Two storey end of terrace house to side of existing house with new vehicular access and all associated site works.
Extend the existing two storey building on site that provides after-school education to students in the area, where the new building will facilitate second and third level students; a new shared entrance serving both buildings; proposed extension is a two storey building, matching the scale and massing of the existing building; the building has been designed to achieve a Net Zero Whole Life Carbon standard and this in part is achieved by an external brick skin, a cross laminated timber structural system, harnessing of natural light and extensive use of photovoltaic solar panels; the building programme will provide a lecture theatre, a science laboratory, classrooms, a reading room, offices, a central atrium, and a kitchen facility; the flat roof will carry solar photovoltaic solar panels and a biodiversity outdoor classroom, and all associated site works; relocate the muga within the complex to the east of the existing building and provide additional outdoor sports equipment; all proposed boundary fencing will match the existing boundary treatment in size and material.
Change of use of existing ground floor retail unit to a restaurant with ancillary take away option; related extract system venting out roof level and all associated site works.
New external signage with internal illumination at high level to Northern façade with internal LED display signage (2.5m x 2.1m) at ground floor level.
Installation of a 7.5m x 8.65m retractable canopy/awning, glazed partitions and planters for a 65sq.m sheltered outdoor seating area to the front of existing commercial unit.
For the demolition of single storey pitched front roof and rear conservatory and construction of new flat roof to single storey front structure, new single storey rear extension and internal ground first floor modifications together with new dormer attic structure consisting of bedroom and en-suite, conversion of existing shed to games room with new front elevation window and new rear glazed doors and all associated works.
Change of use of 58.4sq.m of the front ground floor single storey part of Unit 1 from office/light industrial use to click-and-collect retail use and ancillary site works.
Permission for partial change of use from Warehouse to Office use at ground floor level with floor area of 297 sq.m; extension for office use at first floor level with floor area of 256 sq.m; addition of staircase from warehouse to first floor level; to include all associated site works to facilitate the development. Amendment to previously approved planning permission (Ref. No. SD22A/0465) to remove the 133 sq.m Mezzanine level in the description of the development and submitted plans and particulars at Unit 2B, South West Business Park, Cheeverstown, Citywest, Dublin 24.
Partial Change of use from warehouse to office use with floor area of 551sq.m; Addition of mezzanine level with a floor area of 133sq.m; Addition of staircase from warehouse to mezzanine level to include all associated site works to facilitate the development.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
Construction of 4 warehouse/industrial units in 3 buildings of c.13,611sq.m total gross floor area (including ancillary offices and operational facilities) and up to 15m in height, with rear service yards; 155 car parking spaces; 72 cycle parking spaces; water services infrastructure and sustainable urban drainage system features, including relocation and resizing of a pump station permitted under SD15A/0391; internal road network accessed via 2 site entrances established in the previous planning applications on the Eastern and Southern sides of the site, via the roundabout at Citywest Avenue and the R136 outer ring road; amendments to the proposed tree pits along the green-link permitted under SD15A/0391; public lighting, landscaping, planting and boundary treatments throughout the development; all other necessary site and infrastructural works to facilitate the development.
Erect 837sq.m for 150.3 KWP of photovoltaic panels on the roof, with all associated site works.
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.
Permission to permanently retain the change of use from Civic Offices to medical centre on foot of now expired, 10 year temporary permission (SD08/0594). Proposed uses include public attendance for consultation, treatment and general healthcare provision on all levels from lower ground floor to fourth floor, including retention of existing signage and roof top plant.
Construction of new front door structure to front elevation; single storey rear extension extending existing kitchen space and widening of the existing front entrance pillars with new solid gates and associated works
Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
Change of use of upper ground floor unit from childcare facility, approved under Ref. SD02A/0549, to two 2-bedroom apartments with associated terraces; all associated site works.
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface, permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface, permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.
Demolition of an existing electrical switch room, boiler rooms and existing single storey office building and two associated modern extensions at the rear of the existing Coach House and Stables Buildings; Works to the Coach House and Stables Buildings (currently in office use) include the removal of existing modern interventions (internally & externally) and to restore the buildings to their earlier character when used as stables and coach house; Works include replacement of modern windows and doors with historically accurate ones, lime rendering of external walls, replacement of concrete roof tiles with natural slate and of modern gutters and downpipes; Some modern wall opes will be closed as blind windows; Internally, modern office layouts will be removed and replaced with earlier stables and loft layouts; The change of use of the buildings from office to exhibition/display spaces; Works to the derelict Gardener's Cottage will include its reconstruction based on photographic evidence to reflect its earlier appearance, while the modern windows and door will be removed from the adjacent Cart House to return it to its earlier form, all for use as exhibition/display spaces; Works to the existing two storey Finance Building include altering its south-eastern fa9ade to align with a new courtyard dividing wall, replacing the existing facade with a new glazing system along with solid elements of render, stone & zinc cladding; The internal layout will be reordered to change the use of the ground floor from office to exhibition spaces with retained office and meeting spaces on the 1st floor in a revised layout; A new plant area enclosure with PV array at roof level; The ancillary building to its west will be redeveloped to include a kitchen area on the ground floor and WC facilities at first floor level with new areas of roof and wall in zinc cladding; An existing single storey storage building will be redeveloped and extended for use as a staff office with meeting room, kitchenette, storage room, and WC spaces; A new exhibition building (Machinery Shed) will be constructed, south of the Coach House, white forming a new courtyard between the two buildings; This two-storey pitched roof building will house refurbished antique farm machinery in an exhibition of early farm equipment; The first-floor mezzanine will contain an audio-visual display area and open landings overlooking the ground floor exhibition space; The building will have a PV array at roof level; This building and adjacent landscaped areas will replace an existing car park area of 35 spaces; A new substation, switch room building with back-up generator enclosure will also be constructed as part of the works; All associated site works, plant spaces, civil and utility works and landscaping form part of the application; Belgard Castle is a Protected Structure Ref. 206 and a Recorded Monument - Ref. SMR DU021-026.
The Development will consist of the installation of 1,611 msq solar photovoltaic Panels to various rooftops of the existing building at Blenders, Whitestown Road, Tallaght, Dublin 24, D24VY75
Blenders intend to apply for Retention Permission and Permission for development on lands at Blenders, Whitestown, Tallaght, Dublin 24, D24 VY75. The development for which retention permission is sought consists of minor works arising from deviations to the permitted finished goods warehouse associated with SD23A/0277 as follows: 1.Single storey office, staircase and utility rooms (1 no. panel room and 1 no. fire hose reel pump room) to the north-west of the finished goods warehouse with roof plant over. 2. Standalone bicycle shed to the north east corner of the site. 3. Widening of the internal road in the southwest corner of the site to accommodate additional HGV staging spaces. 4. Relocation of pedestrian walkway to the front of car parking spaces to the north-west of the site. 5. Associated lighting, landscaping, retaining gabion wall and drainage arrangements. Planning permission is sought for: • alterations to the existing entrance to the south of the site in order to prevent HGVs striking the ground surface on entry/exit along with replacement gates and fencing. •new landscaping (including additional planting) •omission of permitted sprinkler tank and meter room from that permitted under SD23A/0277 All associated site works.
Construction of a finished goods warehouse (including freezer room) at the south side of the existing Blenders manufacturing facility. The proposed extension will have a gross floor area of 3,900 sq.m and a maximum height of 20.5m. Also, ancillary works including: PV panels to new proposed warehouse roofs, 3 no. additional loading dock levellers, Relocation of existing carparking (no change in numbers) including provision of 4 no. EV charging spaces and 2 no. accessible parking spaces, 35 no. cycle parking spaces., New HGV staging area to accommodate 4 trucks., Construction of new sprinkler tank (10m high) and pump room (3m high) to the south west of the site along with retaining wall., Provision of internal connections to the main Blenders building., Fire escape door to western elevation of main Blenders building. All associated site works including landscaping, drainage infrastructure and a new path to east of site.
Permission for alterations to existing building (unit 1) to the southwest elevation, namely, 2no. additional dock levellers and re-location of 1 existing roller door and all associated site works
The construction of a two storey, mixed use, development consisting of a public house at ground floor level with a gross floor area of 359sqms. The public house includes internal bin storage and other ancillary rooms. The construction of 4 residential apartments (Gross floor area 374sqms) at first floor consisting of 2no. one bed units; 1no. two bed unit; and, 1no. 3 bed unit. All apartments have private space in the form of balconies with a common area at first floor for access to each apartment with access to this common area off the internal entrance lobby; internal, residential, bike storage room and bin storage room at ground floor level. The proposed development includes communal amenity spaces located to the west of the block and at first floor level; parking of 8 spaces including 1 no mobility space, 2 electric vehicle spaces and is accessed via a new vehicle entrance from the Old Belgard Road. New boundary treatments proposed along with a drop off area and wider soft and hard landscaping including a plaza area which ties into the public footpath on the Old Belgard Road; external bike parking areas within these external spaces; and, a connecting footpath to the established local centre to the north. Associated mechanical plant, PV panels at roof level, groundworks, landscaping, drainage including SUDS measures, lighting, engineering and ancillary works necessary to facilitate the development.
Change of use from Warehouse to Gym facility, with minor internal modifications including reception area, changing/shower rooms, studio and office all with associated and ancillary site works and external signage.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Change the use of Unit 3 of Block 3 from retail to office space (155sq.m gross floor area excluding shared lobby of 34sq.m); signage zones related to the office use; all associated works to complete the development; signage zones located on the fascias of the ground floor retail Unit 2 and two internally illuminated, projecting pharmacy 'cross' signs, for a pharmacy which will be operating from the ground floor retail unit (Unit 2) of Block 3; all associated works to complete the development.
Change the use of Unit 1 of Block 3 to a veterinary clinic as well as permission for signage areas. Retention of a new entrance door on Block 3; sub-division of Unit 1, Block 2, in to two units (1a and 1b) and the change of use to a barber (Unit 1a) and takeaway (Unit 1b); new signage zones; all associated works to complete the development.
Permission to change the use of Unit 3 of Block 2, from retail to a medical practice as well as permission for associated signage area and all associated works to complete the development.
Provision of 2 double sided projecting signs to the northern elevation at the existing mall entrance.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e., off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 10.sq.m and is ancillary to the primary retail use.
The development will consist of a single storey extension to side and rear of existing dwelling (overall floor area 54.3m.sq.) incorporating a new common entrance hallway & toilet (10.6.m.sq.) located at the front of the proposed extension leading to a new 'family flat' (43.7m.sq.) located at the rear of the proposed extension and associated site works.
Amendments to previously granted permission (SD20A/0017) comprising of alterations to façade; installation of roof lights and PV panels.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
Retention of conversion of a portion of an existing industrial unit for exclusive residential use for associated rewinds staff as residential accommodation over two floors consisting of 7 en-suite bedrooms; communal recreational area; communal kitchen and dining area; Permission for landscaped open space; bin and bicycle store and all associated site works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Removal of the three existing grounds keeping sheds and a portacabin unit and replacement of these with a new single building facility in the same location to contain all staff and storage requirements for the groundskeeping and maintenance of the Belgard Castle Estate; The proposed building is 795sq.m in area and consists of areas for storage of machinery ground maintenance equipment, general storerooms and a mechanical and electrical plant room; A part mezzanine floor will provide for additional storage space at first floor; Staff facilities to be provided include for an office area, a canteen, changing/locker rooms with toilets and showers; Externally there will a vehicle and equipment wash area, general hardstanding and staff car parking; Associated civil works include connections to a rainwater storage and connection to a RW soakaway, and a connection to the existing mains for foul water services; The building will be clad in green corrugated sheeting, while burnt timber sheeting will clad the staff area, which will also have a sedum green room. A roof mounted PV array, heat pump technology, rainwater storage and all associated site works also form part of the application; Belgard Castle is a protected structure Ref 206, and a recorded monument - reference SMR DU021-026
A 68.6sqm internal extension to the existing first floor, alterations to front elevation to include new sliding doors and change of use of the entire building from motor sales workshops to funeral home support services.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
Retention for single storey building to rear garden for home office / playroom use and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
The development will consist of the provision of a new glazed entrance lobby (24sqm) at the existing west entrance to the Square Shopping Centre (Level 3) and all associated site and development works.
Aldi Stores (Ireland) Limited are applying for permission for the construction of a single storey Deposit Return Scheme (DRS) Kiosk (Gross Floor Area: 17 sq.m) including 2 no. signage panel areas for branding on the side elevation of the DRS Kiosk (1.0m x 2.0m), and all associated site development works. The development will result in the removal of 2 no. existing car parking spaces in the car park that serves the existing Aldi store at Belgard Road, Tallaght, Dublin 24 D24 VY77.
Refurbishment and extension of the existing 3 storey building and a Change of Use of the existing building and site from a vacant addiction service facility to a National Ambulance facility. Demolition of a staircase and boiler room (40sq.m) and the removal of an external stair-core, entrance ramp and steps to the north of the building; and the provision of lateral and vertical extensions at ground, first and second floor levels principally comprising a single storey, two-bay ambulance garage, increasing the gross floor area of the building from 943sq.m to 1,420sq.m; the rationalisation of floor space in the existing building; the provision of an external canopy to shelter 14 No. emergency vehicles; the provision of a power washing station towards the south-western corner of the site; ancillary staff car-parking; cycle parking; revised elevational treatments; boundary treatments; hard and soft landscaping; and all associated works above and below ground.
Replacement pitched roof over garage and courtyard; single storey utility, toilet and lobby extension to courtyard; single storey sunroom to the rear; single storey glazed porch to the front, at the Old Rectory, Belgard Road, Dublin 24