Construct a single storey extension to the rear of the existing warehouse unit, including alterations to the existing to accommodate same, all ancillary site works and services.
Demolition of 29.5m2 loading bay and removal of 3 no. storage containers and ancillary 5 no. storage tanks with extension of 394m2 9.0m high warehouse extension with 2 no. roller shutters with internal layout changes for installation of new energy efficient and sustainable equipment to existing commercial laundry with 7 no. new car parking spaces, 24 no. new bicycle spaces in secure standalone shelter with new delivery and loading area covered with new canopy and revised internal vehicular routes while retaining existing entrances to Second Avenue with ancillary site and development works.
The development seeking retention consists of the construction of a ground floor extension to the rear of the dwelling.
Permission for change of use and subdivision of existing flower shop to coffee shop/barber shop and associated site works.
Retention for internal mezzanine storage area (132sq.m); single storey compressor room extension (12sq.m) to rear of existing building and single storey packaging shed extension (38sq.m) to side of existing building.
Construction of kitchen extension to rear.
One & a half storey side extension, raised boundary wall and all associated site works
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.
Permission sought for the construction of a 2-story, 3-Bedroom detached house with new vehicular access/egress to Alderwood Avenue to the side of existing dwelling
The proposed development, Innovate Health, Centre of Excellence in Brain Health and Dementia, which will consist of: The demolition (in part) of the existing concrete beams adjoining the neighbouring unit and relocation of existing underground services. A five-storey building with part six-storey elements and set-back accommodation and plant rooms. (c. 6,590m²). The building functions comprise a reception area, café/restaurant, central atrium, radiology department, treatment, assessment and consultation rooms, research facilities, associated offices and meeting rooms and associated staff facilities, plant and storage rooms. Roof terrace at Level 05 at the south end of the building. Extract flues above roof level for laboratory ventilation. The removal of 14 car park spaces in the existing adjacent TUH car park to facilitate a new Entrance Park consisting of hard and soft landscaping and lighting. New footpath, signage, loading bay and accessible parking space off Fourth Avenue. New footpath, signage, set down area and two accessible parking spaces off the internal hospital campus road to the west. Extended footpath to the west of the adjacent car park and new pedestrian crossing to enhance pedestrian access to the existing multi-storey car park. New pedestrian crossing to connect the new Entrance Park with the main entrance to Tallaght University Hospital. Secure enclosed staff bike store to the North and visitor bike racks in the Entrance Park. Bin store to east side of building. Boundary fencing, walls and gates to east of site. The new facility will employ an extension to Tallaght University's Hospital current waste license. All associated ancillary site development and drainage works.
Retention of timber log cabin in back garden to rear and side of house, for use as office, gym, play room/games room and storage area along with ancillary works
Single storey temporary emergency accommodation structure for working staff, for a maximum period of 2 years, comprising 16 sleep pods, a kitchen/dining area, cleaning and changing rooms and toilet facilities, all associated windows and doors and associated site development works.
Construction of a single storey porch extension to the front and a single storey extension to the rear and side of existing dwelling.
Permission to demolish the rear porch and construct a corridor to the rear of the house. Retention to retain the existing single storey structure in the rear garden and use it as a bedroom and en-suite, which will be linked to the existing house with the proposed corridor, all with associated site works.
Permission to demolish the rear porch, construct a glazed link to the rear of the house and construct a new extension for a proposed bedroom and ensuite. Retention to retain the existing single-storey structure in the rear garden and use it as a bedroom and ensuite, which will be linked to the existing house with the proposed glazed link.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
Proposed ground floor rear extension for use as family flat
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Construction of additional floor area of 192.43sqm to existing warehouse and office building of 1658.44sqm, alterations to layout of 152.11sqm of existing warehouse and alterations to existing parking layout to accommodate disabled parking. New first floor of 169.75sqm internally in existing warehouse, internal alterations at ground level, 2 storey extension to southern elevation of existing warehouse to accommodate new entrance lobby and all associated site works.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
Retention of widening of vehicular entrance in front boundary wall. Permission for dishing of kerb.
(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
The amendments to the permitted development will consist of: 1. Reduction in the overall height and internal and external re-configuration of permitted development resulting in the omission of 1 no. floor in Block A and C, and 2 no. floors of Block B to comply with Condition 2 of the permitted development. This will result in an overall reduction in units in the permitted development by 55 no. units from 252 no. units to 197 no. units; 2. Omission of 41 no. studio apartments which will be replaced with 15 no. 1-beds, 13 no. 2-beds and 2 no. 3-bed units including any associated elevational changes to balconies and window openings; 3. Revised layout at ground floor to remove podium courtyard, parking and service area which will be replaced with a new underground car park, entrance and service area; 4. Relocation of permitted creche to the ground floor corner of Blocks B and C and inclusion of an associated outdoor play area resulting in the omission of apartment no. 40 and relocation of tenant amenities/ community space to Block A to comply with Condition 2 of the permitted development; 5. Inclusion of plant equipment at roof level; and, 6. Inclusion of a blue roof drainage system at roof level of all permitted apartment blocks. 7. The development also includes all site development works necessary above and below ground necessary to facilitate the development.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
Retention for granny flat to ground floor on side of existing two storey extension
Ground floor side extension with pedestrian access door, pitched roof over and 1 roof light over.
Conversion and extension of existing garage to side/rear of dwelling with first floor extension over; new ground floor extension to front with new porch area with tiled canopy over, with internal modifications & associated site works.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
The development will consist of converting the existing two bedroom detached single storey bungalow to a two storey three bedroom detached house and all associated site works, through the construction of a new additional first floor storey to the existing single storey house with a new pitched roof over, consisting of an attic conversion and rear roof dormer.
3 externally mounted hotel signs which include: (1) a high-level wall mounted sign to the northeast facade complete with individual lettering and LED halo backlighting; (2) a double fronted suspended soffit sign with integrated LED lighting located adjacent to the main entrance at the northeast corner of the site; (3) a sign with integrated LED backlighting installed into the existing glazed facade located over the main entrance door to the north of the site.
Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
Demolition of existing fire damaged commercial unit and site clearance including all associated site works.
Replacement of a portion of the facade; removal of escalators and infill of voids at first floor (ex. mezzanine 93.5sq.m and second floor (ex. food courts 64sq.m); change of use of the mezzanine floor of the previously approved and constructed retail known as C4 to a Primary Care Centre (Class 8); change of use for ground floor, first floor and second floor of the previously approved and constructed retail unit known as Food Court, to a Primary Care Centre (Class 8); 6 external signage locations: (1) at unit C5 entrance (8.17sq.m); (2) at unit C4 entrance (9.36sq.m); (3) above first/second floors entrance (11.4sq.m); (4) to east elevation (6,25sq.m); (5) above unit C5 entrance (1.5sq.m); (6) above unit C4 entrance (0.75sq.m); the change of use area when completed will form an integral part of the previously approved Academic & Primary Care Centre (SD14A/0041, SD14A/0227, SD15A/0147, SD16A/0046 and SD19A/0158 at Tallaght Cross West, Tallaght, Dublin 24.
Change of use from retail unit to unit for Day Care Centre use along with signage.
Demolition of the existing warehouse unit (1,632sq.m) and the construction of a new 5-6 storey building, accommodating 64 apartments, comprised of 20 1-bed apartments, 16 2-bed apartments, 8 3-bed apartments, 20 2-bed duplex apartments and 1 unit at ground floor level to be either retail or cafe. The proposed development also provides for a podium and an undercroft car parking area, at ground floor level, accommodating 37 car parking spaces, 167 bicycle parking spaces, bin storage, plant room and 2 ESB substations. Vehicular access to the development will be from the Cookstown Road. The development includes all private and communal open spaces, landscaping, boundary treatments, vehicular and pedestrian site access, bin storage, bike storage, signage and all associated site development works including service connections, foul and surface water drainage/attenuation and water supply/storage. On a total site area of approx. 0.28ha (0.7acres).
Retention of single storey flat roof side extension.
Change of use of 58.4sq.m of the front ground floor single storey part of Unit 1 from office/light industrial use to click-and-collect retail use and ancillary site works.
For the demolition of single storey pitched front roof and rear conservatory and construction of new flat roof to single storey front structure, new single storey rear extension and internal ground first floor modifications together with new dormer attic structure consisting of bedroom and en-suite, conversion of existing shed to games room with new front elevation window and new rear glazed doors and all associated works.
28m of new secure metal fencing.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
The installation of a roof mounted telecommunications apparatus comprised of antenna, transmission dishes, radio equipment cabinets and all associated site works.
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
Conversion of an attic to a room with a flat dormer style roof.
(i) Retention permission is sought for the mezzanine floor, stairwell and associated meeting room; (ii) (a) change of use of Unit F1 from cafe to car rental office and erection of partition walls to create a reception area, staff offices, staff mess area, wc, store room and staff canteen at ground floor; (b) upgrade works including replacement of mezzanine floor and stairwell; (c) installation of company signage to front of unit; and (ii) change of use from commercial car park to car rental and car share facility at basement level comprising of the following: (a) removal of 3 car parking spaces to provide for single storey car rental kiosk (28.82sq.m) comprising reception area; (b) redesignation of 30 commercial car parking spaces as car rental spaces (3 car club, 3 staff, 12 return and 12 rental spaces); (c) removal of 7 car parking spaces to provide circulation route, and car washing area (69.18sq.m) comprising 2 power washers, 1 wash pad connected to the existing petrol interceptor in the car park and car drying area. The car wash will connect to the mains water connection; (d) erection of company signage over entrance to car park from Belgard Square North; and (e) drainage and all associated site development and ancillary works necessary to facilitate development.
Single storey extension to the side for extended living.
Erect 837sq.m for 150.3 KWP of photovoltaic panels on the roof, with all associated site works.
Construction of new front door structure to front elevation; single storey rear extension extending existing kitchen space and widening of the existing front entrance pillars with new solid gates and associated works
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.