The works will consist of the construction of a two storey special needs accommodation unit (997sqm.) to side of existing school to include a central activities space, 5 No. classrooms, toilets and shower areas and ancillary spaces with minor alterations to existing school facade at ground and first floor to facilitate connection to the extension. External works will include 12 No. additional parking spaces, play area (200sqm) and sensory garden (100 sqm) together with all associated site works.
Planning Permission for construction of a 15 sq.m, single-storey extension to the rear of existing dwelling.
Planning permission for the revision of previously approved Planning Application FW20A/0011. The revisions include; 1 - To increase capacity from 38 to 44 children, 2 - Change operating hours from previously approved 8.30am - 5.30pm to 7.30am - 6.30pm Monday to Friday, 3 - Retention permissio for a single storey roof structure covering the rear outdoor play area (built Autumn 2020), 4 - All associated site works.
The development consists of modifications to the development permitted under FW16A/0181 for the construction of a Place of Worship. The modifications consist solely of the change of use of 5 no. ancillary community rooms (total 207m2) to education use. AI Rcvd 06/02/24
The retention of two number, single storey temporary classrooms with an ancillary sanitary and storage link, inclusive of access ramp and two covered bicycle stands, within the site of the existing place of worship and all associated external works, including a soft landscape planting plan for the whole of the site. All surface and foul drainage are connected into existing mains. All existing parking and accesses shall remain unaltered and are for use of the school 8am -5pm Monday to Friday and do not affect the operating hours of the place of worship. AI Rcvd 18/12/2024
Permission is sought for the change of use of Unit 6 Block D from office/professional/ financial service unit (class 2) to restaurant/cafe outlet at Unit 6 Block D, The Plaza, Tyrrellstown Town Centre, Dublin 15. AI received 08/03/2024
A single storey pitched roof extension to the side of the existing house measuring 16 sq.m. consisting of a new bedroom and bathroom and the relocation of the existing side gate with associated site works associated with the development.
Application for planning permission of a single-storey side and to the front extension with roof window.
Rear single story extension and side single story extension with 2 new roof windows for extended living.
Proposed extension of playground area to include revised boundary realignment and new vehicular access. Additional Information Lodged on 14th Jan 2020
Permission for the decarbonization by erecting a new single storey, free-standing energy centre, comprising biomass fuel store and enclosed plant room with flue, together measuring 70 sqm in area, and three open-air liquid petroleum gas tanks in a fenced enclosure; installing cowls on elevations of existing school to enable operation of new internal heat recovery units; replacing the existing windows to Tyrrelstown Community Centre and Tyrrelstown Educate Together National School, and the external doors to all existing buildings, with ones matching in appearance but improved in performance; fitting photovoltaic array on the roofs of the existing buildings, relocating two existing open-air bicycle shelters and erecting two new ones in front of Tyrrelstown Educate Together National School; and constructing a new metal fence to protect the existing soft landscaping along part of the western boundary of the site. The project will be carried out in conjunction with remediation of the existing buildings on the site. AI Rcvd 02/05/24
The development will consist of the addition of the proposed external seating arrangement (30 seats) 38sqm, mobile planter dividers and outdoor umbrellas to the West of the site for the purpose of consumption of goods purchased at the premises. All outdoor furniture will be stored indoors within the unit overnight and during all non-operating hours.
Change of use of retail unit No.2 to use as a pizza bakery with home delivery service and takeaway, new fascia signage (individual letters and the tile logo are to be internally lit. The signage panels will not be illuminated); external mechanical plant and new doors in gable wall for fire exit and refuse store. The proposed user will operate from 11am to midnight each day in contravention of condition 16 of FW18a/0117 which allows for trading up to 10pm each day. All associated works to complete the proposed development.
The development consists of: Change of use from retail to a coffee shop/café for the consumption of food and beverages on and off the premises. New fascia signage with individual letters and the logo are to be illuminated. Installation of a bin store for use by the occupant of Unit 1 at the rear of the Lidl store, and an area for external mechanical plant. All associated works to complete the proposed development.
Permission for the construction of a single storey extension with apex roof and relocation of existing access gate to the rear wall along with a new window to the side elevation at ground floor.
The development will consist of the following: 1. Retention Permission to retain the partially constructed walls of a rear extension at the back of the dwelling, comprising a kitchen and dining area; 2. Planning Permission for the construction of a single-storey rear extension (26.5 sqm) with a hip roof of reduced footprint, together with internal alterations and all associated site works.
Retention permission for rear garden shed with an internal area of 12.6m2
Retention planning permission for a single storey
Permission is sought for a single storey ground floor extension to the side/ rear.
Permission for proposed new signage and LED screen to existing school building. AI Rcvd 01/10/2024 Deemed SAI 02/10/24 SAI Rcvd 08/11/2024
The development consists of: Retention of 9 car parking spaces in addition to the 100 spaces permitted under PA Ref: FW18A/0117, relocation of 2 Electric Vehicle parking spaces; and, relocation of trolley bay to a canopy at the side of the foodstore.
1. The construction of 580 no. residential units consisting of 468 no. houses and 112 no. apartment and duplex units, ranging from 1 to 3 no. storeys set out as follows: * 468 no. houses consisting of 232 no. 2-bed units, 186 no. 3-bed units and 50 no. 4-bed units * 112 no. apartments and duplexes consisting of 104 no. 1-bed units and 8 no. 3-bed units 2. A total of 892. car parking spaces will be provided for this scheme comprising 824 no. resident parking spaces and 68. visitor parking spaces and 2,234 no. cycle parking spaces will be provided for this scheme comprising 2,174 no. resident cycle parking spaces and 60 no. visitor cycle parking spaces 3. A total c.2.25ha Class 2 Open Space comprising 15% of the total developed area including pocket parks (including both formal and informal play area), fitness areas, sitting areas, kick-about and ecological regeneration areas. In addition, c. 1.86ha of linear park to the north located under existing ESB powerlines provides a linear open space connection to Sites 2&3 (as permitted under ABP Reg. Ref. 312271), Site 1 (as permitted under FCC Reg. Ref. FW21A/0042 and under construction) and to permitted Dublin GAA facility (FCC Reg. Ref. FW22A/00198). A further 2.41ha of open space is provided within the scheme comprising open space areas, drainage and hedgerow corridors that can not be considered Class 2 Open Space but provide ample open space areas 4. A total c. 2.55 ha of Open space is provided in c. 3.5HA park permitted under Hollystown Site 1 (FCC Reg. Ref. FW21a/0042) 5. A new pedestrian and cyclist facilities, future potential connections to lands to the west and proposed connections to Tyrrelstown Park as agreed with Fingal County Council. Principal vehicular access to the application site provided by the new road extension to 'The Avenue', and internal road network of Sites 2&3 to the east (as permitted under ABP Reg. Ref. 312271. The Application also provides vehicular access to the future potential school site to the south if required as indicated in Fingal Development Plan 2023-2029. 6. The proposed scheme is designed to integrate with recently constructed development at Bellingsmore (FCC Reg. Ref. FW13A/0088/E1), under construction development on Site 1 (FCC Reg. Ref. FW21a/0042) and permitted Strategic Housing Development on Sites 2&3 (permitted under ABP Reg. Ref. 312271) and completes the last phase of the Hollystown-Kilmartin lands in accordance with the Kilmartin Local Area Plan 2023 (now expired). An Environmental Impact Assessment Report has been prepared in respect of the proposed development.
Permission has been requested to convert the garden into a combination of storage space, an enclosed pergola, and a smaller garden.
Planning permission to construct a two storey extension to the rear north eastern side of the existing property consisting of ground floor kitchen/first floor bedroom & replace utility window with a side entrance door, new first floor window at the north western side & associated site works. AI received 7/6/2023
To view details of this application please visit www.hollystown2shd.ie Submissions/observations to An Bord Pleanala, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie ABP 312271 A 10 year planning permission for a strategic housing development at a site of c. 25.3 ha at the townlands of Hollystown, Kilmartin, Hollywoodrath, Cruiserath, Yellow Walls, Powerstown, and Tyrrelstown, Dublin 15, which includes lands in the former Hollystown Golf Course and lands identified under the Kilmartin Local Area Plan 2013 (as extended). The lands are bound by the R121 and Hollywoodrath residential development to the east, the under construction Bellingsmore residential development to the south and north, the former Hollystown Golf Course to the north, Tyrrelstown Educate Together National School, St.Luke's National School and Tyrrelstown Community Centre to the west and south and the existing Tyrrelstown Local Centre to the south. The proposed development will consist of the development of 548 no. residential units, consisting of 147 apartments/duplexes and 401 houses, ranging in height from 2 to 5 storeys and including retail/café unit, 2 no. crèches, 1 no. Montessori, 1 no. community hub, car and bicycle parking, open space and public realm, over a site area of c. 25.3 ha, as follows: 1. On lands to the north of the application site (referred to as Sites 2 & 3) the proposed development includes for 428 no. houses and apartments comprising 27 No. 1-bed apartments, 97 No. 2-bed houses, 267 No. 3-bed houses and 37 No. 4-bed houses set out in 401 no. houses (373 no. 2-storey and 28 no. 3-storey) and 9 no. 3-storey apartment buildings (27 no.). A total of 792 no. car parking spaces will be provided for this part of the scheme, of these, 761 no. spaces will be provided for residents with 30 no. spaces provided as visitor parking and 1 no. space for disabled parking. In terms of bicycle parking, a total of 225 no. cycle parking spaces are provided, comprising 180 no. spaces for terraced units (located in 9 no. bike stores with 20 no. bikes in each) plus 45 no. spaces for the apartments. 2. On lands to the south of the application site and north of the Tyrrelstown Local Centre (referred to as Local Centre) the proposed development includes 120 no. apartment/duplex units in 4 no. blocks ranging in height from 3 to 5 storeys (32 no. 1 bedroom, 68 no. 2 bedroom and 20 no. 3 bedroom) all of which have balconies or terraces set out as follows: • Block A, is a 4 storey building, providing 12 no. units with proposed balconies, with a café/retail unit of 154sq.m and community hub of 144.5 sq.m proposed at ground floor. • Block B, is a 3-5 storey building, providing 34 no. units with proposed balconies and ground floor terraces. • Block C, is a 3-5 storey building, providing 44 no. units with proposed balconies and ground floor terraces. • Block D, is a 4 storey building, providing 30 no. units with proposed balconies and ground floor terraces, with a crèche of 500 sq.m with an external play space of 200 sq.m and a Montessori of 280.3 sq.m with an external play space of 185 sq.m proposed at ground floor. • External communal amenity space is provided at ground podiumterrace levels throughout the scheme. • A standalone 2-storey crèche unit is also provided of 529.6 sq.m with an external play space of 243 sq.m, to the south of the site. • Car Parking is provided in a mix of undercroft in Blocks B & C and at surface level with 108 spaces for residential use and 5 no. creche/Montessori staff spaces, 10 no. creche/Montessori set down spaces, 6 no. visitor spaces and 9 no. public spaces on the Link Street. A total of 300 no. bicycle parking spaces are proposed as part of the development comprising 230 no. long stay spaces for residents and 70 no. short stay spaces for both visitors and the non-residential activity. 3. Vehicular access to Sites 2 & 3 to the north of the application site is through the construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha) as well as via an extension to Hollystown Avenue link road south of the permitted Bellingsmore development. Vehicular access to the Local Centre to the south of the application site is via the existing access point along Hollystown Avenue and the north-south link route from the existing Tyrrelstown Local Centre which is partially completed and partially under construction. Pedestrian and cycle access is also provided along the R121, through existing roads within the application site and through the creation of a new pedestrian/cycle route to the north at the existing entrance to the clubhouse of the former Hollystown Golf Course. 4. The development of proposed Class 1 public open space of 2.77ha and Class 2 public open space of 1.69ha including pedestrian/cycle routes, seating areas, kick about area, playgrounds, dog park, associated landscaping works including planting, changes in level and boundary treatments. In addition 3.21 ha of linear park under the existing power lines and 2.11ha of ancillary linear open space which includes for SUDS and hedgerow features is provided in the scheme. The proposed Class 1 open space is provided as a north south pedestrian and cycle connection to the north an connecting the site to the Ratoath Road and the future Dublin GAA facilitites at this location. 5. The construction of a new foul outfall sewer, approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 6. The development will also provide for all associated ancillary site development infrastructure including landscaped areas and sustainable urban drainage systems under the existing ESB powerlines, and all associated ancillary site development infrastructure including: demolition of an existing shed, ESB sub-stations, public lighting, and foul and surface water drainage; internal roads & footpaths; landscaping; and all associated engineering and site works necessary to facilitate the development. The proposed scheme is designed to integrate with the previously permitted development at Bellinsgmore (Ref FW13A/0088/E1) which is currently under construction and recently permitted residential development on lands to the north east known as Site 1 (FCC Reg. Ref.: FW21A/0042). The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended). The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended), other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with an Environmental Impact Assessment Report, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application may also be inspected online at the following website set up by the applicant: www.hollystown2shd.ie
Universal Developers LLC, intend to apply for a
A ground floor extension to the side and rear of existing house for purposes of sessional use as a montessori pre-school.
Permission for ground floor extension to the side and rear of existing house for purposes of sessional use as a Montessori pre-school.
The development will consist of: Retention of single-storey, flat-roof extension to the side of the existing dwelling. Additional Information Received 11/02/2026
The application site is located within an overall landholding bound to the south by the R121/Cruiserath Road, to the west by the R121/ Church Road and to the north by Cruiserath Drive. The proposed development comprises the provision of artificial lighting to the substation compound, transformers, and Gas Insulated Switchgear (GIS) building permitted under An Bord Pleanála ref: 30683420 and to the client control building permitted under An Bord Pleanála ref: PL06F.248544/ Fingal County Council Reg. Ref; FW17A/0025, along with all associated site and ancillary works.
Planning permission for conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and 2 no. roof windows to the front.
Proposed single-storey Security Gate House (13.2 sq.m.) comprising of an Observation Room and WC, the height does not exceed 4.0m complete with security gates and fencing, all located adjacent to an existing site and it's proposed extension to which the Chemical Act (control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.
We, Glenveagh Homes Ltd, intend to apply for planning permission for development at this site of c.7.71 ha at Hollywoodrath Road (R121) in Hollystown Dublin 15. The site is bound by the R121 to the south and east with emerging residential areas of Hollywoodrath beyond the R121; existing residential areas of Redwood and The Oaks to the north and east; and the remaining former Hollystown Golf Course Lands to the west. The proposed development will consist of: 69 no. houses comprising 52 no. 2-storey houses and 17 no. 3-storey houses (13 no. 2-bed units, 39 no. 3-bed units, 17 no. 4-bed units), private open spaces (including terraces at first and second floor level), carports incorporated into the footprint of each dwelling (providing 125 no, parking spaces) that also accommodate bike storage (138 no. cycle spaces) and refuse storage, and all associated roads, services, visitor parking (13 no. car spaces and 8 no. cycle spaces), public open spaces (Class 2), changes in level, hard and soft landscaping and boundary treatments where required on a residential area of c.1.94 ha. The proposed development also includes: 1. The construction of a new foul outfall sewer (c.0.97 ha), approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 2. The construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha). 3. The development of proposed (Class 1) public open space including walking routes, seating areas, kick about area, playground, dog park, associated landscaping works including planting, changes in level and boundary treatments, and 10 no, public cycle parking spaces (c.3.5 ha). 4. The development of ancillary landscaped areas and sustainable urban drainage systems under the existing ESB powerlines (c.0.77 ha), and all associated ancillary site development infrastructure including: ESB sub-station, public lighting, and foul and surface water drainage; internal roads & footpaths; and all associated engineering and site works necessary to facilitate the development.
Conversion of existing second floor attic into a habitable space, to facilitate two new bedrooms and ensuite. Works will include alterations to existing first floor layout to facilitate new access stair and the installation of four new roof lights to the front elevation, six new roof lights to the rear elevation and one new window to the gable elevation. It is also proposed to widen the existing single gate to the side of the property to incorporate a new double gate and all associated site works.
19,151 sqm of warehousing within 6 No. units for the storage and distribution of materials including chemicals within a proposed secure 33 Acre site. The height of which does not exceed 16.0m. This is inclusive of MHE (Mechanical Handling Equipment) areas, clean rooms, warehouse office, link corridors and associated amenities. • 917 sqm Individual standalone administration office (710 sqm) & staff amenities buildings (302 sqm) • 230 sqm security offices (Hub), • 1,205 sqm of associated plantrooms, stores and ancillary buildings • Provision for 182 No. of car parking spaces for warehousing office staff • Plus 3 No. disability access car parking spaces • Including provisions for 8 No. Electric Vehicle car parking spaces • An external ISO tank & container storage pad complete with associated circulation space (the area of which is circa 9.5 Acres or 38,450 sqm) • A perimeter attenuation channel (the area of which is circa 3,045 sqm with a capacity of over 5,045 cum) • A perimeter security fencing 2.4m high. • Associated landscaping • 6 No. access points • Facility identification signage • Associated ancillary site and civil works at Damastown Rise, Damastown Industrial Estate, Macetown North, Dublin 15, all located within the boundaries of the secure 33 Acre site. This is a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies. Add Info received 5th October 2020. Clarification of Add Info received 22nd December 2021.
The development will include three document storage buildings with ancillary accommodation (Blocks 1-3). Block 1 consists of a 3,762 sq.m document storage facility, including 78 sq.m for warehouse security / WC and lockers, with an additional 651 sq.m of office space spread over three stories, including toilets, circulation areas, shower rooms, and storage. Block 2 consists of a 2,727 sq.m document storage facility, including 78 sq.m for warehouse security / WC and lockers with 192 sq.m of office space spread over two stories, including reception, circulation and a meeting room. Block 3 consists of a 3,488 sq.m of which document storage facility including 78 sq.m for warehouse security / WC with an additional 192 sq.m of office space spread over two stories, including reception, circulation and a meeting room. Additionally, the development will also include the construction of two new pedestrian, cycle and vehicular entrances on Damastown Avenue, a vehicular service entrance on Damastown Rise, two totem signs, a zebra crossing on Damastown Avenue, a set-down area, site lighting, boundary treatments, landscaping, new connections to the existing foul drainage system and watermain, an attenuation basin with connections to the existing watercourse, car parking, 4 loading bays to Block 1, Electric Vehicle (EV) charging spaces, cycle and e-scooter parking spaces, and all associated site development works. Additional Information Received 24/02/2026 Clarification of Additional Information Received 21/05/2026
Retention of a single storey garage and playroom (c. 50.7m.sq.) along with covered seating area and all other ancillary site development works to the rear of the existing dwelling.
The diversion of an existing watercourse, (Powerstown Stream) into an existing drainage channel located adjacent to the north, west and east boundaries of the site. The diverted watercourse will incorporate the provision of a riparian zone (approx. 18-26 metres in width) and a series of swales and ponds. The proposed development will also comprise the provision of 3 No. pedestrian/cyclist bridges on the north, west and east site boundaries; hard and soft landscaping; boundary treatments; signage; changes in levels; and all associated site development works. The proposed development will enable the future development of the subject site. AI received 26/01/23
The development will consist of retention permission for
The development will consist of the provision of a 63.18 kWp ground mounted solar PV array consisting of 108 no. 585 w PV panel modules with an approximate total PV area of 285 m2, together with all associated site works and services. This application is in regard to a site subject to an EPA Industrial Emissions License P1060-01.
Development will consist of a 2480 sq.m logistics warehouse building, the height of which will not exceed 12.5m. This is inclusive of a reception area, wheelchair accessible toilet facilities and a plant room. Photovoltaic panels along the southern aspect of the roof structure not exceeding 150 sq.m. A new heavy goods vehicular entrance along Damastown Rise, 29 car parking spaces, 3 no. disability access parking spaces, cycle parking and a service yard to the rear (north) of the proposed building. Vehicular access for staff shall be via the existing vehicular entrance along Damastown Avenue, associated with the adjoining DG McArdle International Ltd site to the west of the proposed development. New boundary walls and railings detailing to the eastern and southern boundaries, all associated signage, lighting, landscaping and site development works. AI received 22/11/21
Permission is sought for the construction of
Attic conversion including new dormer roof space to rear of existing house at 22 Wellview Park, Mulhuddart, Dublin 15.
Permission for attic conversion including new dormer roof space to rear, new rooflights to front & removal of existing chimney.
The development consisting of/will consist of the retention and reconfiguration of the existing temporary car park (27 no. parking spaces ) located to the west side of the car park with associated drainage. The retention of 4 car parking spaces to the south of existing carpark. Planning permission for 2 new automated traffic barriers and removal of adjoining car spaces. planning permission to convert an existing temporary contractor's carpark to new 25 staff carpark spaces and a commercial vehicle set down area for 10 vehicles with associated landscaping lighting footpaths, and access stairs. Total car parking spaces 191 (existing car parking planning permission total 136 spaces) all on a site 5.03 hectares which forms part of a previously permitted Planning Ref. No. FW16A/0080 and FW15A/0038.
Planning permission is sought for development which will consist of: Change of use of an existing two storey premises from Community Spaces with outdoor area to the rear and office use only to Community Space with outdoor area to the rear, office use and small retail outlet only totalling 519 sqm.
The development will consist of a 24 classroom Primary School extending to 2 storeys in height, with a Gross Floor Area of c. 4.232sq.m. The proposal primary school will also incorporate a 2 classroom special educational needs unit in addition to all ancillary pupil and teacher facilities including external hard and soft play areas and 2 no. ballcourts. The proposed building will incorporate photovoltaic panels on roofs with a bio mass heating unit also proposed. Vehicular access to the development is provided via a new access off Hollywoodrath Avenue along the northern site boundary. Bicycle parking, car parking and bus set down areas are provided within the site boundaries. A separate pedestrian/cyclist access is also proposed off Hollywoodrath Avenue, with a second pedestrian access proposed along the southern site boundary off Bay Meadows Avenue, also known as The Avenue. A new pedestrian crossing on Bay Meadows Avenue also forms part of the proposed development works. A non-vehicular access to the school, for use by emergency services only, is also provided along the southern site boundary. The proposed development also provides for an ESB sub-station in addition to all associated site development works including alterations to ground levels, on-site external lighting, landscaping and boundary treatment.
The construction of a medium voltage (MV) substation. The MV substation building will have a total gross floor area of c. 30 sq.m, and an overall height of c. 4 metres. The proposed development includes the provision of electrical connections associated with the MV substation, along with all associated hard and soft landscaping, services, and all ancillary works. All on a site with an area of 0.33 hectares. The application site is located to the south of the data storage facility permitted under An Bord Pleanála Reg. Ref. L06F.248544 / Fingal County Council Reg Ref. FW17A/0025, and within an overall landholding bound to the south by the R121/Cruiserath Road, to the west by the R121/Church Road and to the north by Cruiserath Drive.
The development applied for will consist of a single storey extension to the existing building to provide an additional 1388 sq.m of storage space, a new vehicular access onto Damastown Way, additional and relocated parking within site curtilage, EV charging spaces, cycle and E-Scooter parking spaces, demolition of existing single storey garage with an area of 87 sq.m and construction of a single storey garage incorporating a toilet and security office with an area of 77 sq.m, landscaping, reconfiguration of connection to existing storm and foul drainage within the site curtilage and all associated site development works.
Planning permission sought for attic conversion to include two each roof windows to front and rear with relocated solar panels.