to
to

Planning records

Showing 601-650 of 25,634 public records
Page 13 of 20
F21B/0312

The development will consist of a single-story side extension and shed to include all associated site works.

57 St. Andrews Park, Glebe, Swords, Dublin, K67 FK33Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted27 October 2021
FW22B/0031

Construction of a single storey extension to the rear and side of existing dwelling and a single storey porch to the front of the existing dwelling. The development will consist of a new porch, new playroom and home office and other minor alterations to existing internal layout together with all associated site works. AI received 17/10/2022

19, Alderwood, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted03 November 2022
F21B/0090

Conversion of existing attic space comprising of modification of existing roof structure, side dormer with A-style roof complete with window, new access stairs, flat roof dormer to the rear and construction of porch to the front.

68 Sandford Wood, Swords, Co DublinFingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted17 May 2021
F26A/0307E

Retention Planning Permission is sought for alterations to previously approved plans (Reg.Ref. F17A/0357, ABP 300045-17) which relate to the construction of 14 no detached dwellings and associated site works. The following changes are sought (i) Amendments to house types A, B and C to include:- Small increase in floor areas; revised fenestration to front of houses on two floors; conversion of garage to side of house type A to living space; replace apex roofs over ground floor bay window, and first floor bedroom, with flat roofs, (ii) adjustment of internal road network as per Fingal County Council Roads Department, (iii) adjustment of foul sewer manhole locations as per Uisce Eireann mandate.

1-14 Baile Bhuin, located west of 1-10 The Orchard, Oldtown, Co DublinFingal County CouncilRetention0 reasons0 conditions5.8 km away
Granted11 June 2026
FW25A/0516E

The proposed development will consist of 1No. Electrical & Instrumentation Kiosk (24 sqm), 1 No. Packaged Boiler Unit (29.9 sqm), 1 No. Regulators Kiosk (66.12 sqm), 1 No. Fuel Gas Skid (27.88sqm), 1No. Gas Analyser kiosk (6.25 sqm), concrete bases for Temporary Pig Trap, Filters, Heat Exchangers and Meters, internal concrete road, 2.4m High AGI perimeter security fence, 3m high boundary fence and all ancillary services and associated site works.'. An Environmental Impact Assessment Report (EIAR) has been prepared with respect to the project and will be submitted with the application.

Kilshane Road, Kilshane, Finglas, Dublin 11Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted04 February 2026
F23B/0045

The development will consist of the construction of a new dormer to the existing hipped (side) roof, new velux rooflights to the rear roofslope with new attic room and all associated internal alterations, site, drainage and landscaping works.

No. 21 Pine Grove Park, Swords, Co. Dublin, K67 D9P2Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted04 May 2023
F22A/0269

The development will consist of a new ancillary family accommodation consisting of the conversion of the existing garages to a living area with a first floor extension above the converted garage, further incorporating a first floor bedroom, storage room and bathroom with two front facing roof dormer windows

1 Lynwood, Doorogue, Ballyboughal, Co. Dublin, A41AW81.Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted22 July 2022
F22A/0127

The conversion of the existing garages to a living area and kitchen with a first floor extension above the converted garage, incorporating a first floor bedroom, storage room and bathroom with two front facing roof dormers.

1 Lynwood, Doorogue, Ballyboughal, Co. Dublin, A41AW81.Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Refused09 May 2022
F19B/0332

Build new 2 storey extension to side of existing dwelling, with change of roof type from hip-roof to new gable end dutch-hip roof, together with new flat roof dormer extension & window to rear & 1 Nr. velux rooflight to rear & 1 Nr. velux rooflight to front with new windows to front at ground level. Internal alterations to include new stair access to first floor and associated site works.

26 Forest Avenue, Swords, Co. Dublin.Fingal County CouncilPermission1 reasons0 conditions5.8 km away
Visual Amenity
Refused29 July 2020
F25A/0255

The development comprises the renovation and extension of the existing semi-detached bungalow including the partial demolition of the existing dwelling, the construction of a single storey, part flat, part mono-pitched roof extension to the rear of the existing dwelling and the construction of a new porch to the front. The proposed development also comprises the installation of a flat roofed dormer extension to the rear of the existing dwelling, the construction of a low wall and railings to the front garden boundaries and all associated landscaping and site works. ** Additional Information received 03/07/2025. **

40 Cherry Garth, Swords, Co Dublin, K67 H9E5Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted29 July 2025
F21B/0384

Retention Planning Permission for roof window to front of existing roof. Planning permission for an attic conversion to non-habitable storage space with 4 no. roof windows to side of existing roof and 2 no roof windows to rear roofs with ancillary works.

3 Forest Avenue, Swords, Co Dublin, K67 Y4X8Fingal County CouncilPermission and Retention0 reasons0 conditions5.8 km away
Granted18 January 2022
F25A/0302E

Permission for Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.

12 Cedar Lawn, Ridgewood, Swords, Co. Dublin, K67 KF84Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted28 May 2025
FW20B/0102

Permission for proposed two attached garages to side of two dwelling houses with associated site development works.

37 & 38, Alderwood, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons6 conditions5.8 km away
Granted08 October 2020
F24A/0695E

Removal of an existing single storey conservatory structure to the rear and replaced with a new single storey extension including 1 no. rooflight, all to the rear of the existing house and all associated site works.

16 Thornleigh Avenue, Swords, Co. Dublin, K67PP58Fingal County CouncilPermission0 reasons0 conditions5.8 km away
Granted12 September 2024
FW25A/0350

Planning Permission is sought for works to existing semi-detached dwelling. Works to include: demolition of existing garden wall in side garden to allow for construction of single storey extension to the side of existing dwelling to accommodate office/music room with access from front and rear garden; 1no. skylight to proposed flat roof over proposed extension and all associated site and landscaping works.

39 Alderwood, Ballymacarney Road, Rathoath Road, Dublin 15, D15 F389Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted09 October 2025
F23B/0024

The development will consist of the construction of a new

9 Hilltown Lawn, Rivervalley, Swords, Co.DublinFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted17 April 2023
F24A/0979E

Planning permission sought for a development that will consist of a change of roof type from hipped to pitched by raising the gable wall, an attic conversion to storage, a new window to the side and a roof dormer to the rear

113 Sandford Wood, Swords, Co. Dublin, K67W972Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted06 January 2025
FW22A/0193

Development and retention permission for development at this c. 3.23 Ha. site at Newtown, Kilshane Cross, Co. Dublin. The development amends a permitted warehouse development (as granted under FCC Reg. Ref. FW20A/0126 and amended by FCC Reg. Ref. FW22A/0108). This application pertains to lands relating to Unit No. 3. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 3: Modifications to the HGV entrance to the west comprising the addition of a traffic island and provision of sliding gates in lieu of permitted swing gatesi the addition of a sprin kier tank and pump room; the addition of bike shelters; the repositioning of the heat pump enclosure; and all associated development works above and below ground. Retention permission is sought for the following modifications to permitted Warehouse Unit No. 3: Revised ground floor layout including the replacement of 4 No. WC's with a first aid room and multi faith room, replacement of the staff facility and office with 'grey box' area (space that is subjectto future tenant fit-out) with associated removal of internal doors to the warehouse, and minor reduction of the length of the marshalling office (by 120mm) (no change to permitted gross floor area); modification of the roof design including minor increase of the office parapet height from 11.9 metres to 12 metres (100mm increase), minor increase ofthe warehouse parapet height from 17 metres to 17.070 metres (70mm increase), repositioned skylights and addition of access hatches and automatic open ventsi repositioned and revised elevational signage (1 No. elevational sign to be provided on the north and west elevation, each measuring 7.28 metres x 1.815 metres)j revised parking layout including the reduction of the total number of car parking spaces from 146 No. to 139 No.; modifications to boundary treatments including the addition of a gate and fencing tothe fire tender access tothe east; addition of a security barrier to the staff/visitor car parking entrance/exit to the west; addition of a cycling path; reorientation of the ESB substation and increase in size from c. 37.5 sq m to c. 63.4 sq m; elevational changes including reduction of precast concrete wall cladding, the repositionlng of fire escape doors, the repositioning of green walls and the repositioning of an external window to the west of the marshalling office; addition of fire corridors; reduction of granite paving and replacement with landscaping adjacent to the entrance to the ancillary office; and all associated development works above and below ground.

Newtown, Kilshane Cross, Co DublinFingal County CouncilPermission and Retention0 reasons0 conditions5.9 km away
Granted24 October 2022
FW25A/0500E

Retention Permission is sought for the following modifications to Unit No. 3: a new staff entrance with a new external canopy provided over the entrance (north elevation); ground level external plant within a new acoustic louvered enclosure; new paladin security fencing (2.4 meters high) along the eastern and southern boundaries; 2 no. external acoustic louvres on the west elevation; and all associated development works.

A c. 3.23 Ha Site at Maersk, Unit No. 3, FW25A/0501E, Newtown, KilshanFingal County CouncilRetention0 reasons0 conditions5.9 km away
Granted27 January 2026
LRD0057/S3E

We, Golden Port Homes Limited, intend to apply for permission for a Large-scale Residential Development on lands at Forest Road, Swords, Co. Dublin. The proposed development will consist of a total of 109 no. residential units (42 no. duplex units; 41 no. apartments; 26 no. houses) as follows: (i) 42 no. duplex units within 3-storey buildings comprising 21 No. 1 bed units at ground level and 21 No. 3 bed units over first and second floor levels with balconies/terraces, private and communal open space; (ii) 41 no. apartments within 2 blocks. Block A will be a 4 storey building with 14 no. apartments (5 no. 1 bed units and 9 no. 2 bed units) with balconies/terraces to the north, south and west elevations, and bin, bicycle parking and plant at ground floor level and pv panels at roof level; Block B will be a 5 storey building with 27 no. apartments (13 no. 1 bed and 14 no. 2 bed units) with balconies/terraces to the east and west elevations and bin, bicycle parking and plant at ground floor level and pv panels at roof level; (iii) 26 no. houses (comprising 5 no. 2 bed, 2 storey terrace houses; 6 no. 3 bed, 2 storey terrace houses; 4 No. 3 bed, 2 storey semi-detached houses; and 11 no. 4 bed, 3 storey houses); (iv) 96 no. Surface level car parking spaces and 4 no. surface level motorcycle parking spaces as well as bike parking stores and spaces; and bin stores; (v) 1 no. ESB substation; (vi) Landscaping, including the provision of new public open spaces with play areas and a MUGA; footpaths and cycle paths, new vehicular access/egress from Forest Road; public lighting; boundary treatment and all associated site, drainage and development works necessary to facilitate the proposed development.

Lands at Forest Road, Swords, Co. DublinFingal County CouncilLRD Application0 reasons0 conditions5.9 km away
Granted30 October 2025
FW24A/0312E

Planning permission is being sought for a single storey extension (66m2) located to the side of the existing detached dwelling for use as a family granny flat.

No 6 Chapelton, Hollystown, Dublin 15, D15AX70Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted16 September 2024
F25A/0294E

Permission for the construction of a single storey porch extension to the front/side of the existing detached property (11.7 sqm total floor area). Works will include minor modifications to the existing porch pitched roof and all associated drainage, site and landscaping works.

87 Sandford Wood, Swords, Co. Dublin, K67 VY20Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted28 May 2025
FW21A/0250

Planning permission is being sought for a development that will consist of the following; 1) The construction of a Gas Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine, 1 no. 28m high Exhaust Stack, 1 no. 2 story Admin Building (c. 680 m2), 1 no. single storey Workshop (c. 661 m2), 1 no. single storey Plant Room Building (c. 608 m2), 1 no. single storey Dew Point Heater Boiler Building (c. 52 m2), 1 no. single storey Electrical Module for Fuel Gas Area Building (c. 45 m2), 1 no. single storey Packaged Electronic Electrical Control Compartment building (PEECC) (c. 150 m2), 1 no. single storey E0Room Building (c. 227 m2), 1 no. single storey Fuel Gas Block Building (152 m2), 1 no. single storey Continuous Emission Monitoring System (CEMS) Building (c. 9 m2), 1 no. single storey Fuel Oil Treatment & Forwarding Building (c.59 m2), an Above Ground Installation (AG() area consisting of 1 no. single storey Instrument Building (c. 28.5 m2), 1 no. single storey Regulator Building (47 m2), 1 no. single store Boiler Building (c. 28 m2), and 1 no. single storey Analyser Kiosk (6 m2), 2 no. 20 m high diesel storage tanks and recessed bund area, 1 no. 17 m high Raw and Fire Fighting Water Tank, miscellaneous plant and equipment. 2) 2. The realignment of a a portion (263 m) of the Kilshane Road within the subject site boundary, including the provision of new footpaths and off0road cycle ways, together with the construction of a new roundabout linking the proposed realignment of Kilshane Road back to the existing road network to the north west of the subject site and to the proposed internal road network to serve the proposed development. 3) The construction of Entrance Gates, 1 no. single storey security office (40 m2 GFA) and a private internal road network providing for vehicular, cyclist and pedestrian access to serve the development. 4) Total provision of 20 no. Car Parking Spaces including 2 no. disabled parking spaces and 4 no. Electrical Charging Points. 5) Provision of lighting columns to serve the development and the installation of Closed-Circuit Television System (CCTV) for surveillance and security purposes. 6) Provision of 20 no. Sheltered Bicycle Parking Spaces. 7) Provision of hard and soft landscaping works, tree planting and boundary treatments. 8) Construction of a Wastewater Treatment Plant and Percolation Area together with a Surface Water Attenuation Area to serve the development. 9) All associated site works necessary to facilitate the development.

Kilshane Road, Kilshane, Finglas, Dublin 11.Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Refused10 February 2022
F20B/0253

Permission for alterations to existing hip roof to side to create Dutch gable roof to accommodate attic stairs to allow conversion of attic into non habitable storage with Dormer to rear and ancillary works.

129, Sandford Wood, Swords, Dublin, K67E4X6Fingal County CouncilPermission0 reasons13 conditions5.9 km away
Granted04 December 2020
F25A/0518E

The development will consist of: Two-storey pitched roof extension to the front and side with front-facing windows, two side windows at first floor, a new side door, and a Velux to the front roof slope. Single-storey flat roof front extension with new front door, window, and two rooflights. Additional Information Received 8/9/2025

13A Hilltown Lawn, Hilltown, Swords, Co. Dublin, K67 WC57Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted24 September 2025
F21B/0064

A first floor rear extension, a ground floor rear extension, and the conversion of the existing attic space with a rear dormer and comprising the modification of the existing roof structure from hipped to pitched by raising the gable wall.

117 Sandford Wood, Swords, Co. DublinFingal County CouncilPermission0 reasons0 conditions5.9 km away
Refused26 April 2021
FW25A/0501E

Permission is sought for the omission of an existing temporary canopy and the erection of a new level access canopy (6.8 meters) adjacent to the existing building. Retention permission is sought for the following modifications to Unit No. 4: the removal of permitted signage panel on the north elevation; repositioning of signage panels and replacement signage on the east, south and west elevations (replacement signage: 7.28m x 1.81m); the provision of an additional sprinkler tank (c. 103 sq m); extension of the existing pump house (additional c. 20 sq m); revised boundary treatment surrounding the sprinkler tank and pump house area including replacement fencing and entrance gates; repositioned turning circle area; realignment of the running track and associated landscaping works; ground level external plant within a new acoustic louvered enclosure; 2 No. external acoustic louvres on the east elevation; and all associated development works.

A c. 1.361 Ha site at Maersk, Unit No. 4, Quantum Distribution Park, NFingal County CouncilPermission and Retention0 reasons0 conditions5.9 km away
Granted27 January 2026
FW22A/0199

IPUT plc intend to apply for permission for development at this c. 1.405 Ha.site at Newtown, Kilshane Cross, C0. Dublin. The development amends a permitted warehouse development (as granted Under Ref FW20A/0126, subsequently part amended by FCC Reg. Ref. FW22A/0108 (Unit No. 2) and proposed to be part amended by a live application (FCC Reg. Ref. FW22A/0193 - Unit No. 3). The subject application pertains to lands relating to Unit No. 4. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 4: Revised ground floor and first floor layout including the reduction in size of the marshaling OTice from c. 65.9 sq m to C. 50.7 Sq m and corresponding increase to the warehouse area from c. 6,036.2 Sq m toC. 6,051.4 Sq m (no change to total permitted gross floor area); modification of the roof design Including a minor increase of the warehouse parapet height from 17.05o metres to 17.070 metres (2omm increase), a minor decrease of the ancillary office parapet height from 8.3 metres to 8.25 metres (5omm decrease), revised PV panel layout, revised roof light, revised AOV (Automatic Opening Vent) layout, and omission of roof hips; revisions to staff/visitor car parking entrance"ëexit to the east comprising the addition of a traffic island with security barriers; revisions to HGV entrance/exit layout to the east comprising the addition of a traffic island with security barrier and sliding gate; provision of yard extension to the south (c. 60.8 sq m) including additional security gates for maintenance access point; increase in electric charging spaces from 2 No. to 6 No. (no change in overall total quantum of car parking spaces permitted); addition of a cycle path and amendments to pathways and landscaping; the addition of covered bike spaces in lieu of previously uncovered stands and increase from 10 No. spaces to 11 No. spaces; revised fire tender layout; addition of a sprinkler tank (c. 88.3 sq m) and pump house (c. 30 sq m); revised Variable Refrigerant Flow Heat Pump compound location and layout; repositioning of the ESB substation and addition of a maintenance room, increasing the size from c. 24.4 sq m to c.36 sq m; revised graded access door locations; elevational changes including reduction of concrete façade on the eastern elevation, amended glazing arrangement, the repositioning of green walls, the repositioning of fire escape doors and the addition of fire escape routes; and all associated development works above and below ground.

Newtown, Kilshane Cross, Co. DublinFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted24 October 2022
F20B/0137

A 1 storey extension to the front and side elevations of the property. Add Info received 26th August 2020. Clarification of Add Info received 2nd October 2020.

83 Broadmeadows, Swords, Co DublinFingal County CouncilPermission0 reasons9 conditions5.9 km away
Granted19 October 2020
F21B/0199

Permission for extension to gable end of existing dwelling with first floor extension over.

162 Glasmore Park, Swords, Co DublinFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted16 July 2021
F21A/0569

Retention permission for conversion of existing attic space to non-habitable storage area, 1 no. velux rooflight to front roofslope elevation and 2 no. velux rooflights to the rear roofslope elevation, widening of driveway entrance and all associated works.

32 Pine Grove Park, Swords, Co Dublin, K67 H2X2Fingal County CouncilRetention0 reasons0 conditions5.9 km away
Granted08 December 2021
F25A/1106E

The development will consist of alterations to existing hip roof to side to create gable roof to accommodate new attic stairs to allow for proposed conversion of attic space into a non habitable room. Works also include raising of the existing gable wall including a new landing window at attic level, along with 2 no. rooflights to the front and rear roof slopes and all associated site works.

127 Sandford Wood, Swords, Co. Dublin, K67 R772Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted27 January 2026
FW23A/0191

The development will consist of: the provision of 12 no. logistics/warehouse buildings (c. 159,924 sq.m) as follows: Building X1 (c. 6,364 sq.m and a height of c. 17.06m), Building X2 (c. 8,072 sq.m and a height of c. 17.06m), Building X3 (c. 4,896 sq.m and a height of c. 17.06m), Building X4 (c. 42,490 sq.m and a height of c. 17.63m), Building X5 (c. 23, 102 sq.m and a height of c. 17.25m), Building X6 (c. 8,843.3 sq.m and a height of c. 17.25m), Building X7 (c. 6,339.5 sq.m and a height of c. 17.63m), Building X8 (c. 8,010.7 sq.m and a height of c. 17.25m), Building X9 (c. 10,684.2 sq.m and a height of c. 17.25m), Building X10 (C. 13,041.5 sq.m and a height of c. 17.25m), Building X11 (c.13,042.4 sq.m and a height of c. 17.25m), Building X12 (c. 15,038.4 sq.m and a height of c. 17.25m), each building will include an attached 2 to 3-storey ancillary office building ranging in height c. 8.35m to 12.10m; associated yard areas, trailer and truck parking, and car and bicycle parking spaces at surface level; ancillary facilities to include a campus management/community building (c. 689 sq.m) with associated outdoor sports/amenity space, a retail/café unit (c. 45 sq.m) and 12 no. substations (c. 604 sq.m combined); internal pedestrian, bicycle and vehicular circulation roads, lanes and pathways, with primary access via the existing roundabout at Cherryhound-Tyrrelstown M2-M3 Link Road and secondary emergency access via R121; new pedestrian/bicycle links to adjoining lands, including the provision of a pedestrian crossing and bus shelter at Hollywoodrath Drive, and pedestrian/bicycle links to Hollywoodrath Drive, the R121 and lands to the northeast; associated landscaping, public open space, boundary treatments, lighting, signage and CCTV; associated drainage, attenuation and service connections; and all associated temporary construction compounds and site works. An Environmental Impact Assessment Report accompanies the planning application. AI rcvd 31/10/2023 SAI rcvd 07/11/2023

Lands (c.46.7 ha) located to the northwest of the Cherryhound-TyrrelstFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted10 January 2024
F23A/0481

The development will consist of:

Millview House, Balheary, Swords, Co. DublinFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted21 March 2024
F21A/0659

The proposed development will consist of the construction of a new vehicle access and agricultural gate to existing land within daa ownership. The access will be c. 4 metres in width and will include a permeable hardstand area. The proposed agricultural gate will be between 1.2 and 1.5 metres in height. The proposed development will also include all ancillary works including site excavation and development works above and below ground. Development on a site of c. 700 square metres.

Dublin Airport, Townland of Pickardstown, Co. Dublin.Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted28 January 2022
F25A/0310E

Planning Permission for the conversion of an existing attic roof space, new access stairs, roof windows to the rear, dormer roof to the rear and all associated works.

31 Dooroge Woods, Dooroge, Ballyboughal, Co. Dublin, A41 EY77Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted03 June 2025
F21A/0501

Permission for (i) demolishing the substandard single-storey kitchen annex at the rear of the house (ii) building a part single-storey and part two-storey extension at the side and rear of the dwelling, (iii) widening the existing vehicular entrance at the front with new raised front garden wall and gate piers, and (iv) all associated internal, site and drainage works.

140 Glasmore Park, Swords, Co DublinFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted10 November 2021
F26A/0213E

Planning Permission is sought for: Conversion of existing attic to storage area, with new dormer window to rear, 1 no. new Velux rooflight to rear, and 2 no. new Velux rooflights to front, to include gabling of existing hipped roof to side, and all associated site works.

52 Glen Ellan Green, Swords, Co. Dublin, K67 KW08Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted12 May 2026
FW25A/0523E

Kilshane Energy Ltd. intends to apply for planning permission for revisions to previously approved Gas Turbine Power Generation Station (Reg. Ref: FW22A/0204) at a site located at Kilshane Road, Kilshane, Finglas, Dublin 11, comprising the following amendments: 1. Revisions to previously approved administrative/warehouse building consisting of the following: (a) Revised internal layout consisting of addition of new stair core and lift at ground floor level connecting to new storage area at first floor level (428 m2 GFA), increasing the total GFA of the administrative/warehouse building from 855 m2 to 1283 m2. (b) Revised façade design to elevations including revised fenestration to south elevation, revised fenestration and door design to west elevation, revised fenestration to east elevation and provision of new external fire staircase and first floor level access door to east elevation. (c) Increase in height of administrative/warehouse building by 1 m to 7.38 m. (d) Revised colour of material finish from green to dark grey. 2. Revisions to previously approved gas turbine including revised shape of evaporative cooler, addition of servicing gantries and the slight moving of the gas turbine c. 5.57 m to the north as demonstrated on the enclosed architectural plans (Drg No. Drawing No. 25043-PL-04.1) Internal gas turbine machinery and installation as part of revised gas turbine model to be provided to later specialist design as previously approved under Reg. Ref. FW22A/0204. 3. Revised size and location of fin fan coolers within power island compound as demonstrated on enclosed architectural plans. 4. Revisions to layout of diesel storage compound to now provide 1 no. larger fuel storage tank with an increase in maximum height from 16.2 m to 20 m and an increase in diameter from 24.4 m to 49 m. 5. Revised design and location of the Packaged Electronic/Electrical Control Compartment (PEECC) within the power island compound to now comprise a single storey stilted building raised 2.6 m above ground level, accessed via 2 no. external stairs and a new servicing gantry at finished floor level, with a floor-to-ceiling height of 3.25 m and an overall height of 6 m, and an increase in GFA from 72 m² to 148.51 m² together with façade changes. 6. Revised design and location of BOP Power Distribution Centre within power island compound as demonstrated on enclosed architectural drawings including increase in GFA from 129 m2 to 160.6 m2 together with façade changes including revised fenestration to west and east elevations. 7. The addition of new Aux Equipment Block (connected to the Gas Turbine) with a GFA of 361.20 m2 and height ranging from 7.65m to 9.59m and new servicing gantries for the purposes of sheltering specialist equipment and machinery as identified on the enclosed architectural drawings. 8. The addition of a HVAC Structure within power island compound with a maximum height of 8.84 m which supports two HVAC units on the top and the Starter Transformer and Excitation Transformer below. 9. Revision to previously approved Acoustic Wall within power island compound consisting of a slight decrease in length from 107.0m to 101.6m. 10. Removal of previously approved 16.2m high x 18.3m dia Demin Water Tank and replaced with Separate Demin Water Tank to be added as a non-permanent structure rather a small cube refill tank. 11. Removal and replacement of select number of smaller equipment items as identified on the equipment identification drawings prepared by CWPA Planning & Architecture (Drawing No. 25043-PL-14). 12. Minor revision to internal road network as demonstrated on enclosed architectural drawings to accommodate proposed amendments. Additional Information Received 13/02/2026 Significant Additional Information Received 25/02/2026 Clarification of Additional Information Received 30/03/2026

Kilshane Road, Kilshane, Finglas, Dublin 11Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted23 April 2026
FW25A/0515E

The proposed development consists of an extension of an existing Block Valve located at West Business Park, Blanchardstown, Dublin 15. The extension will consist of a concrete base for Temporary Pig Trap, an Asphalt Access Road, an internal Concrete Road, a 2.4m high Security Fence and all ancillary services and associated site works. An Environmental Impact Assessment Report (EIAR) has been prepared with respect to the project and will be submitted with the application.

West Business Park, Blanchardstown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted04 February 2026
FW22A/0204

The proposed development will consist of the following:

Kilshane Road, Kilshane, Finglas, Dublin 11.Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted23 June 2023
F21A/0363

The construction of a new vehcile access and agricultural gate to existing land within daa ownership. The access will be c.4 metres in width and will include a permeable hardstand area. The proposed agricultural gate will be between 1.2 and 1.5 metres in height. The proposed development will also include all ancillary works including site excavation and development works above and below ground.

A site of c.678 square metres at, Dublin Airport, Co. Dublin, in the tFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted26 August 2021
F22A/0507

Permission to erect a 5.2m x 1.85m x 2.8m high stainless steel and glass bus shelter with 2 No. internally illuminated Advertising Panels each of 2 sq. metre area on the public footpath at bus stop No. 733.

Public footpath at Bus Stop No. 733, Rathingle Road (southeast of juncFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted15 November 2022
F20B/0344

Removal of the existing single storey rear extension and the construction of a new single storey extension to the rear/side of existing dwelling, including new roof lights, minor internal modifications at ground floor level and all associated site works.

125 Sandford Wood, Swords, Co DublinFingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted24 February 2021
F20B/0179

Proposed new gable wall to the side of the existing house and a proposed new flat roof dormer to the rear of the existing house roof and all ancillary works.

54 Glen Ellan Green, Swords, Co. Dublin, K67TP22Fingal County CouncilPermission0 reasons9 conditions5.9 km away
Granted18 September 2020
F25A/0911E

Planning Permission is sought for attic development to include removal of existing hipped section of roof, construction of a raised gable end with new flat roof type dormer extension & windows to rear, installation of 2 Nr. windows to side and associated site works. Retention Permission is also sought for existing porch extension to front comprising 3.6m2. Additional Information Received 14/12/25

51 Cherry Garth, Swords, Co. Dublin, K67 A6X8Fingal County CouncilPermission and Retention0 reasons0 conditions5.9 km away
Granted12 January 2026
F23B/0007

Conversion of existing attic space

87 Glasmore Park, Swords, Co. Dublin, K67 FH04Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted14 March 2023
F21B/0313

The construction of a dormer window to the rear.

86 Glasmore Park, Swords, Co. Dublin.Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted27 October 2021
FW25A/0338

Retention development will consist of vehicular entrance to the side/front of the site. A partial flat roof single storey extension connecting the existing dwelling to the game's room/art studio. Retention for single storey extension to the side connecting with partial flat roof single storey to existing house. Moving the existing entrance door into the retention works. Retention for single storey detached office to the side of the existing house. Planning permission will consist of a proposed new dormer roof to the front of the existing dwelling roof to bring more natural light into the kitchen/living area. A new stone cladding finish to the side elevations of the dwelling matching in with neighbouring stone finishes and all ancillary works.

Lily Cottage, Hollywoodrath, Dublin 15, D15 A89HFingal County CouncilPermission and Retention0 reasons0 conditions5.9 km away
Granted06 October 2025
F25A/1000E

The development will consist of the construction of a single-storey warehouse extension of 127 sq.m. internal area to the existing factory, provision of an internal access doorway linking the extension to the existing building and all associated siteworks and services.

Keeling Juices, Grange, Ballyboughal, Co. Dublin, A41 X903Fingal County CouncilPermission0 reasons0 conditions5.9 km away
Granted17 December 2025
Showing 601-650 of 25,634
Page 13 of 20