Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
Attic conversion with hip to gable roof and dormer to rear roof to accommodate stairs to allow access to attic as non-habitable storage space with roof windows to front all with associated ancillary works.
Retention for as constructed extended floor areas to ground floor level reception area (approx. 38sq.m) and first floor level office areas (approx. 49sq.m). Permission to construct a new extension to the north-eastern corner of a permitted storage warehouse building together with associated external signage, site development works; provide additional storage space at second floor level only (approx. 2,198sq.m) and form an undercroft to the permitted access/entrance areas.
Retention Planning Application to carry out the following developments to a permitted storage warehouse (Planning Reg. No.'s SD22A/0104, SD21A/0214, SD15A/0254), located at M50 Business Park beside the M50 Ballymount Interchange. The development will consist of (1) Retention Permission for as constructed extended floor area to first floor level storage area (approx. 200 sqm). (2) Retention Permission for as constructed additional stair core (Stair 05) and revised location and layout to permitted stair core (Stair 04). (3) Retention Permission for omission of solid masonry / RC wall to undercroft at north-east elevation. (4) Retention Permission for inclusion of a new pedestrian door to existing building, adjacent to main entrance door to reception area.
Construct additional floors at third and fourth floor levels internally as modifications to a recently permitted development under SD21A/0214 - extension of an existing storage warehouse building.
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e. off licence use) within the overall permitted retail unit; off licence floor area 8sq.m and is ancillary to the primary retail use.
Demolition of the existing warehouse unit (1,632sq.m) and the construction of a new 5-6 storey building, accommodating 64 apartments, comprised of 20 1-bed apartments, 16 2-bed apartments, 8 3-bed apartments, 20 2-bed duplex apartments and 1 unit at ground floor level to be either retail or cafe. The proposed development also provides for a podium and an undercroft car parking area, at ground floor level, accommodating 37 car parking spaces, 167 bicycle parking spaces, bin storage, plant room and 2 ESB substations. Vehicular access to the development will be from the Cookstown Road. The development includes all private and communal open spaces, landscaping, boundary treatments, vehicular and pedestrian site access, bin storage, bike storage, signage and all associated site development works including service connections, foul and surface water drainage/attenuation and water supply/storage. On a total site area of approx. 0.28ha (0.7acres).
Construction of a new single storey extension to the front of existing dwelling comprising of living room extension and porch.
A single storey family flat to the side of existing house.
Extension to existing external freezer plant platform structure to east of existing building and associated site works.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Permission for a proposed Sprinkler Tank & Pump House and Retention Permission for a reduced size ESB substation as part of an overall warehousing development at Kingswood Road, Citywest Business Campus, Co. Dublin. (Existing granted Planning Reg Ref: SD22a/0290 & SD23A/0281 with associated warehousing development works under construction on site). 1. Provision of Sprinkler Tank 10.00m diameter, 9m high, effective capacity = 675m3, to rear (South-west) yard, which will serve the warehouse building's sprinkler system; 2. Provision of Pump House servicing the proposed sprinkler system, 48m2, 2.8m high, adjacent to above referenced sprinkler tank; and 3. Associated site landscape enhancement in the immediate area of the proposed Sprinkler Tank & Pump House. The subject elements for which Retention Permission is sought are as follows: 1. Retention Permission for a reduced size ESB Substation from 37m2 (as granted) to 24m2 as recently constructed.
The construction of a 250m2 mezzanine floor extension within an existing warehouse building, and all associated site works.
Extension of the existing depot to provide additional bus parking facilities comprising a total of 221 bus spaces (including 45 electric bus parking spaces), 33 car parking spaces (including 15 electric car parking spaces), 5 motorcycle parking spaces and 30 bicycle parking spaces; revisions to the layout and configuration of the existing bus and car parking areas; the installation of electric vehicle charging units and associated infrastructure; new vehicular entrance/egress arrangement (including barrier and ramp) to Ballymount Avenue on the north-eastern site boundary; the provision of 4 pedestrian entrances located on the south-eastern, south-western and north-eastern site boundaries; internal roads and pedestrian pathways; minor elevational amendments to the existing transport depot building (relocation and addition of roller shutter doors and relocation of signage); hard and soft landscaping; boundary treatments; changes in level; lighting; surface water drainage; piped infrastructure and ducting, and all associated site excavation and development works above and below ground. (The development will also include the underground diversion of the existing ESB power line traversing the south-eastern corner of the site.)
28m of new secure metal fencing.
Installation of up to 100kW (540sq.m) of roof mounted solar PV panels and all associated works.
Planning permission is sought for the following alterations: • Internal alterations at the ground floor level of the permitted warehouse/logistics unit, including a change of use of 310 sq.m, to provide additional ancillary staff welfare facilities and ancillary office accommodation; • Provision of an additional 158 sq.m at first floor level for ancillary office accommodation; • Amendments to façade treatment including signage and louvres; • Repositioning of the roof mounted Solar PVs; • Other associated alterations including to the landscaped areas; and • All associated development works Retention permission is sought for the following: • Reconfiguration of car parking layout, including amendments to circulation arrangements adjacent to the building entrance. No change is proposed to the overall number of car parking spaces; • Repositioning of the bicycle shelters; • Amendments to façade treatment, including: o Reconfiguration of glazing mullion centres and incorporation of additional opening sections; o Provision of a first-floor opening vent window to Staircore 2; o Minor adjustments to the cladding arrangement at parapet level; • Repositioning of the roof mounted AOVs; and • All associated site development works. The proposed alterations result in an overall increase of 158 sq.m in the total GFA of the warehouse/logistics unit from 3,026 sq.m to 3,184 sq.m (including ancillary office and staff welfare facilities).
The proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 4no. electric vehicle charging bays & 2no. charging units. II. Installation of a new ESB Unit Substation. III. Installation of a new CT Metering cabinet. IV. Associated revisions to existing car parking spaces & landscaped area. V. Erection of associated signage. VI. All associated site development works including lighting, drainage infrastructure and line marking.
Two storey extension to rear of existing building to accommodate additional vehicle service bays on the ground floor and additional office space and ancillary accommodation on the first floor.
Development at a site of 1.65ha comprising of the erection of secure anti-climb wire-mesh fencing around the perimeter of the existing building at a height of 2.1m, with associated landscaping works to screen the fencing. The provision of electronic vehicular access gates off the internal access road for access to rear service compound and car parking, vehicular barriers, and internal access footpaths, in addition to all associated site development works.
Erection of secure fencing and gates to the perimeter of the site, including all associated site development works, landscaping and planting.
New external Freezer Plant Platform Structure; single storey MRO Stores building within the existing construction compound; external Data Centre unit to the south of the existing Manufacturing Suites Building; airlock extension & relocated external double emergency exit doors to the south of the existing Manufacturing Suites Building; Pallet Storage building adjacent to the existing Drum Store West building within the Utility Yard and boiler Water Chemical Dosing Unit within the CUB yard and all associated site works.
Attic Conversion with WC dormer roof window & 1 no rooflight in rear slope of roof at attic Level
Retention of 2 single storey extensions to the industrial use at Plant Area 2 including a 124sqm extension with a sliding door entrance and a sloping lean to roof to the east and a 34sqm extension with a rolling shutter and a sloping lean to roof at the south west; and all associated site works.
Combination of single storey and two storey flat roof extensions to the rear of the existing building along with associated internal modifications and siteworks.
Combination of single storey and two storey flat roof extensions to the rear and side of the existing building along with associated internal modifications and siteworks
The proposed development, Innovate Health, Centre of Excellence in Brain Health and Dementia, which will consist of: The demolition (in part) of the existing concrete beams adjoining the neighbouring unit and relocation of existing underground services. A five-storey building with part six-storey elements and set-back accommodation and plant rooms. (c. 6,590m²). The building functions comprise a reception area, café/restaurant, central atrium, radiology department, treatment, assessment and consultation rooms, research facilities, associated offices and meeting rooms and associated staff facilities, plant and storage rooms. Roof terrace at Level 05 at the south end of the building. Extract flues above roof level for laboratory ventilation. The removal of 14 car park spaces in the existing adjacent TUH car park to facilitate a new Entrance Park consisting of hard and soft landscaping and lighting. New footpath, signage, loading bay and accessible parking space off Fourth Avenue. New footpath, signage, set down area and two accessible parking spaces off the internal hospital campus road to the west. Extended footpath to the west of the adjacent car park and new pedestrian crossing to enhance pedestrian access to the existing multi-storey car park. New pedestrian crossing to connect the new Entrance Park with the main entrance to Tallaght University Hospital. Secure enclosed staff bike store to the North and visitor bike racks in the Entrance Park. Bin store to east side of building. Boundary fencing, walls and gates to east of site. The new facility will employ an extension to Tallaght University's Hospital current waste license. All associated ancillary site development and drainage works.
Single storey stand-alone home office and games room (floor area 37.2sq.m) located to the rear of the overall property.
Proposed single-storey shed and garden room circa 49sqm and all associated site works.
Retention of a single storey garden room to the rear of the existing house and for alterations to the boundary wall to include the reposition of side access gate and for all associated site works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
Retention permission is sought for an existing free standing advertisement sign located within the subject grounds fronting onto the junction of Upper Ballymount Road and Calmount Road Dublin 24.
Demolition of industrial shed attached to existing industrial building.
(i) Alterations to existing roofs to include increasing roof height of one bay to match adjoining bay; (ii) new wall & roof cladding including louvred ventilation panels and translucent panels over existing cladding and to altered areas of buildings and extensions; (iii) provision of new roller-shutter doors to three existing opes and three new opes; (iv) demolition of three ancillary structures attached to the north side of the building and provision of four new single storey pitched roof structures attached to the north side of the building; (v) demolition of some existing wall and roof structures to the eastern end of the building, and the provision of new walls & roofs to form new areas of the high-bay plant/fabricating area with raised roof on parapet levels; (vi) demolition of a detached single storey plant building on the north-west of the site and storage buildings on the east of the site and construction of 3 new single storey detached plant and storage buildings; (vii) provision of new signage to the west facing elevation of the building at high level; (viii) all other associated siteworks & services to facilitate the development.
The development consists of additions, alterations and modifications to the existing and permitted industrial facilities (permitted under Reg. Ref. SD23A/0123) at the Pfizer site in Grange Castle. They include; (a) The relocation of and modifications to the previously permitted photovoltaic solar panel substation, adjacent to the car park at the centre of the site and to the south-east of the DS2 building permitted under Reg. Ref. SD23A/0123. The proposed building is now approximately 41 square metres and approximately 6.3 metres high. (b) The construction of a waste compound office, within the waste compound to the south of the DS2 building, both previously permitted under Reg. Ref. SD23A/0123. The proposed building is approximately 14.4 square metres and approximately 2.85 metres high. (c) Modifications and alterations to the existing access and egress (Pfizer Gate No. 3) from the public road within the Grange Castle Business Park, including installation of new vehicular gate and associated fencing including associated minor alterations to existing adjacent berms and modifications and alterations to the existing public pathway and public cycle lane adjacent to the existing entrance (Pfizer Gate No. 3). (d) The works also include modifications to previously permitted underground utilities, site lighting, internal roads and footpaths and all associated siteworks.
The development will consist of change of use from Retail use to retail use with ancillary off licence use
The amendments to the permitted development will consist of: 1. Reduction in the overall height and internal and external re-configuration of permitted development resulting in the omission of 1 no. floor in Block A and C, and 2 no. floors of Block B to comply with Condition 2 of the permitted development. This will result in an overall reduction in units in the permitted development by 55 no. units from 252 no. units to 197 no. units; 2. Omission of 41 no. studio apartments which will be replaced with 15 no. 1-beds, 13 no. 2-beds and 2 no. 3-bed units including any associated elevational changes to balconies and window openings; 3. Revised layout at ground floor to remove podium courtyard, parking and service area which will be replaced with a new underground car park, entrance and service area; 4. Relocation of permitted creche to the ground floor corner of Blocks B and C and inclusion of an associated outdoor play area resulting in the omission of apartment no. 40 and relocation of tenant amenities/ community space to Block A to comply with Condition 2 of the permitted development; 5. Inclusion of plant equipment at roof level; and, 6. Inclusion of a blue roof drainage system at roof level of all permitted apartment blocks. 7. The development also includes all site development works necessary above and below ground necessary to facilitate the development.
(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
Change of use of premises from offices and showrooms to health club and for sign on south façade of building.
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.
Extension, Change of Use and alterations to Kilnamanagh Shopping Centre; A two storey extension is proposed along the centre's eastern elevation (total GFA increase of 2,336sq.m); Change of Use of the first-floor retail area (last used by Dunnes Stores as textile sales space) which will be extended and subdivided to provide for two new non-retail, service units; Unit 1 will extend to c.1,411sq.m for use as a health centre and Unit 2 will extend to 790sq.m for use as a gym; Removal of condition 3 of PA Ref: SD06a/0095 to allow for the increased net sales area to allow for the increase in net comparison sales space at ground floor level; New entrance ramp and steps at the north of the extension; The southern lobby entrance into Dunnes Stores will be demolished and replaced with a new glazed lobby entrance; New walkway canopy generally on the north and south elevations; New ramped access next to existing pedestrian entrance steps on Mayberry Road; Reconfigure existing entrance to Treepark Road including revised parking layout generally around the east side of the building to allow for an adjusted, one-way, system around the centre; Car parking, as a result of the extension, will be reduced; Four electric vehicle parking spaces; Covered cycle parking; New enclosed service yard wall and gates to existing service area on the west side of the centre; New signage (including illumination) proposed to elevations including two Totem signs; Recladding on elevations. Additional landscaping treatment generally around the east side of the centre arising from the amendments to the car park. Landscaping works and all drainage works including SUDS measures; All other ancillary works to facilitate the development.
The development will consist of: 1. The change of use of part of the first floor from retail to gym use within a unit with a gross floor area of circa 790sqms; 2. Alterations to ground floor lobby entrance and steps; and 3. The installation of temporary wheelchair access ramp to the lobby entrance along the centre's eastern elevation. 4. Planning permission for a 24 hour gym; 5. Erect two new external signs, including manifestations to first floor windows. 6. Installation of bicycle parking.
Retention/change of use for existing development and shed/outbuilding; the development was originally built for residential purposes but is currently being used as a childcare facility.
Permission for the construction of a two- storey classroom building for additional crèche facilities and all associated site development works to the east elevation at the south corner of St. Ultan's Campus.
PERMISSION:For the construction of an ASD School Playground area and all associated site development works to the west elevation at south corner of the St. Ultan's Campus, Cherry Orchard Ave, Cherry Orchard, Dublin 10.
Change of use of an existing single storey detached store (floor space - 154sq.m) to a research and development gas innovation workshop and store.
(I) Change of use of ground floor (1,002 sq.m gross) from wholesale light manufacturing uses for the clothing trade to light industrial with ancillary testing area (fitting rooms, club building workshop putting and chipping greens and fitting bays) for sports equipment manufacture and an area of display of golf equipment and clothing/accessories for wholesale, together with associated/ancillary reception area, refuse storage, bicycle parking (5 no. spaces) and circulation.(ii) Provision of a new first floor of 833 sq.m gross for use as light industrial use to facilitate electric buggy repair (428 sq.m) and staff canteen (75 sq.m), together with associated/ancillary circulation (iii) Provision of a new second floor of 810 sq.m gross for use as storage, including plant. (v) Minor amendments to roof to facilitate AOV's and air extract ducts (vi) 1 no. new non-illuminated sign of 20.2 sq.m on the south-west (rear) elevation and 1 no. illuminated (blacklit) sign at fascia level to the north-east elevation 2.15 sq.m.