Permission sought to provide secure car parking with 1.2M high walls and vehicular gates to front and 2.0M high wall to side and also first floor bathroom extension to rear together with associated site works
Permission sought to replace ground floor windows
Permission for retention of alterations to ground floor windows and doors to units no. 2 and 3 and for permission for 2 meter high boundary wall to side with 1.2 meter high wall at front with vehicular entrance to unit no. 3 to provide enclosed garden and parking for 1.2 meter high wall at front of unit no. 2.
Attic conversion incorporating dormer windows to rear and rooflight to front.
The construction of a single storey building to be used as an additional childcare room for the existing Ballybrack/Killiney Montessori Preschool & Afterschool which is operating out of the parochial hall. The proposal includes new landscaping to St. Matthias Church Grounds for the provision of child play areas and the provision of covered cycle parking. The proposed structure and the parochial hall are seperate buildings within the grounds of St. Matthias Church, which is a protected structure.
Permission for development at this site
Permission for change of use to convert the two existing ground floor commercial units into two 1 bedroom apartments also, restore existing first floor unit to original 3 bedroom apartment, including all ancillary works.
Permission for subdivision of site
Permission for development. The development will consist of
Permission is sought for development consisting of 1) demolition of existing entrance Porch, 2) New gates to the ope between existing piers, 3) new single-storey extension to front of the existing two storey house, to provide a larger kitchen and dining area, and covered entrance space, 4) minor alterations to internal layouts and general refurbishment works throughout, and 5) energy retrofit to existing, including external insulation wrap to existing external walls, replacement of windows and external doors, new air to water heat pump and all associated mechanical and electrical systems along with all water, drainage services, civil and landscaping works associated with the upgrades.
Permission is sought for development consisting of 1) subdivision of the existing site by a new 0.9m high fence to the front garden, and a new 2.1m high garden fence to the rear garden to create a new site for a house. 2) New gates to the existing ope between piers, to provide a new vehicle entrance to the new site from Quinn's Road and 2No. car parking spaces to the front of the house. 3) new three-storey (including inhabited attic space) dwelling house, with dormer to front, and 3 no. rooflights to rear 4) New foul water drainage connection to the existing public drain, and new surface water soakaway, along with all water, drainage, services, civil and landscaping works associated with the new house
Amendments to granted planning permission
Amendment to granted planning permission
Permission for development. The development will consist of
Permission is sought for change of use/conversion of existing two storey garage adjacent and connected to existing house into a seperate dwelling of 138sqm, together with all site works & new utility connections.
LSREF V Eden T1 Limited Intend to Apply for Permission on this site In the Townlands of Laughanstown and Brennanstown, Dublin 18. This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as amended. The proposed development is located in Development Area 8 – Tully of the Cherrywood Planning Scheme 2014 (as amended) and includes lands part of Tully Village Centre east of Castle Street, identified in this application as Plot T1. The development is generally bound by Gun and Drum Hill Road to the south, Castle Street to the west, development permitted under Reg. Ref. DZ20A/0399, amended by Reg. Ref. DZ21A/1069, and also Reg. Ref. DZ21A/0664 to the north and development permitted under Reg. Ref. DZ22A/0729 to the east. The proposed development comprises of amendments to development permitted under DZ23A/0106 consisting of: • Reconfiguration of the basement layout, reduction in basement footprint from 6,853sqm to 4,925sqm and associated works including, the reconfiguration and reduction of car parking spaces from 167no. to 120no.; reconfiguration and decrease in the number of long stay bicycle parking spaces from 180no. to 92no.; relocation and resizing of plant rooms. • Layout alterations at ground floor level of Block A including the omission of permitted HIE Unit 4.3 (56.7sqm) and relocation of Retail Unit 2.8 (now 93.6sqm) further south to facilitate the provision of a bicycle store accommodating 62no. bicycle parking spaces at ground floor level of Block A; Omission of ground floor tenant amenity (28.3sqm) facilitating an increase in area of Retail Unit 2.1 by 24.4sqm (now 173.6 sqm) and Food & Beverage Unit 3.2 by 7.6sqm (now 222sqm). • Provision of bicycle lift to basement at ground floor level of Block A and revised entrance and design of bicycle access stairs to basement at Block A. • Provision of 32no. bicycle parking spaces in stand-alone, covered and secure bicycle shelter, replacing 4no. car parking spaces permitted at grade. • Overall increase in the total number of bicycle parking spaces provided from 284no. to 288no. • Overall reduction in the total number of car parking spaces provided from 210no. to 157no. • Omission of the blue roof attenuation and the basement level concrete surface water attenuation tank, and inclusion of an underground cellular attenuation tank in lieu. • Reduction in residential floor to floor height from 3275mm to 3150mm in Block A resulting in an overall building height reduction of approximately 500mm. • All ancillary site development and landscaping works. The development as otherwise permitted under Reg. Ref. DZ23A/0106 remains unchanged.
The planning permission is as follows: The development proposed consists of a mixed use commercial and Build to Rent apartment development (total overall gross floor area of c. 16,508sqm) consisting of 2no Blocks of 3-5 storeys over basement on a developing tile (T1) of approximately 1.09 Ha comprising of the following- Block A comprises 1no. supermarket (gross floor area of c. 2748.6sqm) 8no. retail units (gross floor areaof c. 992.9sqm) 3no. food and beverage/non retail units (gross floor area of c.276sqm) 1no. high intensity employment unit (gross floor area of c.68.1sqm) 1no loading/delivery area (c.138sqm at ground floor level facilitating deliveries to proposed retail units. 139no. Build to rent residential units, in a mix of 25no. studios, 50 no. 1-bedroom apartments and 64 no. 2 bedroom apartments. Each proposed residential unit has private open space in the form of a balcony/terrace, a range of tenant amenity/tenant facility floorspace at ground floor and podium level (overall c.205sqm) including a single storey tenant amenity building (c. 150sqm) Block B comprises 1no community facility (gross floor area of c.215sqm) 2no. high intensity employment units (gross floor area of 488sqm) 2no food and beverage/non retail units (gross floor area of c. 279.1sqm) The development also includes public open space in the form of the Village Green c.1132.1sqm of communal open space serving the proposed Build to Rent residential units, 202no. car parking spaces 167no. at basement and 33no. at surface level). It is also proposed to make use of 4no. existing car parking spaces located adjacent to the proposed development on Castle Street as additional non residential visitor parking spaces (2no. and Gun and Drum Hill Road (2no) An additional 2no. car parking spaces for use as non-residential visitor parking spaces are proposed on Gun and Drum Hill Road, together with the provisionof a new vehicular access off Gun and Drum Hill Road serving the development (being amendments to the Phase 1 Roads permission, permitted under DZ15A/0758 and as extended by DZ15A/0758/E). 2no. existing car parking spaces on Castle Street to be used as a pull-in loading bay for use Monday-Saturday between 7am and 7pm, 258 No. bicycle parking spaces (156 No. at basement and 102 No. at surface level) 9no. motorcycle parking spaces (7 no. at basement level and 2 no. at surface level. Bring bank consisting of 6 no. bottle banks, 3 no. ESB substations/Switchrooms, Basement Ventilation, all ancillary site development and infrastructional works, hard and soft landscaping and boundary treatment works. The application also provides for the use of roads and services at Gun and Drum Hill Road, Grand Parade, Castle Street and Barringtons Road (permitted and under construction under DZ15A/0758 as extended by DZ15A/0758/E and as amended by DZ20A/0399, Dz21A/0334 and DZ21A/0664).
Permission for a single-storey, 108sqm extension to include
Permission for a ground & 1st floor extension to the side
Permission for development consisting of amendments to the development permitted under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E and as amended under Reg. Ref.: DZ24A/0621/WEB, on lands within the townland of Brennanstown, Dublin 18. The application site is bound by Brennanstown Square to the north, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, Cabinteely Stream (partly) and Beech Park to the east. The lands are located in the Cherrywood Strategic Development Zone Planning Scheme area and forms part of the Development Area 5 (known as Druid’s Glen) within Cherrywood SDZ. This amendment application relates to Phase 02 and 03 of the permitted development, which is located to the south of the Cherrywood SDZ Planning Scheme’s Druid’s Glen Distributor Road (also known as P* to P3), recently opened as a public road. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). The proposed amendments, which relate to the Phases 02 and 03 area of the permitted development, can be described as follows: - Redesign of Apartment Block E (now referred to as Block 2) to comprise 43 no. apartments, including 7 no. 1 beds and 36 no. 2 beds, in a 4 no. storey building with associated private terraces / balconies on the northern, southern, eastern and western elevations. There is no change to the total number of apartments in this block; - Replacement of 36 no. triplex units in Blocks F and G, with 1 no. 3 bed house and 9 no. 4 bed houses (comprising of 3 storey terraced housing); - Replacement of 12 no. duplex units in Block D1 with a new apartment block (referred to as Block 3) to comprise 43 no. apartments, including 7 no. 1 beds, 28 no. 2 beds, and 8 no. 3 beds, in a 4 no. storey building with associated private terraces / balconies on the northern, southern, eastern and western elevations; - Redesign of 8 no. duplex units in Block D2 (now referred to as Duplex Block D01) to comprise 12 no. 3 bed duplex units, in a 3 no. storey building with associated private terraces / balconies on the northern elevation; - Replacement of 48 no. apartments in Block H with 16 no. 3 bed duplex units in a 3 no. storey building (referred to as Duplex Block D02) with associated private terraces / balconies on the southern elevation; - Replacement of 24 no. triplex units in Blocks K and J with a new apartment block (referred to as Block 5) to comprise 42 no. apartments, including 7 no. 1 beds, 23 no. 2 beds, and 12 no. 3 beds, in a 4 no. storey building with associated private terraces / balconies on the northern, southern, eastern and western elevations; - Replacement of 44 no. 3 bed houses and 16 no. 4 bed houses, with 42 no. 3 bed houses and 30 no. 4 bed houses (comprising of 2 storey terraced housing); - Removal of permitted basement floor level located on the eastern part of the site (below the previously permitted Blocks E, F, G and H) and reconfiguration of the car parking at surface / ground level to provide 267 no. spaces; and -All associated development, including alterations to the internal road layout, cycle and bin storage, PV panels at roof level, plant, provision of an additional ESB substation (2 no. in total), open space, landscaping, drainage and site development works. The permitted development (under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E and as amended under Reg. Ref.: DZ24A/0621/WEB), provides for 346 no. residential units and the proposed amendments would result in an increase to 353 no. residential units (i.e. 7 no. additional units in Phase 02 and 03).
We, Manciano Limited, intend to apply for planning permission for development consisting of amendments to the development permitted under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E, on lands within the townland of Brennanstown, Dublin 18. The application site is bound by Brennanstown Square to the north, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, Cabinteely Stream (partly) and Beech Park to the east. The lands are located in the Cherrywood Strategic Development Zone Planning Scheme area and forms part of the Development Area 5 (known as Druid’s Glen) within Cherrywood SDZ. Phase 01 of the permitted development is located to the north of the Cherrywood SDZ Planning Scheme’s Druid’s Glen Distributor Road (also known as P* to P3), currently substantially constructed and opened as a public road. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). The proposed amendments, which relate to the Phase 01 area of the permitted development, consist of the following: • Provision of an additional 3 no. 2 storey, 3 bed terraced houses (House Type B1) and associated reconfiguration of the permitted surface parking area (including a reduction from 16 no. to 14 no. spaces); • Replacement of 4 no. 2 storey, 4 bed semi-detached houses and 1 no. 2 storey, 4 bed detached house, with 6 no. 4 bed terraced houses (new house types A1 & A2). This results in 1 no. additional house; • Reconfiguration of Block A, a 3 no. storey duplex building, to provide for 8 no. 3 bed duplex units, in place of 4 no. 3 bed and 4 no. 2 bed duplex units, and associated external alterations to fenestration and balconies; • All associated development, including car parking changes, cycle and bin storage, landscaping and site development works. The permitted development (under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E) provides 342 no. residential units and the proposed amendments would result in an increase to 346 no. residential units.
Planning permission for the development of erection of a garden shed of floor area c. 2sqm and height up to 2.1m within the back garden.
Permission for a residential development at a site measuring approximately 8.24 ha in area. The development will consist of the construction of 342 new residential dwellings, comprising 189 no. apartments arranged in 4 blocks (all 4-storeys in height and comprising 15 x 1 bed units and 174 x 2 bed units); 28 No. duplex units (comprising 14 x 2 bed units and 14 x 3 bed units); 60 No. triplex units (comprising 40 x 2 bed units and 20 x 3 bed units) and 65 No. 4 bedroom houses (comprising a mix of detached, semi-detached and terraced house types) together with a Childcare Facility at ground floor level within Block C with a floor space of 249sq.m. (GFA), and ancillary open space. The proposed development includes for all associated infrastructural works to include the part delivery of the Cherrywood SDZ Planning Scheme's Druid's Glen Distributor Road (also known as Q to P3), measuring approximately 390 m in length to include the construction / completion of the part approved 3-span bridge (Option 1) over the Cabinteely Stream under Planning Ref. DZ16A/0587 (ABP Ref. PL06D.247915). It is noted that a portion of Road Q to P3 was also granted under Planning Ref. D15A/0385 (as amended by DZ19A/0622) and the road may be constructed under that permission. Permission is sought for the inclusion and utilisation of a temporary haul road (to be constructed by the Dún Laoghaire-Rathdown County Council Contractor as part of the Druid's Glen Road Q - P3 east of the Cabinteely Stream (up to a point CH 100m as defined on ATKINS Drawing No. 0101A). This temporary haul route would connect directly to the N11 via the proposed Junction Q and includes for a culvert, or temporary bridge crossing at the Cabinteely Stream. The proposed temporary haul route comprises a 4m wide unbound haul road approximately 160m long, and will be constructed from approximately CH 560m on Druid's Glen Road to a proposed site compound area to the west thereof measuring approximately 30m wide and up to 45m long in plan area and will be situated at, or above the 30m site contour. This site compound will be made available to the Dún Laoghaire-Rathdown County Council Contractor building the Druid's Glen Road from N11 to point P3. Following the sectional completion of Druid's Glen Road, the proposed temporary haul road will be available to accommodate construction traffic associated with the appointed contractor(s) responsible for the development of the subject lands (as per any planning permission granted). It is proposed that this temporary haul route would remain available until the permanent bridge crossing the Cabinteely Steam becomes operational. The development will also include the construction of: ancillary waste storage facilities; ancillary waste recycling collection area; associated car parking (total of 565 no. car parking spaces, comprising 257 spaces at basement level and 308 surface level spaces (including 9 no. ancillary car parking spaces in connection with the childcare facility); bicycle parking spaces (total of 492 no. cycle parking spaces, comprising 156 basement level spaces and 336 surface level spaces); a number of ancillary public open spaces; provision of boundary treatments; lighting; associated hard and soft landscaping (including changes in site levels and playground provision); associated infrastructural and site development works above and below ground (including 2 No. permanent water attenuation ponds and 1 no. temporary attenuation pond). The application site is located within the Cherrywood Strategic Development Zone.
Permission for a residential development at a site measuring approximately 8.24 ha in area. The development will consist of the construction of 342 new residential dwellings, comprising 189 no. apartments arranged in 4 blocks (all 4-storeys in height and comprising 15 x 1 bed units and 174 x 2 bed units); 28 No. duplex units (comprising 14 x 2 bed units and 14 x 3 bed units); 60 No. triplex units (comprising 40 x 2 bed units and 20 x 3 bed units) and 65 No. 4 bedroom houses (comprising a mix of detached, semi-detached and terraced house types) together with a Childcare Facility at ground floor level within Block C with a floor space of 249sq.m. (GFA), and ancillary open space. The proposed development includes for all associated infrastructural works to include the part delivery of the Cherrywood SDZ Planning Scheme's Druid's Glen Distributor Road (also known as Q to P3), measuring approximately 390 m in length to include the construction / completion of the part approved 3-span bridge (Option 1) over the Cabinteely Stream under Planning Ref. DZ16A/0587 (ABP Ref. PL06D.247915). It is noted that a portion of Road Q to P3 was also granted under Planning Ref. D15A/0385 (as amended by DZ19A/0622) and the road may be constructed under that permission. Permission is sought for the inclusion and utilisation of a temporary haul road (to be constructed by the Dún Laoghaire-Rathdown County Council Contractor as part of the Druid's Glen Road Q - P3 east of the Cabinteely Stream (up to a point CH 100m as defined on ATKINS Drawing No. 0101A). This temporary haul route would connect directly to the N11 via the proposed Junction Q and includes for a culvert, or temporary bridge crossing at the Cabinteely Stream. The proposed temporary haul route comprises a 4m wide unbound haul road approximately 160m long, and will be constructed from approximately CH 560m on Druid's Glen Road to a proposed site compound area to the west thereof measuring approximately 30m wide and up to 45m long in plan area and will be situated at, or above the 30m site contour. This site compound will be made available to the Dún Laoghaire-Rathdown County Council Contractor building the Druid's Glen Road from N11 to point P3. Following the sectional completion of Druid's Glen Road, the proposed temporary haul road will be available to accommodate construction traffic associated with the appointed contractor(s) responsible for the development of the subject lands (as per any planning permission granted). It is proposed that this temporary haul route would remain available until the permanent bridge crossing the Cabinteely Steam becomes operational. The development will also include the construction of: ancillary waste storage facilities; ancillary waste recycling collection area; associated car parking (total of 565 no. car parking spaces, comprising 257 spaces at basement level and 308 surface level spaces (including 9 no. ancillary car parking spaces in connection with the childcare facility); bicycle parking spaces (total of 492 no. cycle parking spaces, comprising 156 basement level spaces and 336 surface level spaces); a number of ancillary public open spaces; provision of boundary treatments; lighting; associated hard and soft landscaping (including changes in site levels and playground provision); associated infrastructural and site development works above and below ground (including 2 No. permanent water attenuation ponds and 1 no. temporary attenuation pond). The application site is located within the Cherrywood Strategic Development Zone.
Planning permission for development will consist of the demolition of existing single-storey garage roof. Construction of new two-storey front/side flat roof extension, conversion of existing garage at ground floor level, incorporating new office and boiler room. First floor comprising of new master bedroom and en-suite. Alteration to existing front door entrance, new window into new utility room at the side of existing dwelling, minor internal alterations to ground and first floor levels. Construction of new rear single storey flat roof extension, new single storey cantilever roof and new decking area, existing rear single story shed to be demolished. Energy retrofit to existing dwelling, including external insulation wrap to existing external walls, replacement of windows, doors & installation of solar panels to existing two-storey semi-detached dwelling and associated site works.
Permission is sought for subdivision of the existing site for the construction of a new 4 bedroom, 2 storey detached dwelling in the side garden of the exisiting house, new vehicular access onto Cherrington Drive and all associated site works.
Permission for development. The development will consist of: (i) demolition of existing non-original single storey conservatory with roof balcony approved under Reg. Ref. D12A/0225 (20.5 m sq.) (ii) erection of the new single storey conservatory with roof balcony (34.1m sq.) (iii) reinstatement of landscaping and ancillary works necessary to facilitate the development.
The development will consist of amendments to planning application D23B/0294 which was granted permission on 12/10/2023. The amendments include: 1) changing the roof profile of the rear extension; 2) changing the location of rooflights; 3) moving the south wall of the rear extension; and 4) changing the size of the window to the bathroom.
Permission for development. The development will consist of a single-storey side and rear extension, with new roof lights, to the existing end-of-terrace single-storey dwelling and all associated site works
Permission for a part-single storey, part two-storey side extension to an existing end of terrace single-storey dwelling and all assorted site works.
Planning permission for construction of a family dwelling house with onsite wastewater disposal, connection to mains water, entrance and driveway including ancillary works.
This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as amended. The site of the residential development proposed is located in the Cherrywood Planning Scheme area and forms part of Development Area 8 - Tully. The site of this application is generally bounded by Gun and Drum Hill Road to the south, Lehaunstown Lane to the east, development permitted under Reg. Ref. DZ20A/0399 and DZ21A/0664 to the north and other lands within Development Area 8, Tully (Tully Village Centre lands) to the west. The development proposed consists of 57no. residential dwellings (total gross floor area of c.4,842.4 sqm) in a mixture of houses and duplexes, in a range of buildings 2 to 3 storeys in height on a development tile (T3) of approximately 1.14 Ha comprising of the following: - 21no. 2 storey houses, consisting of 9no. 2 bedroom houses, 8no. 3 bedroom houses and 4no. 4 bedroom houses. - 36no. duplexes, all 3 bedroom, accommodated in 3 storey buildings. - private communal amenity open space (c. 435 sq m) - a 10m wide ecological buffer alongside Lehaunstown Lane; - provision of internal road network including new road carriageways, pedestrian and cycle facilities; - the provision of 85no. surface level car parking spaces, as well as Ino. car share and Ino. set down space. - 114no. cycle parking spaces; - 2no. motorcycle spaces; - all associated and ancillary site development and infrastructural works, including the provision of bike stores and bin stores, ESB substation / switch room, hard and soft landscaping and boundary treatment works. The proposed development also includes minor amendments to development permitted under DZ15A/0758, DZ20A/0399 and DZ21A/0664 Vehicular access serving the proposed development is via a single new proposed entrance off the existing/permitted Gun and Drum Hill Road and utilises the existing/permitted roads including the wider Phase 1 Roads permitted under DZ15A/0758, including Grand Parade. The development proposed will also utilise the extension of Castle Street westwards to the Ticknick Stream, together with a temporary bus turn back facility and a temporary attenuation pond all in Development Area 3 - Priorsland and its associated drainage connections in the T2 tile (each already permitted and under construction under Reg. DZ20A/0399). The application also provides for the use of existing roads at Gun and Drum Hill Road, Grand Parade, (both permitted and under construction under Reg. Ref. DZ15A/0758) and the existing Valley Drive and the Wyattville Link Road. The total area of the planning application site amounts to approximately 8.34Ha.
Permission for a new detached two storey house of 148.5sqm together with all site works including a new entrance onto Ballybride & all new utility connections.
Permission for dormer bungalow
This application relates to development in the Cherrywood Strategic Development Zone. (i) works to the existing two storey dwelling which includes a tower house (Record of Monuments/ Protected Structure) comprising installation of new insulated slab floors at ground floor. Repair and local strengthening of first floor. Repair of existing timber windows, window boards and shutters where possible and replacement of missing windows with timber sash windows. Making good of internal walls, plasterwork, architrave throughout. Erection of stud wall to create bathroom and storage area. Reinstallation of stair case. Damaged and loose cement render removed from walls of tower house and coating of limewash added. Limeslurry to be added to remaining walls in house. Reinstatement of rear external door. Installation of new stud walls to create new W.C. and bathroom at first floor. Creation of void at first floor to allow view of tower house wall from ground floor (this portion of floor is currently missing); (ii) works to stables (protected structure) comprising the removal of stable partition walls and lower animal pen walls and doors to provide for 6 no. retail units at ground floor associated with the overall development. Installation of new insulated floor slab with radon barrier and polished concrete finish to ground floor of stables. Replacement of non-original windows with fixed aluminium windows. Removal of 2 no. existing granite cill at first floor to facilitate new door ways. Erection of pedestrian bridges connecting the first floor to a new mezzanine floor within the garden centre. Repair of timber mezzanine floor with insertion of new steel beams and timber floor joists where existing floor rotted away. Limewashing of walls. Installation of new internal staircase. The first floor is proposed to serve as retail space for homewares. A new opening proposed to North-West facing elevation to allow for required fire escape to stables building; (iii) erection of 3808.88 sqm garden centre structure with ground and mezzanine floors. At ground floor the centre will contain open plan retail space, warehouse, office, W.C., store room and elevator. Primary access is to the north west of the building with secondary access along north eastern, south eastern facades. The centre will merge with the stables resulting in a double height, covered courtyard. The mezzanine floor will contain further retail space, warehouse, staff facilities, store room and external viewing platform/balcony on south eastern façade. Access to the mezzanine floor is provided via a central staircase, an elevator and via the protected stairwell on 1st floor of the stables; (iv) erection of external garden centre (946 sqm) comprising a Rovero structure with retractable roof, directly adjacent to main centre; (v) provision of 106 no. car parking spaces including 95 Car Parking Spaces, 4 Accessible Bays, 4 Loading bays and 3 Family Bays). Car parking spaces will comprise permeable gravel; (vi) provision of 42 no. bicycle parking bay/spaces including 4 no. cargo bicycle bay/spaces and 1 no. motorcycle bay/space; (vii) provision of new pedestrian vehicular access via Mercer Road to north using an existing opening in the wall, and new vehicular access to warehouse via Castle Street. The existing entrances to the south will be maintained and used for pedestrian and cyclist access only; (viii) provision of wetland area and detention basin to facilitate SUDs drainage in front garden of dwelling; (ix) erection of 2 no. fascia signage along north west elevation and signage to main entrance gates (only visible when gates are open); (x) landscaping, repair to existing granite boundary wall and original gateway, new piers to original boundary wall where new entrance ways, SuDS drainage and all ancillary works necessary to facilitate the development.'
Permission for the Retention of existing shed to side passage and Planning Permission for development consisting of: i) the construction of a single storey extension to the rear including elevational changes to the front and side; ii) new vehicular access gate to side passage shed and new roof; iii) demolition of existing sheds to the rear; together with ancillary siteworks and services.
Permission is sought for the widening of the existing
Permission for two storey, two bedroom detached
Application for Permission for Retention of garage conversion, enclosed side passage with extended open sided awning with canopy roof and single storey flat roof kitchen extension to rear with ancillary works.
LSREF V Eden T13 Limited Intend to Apply for Permission on a site In the Townlands of Laughanstown and Brennanstown, Dublin 18. This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as amended. The site of the proposed development is located in the Cherrywood Planning Scheme area and forms part of Development Area 8 – Tully. The site of the development proposed is generally bound by other lands within Development Area 8 – Tully zoned for education use to the south, Beckett Park to the north and west and Castle Street to the east. Permission is sought for amendments to development permitted under Reg. Ref. DZ23A/0028 consisting of development comprising: the addition of 4no. apartment units (2no. 1 bed and 2 no. 2 bed units) at Level 03 of Apartment Building 1, together with an increase in parapet height (c.800mm) for a section of the Apartment Block to provide a stepped building profile (Apartment Building 1 now 4 storeys overall); 4no. additional car parking spaces, 5no. additional bicycle parking spaces and 1no. additional motorcycle parking space; repositioning of a portion of the attenuation area, together with all ancillary and associated site development works; all on a development tile (T13) of approximately 0.8ha.
Construction of one no. detached two storey, 2 bedroom dwelling within the side garden of the existing split-level two storey detached dwelling with PV panels within the front roof slope, as well as all ancillary site development works. Vehicular access will be via a sharing of the existing entrance to both houses. The new dwelling will be served by 1 no. car parking space within a communal and redesigned car parking area to the front of the proposed dwelling that will include 2 no. spaces to serve the existing house. The development will include the filling in of one side window panel on the north west elevation of the existing house.
The development will consist of: 1) Demolition of flat roofed single storey garage conversion & kitchen to front, side and rear elevations of existing dwelling, 2) Demolition of flat roofed covered side passage storage area & flat roof out-buildings to rear garden, 3) Modifications to existing elevational treatments to front, side and rear elevations of existing dwelling, 4) Construction of flat roof single storey entrance porch to front elevation of existing dwelling, 5) Construction of two storey dormer roof extension to side elevation of existing dwelling, 6) Construction of part single storey / part two storey flat roofed extension to side and rear elevations, 7) Internal alterations to ground and first floors, 8) Incorporation of deep retrofit energy efficiency measures, 9) Widening of existing vehicular entrance and construction of new entrance piers along with all ancillary and associated site works.
A) Alterations and extensions to existing detached dwelling comprising; Single storey extension to rear at ground floor level, Internal layout changes, Elevational alterations to rear and sides at ground floor level, Modifications to balcony to rear at first floor level, 2 No. new dormer windows to rear of main roof. b) Alterations and extensions to existing detached structure comprising garage/gym and family flat/apartment comprising; Single storey extension to rear providing extended areas to family flat/apartment and a new internal link between main house and detached structure, Internal layout changes to existing family flat/apartment at first floor level, Conversion of garage/gym to cinema room, Consequential elevational alterations. c) Alterations to existing swimming pool and garden comprising; Removal of existing covered surround to existing swimming pool and demolition of existing single storey structure with associated facilities, Minor amendments to swimming pool, Single storey detached structure containing gym, changing, storage and associated plant, Covered external Kitchen/Dining/Seating area with connecting open colonnade to main house, Green house and small reflective pool feature, Hard and soft landscaping.
Permission for the a) removal of existing two storey porch and replacement with new single storey open porch (8m2), and b) single storey extension to rear (15m2) to match existing
Permission is sought for the demolition of the existing
Permission sought for a residential development at a site measuring approximately 6.57ha. The development will consist of the construction of 367 no. new residential dwellings, comprising 190 no. apartments arranged in 4 blocks, ranging in height between 4- to 5-storeys in height (comprising 15 x 1 bed units and 175 x 2 bed units): 24 no. duplex units (comprising 12 x 2 bed units and 12 x 3 bed units); 60 no. triplex units (comprising 40 x 2 bed units and 20 x 3 bed units) and 93 no. 4 bedroom houses (comprising a mix of detached, semi-detached, and terraced house types) together with a Childcare Facility with a floorspace of 233 sqm (GFA) and ancillary open space. The proposed development includes for all associated infrastructural works to include the part delivery of the Cherrywood SDZ Planning Scheme`s Druid`s Glen Distributor Road (also known as Q to P3), measuring approximately 390m in length to include the construction/completion of the part approved 3-span bridge (Option 1) over the Cabinteely Stream under Planning Ref. DZ16A/0587 (ABP Ref. PL06D.247915) immediately adjoining the application site to the east. The development will also include the construction of: ancillary waste storage facilities; ancillary waste recycling collection area; associated car parking (total of 607 no. car parking spaces, comprising 218 spaces at basement level and 389 surface level spaces (including 6 no. ancillary car parking spaces in connection with the childcare facility)); bicycle parking spaces (total of 300 no. cycle parking spaces, comprising 202 basement level spaces and 98 surface level spaces); a number of ancillary public open spaces; provision of boundary treatments; lighting; associated hard and soft landscaping (including changes in site levels and playground provision); associated infrastructural and site development works above and below ground (including 2 no. permanent water attenuation ponds and 1 no. temporary attenuation pond).
Permission. This application relates to development
The development will consist of 1. Revisions to the internal layout of the existing forecourt amenity building to incorporate an increase in net retail floor area to 81sqm and the relocation of the existing off-licence (10sqm), a new deli area with hot and cold meals and refreshments for sale for consumption on and off the premises and changes to customer toilets, back of house and storage areas 2. Revisions to the building elevations including new entrance and access doors. 3. All associated site and development works
Planning permission for amended location of the front door, additional windows & door to both side elevations, two storey extension to the rear of existing detached house, and Retention of existing garden room/shed in rear garden and associated site works.
Permission for the construction of a new two-storey, 267sqm, four-bedroom detached house (replacing existing outbuilding) with all associated works plus an attached car port using existing entrance driveway, together with connections to existing public services and drainage. Clontra House is a protected structure, RPS ref. 1811.