co.Cork

    Construction of a new dwelling house, the proposed house site is to be sub-divided from the plot of the existing bungalow with proposed works including the removal of existing septic tank drainage system serving existing bungalow, replacing with pumped individual connection to public sewer and alterations of existing gateway to provide access driveway for new dwelling together with boundary fencing, underground services and associated site works including the pumping individual connection to public sewer for proposed house.Grounds not yet categorised
    Decision08 June 2023View record
  24. © OpenStreetMap
    24/6382Granted

    Glenview Ballydaniel More Ballymore Cobh, Co.Cork

    Permission to refurbish, alter and extend existing dwelling consisting of; alter and extend the existing ground floor to the front, sides, and rear, alterations to all elevations, new replacement dormer roof with attic accommodation within, construct detached garage/store building, removal of existing mobile home building and all ancillary site development worksDecision record indexed
    Decision26 June 2025View record
  25. © OpenStreetMap
    26/0313Granted

    14 Hillcrest, Pembroke Woods, Passage West, Co. Cork, T12 XHR0

    (a) alterations and conversion of existing store and partial conversion of existing car port at lower ground floor level of dwelling for use as entrance hall, cloakroom, laundry and WC, (b) elevational changes, which includes 3 no. new windows to side elevations, and (c) associated site works, all to existing split level three storey detached dwellingDecision record indexed
    Decision07 April 2026View record
  26. © OpenStreetMap
    20/4230Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    The erection of 1 no. one storey modular building for office use and 1 no. one storey modular building for welfare use in the existing recycle centre compound, 2 no. one storey modular buildings both for office use to the north and 1 no. one storey modular building for office use to the north west of the existing laboratory building and all associated site works at their production facility. The site currently operates under an Industrial Emissions (IE) licence (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
    Decision01 April 2020View record
  27. © OpenStreetMap
    22/5541Granted

    Ballintaggart Townland Ringaskiddy Co.Cork

    (1) permission for retention of the following, (a) modifications to the elevations, (b) the extension of the goods lift to roof level including an external canopy at roof level, (c) the relocation of the firefighting stairs to the west of the existing building including signage on the western elevation, (d) an external access stairs from low level roof to high level roof, (e) additional production floor area of 139.5sq.m at ground floor mezzanine level, (f) additional production floor area of 621sq.m and 2 no. access platforms at second floor mezzanine level, (g) additional production floor area of 46.8 square metres at third floor level and (h) modifications to the location and size of the production stairs on the west & east side of the south side extension. This retention permission relates to the previously permitted New Product Technology Laboratory extension, planning ref. 18/7382. (2) Permission for the following, (a) the construction of a 4-storey production extension at ground floor level to the north & west with a ground floor and second floor mezzanine including a fire escape stairwell at the north west corner of this proposed extension. The proposed extension has a total floor area of 1,736 square metres. (b) additional plant room floor area of 166 square metres at third floor level and (c) the provision of roof mounted plant on the low-level roof area of the New Product Technology Laboratory building. The proposed development is covered by an existing Industrial Emissions Directive Licence no. P0013. As the development refers to a modification to an establishment to which the Major Accident Directives applies, information as specified in the third schedule of the major accident regulations will be submitted with the application.Decision record indexed
    Decision24 August 2022View record
  28. © OpenStreetMap
    25/4704Granted

    Barnahely Ringaskiddy Co.Cork

    Permission for an upgrade and extension to the existing biomedicines manufacturing facility, including: 1) construction of a part single-storey and part two-storey extension to the northern elevation of the existing production building P01 with total floorspace of c. 1,718 sqm and a maximum height of c23.01m, 2) construction of a new medium voltage and low voltage (MV &LV) electrical sub-station with 2 no. single storey over service void building units with total floorspace of c.346sqm and maximum height c.6.33m, and to include a back-up generator, 3) construction of an extension to the existing central utility plant (CUP) to accommodate new boiler, heat pumps and plant rooms with total floorspace of c.482sqm and maximum height to parapet, c.14.2m and to include demolition of an existing boiler house of 68.6sqm, 4) works to upgrade and expand the existing on-site Waste Water Treatment plant (WWTP) incorporating new plant and equipment for increased hydraulic and biological treatment capacity; including a new single storey electrical substation with total floorspace of c.233sqm and maximum height c.5.29m, back-up generator, cooling towers, and odour control unit, 5) all associated site development, landscaping and ancillary works including re-profiling of the earthen berms in the vicinity of the WWTP and associated demolition works, boundary fencing, underground services, high-level pipe and cable racks, internal site roads, yards and temporary construction compounds. This application relates to development, which comprises an activity, which holds an Industrial Emissions Directive Licence (reg. no. P0778-02). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the development.Decision record indexed
    Decision10 June 2025View record
  29. © OpenStreetMap
    19/6654Granted

    1A The Maples Pembroke Woods, Pembroke Passage West Co. Cork

    The construction of a single storey domestic garage to facilitate storage of vehicles, motorbikes and garden implements. Retention of an attic conversion to the existing dwellinghouse which includes 2 no. bedrooms, 1no. bathroom and 4 no. velux windows. Alterations to the front and rear elevations to include 1 no. window on each at 1st floor/attic level.Decision record indexed
    Decision08 January 2020View record
  30. © OpenStreetMap
    25/4329Granted

    Harbour Heights Rochestown Road Ardmore Passage West, Co. Cork

    Permission for: a) Construction of 1 No. detached dwelling on service site no. 178, b) All associated site works, (as permitted under Planning Ref. 16/7217 and extended under Planning Ref. 22/4692).Decision record indexed
    Decision01 October 2025View record
  31. © OpenStreetMap
    24/5275Refused

    Harbour Heights Rochestown Road Ardmore Passage West Co Cork

    Permission for: a) the construction of 2 no. semi-detached and 1 no. detached dwellings (3 dwellings in total) in lieu of 3 permitted serviced sites "no. 27, 28 & 29 The Gardens", b) all associated site works. The proposed development is a change of plan from that originally permitted under Cork County Council Ref. 16/7217 and extended under Ref. 22/4692.Grounds not yet categorised
    Decision28 August 2024View record
  32. © OpenStreetMap
    23/6167Granted

    Ballydanielmore Cobh Co. Cork

    Permission for the retention of extensions and alterations to existing dwelling and all associated site works.Decision record indexed
    Decision13 December 2023View record
  33. © OpenStreetMap
    25/4325Granted

    Harbour Heights Rochestown Road Ardmore Passage West Co. Cork.

    Permission for: a) Construction of 1 no. detached dwelling on service site no. 177, b) All associated site works, (as permitted under Planning Ref. 16/7217 and extended under Planning Ref: 22/4692).Decision record indexed
    Decision29 September 2025View record
  34. © OpenStreetMap
    23/6568Granted

    Harbour Heights Rochestown Road Ardmore Passage West, Co. Cork

    Permission for the retention and full planning permission for the completion of house numbers 132, 133, 134, 135 & 136. The changes where permission for retention is being applied for comprise of the following: a) Revised positions of house footprints to that permitted b) Revised finished floor level to a lower elevation c) All associated site works. The proposed development is a change of plan from that originally permitted under Cork County Council Planning Ref. 167217 and extended under Planning Ref: 224692.Decision record indexed
    Decision23 February 2024View record
  35. © OpenStreetMap
    23/5834Granted

    Ballintaggart & Ballybricken Ringaskiddy Co Cork

    Permission for construction of Bld. 124 - Site Lab Building. This will comprise a new five-storey building (circa 10,881 square metres with a maximum height of circa 30.2m above ground) which will include laboratories, a canteen, ancillary office space and plant and utility space, and associated site development works, including; roads, paths, yards, underground services and landscaping. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-05. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision02 November 2023View record
  36. © OpenStreetMap
    24/4022Granted

    Beechview Rathanker Passage West Co.Cork

    Permission for construction of single storey extension to front of existing dwelling consisting of bedroom & shower room.Decision record indexed
    Decision02 April 2024View record
  37. © OpenStreetMap
    22/5566Granted

    Ballydaniel More Cobh Co.Cork

    The construction of a new dwelling house, new vehicular entrance, install a new wastewater treatment system and percolation area and all associated site worksDecision record indexed
    Decision06 December 2022View record
  38. © OpenStreetMap
    22/4608Granted

    Barnahely Ringaskiddy Co.Cork

    (i) 1 no. 3-storey office extension to the existing administration building with a floor area of approximately 2,721 square meters, an overall parapet height of 16.3 meters and connected by overhead passageway to the southern elevation of the administration building; (ii) temporary continuation for a further 2 years of use of the existing 4 no. single-storey, 360 square meter pre-fabricated temporary modular office units permitted under planning reference 16/07150; (iii) permanent continuation of use for the existing 95 no. car spaces temporarily permitted under reference 16/07150. The development will include associated works for local site roads, footpaths, connection to underground services, landscaping and site works. The proposed development is located on lands approximately 1.32 hectares within the existing permitted manufacturing campus. This application relates to development which comprises an activity which holds an industrial emissions directive licence (Reg. No. P0778-02)Decision record indexed
    Decision10 May 2022View record
  39. © OpenStreetMap
    20/6995Granted

    Pfizer AGI (Above Ground Installation) Pfizer Ballintaggart Ringaskiddy, Co. Cork

    Works involving the replacement of approximately 80m of existing 2.4m high chainlink fence and associated gates with new 2.4m high green palisade security fencing/gates and all associated works at an existing Above Ground Natural Gas Installation.Decision record indexed
    Decision17 February 2021View record
  40. © OpenStreetMap
    24/6089Granted

    21 Maple Rise Pembroke Woods, Pembroke Passage West Co.Cork

    Permission to construct a dwelling house and all associated site worksDecision record indexed
    Decision25 April 2025View record
  41. © OpenStreetMap
    21/6865Granted

    Ballydaniel More Farranastig, Cobh Co. Cork

    Construction of a two storey dwellinghouse, new vehicular entrance, on site bio-unit, and associated site works.Decision record indexed
    Decision03 May 2022View record
  42. © OpenStreetMap
    21/5132Granted

    The existing Pfizer site in Ballintaggart and Ballybricken Ringaskiddy Co. Cork

    A 10 year permission for the construction of a new Clinical Manufacturing Facility (referred to as RCMF) at the existing Pfizer site. The proposed RCMF facility will include (i) a new five storey clinical manufacturing building (c.11,468sqm and maximum height 29.425m) which will include production areas, laboratories, ancillary office space, warehouse, and plant and utility space. The building will be constructed in two sequential phases, Phase 1 comprising c.9,465 sqm and Phase 2 comprising c.2,003sqm; (ii) a single storey warehouse drum store building (c.420sqm and maximum height 13.00m); (iii) an external utility yard comprising; a two storey electrical building (c.94sqm and maximum height 11.70m), an emergency generator with flue stack, 1No. liquid nitrogen tank, 2No. evaporators, 3No. bunded chillers, 2No. bunded receiver tanks, 2No. bunded glycol tanks, a three storey steel frame structure (to a maximum height of 12.91m) to accommodate; dry coolers, heat exchangers and other miscellaneous utility plant and machinery above the utility yard; (iv) an elevated structural steel piperack (c.210m in length and maximum height 9.19m) to provide piped utility services to the new facility, and; (v) all associated site development works, including roads, paths, yards, underground services and landscaping. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (P0013-04). As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accident Regulations will be submitted with the application. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.Decision record indexed
    Decision22 June 2021View record
  43. © OpenStreetMap
    24/5501Granted

    Barnahely Ringaskiddy Co Cork

    Modular buildings and structures comprising as follows: 1) Permanent retention of an existing 884sq.m temporary equipment store building and extension of the building by a further c.414 sqm, 2) Construction of a new single storey c.110 sq.m amenity building and a new single storey c.60 sq.m workshop building, both located at the site waste water treatment plant area, 3) Temporary continuation for a further 5 years of use of the existing 4 no. single storey, 360 sq.m pre-fabricated temporary modular office units permitted under planning references 16/07150 and 22/4608, 4) Temporary continuation for a further 5 years of use of existing 276 sq.m modular gowning and locker building permitted under planning reference 21/5786. This application relates to development which comprises activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02).Decision record indexed
    Decision01 October 2024View record
  44. © OpenStreetMap
    24/4910Granted

    Barnahely Ringaskiddy Co.Cork

    Permission for the construction of extensions to the canteen facilities at our existing bio-pharmaceuticals manufacturing facility. The proposed development will comprise: i) a c.93sqm single storey extension to the northern side of the existing canteen to facilitate additional seating, and ii) a c.90 sqm extension to the southern side of the canteen to facilitate additional kitchen space. This application relates to development which comprises an activity which holds an industrial emissions directive licence (reg. no. P0779-02)Decision record indexed
    Decision13 July 2024View record
  45. © OpenStreetMap
    21/5402Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    1) The construction of an electrical building, 2) i) amendments to the footprint and elevations of the recently permitted water treatment and electrical building which was granted planning under Planning Ref. 20/05207, ii) the construction of a first floor electrical room extension to this permitted water treatment and electrical building. The proposed development is covered by an existing Industrial Pollution Control License No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision12 July 2021View record
  46. © OpenStreetMap
    25/5676Granted

    20 The Close Harbour Heights Ardmore Passage West Co. Cork T12 FH0A

    Permission to construct first floor extension to rear of existing detached two storey dwelling and all ancillary site development works.Decision record indexed
    Decision08 October 2025View record
  47. © OpenStreetMap
    24/6460Granted

    Barnahely Ringaskiddy Co.Cork

    Permission for (i) Construction of a 2 no. storey extension to the west elevation of production building P01 comprising gross floor area of approximately 294sq.m with maximum height of 19.2m (to parapet) to facilitate installation of new equipment (parts washers and autoclaves) to replace end-of-life equipment. (ii) All associated site development works including adjustment to adjacent hard-standing and kerbing, repositioning of the existing Liquid Nitrogen Enclosure, provision of drainage and site service connections and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02)Decision record indexed
    Decision21 February 2025View record
  48. © OpenStreetMap
    21/6619Granted

    Karma Rathanker Passage West Co. Cork

    1. Removal of the existing roof, 2. Construction of a first floor extension with new roof, a new front porch, and a ground floor extension to the side of the existing dwelling, 3. Alterations to all elevations to include 4 no. rooflights, and all associated site works.Decision record indexed
    Decision17 November 2021View record
  49. © OpenStreetMap
    21/4631Granted

    Ballintaggart and Ballybricken townlands Ringaskiddy Co. Cork

    A 10 year planning permission to amend the recently permitted development for the construction of a contractor’s compound, welfare facilities, an internal access road and associated works, Ref: 20/5533. The amendments include adjusting internal access roads and associated works. The proposed amendments include relocating a section of road accessing the permitted contractors compound, construction of associated earth reinforced retaining walls, the working and grading of site-won material, the removal of 88 trees, replacement planting of 90 trees, the erection of protective fencing around trees that are to remain, and some other minor demolitions and alterations. The proposal includes the removal of 3 No. double-stacked temporary portable contractor cabins (total floor area removed = 192m2, overall height of 4.95m) and removal of a section of steel gantry walkways from the previously permitted contractors compound. The development will include all adjustments required to associated on-site infrastructure. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision31 May 2021View record
  50. © OpenStreetMap
    23/6129Granted

    Ballintaggart Ringaskiddy Co Cork

    Construction of 2 no. one storey modular buildings for office use and 2 no. storage containers to the north of the existing Operation Support Group Building including all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision11 December 2023View record
Showing 501-550 of 4,240
Page 11 of 20