The development will consist of a two-storey extension to the EAST of the existing hotel, bar and restaurant and will include the following. a) Partial demolition of existing premises Including metal fencing together with compound walls and storage sheds. b) Provision of 50 additional rooms over 2 no. Floors (ground floor and first floor) including reception lobby, administration, toilets, storage, and laundry rooms. c) 88 car parking spaces including 3 no. wheelchair spaces., 20 bicycle parking spaces and bus parking. d) Connection to foul sewer network. e) Provision for free standing canopy and store plant room structure. ) Alterations to existing entrance. g) All other associated site works and landscaping. The overall proposed development will be 1946 m2 gross floor area. AI received 11/04/23
The application is bound to the south, southwest, and to the east by existing, permitted and proposed development within Northwest Logistics Park situated on Kilshane Avenue, to the north and northwest by undeveloped greenfield lands and to the west by the Ratoath Road. Ten-year permission for development that will consist of the following: - Construction of 6 no. warehouses/logistics units including ancillary office/administration use and entrance/reception areas over two levels (Units 1-6) with a combined total floor gross area (GFA) of 50,934 sq.m; - Unit 1 is located within the south-western portion of the site (with a GFA of 16,457 sq.m.). Unit 2 is located in the southern portion of the site (with a GFA of 5,612 sq.m), Unit 3 is located in the south-eastern portion of the site (with a GFA of 5,621 sq.m), Unit 4 and Unit 5 are located in the centre of the site (with a GFA of 8,550 sq.m and 8,535 sq.m respectively), and Unit 6 is located in the northern portion of the site (with a GFA of 6,159 sq.m). - Unit 1 will have a parapet height of 17.59 metres, while all other units will have a parapet height of 17.49 metres. -Ancillary ESB substations (6 no. in total) are included for each of the proposed warehouses/logistics units. The gross floor area (GFA) of each substation is 25 sq.m. Unit 1 includes a sprinkler tank, valvehouse and pumphouse. - The proposal includes a new estate road entrance from Kilshane Avenue, access arrangements and internal road network to serve the proposed units., and pedestrian and cycle infrastructure. The units are served by a total of 501 no. car parking spaces, 230 no. cycle spaces, 80 no. heavy goods vehicle parking spaces (including loading bay parking), loading bays and service yard areas. - The proposed includes PV panels at roof level, hard and soft landscaping and planting, boundary treatments, public open spaces and woodland areas, security gates, cycle shelters, lighting, entrance signage, signage zones for each of the proposed units and all associated works including underground foul and storm water drainage network, attenuations rea, SUDS features and utility cables. An Environmental Impact Report (EIAR) Will be submitted to the Planning Authority, with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy with the Planning Authority. The application is bound to the south, southwest and to the east by existing permitted and proposed development within Northwest Logistics Park situated on Kilshane Avenue, to the north and northwest by undeveloped greenfield lands and to the west by the Roatoath Road. AI received 24/11/22
Permission for the installation of 3,391 m2 of roof mounted PV (Photovoltaic) Solar Panels with anti-reflection coating to roof of existing warehouse, together with all associated site works.
The erection of 2 No.9m high sprinkler water storage tanks, with associated containerisded pump house and a mono-pitched maintenance shed to the south-east of site, together with all associated site works. Add Info received 18th August 2020.
The development will consist of the removal / decommissioning of existing septic tank and the provision of a new replacement wastewater treatment system and associated works all to service the existing dwelling. Additional Information Received 23/02/2026
Construction of a garage amounting to 46 sq.m., the widening of the existing vehicular entrance and all associated site works.
Permission is sought for the construction of
Proposed front/side single storey extension with associated site development works.
The proposed development consists of the following: Construction of a high technology manufacturing unit (for the manufacturing of high technology electrical components), with a total gross floor area (GFA) of 23,6000 sq.m (including ancillary office space of 2,318 sq.m. at ground and first floor levels), and with a main parapet height of c. 12 metres and maximum height of 14.5 metres. The proposed unit will be known as Unit 901; Provision of a link corridor between the proposed high technology manufacturing unit and Unit 900 to the south (logistics/warehouse unit permitted under Reg. Ref. FW21A/0146); The provision of 562 no. car parking spaces, dedicated bus drop off and 275 no. bicycle parking spaces along with HGV loading bays and a service yard to the west of the proposed unit. The vehicular access to the unit will be provided via two entrances from the roundabout proposed under Reg. Ref. FW21A/0146, which provides access to Kilshane Avenue to the east. The development also includes rooftop plant for the proposed unit, an ESB substation with switchroom, 2 no. emergency generators, 2 no. sprinkler/water tanks and 2 no. pumphouses, 2 no. smoking shelters, bicycle shelters, landscaping, boundary treatments, entrance gates, site lighting, all associated site development works, underground foul and storm water drainage services and attenuation areas including connections to existing/permitted services infrastructure and all ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The application site (with an area of c. 5.9 hectares) is located to the north of the warehouse/logistics development (Unit 900) permitted under Reg. Ref. FW21A/0146, to the northeast of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west.
We, Glenveagh Homes Ltd, intend to apply for planning permission for development at this site of c.7.71 ha at Hollywoodrath Road (R121) in Hollystown Dublin 15. The site is bound by the R121 to the south and east with emerging residential areas of Hollywoodrath beyond the R121; existing residential areas of Redwood and The Oaks to the north and east; and the remaining former Hollystown Golf Course Lands to the west. The proposed development will consist of: 69 no. houses comprising 52 no. 2-storey houses and 17 no. 3-storey houses (13 no. 2-bed units, 39 no. 3-bed units, 17 no. 4-bed units), private open spaces (including terraces at first and second floor level), carports incorporated into the footprint of each dwelling (providing 125 no, parking spaces) that also accommodate bike storage (138 no. cycle spaces) and refuse storage, and all associated roads, services, visitor parking (13 no. car spaces and 8 no. cycle spaces), public open spaces (Class 2), changes in level, hard and soft landscaping and boundary treatments where required on a residential area of c.1.94 ha. The proposed development also includes: 1. The construction of a new foul outfall sewer (c.0.97 ha), approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 2. The construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha). 3. The development of proposed (Class 1) public open space including walking routes, seating areas, kick about area, playground, dog park, associated landscaping works including planting, changes in level and boundary treatments, and 10 no, public cycle parking spaces (c.3.5 ha). 4. The development of ancillary landscaped areas and sustainable urban drainage systems under the existing ESB powerlines (c.0.77 ha), and all associated ancillary site development infrastructure including: ESB sub-station, public lighting, and foul and surface water drainage; internal roads & footpaths; and all associated engineering and site works necessary to facilitate the development.
We, Earlsland Corporation Unlimited Company, intend to apply for planning permission for development on lands adjacent to Unit 900, Northwest Logistics Park, Ballycoolin, Dublin 15. The application site is located to the west of Unit 900, which is accessed from Kilshane Avenue, is situated to the south of Bay Lane, and is bound to the west by the lands where Ellipse Logistics Park is under construction. The proposed development is for an extension of the existing warehouse / logistics unit to provide an additional 9,080 sq.m of warehouse / logistics floor space, comprising one level with a maximum height of c. 17.09m. The proposal includes an extended service yard and dock levellers, plant rooms, PV panels at roof level, foul and surface water drainage, landscaping, boundary treatment, lighting and all associated works. Additional Information Received 18/07/2025 Clarification of AI received 16/10/25
Permission for modification of approved plans Reg. Ref. FW21A/0077 to replace the approved warehouse/logistics building (total gross floor area: 11,090 sq.m. and max height: 17.8 metres) including 2 storey ancillary office accommodation (1,050 sq.m.), etc. with the following works that only relate to the southern part of the approved development: (1) a revised warehouse/logistics building (total gross floor area: 4,179 sq.m. and max height: 15.255 metres) including 2 storey ancillary office accommodation (529 sq.m.), loading bays, marshalling yard, plant and solar panel array at office & warehouse roof level screened by a parapet, and 3 no. back lit elevational signs (total area: 21.8 sq.m.): (2) 45 no. surface car parking spaces to serve the proposed warehouse building; (3) 1 no. ESB sub-station/MV/LV building (24 sq.m.); (4) an additional data storage building (total gross floor area 6,350 sq.m and max height: 11.290 metres) including 2 storey ancillary office accommodation (1,205 sq.m.), electrical rooms, data hall, mechanical plant rooms, a vehicle loading bay, ancillary workshops, back-up generators with acoustic/visual louvred screening, solar panel array at office roof level screened by a parapet, mechanical plant and solar panel array within an area on the main roof screened from all sides, 2 no. back lit elevational signs (total area: 4.5 sq.m.); (5) 24 no. car parking spaces to serve the data storage building: (6) 1 no. water sprinkler pump house (11.65sq.m) and 1 no. tank; (6) a security hut (37.9 sq.m.); (7) 1 no. ESB sub-station/MV/LV building (24 sq.m.): and local revisions to the following elements to serve both the additional data storage and revised warehouse buildings (8) internal site road network and circulation areas connecting to access road south of the site; (9) landscaping and planting, perimeter security fencing (2.4 metre high), site lighting, bollards, camera poles, bin stores, smoking shelters, bicycle parking, and ancillary site development works including 2 no. underground attenuation tanks all on the southern part of a c. 5.6 hectares site in the townland of Bay, Corduff Road, Ballycoolin, Dublin 15. AI received 08/02/22
THE CONSTRUCTION OF (1) A WAREHOUSE/LOGISTICS BUILDING (TOTAL GROSS FLOOR AREA: 11,090 SQ.M. AND MAX HEIGHT: 17.8 METRES) INCLUDING 2 STOREY ANCILLARY OFFICE ACCOMMODATION (1,050 SQ.M.), LOADING BAYS, MARSHALLING YARD, SCREENED PLANT, SOLAR PANEL ARRAY AT OFFICE ROOF LEVEL, AND 4 NO. BACK LIT ELEVATIONAL SIGNS (TOTAL AREA: 32.1 SQ.M.); (2) 62 NO. SURFACE CAR PARKING SPACES AND 9 NO. TRUCK PARKING SPACES TO SERVE THE PROPOSED WAREHOUSE BUILDING; (3) A DATA STORAGE BUILDING (TOTAL GROSS FLOOR AREA 6,350 SQ.M AND MAX HEIGHT: 11.14 METRES) INCLUDING OFFICE AND ANCILLARY ACCOMMODATION (1,210 SQ.M.), ELECTRICAL ROOMS, DATA HALL, MECHANICAL PLANT ROOMS, A VEHICLE LOADING BAY, ANCILLARY WORKSHOPS, BACK-UP GENERATORS, SCREENED PLANT ON THE ROOF, 2 NO. BACK LIT ELEVATIONAL SIGNS (TOTAL AREA: 4.5 SQ.M.); (4) 32 NO. CAR PARKING SPACES TO SERVE THE DATA STORAGE BUILDING; (5) 2 NO. WATER SPRINKLER PUMP HOUSES (11.65 SQ.M. EACH) AND 2 NO. TANKS; (6) A SECURITY HUT (37.9 SQ.M.); (7) 2 NO. ESB SUB-STATIONS/MV/LV BUILDINGS (24 SQ.M. EACH); (8) INTERNAL SITE ROAD NETWORK AND CIRCULATION AREAS CONNECTING TO ACCESS ROAD SOUTH OF THE SITE; (9) LANDSCAPING AND PLANTING INCLUDING PROVISION OF PLANTED BERMS TO THE WESTERN AND NORTHERN SITE BOUNDARIES; (10) PERIMETER SECURITY FENCING (2.4 METRE HIGH), SITE LIGHTING, BOLLARDS, CAMERA POLES, BIN STORES, SMOKING SHELTERS, BICYCLE PARKING, AND ANCILLARY SITE DEVELOPMENT WORKS INCLUDING 2 NO. UNDERGROUND ATTENUATION TANKS. AI received 23/07/21 CAI received 26/08/21
Permission for infill with inert material (4.24 hectares) of a site surrounded by an obsolete trotting track, on lands at The Whitehouse Hotel Lands, Newpark, The Ward, Co. Dublin. Development includes provision of temporary access from the subject site to the existing R136 Road, with reinstatement of the land to market gardening use, subsequent to filling. AI received 16/12/21 AI deemed significant Revised public notices received 26/01/22
Planning permission for infill with inert material (4.24 hectares) of a site surrounded by an obsolete horse trotting track. Development includes provision of temporary access from the subject site to the existing R135 road, with reinstatement of the land to market gardening use, subsequent to infilling. AI Received 19/12/2022
Intends to apply for retention permission for an existing plant yard, buildings and associated services, Permission is sought for a new entrance and access road off the R135. Permission is also sought to carry out manufacture of topsoil and construction and demolition waste storage and processing at the site.
Modification of approved plans Reg Refs FW21A/0077 and FW21A/0222 for the change of use of the revised warehouse/logistics building (total gross floor area 4.179 sq.m and max height 15.255 metres) including 2 storey ancillary office accommodation (529 sq.m) in reg ref FW21A/0222to an energy centre within the approved building structure containing 12 no generator units with associated flues (6 no flues each 30m high) to power the approved 2 no data storage buildings on this site; external plant at approved loading bays with 2.75m high acoustic louvre screen surround comprising a radiator farm with 12 no radiators and 2 no black start (emergency) diesel generators, 1 no water sprinkler, pump house (11.65 sq.m) and 1 no tank, 1 no gas skid, reduced car parking from 45 to 13 no spaces and ancillary site development works.
Infill with inert material (4.24 Hectares) of a site surrounded by an absolute horse trotting track, on lands at The Whitehouse Hotel, Newpark The Ward, Co. Dublin. Development includes provision of temporary access from the subject site to the existing R135 road, with reinstatement of the land to market gardening use subsequent to infilling.
The development will consist of a 24 classroom Primary School extending to 2 storeys in height, with a Gross Floor Area of c. 4.232sq.m. The proposal primary school will also incorporate a 2 classroom special educational needs unit in addition to all ancillary pupil and teacher facilities including external hard and soft play areas and 2 no. ballcourts. The proposed building will incorporate photovoltaic panels on roofs with a bio mass heating unit also proposed. Vehicular access to the development is provided via a new access off Hollywoodrath Avenue along the northern site boundary. Bicycle parking, car parking and bus set down areas are provided within the site boundaries. A separate pedestrian/cyclist access is also proposed off Hollywoodrath Avenue, with a second pedestrian access proposed along the southern site boundary off Bay Meadows Avenue, also known as The Avenue. A new pedestrian crossing on Bay Meadows Avenue also forms part of the proposed development works. A non-vehicular access to the school, for use by emergency services only, is also provided along the southern site boundary. The proposed development also provides for an ESB sub-station in addition to all associated site development works including alterations to ground levels, on-site external lighting, landscaping and boundary treatment.
Planning permission sought for attic conversion to include two each roof windows to front and rear with relocated solar panels.
The development will consist of: Retention of single-storey, flat-roof extension to the side of the existing dwelling. Additional Information Received 11/02/2026
Planning permission is sought for: • Demolition of an existing vacant dwelling house (with a maximum height of c. 5.4m) located in the southern portion of the Site. • Demolition of an existing outbuilding (with a maximum height of c. 6.5m) located in the northeastern portion of the Site. • Demolition of an existing gateway located at the southern site boundary and extension of fence to close the existing entrance. • Associated and ancillary site clearance works to make the site ready for potential future development.
Retention permission is sought for the following: -Provision of solar panels (with an area of c.335 sq.m in total) at roof level of the warehouse/logistics unit. -Amendments to the permitted northern boundary treatment, to comprise 1.8m high fencing atop a plinth wall, pending the delivery of future development to the north of site (under Reg. Ref.: FW22A/0066). The application site is located to the west of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west.
The proposed development consists of the following:
Planning permission for the retention and completion of amendments to the development permitted under Reg. Ref.: FW21A/0146 on a site to the north of Northwest Logistics Park, Ballycoolin, Dublin 15 (formerly known as Northwest Business Park). The application site is located to the west of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west. The proposed amendments relating to permitted warehouse / logistics development (Unit 900) comprise the following: • Amendments to the permitted northern security fence boundary, relocating it southwards to accommodate future development to the north of the site (under Reg. Ref.: FW22A/0066). • Provision of an access control barrier at the entrance to the development; • Amendments and rearrangement of permitted bicycle & smoking shelters due to proposed alteration to northern fence line. • Amendments to the permitted ESB substation including relocation and provision of an ESB vehicle set down area. • Amendments to the permitted plant areas: the permitted external yard plant enclosure is increased to accommodate mechanical plant requirements, and an additional electrical plant room with a gross floor area of c.115 sq.m is proposed to the southern façade of the main warehouse / logistics building. • Amendments to the permitted sprinkler tank and pump house, which are repositioned, and the sprinkler valve house area which is reduced in scale. • Amendments to perimeter footpaths along the northern and western building frontages. • Amendments to the permitted grade doors, including the omission of 1 no. grade door and repositioning of 1 no. grade door along the northern facade. • Amendments to and reconfiguration of the internal layout of the permitted warehouse / logistics unit including provision of an additional storeroom, relocation of a server room and the reconfiguration of a driver access room & pallet truck charging points. • Associated amendments to building facades, including alterations to the location of permitted green walls, and provision of an external fire escape stair to the southern façade. • Provision of a communications antenna c. 2 metres in height at roof level. • Alteration to the route of permitted underground foul sewer connection to the southwest of the site, including associated alteration to the development boundary to facilitate the alteration. • All associated and ancillary works.
Permission for ground floor extension to the side and rear of existing house for purposes of sessional use as a Montessori pre-school.
A ground floor extension to the side and rear of existing house for purposes of sessional use as a montessori pre-school.
Development will consist of a proposed 4 bedroom 2 storey house including a new vehicular entrance and onsite waste water treatment system.
The application site is bound by Kilshane Avenue to the south, the permitted access road to a warehouse/ logistics development (permitted under Reg. Ref.: FW22A/0156) to the west, a light industrial/warehouse unit to the east (occupied by Kirby Tyres), and a vacant site (under the control of the applicant) to the immediate north. The proposed development consists of the construction of a single-storey building with a total gross floor area (GFA) of 499 sq.m with an overall height of 6m, to include (1) a café / restaurant unit with a GFA of 256 sq.m, and (2) a convenience retail unit, with a GFA of 243 sq.m (150 sq.m net retail area), and a delicatessen area; and includes use for the preparation and sale of hot food and beverages for consumption on and off the premises within both units. The proposal includes the provision of 26 no. car parking spaces, 3 no. motorcycle parking spaces, and 20 no. cycle parking spaces. The proposal includes vehicular and pedestrian access off the permitted access road to a warehouse/logistics development (permitted under Reg. Ref.: FW22A/0156) to the west, pedestrian access from Kilshane Avenue to the south, and proposed infrastructure provided up to the application site boundary to facilitate potential future vehicular access to the adjoining lands to the north. The development also includes signage zones on the building, associated outdoor seating area and terrace for the café / restaurant unit, green roof, service yards and delivery area, landscaping, boundary treatments, lighting, ESB substation, cycle and pedestrian infrastructure, foul and surface water drainage, an entrance signage zone relating to the warehouse/logistics development permitted under Reg. Ref.: FW22A/0156, site clearance and all associated works. AI received 9/8/2023
Retention of existing single storey playroom / study / home office / utility area with associated site works.
Permission is sought for Retention of existing single storey, playroom/ study / home office / utility area with associated site works.
Conversion of existing second floor attic into a habitable space, to facilitate two new bedrooms and ensuite. Works will include alterations to existing first floor layout to facilitate new access stair and the installation of four new roof lights to the front elevation, six new roof lights to the rear elevation and one new window to the gable elevation. It is also proposed to widen the existing single gate to the side of the property to incorporate a new double gate and all associated site works.
Proposed removal/decommissioning of existing septic tank and provision of new replacement wastewater treatment system & percolation area to serve existing dwelling and all associated works.
The development will consist of the construction of an internal first and second floor mezzanine floor of 830 square metres, within the existing Industrial Building of measuring 2,920 square metres, for storage purposes only. Two new internal access stairs and all associated works. The removal of the existing signage measuring 22m2 located to the front (South) elevation and replacement with new 11.1m2 non illuminated corporate signage, provision of new signage above all twelve loading bay doors measuring 9.7m2 each. New signage positioned as: one to south elevation, one to west elevation, eight to north elevation, two to east elevation.
Retention of existing single storey, playroom/study/home office/utility area with associated site works.
The proposed development consists of an extension of an existing Block Valve located at West Business Park, Blanchardstown, Dublin 15. The extension will consist of a concrete base for Temporary Pig Trap, an Asphalt Access Road, an internal Concrete Road, a 2.4m high Security Fence and all ancillary services and associated site works. An Environmental Impact Assessment Report (EIAR) has been prepared with respect to the project and will be submitted with the application.
The development will consist of the retention of the existing domestic garage in the rear garden & its change of use to a self-contained one bed/kitchen unit with all. associated site development works.
Planning permission for the extension of the existing car park to provide additional car parking and storage/bin storage hard standing area and all associated site development works. AI Rcvd 23/08/2024
Please see attached documents for a full description: Planning permission for two single storey units to be used for the ancillary servicing and maintenance of vehicles.
Planning permission for conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and 2 no. roof windows to the front.
11 x non-illuminated woodmark signs on the eastern elevation, 1 x non-illuminated woodmark sign on the southern elevation and 2 x non-illuminated woodmark signs on the western elevations, together with 14 no. non-illuminated directional signs across the site. The application site is bounded by Ratoath Road to the west, Kilshane View to the south and Kilshane Avenue to the east.
Permission for the completion and retention of alterations to a development permitted under Reg. Ref: FW20A/0190. The Application site is bounded by Ratoath Road to the west, Kilshane View to the south and Kilshane Avenue to the east. The alterations, for which permission for completion and retention is sought, comprise of the following: (1) Internal alterations to permitted Unit 638 to raise the finished floor level of the first floor level by 1.8 metres, to 6 metres above ground level. (2) Associated external alterations including relocation of windows on all elevations, omission of windows on the south and east elevation, addition of a window on the east elevation, provision of a van dock canopy on the east elevation, addition of a door on the south elevation and dock doors increased to 4m on the east elevation, parapet height raised by c. 2m on part of the south elevation, adjustments to facade panelling on all elevations. (3) Omission of rooflights at roof level. (4)Alterations to the permitted ESB substation/switchroom including an increase in GFA of 38 sq. and associated external modifications. (5) Relocation of 1 no. power module and provision of screened plant enclosure. (6) Provision of paladin fencing to enclose the HGV service yard internally within the site; and all associated and ancillary works.
The application site is bound by Ratoath Road to the west, Kilshane View to the south and Kilshane Avenue to the east. The proposed development consists of the following: - Construction of a warehouse distribution facility building (unit 638), including 5,575 sq.m of warehouse floorspace and 2,232 sq.m of ancillary office floorspace, resulting in a total GIA of 7,807 sq.m, and a maximum building height of 14.74 metres; - 129 no. car parking spaces and 66 no. cycle spaces; - HGV loading bays, service yard and van staging bays, with a canopy proposed over the van staging bay to the north of the building; - Associated delivery van fleet storage area accommodating 400 no. spaces located on the northern part of the site; - The proposal includes three vehicular access points (one from Kilshane View and two from Kilshane Avenue) off the existing estate road network serving the Logistics park; - The development also includes and ESB substation, EV charging infrastructure (including power module units), guard shelters, signage zones for the unit, PV panels at roof level, landscaping, boundary treatments, security fencing, entrance gates, site lighting, and all associated site development works, including underground foul and storm water drainage network and attenuation areas. Add Info received 24th February 2021.,
To view details of this application please visit www.hollystown2shd.ie Submissions/observations to An Bord Pleanala, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie ABP 312271 A 10 year planning permission for a strategic housing development at a site of c. 25.3 ha at the townlands of Hollystown, Kilmartin, Hollywoodrath, Cruiserath, Yellow Walls, Powerstown, and Tyrrelstown, Dublin 15, which includes lands in the former Hollystown Golf Course and lands identified under the Kilmartin Local Area Plan 2013 (as extended). The lands are bound by the R121 and Hollywoodrath residential development to the east, the under construction Bellingsmore residential development to the south and north, the former Hollystown Golf Course to the north, Tyrrelstown Educate Together National School, St.Luke's National School and Tyrrelstown Community Centre to the west and south and the existing Tyrrelstown Local Centre to the south. The proposed development will consist of the development of 548 no. residential units, consisting of 147 apartments/duplexes and 401 houses, ranging in height from 2 to 5 storeys and including retail/café unit, 2 no. crèches, 1 no. Montessori, 1 no. community hub, car and bicycle parking, open space and public realm, over a site area of c. 25.3 ha, as follows: 1. On lands to the north of the application site (referred to as Sites 2 & 3) the proposed development includes for 428 no. houses and apartments comprising 27 No. 1-bed apartments, 97 No. 2-bed houses, 267 No. 3-bed houses and 37 No. 4-bed houses set out in 401 no. houses (373 no. 2-storey and 28 no. 3-storey) and 9 no. 3-storey apartment buildings (27 no.). A total of 792 no. car parking spaces will be provided for this part of the scheme, of these, 761 no. spaces will be provided for residents with 30 no. spaces provided as visitor parking and 1 no. space for disabled parking. In terms of bicycle parking, a total of 225 no. cycle parking spaces are provided, comprising 180 no. spaces for terraced units (located in 9 no. bike stores with 20 no. bikes in each) plus 45 no. spaces for the apartments. 2. On lands to the south of the application site and north of the Tyrrelstown Local Centre (referred to as Local Centre) the proposed development includes 120 no. apartment/duplex units in 4 no. blocks ranging in height from 3 to 5 storeys (32 no. 1 bedroom, 68 no. 2 bedroom and 20 no. 3 bedroom) all of which have balconies or terraces set out as follows: • Block A, is a 4 storey building, providing 12 no. units with proposed balconies, with a café/retail unit of 154sq.m and community hub of 144.5 sq.m proposed at ground floor. • Block B, is a 3-5 storey building, providing 34 no. units with proposed balconies and ground floor terraces. • Block C, is a 3-5 storey building, providing 44 no. units with proposed balconies and ground floor terraces. • Block D, is a 4 storey building, providing 30 no. units with proposed balconies and ground floor terraces, with a crèche of 500 sq.m with an external play space of 200 sq.m and a Montessori of 280.3 sq.m with an external play space of 185 sq.m proposed at ground floor. • External communal amenity space is provided at ground podiumterrace levels throughout the scheme. • A standalone 2-storey crèche unit is also provided of 529.6 sq.m with an external play space of 243 sq.m, to the south of the site. • Car Parking is provided in a mix of undercroft in Blocks B & C and at surface level with 108 spaces for residential use and 5 no. creche/Montessori staff spaces, 10 no. creche/Montessori set down spaces, 6 no. visitor spaces and 9 no. public spaces on the Link Street. A total of 300 no. bicycle parking spaces are proposed as part of the development comprising 230 no. long stay spaces for residents and 70 no. short stay spaces for both visitors and the non-residential activity. 3. Vehicular access to Sites 2 & 3 to the north of the application site is through the construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha) as well as via an extension to Hollystown Avenue link road south of the permitted Bellingsmore development. Vehicular access to the Local Centre to the south of the application site is via the existing access point along Hollystown Avenue and the north-south link route from the existing Tyrrelstown Local Centre which is partially completed and partially under construction. Pedestrian and cycle access is also provided along the R121, through existing roads within the application site and through the creation of a new pedestrian/cycle route to the north at the existing entrance to the clubhouse of the former Hollystown Golf Course. 4. The development of proposed Class 1 public open space of 2.77ha and Class 2 public open space of 1.69ha including pedestrian/cycle routes, seating areas, kick about area, playgrounds, dog park, associated landscaping works including planting, changes in level and boundary treatments. In addition 3.21 ha of linear park under the existing power lines and 2.11ha of ancillary linear open space which includes for SUDS and hedgerow features is provided in the scheme. The proposed Class 1 open space is provided as a north south pedestrian and cycle connection to the north an connecting the site to the Ratoath Road and the future Dublin GAA facilitites at this location. 5. The construction of a new foul outfall sewer, approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 6. The development will also provide for all associated ancillary site development infrastructure including landscaped areas and sustainable urban drainage systems under the existing ESB powerlines, and all associated ancillary site development infrastructure including: demolition of an existing shed, ESB sub-stations, public lighting, and foul and surface water drainage; internal roads & footpaths; landscaping; and all associated engineering and site works necessary to facilitate the development. The proposed scheme is designed to integrate with the previously permitted development at Bellinsgmore (Ref FW13A/0088/E1) which is currently under construction and recently permitted residential development on lands to the north east known as Site 1 (FCC Reg. Ref.: FW21A/0042). The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended). The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended), other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with an Environmental Impact Assessment Report, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application may also be inspected online at the following website set up by the applicant: www.hollystown2shd.ie
Retention permission for a single storey ESB substation building (total floor area 24m2) to the North East roadside boundary to include all associated site works at Unit 629, Northwest Logistics Park, Kilshane Avenue, Northwest Business Park, Dublin.
Permission has been requested to convert the garden into a combination of storage space, an enclosed pergola, and a smaller garden.
Planning permission to construct a two storey extension to the rear north eastern side of the existing property consisting of ground floor kitchen/first floor bedroom & replace utility window with a side entrance door, new first floor window at the north western side & associated site works. AI received 7/6/2023
Full planning permission for site alterations, which comprises the installation of a cardboard compactor, 2x bollards, alterations to the van dock ramp, a fence and an associated secure gate to enclose the cycle storage, and a guard hut (1.96sqm)
Planning Permission for a) single storey extension to front porch b) single storey extension to the side and rear c) modifications to fenestration d) external wall insulation to all external walls with external render finish e) 2no. rooflights to flat roof of new extension f) and all associated site works
The diversion of an existing watercourse, (Powerstown Stream) into an existing drainage channel located adjacent to the north, west and east boundaries of the site. The diverted watercourse will incorporate the provision of a riparian zone (approx. 18-26 metres in width) and a series of swales and ponds. The proposed development will also comprise the provision of 3 No. pedestrian/cyclist bridges on the north, west and east site boundaries; hard and soft landscaping; boundary treatments; signage; changes in levels; and all associated site development works. The proposed development will enable the future development of the subject site. AI received 26/01/23