Construction of dwelling house, construction of garage and installation of on-site wastewater treatment system and associated site worksDecision record indexed
The Existing Eli Lilly Pharmacuetical complex at Ballythomas East, Ballythomas West, Horse Hill More North and Ballyvrin Lower, Dunderrow, Kinsale, Co.Cork
The development will consist of: a) a 3 storey administration extension (gross floor area approx. 523sq.m and approx. 26m high to parapet) with intermediate mezzanine floors for welfare, office and storage use to the existing IE2b pharmaceutical manufacturing building with roof mounted plant and equipment, all located to the north east of the existing IE2b building; b) a single storey extension to the ground floor of the existing nanofiltration room located on the eastern side of the IE2b production building (gross floor area 8sq.m); c) local ancillary site development works including modifications to underground services and hard surfaced areas. The proposed development is covered by an existing industrial emissions (IE) licence no. P0009-05. The development refers to a modification to an establishment to which the major accident regulations applies.Decision record indexed
Permission for the construction for two new server rooms and associated works. The proposed development consists of the construction of two permanent prefabricated server buildings within the pharmaceutical production site, each with a height of up to 5.5 metres, with external plant and equipment located adjacent to the buildings, associated with the operation of the server equipment. The proposed development is covered by an Industrial Emissions Directive Licence No. P0009-05. As the proposed development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
Permission for the construction of new dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works.Decision record indexed
Permission for the construction of a new detached dwelling, a new bio-filtration waste water treatment unit, a new potable well, a new vehicular entrance, a new detached garage and store area and all associated site works at Ballyregan More, Kinsale, County Cork.Decision record indexed
Ballythomas East, Ballythomas West, Horsehill More Dunderrow Kinsale Co.Cork
The development will consist of a two-storey extension to an existing Chiller/Boiler house building (IE04). The extension is to accommodate a new Chiller on the ground floor with the associated Motor Control Centre (MCC) on the 1st floor. It is intended to construct an access stair to the 1st floor which will also act as a fire escape. The extension will also include associated site works including the construction of a retaining wall and the realignment of underground services. The proposed development is covered by an existing Industrial Emissions (IE) Licence No. P0009-04. The development refers to a modification to an establishment to which the Major Accident Regulations applies.Decision record indexed
Eli Lilly Pharmaceutical Complex Ballythomas East, Bally Thomas West Horsehill More North and Ballyvrin Lower Dunderrow, Kinsale, Co. Cork
Permission for 7no. new motor control centre (MCC) rooms and associated development to serve 6 No. existing buildings within the facility (building no’s IE1, IE6, IE7, IE8, IE11, and IE22). The proposed MCC rooms development comprises as follows: 2 No. single storey MCC room structures of approx. 57 sq.m. each adjacent to building IE1, and local diversion of existing foul sewer adjacent to building IE1; ground floor extension of approx. 12sq.m. to building IE6 and internal alterations to part (approx. 34sq.m.) of existing ground floor of building IE6 to accommodate an MCC room of approx. 46sq.m. in total; first floor/roof level extension at building IE7 for MCC room of approx. 55.50sq.m. (including removal and replacement of approx. 15sq.m. of existing access area) to be accessed by existing external stairs; first floor / roof level extension to existing single storey gas shed adjacent to building IE8 to accommodate an MCC room of approx. 42.16sq.m., and provision of new external access stairs; first floor / roof level extension at building IE11 to accommodate an MCC room of approx. 49.50sq.m., and provision of new external access stairs; and first floor / roof level extension at building IE22 for MCC room of approx. 58.50sq.m., and provision of new external access stairs; and all ancillary access and associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended). The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazard Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
Within existing Eli Lilly pharmaceutical complex Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow Kinsale Co. Cork
The proposed two-phase development located at the north-west corner of the existing IE08 pharmaceutical manufacturing and production building will consist of; demolition of an existing external staircase, internal modifications to the existing IE08 production building and the construction of a new 5 storey extension (including mezzanine floor). The proposed extension will be a non-production administration and support infrastructure facility. It will include; 1) rooms to accommodate electrical, IT and automation infrastructure to service the existing production building and the proposed extension. 2) New Administration facilities including staff changing areas, WC facilities, canteen and office areas, new entrance lobby, stairs and lift, 3) mechanical and electrical plant, including rooftop plant, 4) external works including revisions to the internal vehicle roadways and pedestrian access ways and all associated site development, drainage, landscaping and ancillary works. The development will be located on a site that currently operates under an Industrial Emissions (IE) License No. P0009-04 under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003). The new development is on a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies.Decision record indexed
Ballythomas East Ballythomas West Horsehill More North and Ballyvrin Lower Townlands Dunderrow Kinsale Co Cork
Single storey extension at ground floor level to an existing boiler house building (IE04). The extension is to accommodate a new boiler on the ground floor. The extension will also include associated site works including the construction of a new external 23m high boiler stack with platform access and the re-alignment of existing underground services. The proposed development is covered by an existing Industrial Emissions (IE) Licence No. P0009-05. The development refers to a modification to an establishment to which the Major Accident Regulations applies.Decision record indexed
Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow, Kinsale Co.Cork
Amendments to as-permitted development, located at the northwest corner of the existing IE8 Pharmaceutical Manufacturing Building, will consist of the demolition of the existing entrance and female changing room at ground floor and breakroom offices at mezzanine level, modifications to the existing IE8 building to facilitate the construction of a 5 storey extension (including mezzanine floor) as-permitted under planning register no. 21/6388, to be constructed in two phases with phase 1 complete. The proposed extension will include a range of support accommodation including new entrance, lobby, staff changing areas, WC facilities, canteen, office areas, electrical rooms, new stairs and lift and mechanical/electrical plantrooms areas, including rooftop plant. External works will include: modifications to existing ground levels to facilitate the proposed extension; alterations to existing elevations; modifications to the internal vehicle and pedestrian access roadways and all associated ancillary site development and drainage works. Proposed amendments will include an increase in floor area of the as-permitted extension from ground floor to roof level to extend the ground floor staging area and the provision of AHU plant platforms over, an increase in height of the as-permitted parapet level to accommodate roof plant screened enclosure, minor amendments to internal layouts and amendments to the external facades including revised fenestration designs. The development will be located on a site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act of 1992 (as amended for the protection of the Environment act 2003). The new development is on a site to which Chemicals Act (Control of Major Accidents Hazards involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies.Decision record indexed
Eli Lilly Campus, Ballythomas West, Ballythomas East, Horsehill More (North) & Ballyvrin Lower, Dunderrow, Kinsale, Co. Cork.
Permission for development at Eli Lilly Kinsale pharmaceutical manufacturing campus. The proposed development will consist of: (1) Construction of a 3 storey laboratory extension to the existing laboratory/administration building (known as IE28) to comprise gross floor area of approximately 4,277sqm with height to parapet of approximately 19.62m and maximum height (roof top mechanical unit lourve) of 24.25m. (2) Re-alignment of the existing internal security fence and provision of pedestrian turnstile access. (3) All associated site development works including modification to adjacent internal site roads and site services, drainage connections, provision of hard standing areas and landscaping. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence (no. P0009-05) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environmental Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies.Decision record indexed
Ballythomas East Ballythomas West, Horsehill More North Ballyvrin Lower, Dunderrow Kinsale, Co. Cork
Development located within the existing manufacturing facility. The development will consist of the demolition of an existing stairs in IE8 production building and construction of an extension to IE8 production building to accommodate a replacement stairs to service the ground floor, ground floor mezzanine, first floor, first floor mezzanine & second floor levels, and infill the footprint of the demolished stairs with new floors at all levels above ground floor to facilitate alterations to the building. The extension includes an area between the new stairs and the existing production building to provide an expanded area at ground, first and second floor levels. It also includes for an air handling unit on the roof and all associated site works. The proposed development is covered by an existing Industrial Emissions (IE) License No. P0009-04. The development refers to a modification to an establishment to which the Major Accident Regulations applies.Decision record indexed
Ballythomas East, Ballythomas West, Horsehill More North, And Ballyvrin Lower, Dunderrow, Kinsale, Co.Cork
Permission for the construction of a single storey extension to building IE8 and associated site works. The proposed development is covered by an existing Industrial Emissions (IE) Licence no. P0009-05. The development refers to a modification to an establishment to which a Major Accident Regulation applies.Decision record indexed
Ballythomas East Ballythomas West Horsehill More North & Ballyvrin Lower Dunderrow Kinsale Co Cork
Development of this site at building IE22 at the townland of Ballythomas West within the existing Eli Lilly pharmaceutical complex. The development will consist of extensions to an existing Motor Control Centre (MCC) and Compressor house (building IE22) to accommodate a new MCC room and a new compressor room. The development comprises a first floor/roof level extension (approx. 43.47 sqm) to the existing single storey IE22 for use as a new MCC room; a ground floor extension (approx. 36.1 sqm) to IE22 for use as a compressor room; a new external access stairs to the first floor MCC room extension; and all ancillary access and associated site development works. The proposed development will be constructed in lieu of a first floor extension to IE22 previously permitted under Pl.Reg.No. 23/6576. The development will be located on a site that currently operates under an Industrial Emission (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended). The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
Retention of the following; 1) minor alterations, as constructed, to elevations of existing 2-storey dwelling house permitted under planning reference no 79/1767, 2) conversion of permitted adjoining domestic garage to habitable space, used as extension to dwelling house, 3) existing detached 2-storey ancillary domestic garage as constructed on site, 4) single-storey boiler house as constructed to side elevation of dwelling and 5) all completed site works. Permission for; 1) the decommissioning of existing on-site septic tank, 2) the installation of new on-site tertiary sewage treatment system to serve dwelling and 3) all associated site works.Decision record indexed
Construction of dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works along and the installation of a mobile home for the duration of construction of dwelling house.Decision record indexed
Construct the following: (a) a cattle house with two no. slatted slurry tanks, (b) a calf house, (c) a straw storage shed, (d) a slatted soiled water tank, (e) two no. rainwater harvesting tanks, (f) roof existing cattle feeding yard, permission to relocate the following: (i) existing rainwater harvesting tank, (ii) existing plant room and carry out all associated site works at Ballymountain, Upton, Co. Cork.Decision record indexed
Ballythomas West Ballythomas East, Horsehill North Ballyvrin Lower, Dunderrow Kinsale, Co. Cork
The development will comprise of a single-storey extension to the existing Electrical Load Centre Building (LC6), of approx. 75sqm; modifications to LC6 that are required to accommodate the proposed extension, including elevational revisions to match proposed new extension; and all associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies.Decision record indexed
Permission for the construction of extensions and alterations to an existing dwelling house, including the demolition of an existing extension and garage, the construction of a garage, the installation of a new on-site wastewater system, a new vehicular entrance and all associated site worksDecision record indexed
A new vehicular entrance off the L6089 to access the permitted solar farm development (Pl.Reg.No. 15/6968, as extended by Pl.Reg. No. 21/4496 and modified by Pl.Reg.No. 22/6452) including all ancillary works.Decision record indexed
Ballythomas East, Ballythomas West, Horse Hill More North & Ballyvrin Lower Dunderrow, Kinsale, Co. Cork
Permission to: a) Construct a new service/plant cabin, all associated site and structural works, b) Demolish an existing service/plant cabin and demolish existing associated structural works, all within their existing manufacturing facility. The proposed development is covered by an existing Industrial Emissions (IE) License no. P0009-05. The development refers to modifications to an establishment to which the Major Accidents Regulations apply.Decision record indexed
Permission for alterations and extensions to dwelling house consisting of a two-storey side extension, ground floor rear extension, elevational changes and associated site works.Decision record indexed
The construction of new dwellinghouse, domestic garage, new entrance, septic tank and percolation area together with all other ancillary site works.Decision record indexed
Permission for works to existing single-storey dwelling to comprise 1) construction of two-storey extension to side of dwelling, 2) modifications to single storey porch to front elevation and all associated site worksDecision record indexed
Permission for modifications to design of porch as previously granted permission as part of planning ref no. 24/4406 to comprise the provision of 2 no. windows to side elevations of porch, modifications to door screen to same, stone cladding and all associated worksDecision record indexed
To construct a dwelling house, a garage for domestic purpose, to install a domestic waste water treatment system and to carry out all associated site works.Decision record indexed
Construction of new dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site worksDecision record indexed
Permission for the construction of new dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works.Decision record indexed
Provision of stone finish to front and both sides of front porch, stone finish to front of both gable end extensions and 2 new rooflights to back of dwelling. Extension of duration of permission granted under planning reference: 15/05717.Decision record indexed
Permission to construct a dwelling house, a garage for domestic purpose, to install a domestic waste water treatment system and to carry out all associated site works.Decision record indexed
Permission for refurbishment of existing two storey detached dwelling, construction of two storey & single storey extensions to side and rear of existing dwelling, conversion of existing outbuildings to habitable accommodation ancillary to the main dwelling, new wastewater treatment system and percolation area to replace existing septic tank and all ancillary site development works.Decision record indexed
In the townland of Ballythomas West within the existing Eli Lilly pharmaceutical plant at Ballythomas East, Ballythomas West, Horsehill More North and Ballyvrin Lower, Kinsale, Co. Cork, P17 NY71
The development will consist of the provision of a single-storey building extension (gross floor area of approx. 172sqm and building height of approx. 6.6m) to an existing electrical load centre building (LC7) and associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 ( as amended for the Protection of the Environment Act 2003). The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances ) Regulations 2015 (S.I.209 of 2015) applies.Decision record indexed
The development will consist of the closing up of an existing site entrance, the demolition of an existing single storey storage building, the demolition of an existing single storey dwelling, the removal of an existing septic tank and percolation area, the opening up of a new site entrance, the construction of a new two-storey dwelling, the installation of a private well, the installation of a wastewater treatment system and polishing filter and all ancillary works.Decision record indexed
Ballythomas East, Ballythomas West Horsehill More North Ballyvrin Lower, Dunderrow Kinsale, Co. Cork
Permission for construction of an expansion to the existing waste water treatment plant, that includes a) three number buildings consisting of i) a single storey precipitation building (8.6m high) that including an open storage area, ii) single storey electrical building (5.4m high), iii) two storey filter press building (9.6m high), b) process vessels and associated access stairs and platforms, c) structural steel service racking, d) Underground services, drainage and other associated siteworks. The proposed development is covered by an existing industrial emissions (IE) licence no. P0009-05. The development refers to a modification to an establishment to which a major accident regulation applies.Decision record indexed
Construction of a single storey dwelling house, entrance, domestic garage, sewerage treatment system and all associated site works. Extension of Duration of Permission granted under Planning Reference: 15/5901Decision record indexed
The construction of a new 2 storey dwelling house, domestic garage, proprietary waste water treatment system and percolation area and all associated site works.Decision record indexed
Permission for the proposed demolition of an existing dwelling and the provision of a proposed replacement dwelling, car port, wastewater treatment system, new site entrance arrangement and all associated site worksDecision record indexed
Permission for a) the retention of an extension to an existing agricultural building consisting of a dry store, b) the retention of an existing agricultural building consisting of livestock cubicle housing, slatted slurry storage tank and feeding area, c) the construction of an extension to an agricultural building comprising of livestock cubicle housing, slatted slurry storage and covered feeding area, d) the demolition of an existing silage slab, e) the construction of an agricultural building comprising of loose straw bed calf housing, f) the construction of three silage pits and associated silage apron, g) the construction of a silage effluent storage tank, h) the construction of three meal bins, i) the construction of ancillary concrete and j) all associated site works.Decision record indexed