Alterations to a previously approved development (Reg. Ref. SD15A/0061 and Reg. Ref. SD16A/0398) which relates to a 10-year permission for the construction of a Peaker Power Plant in a single storey building with a mezzanine level, together with associated plant equipment including water & fuel tanks. The alterations to the previously approved development (Reg. Ref. SD15A/0061 & SD16A/0398) include the following: (i) alterations to the previously approved building within the eastern portion of the site as follows: (a) an increase in the overall footprint of the building to the north-west to include office space, and staff facilities at ground floor level; and to the north-east to include a boiler room at ground floor level; (b) revised roof footprint to the rear of the building, with the roof being lowered to the rear; (c) relocation of stair cores and updates to building elevations, including the introduction of additional glazing; (d) amendments to the external open service yard to the north of the building including the removal of the previously approved transformer rooms, addition of containerised plant and minor alterations to the location of shaft towers; (e) a minor increase in the height (by 600mm) of the screen to the service yard. Alterations to the western portion of the site include; (ii) minor amendments to the positioning of the internal roadway; (iii) amendments to the tank bund area and tank arrangement to the west of the site, and the addition of contained plant and a pump house building; (iv) minor amendment to the location of the approved tanker unloading area; (v) relocation of car parking spaces from the south of the site to the north of the main bund areas, with the exception of the approved accessible parking space; (vi) provision of a gas skid & support structure to the south-west of the site; (vii) provision of an enlarged plant compound to the west of the bund area and relocation of transformers to this compound; (viii) revisions to the positioning and an increase in size of the approved pipe bridge to align with services; (ix) provision of a new bicycle parking shelter comprising 8 no. parking spaces; (x) amendments to soft landscaping to accommodate the revised layout and; (xi) drainage, boundary treatments, site lighting, EV car charging ports; and all associated site development and ancillary works necessary to facilitate the development. The capacity of the plant will be 115MW as approved under Reg. Ref. SD15A/ 0061. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
New signage (2.225sq.m) to the side elevation (north east facing), all associated site and ancillary works in accordance with the plans as submitted.
Construction of two new three storey primary school buildings for Gaelscoil na Camoige agus Gaelscoil Chluain Dolcain providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation; The development will also consist of the construction of a new single storey PE Hall building for Colaiste Chilliain; The development will also include two new pedestrian access routes, with one located on New Nangor Road and with another located at the junction of New Nangor Road and Old Nangor Road; A new vehicle entrance and exit onto Old Nangor Road to provide a one-way vehicle route with a bus/vehicle set down zone, conversion of existing vehicle entrance to Colaiste Chillian to an in-only entrance; 2 new hard play courts and play space at each primary school with site landscaping, bicycle parking spaces and car parking spaces for each primary school including accessible car parking spaces, internal refurbishment works to Colaiste Chilliain to facilitate the reintegration of teaching accommodation upon Gaelscoil Chluain Dolcain's move to the new school; Removal of the existing temporary changing room and relocation of car park at Gaelscoil Chluain to provide accessible parking spaces and associated works; Connections to public utility and drainage services, boundary treatments, installation of PV panels, alterations to existing drainage layout and associated site development works.
A 2 storey 2 bedroom house attached to side of existing house, connections and all necessary ancillary site development works. Form new pedestrian entrance within existing boundary wall, demolition of existing single storey side extension, internal alterations to existing house, rooflight within rear roof slope of existing house and increased vehicular entrance off the public road.
Change of use of part of existing convent building (Protected Structure - Ref. 158) from staff accommodation ancillary to the adjacent nursing home/retirement home permitted under Ref. SD18A/0328 (ABP-304708-19) to community geriatric daycare centre (Ageing Well Centre) with all associated ancillary accommodation (1267sq.m); Internal alterations and improvements to the interior of the convent at ground, first and second floors; External alterations to accommodate two stair cores (one includes a lift) within the courtyard space and minor alterations to existing windows and doors to facilitate new escape routes; All ancillary site and development works associated.
Provision of an establishment to which to European Communities (Major Accident Hazards involving Dangerous Substances) Regulations 2006 as amended by Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 apply, constituting a change of use; The new establishment will include all the existing and permitted buildings (SD13A/0143 as amended by SD13A/0265, SD14A/0194 as amended by SD15A/0343, SD16A/0088 as amended by AD17A/0318 & SD20A/0283, SD21A/0203 & SD21A/0288, all within an existing campus; The proposal relates to the total quantum of fuel oil to be stored within existing and permitted tanks across the existing and permitted buildings; For the avoidance of doubt no works or physical development is proposed and the application relates to an existing development which comprises or is for the purpose of an activity requiring an integrated pollution prevention and control (IE) licence.
Planning permission sough for 8 square meter single story extension to front with pitched roof for new entrance and extended living room.
A new unmanned service station development consisting of construction of new petrol filling station forecourt with 4 dispensers, 2 underground fuel storage tanks with canopy structure (covering c. 235sq.m and 6.2m in height) with associated signage; Widen existing site entrance to the north-east of the site and creation of new egress location onto the Fonthill Road along the northern boundary to allow one-way internal road network incorporating new pedestrian crossing over existing footpath at site egress location; Automatic brush car wash and adjoining jet car wash with water recycling system; Single storey services building structure comprising of a car wash plant room and comms room area (gross floor area 16.3sq.m.); 4 electric charging bays, each comprising of a parking space and electric vehicle charging unit and associated signage; 3-room ESB substation to cater for EV charging infrastructure (gross floor area 38.3sq.m.); Air/Water services area with 2 car parking spaces; 2 internally illuminated double-sided totem signs, 1 at site entrance (4m high x 1.91m wide) with advertising area 15.3sq.m and 1 adjacent the new site egress location (5.8m high x 1.91m wide) with advertising area 22.16sq.m; All other associated underground and overground infrastructure, drainage, lighting, CCTV unmanned systems, landscaping and site development works.
Demolish the existing rear extension to the rear of the existing semi-detached bungalow and construct a new extension to the rear with a roof structure to match existing with rooflights; new bay window to side, internal alterations & associated site works.
Demolition of single storey Extensions to side and rear and construction of 2 storey Extension to side and rear. Single storey extensions to front and rear and alterations to front facade to include new feature gable at first floor level and all associated site development works.
Construction of new 41sqm single storey detached insulated steel shed on concrete base to South side of existing Health centre, adjustments to existing concrete footpaths/grassed areas & surface water system to suit & all associated ancillary works.
Relocation of the existing customer service desk (c. 16sq.m) permitted under Reg. SD19A/0197 from the Yellow Entrance Mall of the Central Rotunda to a new location at the junction of the West Mall and the Central Rotunda and all ancillary site development works.
Removal of existing front boundary wall and replace with new selected stone boundary wall with new extended front vehicular access opening and widen existing front driveway.
Modifications to the Primary Healthcare Centre as permitted under Reg. SD11A/0135 (An Bord Pleanala Ref. PL06S.239890) and SD20A/0054 comprising of relocation of existing bus shelter on Boot Road (Bus Stop No. 3465) by c.75m northwards and construction of a new stainless steel and glass bus shelter including a double-sized internally illuminated advertising panel; Construction of an external stair core from the basement car park to surface level with associated changes to car parking layout.
Internal modifications and single storey extension to the existing classrooms and SEN Unit at the south west corner of the campus to provide additional SEN accommodation, including a single storey Resource Room Extension in the south east corner.
10 year permission for development consisting of removal of an existing unused waste water treatment facility on site and the erection of two data centre buildings, gas powered energy generation compound, and all other associated ancillary buildings and works; the two data centre buildings, DUB 15 and DUB 16, will comprise a total floor area of c. 33,577sq.m over two storeys; the first 2 storey data centre building (DUB15), located to the southwest of the site, will comprise 16,865sq.m data storage use, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; a second 2 storey data centre building (DUB16), located to the southeast of the site, will comprise 16,712sq.m data storage areas, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; both data centre buildings will reach a height of 20m; emergency generators and associated emission flues and plant are proposed in compounds adjacent to each data centre building; gas powered energy generation is proposed to the north east corner of the site to provide electricity for the proposed development; the application proposes to re-route and widen an existing watercourse constructed following an earlier planning permission; it is proposed to reroute this watercourse along the eastern and southern boundary of the site; landscaping is proposed to the south of the site to screen the buildings; fencing and security gates are proposed around the site; new access roads within the site are proposed along with 71 car parking spaces and 26 cycle spaces, bin stores, site lighting, and all associated works including underground foul and storm water drainage attenuation and utility cables and all other ancillary works; a Natura Impact Statement will be submitted to the planning authority with the application.
Permission for residential development comprising 9 dwellings. The proposed development is comprised of: (1) 2 Type A, 2 bed two storey semi-detached houses; (2) 1 Type B, 3 bed two storey detached house with attic conversion; (3) 2 Type C, 3 bed two storey end terrace houses with attic conversions; (4) 2 Type D, 2 bed two storey mid terrace houses with attic conversions; (5) 2 Type E, 3 bed two storey end terrace houses with attic conversions; (6) proposed new vehicular access road from St. Johns Road (located on lands owned by South Dublin County Council); (7) connections to all services and all ancillary site development works and (8) a pedestrian access gate at the intersection of Commons Road and Fonthill Road (located on lands owned by South Dublin County Council).
A social housing development comprising of 10 one bed units in a three storey apartment building, associated car parking and bicycle parking, bin store, new vehicular access onto Old Nangor Road, new pedestrian access to replace existing vehicular entrance, landscaping, boundary treatments and all associated site and engineering works necessary to facilitate the development.
Alterations to the existing single storey front extension including removal of pitched roof profile; construction of new flat roofed ground and first floor extension over the existing garage conversion and extension to side and rear of house with roof lights; external insulation to front, side and rear; SuDS drainage; all associated landscaping and site development works.
New external Freezer Plant Platform Structure; single storey MRO Stores building within the existing construction compound; external Data Centre unit to the south of the existing Manufacturing Suites Building; airlock extension & relocated external double emergency exit doors to the south of the existing Manufacturing Suites Building; Pallet Storage building adjacent to the existing Drum Store West building within the Utility Yard and boiler Water Chemical Dosing Unit within the CUB yard and all associated site works.
Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.
Partial demolition and reconstruction of a 2 storey, corner extension to the rear; provision of a new flat roof with rooflight to this extension; demolition of the two storey extension at the centre of the back (east) of the house; construction of a new flat roofed two storey extension with roof lights; repairs to windows with replacements where necessary or appropriate; construction of single storey bay extension with pitched roof to the south elevation at lower ground floor/basement level; minor internal alterations, general refurbishment, provision of maintenance access to centre valley, addition of photovoltaic panels, repairs to plasterwork, increase in height of rear garden boundary wall to the north; outbuilding to the rear, internal alterations, roof repairs, new doors and window and general refurbishment; minor hard and soft landscaping works including parking area to the northeast; all ancillary site works above and below ground.
Alteration to the front domestic south facing elevation consisting of 17sq.m of PV solar panels located on the existing house front roof pitch; alterations to first floor front bedroom windows ope to contain a central self-coloured acrylic render external insulated system on masonry wall to create new window elevational layout; alterations extending beyond the front building line of the domestic south facing elevation consisting of new self-coloured acrylic render external insulated system to ground and first floor level and grey brick slip finish to external insulated system to ground floor bay window walls.
Retention permission for the existing telecommunications compound, including enclosure and ground mounted equipment; Permission for the replacement of a 25m high lattice tower with a new monopole carrying antennae, dishes and associated equipment with ground works, including foundation (overall height of 20m, excluding lightning finial).
First floor extension to the rear and side over the existing rear/side extension providing 2 new bedrooms and study and bathroom; 3 new rooflights; internal alterations and associated works.
916sq.m new canopy overall height 5.8m over existing external retail area to the north of the existing polytunnel structure together with all associated site works.
Retention of 2 apartments previously used as a two storey retail premises comprising a 1 one bedroom apartment at ground floor level and 1 two bedroom apartment at first floor level; Permission for internal amendments and minor elevational alterations at first floor level to the southern and western elevations along with proposed new bin storage, bicycle parking and all other ancillary site development works.
Amendments to the permitted development previously granted under SDCC Ref. SD19A/0320 and An Bord Pleanala Ref. 306251-19; including the erection of 2 bus shelters on Fonthill Road each comprising of a bus stop sign, real time passenger Information (RTPI) unit and a two-sided internally illuminated advertising panel (c. 1.9sq.m each side); road alterations on Fonthill Road comprising of the amendment of staggered to straight Toucan crossings, the addition of a new straight Toucan crossing, the replacement of bus lay-by areas with bus islands, and the removal of a left slip lane; all associated site services and site development works.
New office space at first floor level (66.sq.m); minor alterations on the road frontage elevation (southeast) to include additional windows for new offices; all works proposed are ancillary to the use of the existing building and business.
Extend the life of SD16A/0012 for ten years - planning permission was granted on site for a detached single storey building of 355sq.m to be used as youth and family support centre including counselling rooms, training rooms, offices, kitchen, toilet facilities, 20 car parking spaces, new road entrance and associated site works under SD10A/0154 for a period of 5 years; a further 5 year planning permission was granted under SD16A/0012.
Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.
Retention permission for the continuation of the temporary staff car park for a period of 5 years consisting of 204 spaces (previously authorised under Planning Application Reg. Ref. No. SD15A/0159) and a shop mobility structure (c. 34sq.m). Permission is also sought for a period of 5 years for a new barrier at the entrance to the temporary car park: and all ancillary site services, drainage and site development works.
Bungalow to rear of existing dwelling and all associated site works
Change of use of the first floor office accommodation to a one bed apartment; change of use of the attic floor office accommodation to a studio apartment; new dormer window within the rear roof slope; ground floor which is currently vacant remains as office accommodation; all necessary ancillary site development works.
New double side extension, single storey rear extension and dormer attic structure and associated works; Demolition of existing side extensions and rear extension; new kitchen/day room, utility, WC & playroom at ground level, bedroom with en-suite at first floor and bedroom with en-suite at attic level; widening existing front entrance.
Demolish an existing single storey glazed conservatory to the rear. Erection of a new single storey flat roof extension to the rear. Erection of a new single storey porch structure and flat roof canopy to the front. Widening of existing vehicular entrance and all associated alterations & site works to the existing two storey house.
(i) Partial demolition of the existing boundary wall; (ii) provision of a new vehicular entrance accessed off Convent View; (iii) associated driveway works; (iv) construction of a new dividing boundary wall and (v) all ancillary works inclusive of dished kerbing, landscaping boundary treatments, necessary to facilitate the development. Outline Permission is sought for: (i) Construction of 1 detached single storey dwelling, and associated drainage, to the side (north) of existing dwelling at 1 Convent View, Boot Road, Clondalkin, Dublin 22. (D22 YV78).
Mixed leisure, entertainment and retail extension to the existing Liffey Valley Centre organised around a large public plaza and pedestrian friendly east-west street with parapet levels varying between c.15m and c.18m above street level; the scheme provides for: (a) a two storey commercial extension (c.46,783sq.m gross) with plant areas at roof level to the existing Centre providing for mixed leisure and entertainment units (c. 9,247sq.m gross), food/beverage units (c.4,052sq.m gross), retail units (c. 21,051sq.m gross) and all ancillary space and circulation areas (c.12,433sq.m gross); the main retail area will be anchored by two stores (comprising a total of c.10,090sq.m gross) located on either side of the public plaza; (b) a central public plaza fronting onto the east-west street covered with a large glass canopy in the form of a curved gridshell structure, this structure will be the tallest part of the proposal at a height of c. 20m above street level, the food/beverage units are located around the plaza at both ground and first floor levels; (c) car parking over two levels (c.900 spaces including 45 universal access spaces and c.200 long stay cycle spaces with an area of c.27,917sq.m gross) located north-east of the extension area c. 290 short stay cycle spaces, 27 short stay car parking spaces and car/taxi set down areas on the east-west street; c.100 long stay cycles spaces provided within the existing car park to the adjacent to the Westend development (Vue Cinema and restaurants); approximately 2,085sq.m of existing gross floor space is to be removed/demolished over ground and first floor to facilitate the extension; the proposal includes all associated service yards, plant and equipment, photovoltaic panels, electricity substations, all utility connections and works, street lighting, signage, landscaping and boundary treatments; the proposal includes the construction of new toucan crossing points for cyclists on Ascail an Life (Ring Road around the Centre) at the western end of the east-west street to provide safe connection to the existing cycle network. An Environmental Impact Assessment Report (EIAR) is submitted.
Erection of a perimeter steel fence to match existing fence as erected on neighbouring property 2.5m high and the installation of a new electronically controlled entrance gate set back approx. 13m from road side 2.1m high.
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.
Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: The construction of 4 ICT Facility buildings (ICT Facilities 1, 2, 3, and 4) with a combined total gross floor area {GFA) of c. 47,564.5 sq.m, Each ICT Facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ICT Facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a GFA of c. 15,196 sq.m (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, Each of the ICT Facilities will include an associated external plant area of c, 6,624 sq,m, ICT Facility 4 will be located in the southern portion of the site and comprises a GFA of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, This ICT Facility includes an associated external plant area of c. 777.5sq.m, Each ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the Energy Centre and 110kV GIS substation permitted under Reg, Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ICT Facility Buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables.
New first floor rear extension over existing extension with modification of remaining roof covering ground floor element to include 3 roof lights; alterations to three first floor rear windows; inclusion of two new roof lights on rear roof of existing first floor side extension; partial attached garage converted to new utility, cloaks and toilet room, some general internal alterations on first floor level.
Change of use from offices at first floor level to residential one bedroom apartment; reconfiguration of an existing layout to accommodate new apartment and a new private open space with 1.8m high timber screen on existing flat roof at first floor level and a new window and terrace door to the rear and side and all associated site development works.
Alterations to previously approved, but not yet constructed development under planning Ref. Ref. (SD11A/0135 - Block A was approved as a primary health care building and will remain so; Block B was approved as a nursing home building and permission is now sought to use that building as a primary health care us; Permission is also sought for an external café and relocation of sub-station from entrance area to a position on Fonthill Road); alterations to Block A of 3,249sq.m consist of minor internal reconfiguration to stair No. 1 cores, position of lift shafts and circulation areas; alterations to Block B of 3,521sq.m (previously approved use as a nursing home) to facilitate the use as a primary healthcare centre include internal reconfiguration to provide 10 consultation rooms; 37 offices; 7 clinic rooms; 4 administration/reception; 4 large group rooms and associated ancillary uses including a new external lift and stair to car park; a total of 149 car parking spaces are to be provided for the proposed development; this includes 125 spaces at basement level including 6 accessible car parking spaces and 24 spaces at surface level including 3 accessible car parking spaces; alterations to the previously approved permission also include for 20 new bicycle parking spaces; new plant space and storage; the previously approved entrance from Boot Road/Convent Road providing pedestrian, cycle and vehicular access including previously approved landscaping, remain as approved.
New brickwork boundary wall and gates including enlarged W.E.E.E. enclosure.
Construction of a two storey, detached three bedroom dwelling in the side garden area to include off street parking for two cars using the existing vehicular access driveway; proposed new vehicular access driveway for the existing house; ancillary site works and connections to all services.
Upgrading works to existing detached bungalow to include: alterations to existing external window and door fenestration; new external window openings; minor demolition works; new single storey extension to rear; new canopy to rear; new flush type roof light; internal reconfiguration; external landscaping; SuDS drainage and all associated ancillary works to facilitate the development.
New stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high with 2 internally illuminated advertising panels each of 2.0sq.m area on the public footpath.
New stainless stell and glass bus shelter, 5.2m x 1.85m x 2.8m high with 2 internally illuminated advertising panels each of 2.0sq.m area on the public footpath.