(1) CHANGE THE USE OF EXISTING OSTEOPATH CLINIC TO PRIVATE HOUSE, (2) DEMOLISH EXISTING OLD HOUSE AND CONSTRUCT AN OSTEOPATH CLINIC SERVED BY A EFFLUENT TREATMENT TANK AND POLISHING FILTERDecision record indexed
To demolish an existing hay barn, construct a new dwelling house and private garage, link with an existing entrance and access road and install a new wastewater treatment system along with all associated worksDecision record indexed
A) Renovate and extend the existing dwelling house, B) Make elevational changes, C) Install a mechanical wastewater treatment tank and percolation area and D) Upgrade existing entrance & all associated site worksDecision record indexed
RETENTION PERMISSION (A) TO RETAIN THE DWELLING HOUSE AND GARAGE AS CONSTRUCTED ON SITE & PLANNING PERMISSION FOR (B) DEMOLITION OF SINGLE STOREY SUN ROOM AND BAY WINDOW TO REAR (C) CONSTRUCTION OF STOREY AND A HALF DORMER STYLE EXTENSION TO REAR AND SEPERATE SINGLE STOREY EXTENSION TO REAR (D) NEW FIRE ESCAPE COMPLIANT ROOF LIGHTS TO FRONT (EAST) ELEVATION AND TO SIDE ROOF PLANES (NORTH AND SOUTH) OF FRONT GABLE SECTION (E) CHANGES TO ROOF LIGHTS TO REAR (WEST) ROOF PLANE (F) ALTERATIONS TO OPES TO REAR (WEST) ELEVATION AT GROUND FLOOR LEVEL AND (G) ALL ANCILLARY SITE WORKSDecision record indexed
TARBERT 220KV SUBSTATION, TARBERT GENERATING STATION, TARBERT ISLAND (TOWNLAND)
THE PROPOSED DEVELOPMENT WILL COMPRISE OF THE FOLLOWING ON A SITE MEASURING APPROXIMATELY 6.9 HECTARES: (1) REMOVAL OF EXISTING CABLE JOINT, BAY WITHIN TARBERT GENERATING STATION, 220kV SWITCHGEAR WITHIN THE EXISTING TARBERT SUBSTATION COMPOUND AND ASSOCIATED 220kV CABLING; (2) TWO NO. NEW LENGTHS OF 220kV UNDERGROUND CABLING MEASURING APPROXIMATELY 340M EACH, RUNNING BETWEEN TWO NO. NEW UNDERGROUND CABLE JOINT BASE IN TARBERT GENERATING STATION AND THE CONNCETION POINT AT TARBERT SUBSTATION; (3) THE NEW 220kV SWITCHGEAR BAY WITHIN THE EXISTING TARBERT SUBSTATION COMPOUND COMPRISING ASSOCIATED ELECTRICAL EQUIPMENT, INCLUDING CABLE SEALING ENDS, INSULATORS, OVER HEAD CONDUCTORS, SURGE ARRESTORS, LIGHTNING MASTS AND LIGHTING POLES; AND (4) ALL ANCILLARY SITE DEVELOPMENT WORKS INCLUDING TEMPORARY CONSTRUCTION COMPUND AND LAYOUT AREAS, SITE PREPARATION WORKS AND GROUND LEVELING AS REQUIRED TO FACILITATE THE WORKS. TARBERT GENERATING STATION IS LICENSED BY THE ENVIRONMENT PROTECTION AGENCY (EPA) UNDER THE INDUSTRIAL EMISSIONS (IE) LICENSE (REF: P0607-02). THE PROPOSED DEVELOPMENT INCLUDES WORKS LOCATED WITHIN THE IE LICENSE BOUNDARY OF TARBERT GENERATING STATION WHICH IS AN UPPER TIER ESTABLISHMENT TO WHICH THE CHEMICALS ACT (CONTROL OF MAJOR ACCIDENTS HAZARDS INVOLVING DANGEROUS SUBSTANCES) REGULATIONS 2015 (THE COMAH REGULATIONS) APPLY. THIS PLANNING IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS). AMENDMENTS TO THE NIS HAVE BEEN MADE IN RESPONSE TO THE FURTHER INFORMATION REQUESTDecision record indexed
RETAIN AN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE (PREVIOUSLY GRANTED UNDER LOCAL AUTHORITY REF NO. 11/969) (AN BORD PLEANALA REFERENCE PL 08.240232) TOGETHER WITH ASSOCIATED GROUND EQUIPMENT, SECURITY FENCE, AND ACCESS TRACKDecision record indexed
NATIONAL OIL RESERVES AGENCY, TARBERT OIL STORAGE PLAN, TARBERT ISLAND TARBERT CO KERRY
CONSTRUCT AND INSTALL A GROUND MOUNTED SOLAR ARRAY CONSISTING OF 296 SOLAR PV PANELS ALONG WITH ASSOCIATED SITE WORKS LOCATED WITHIN THE SITE BOUNDARYDecision record indexed
A side sunroom extension, an attic conversion to include rear dormer and roof light windows to an existing dwelling house, existing agricultural entrance now in use for both house and agriculture, driveway and red line site boundary as-builtDecision record indexed
Permission for a) an extension to the Western side and Northern side of dwelling b) internal alterations to dwelling, c) the demolition of a chimney to dwelling house, and d) associated site worksDecision record indexed
The construction of a dwelling house, detached domestic garage, new entrance and entrance walls, the installation of a mechanical aeration unit with polishing filter system with all associated site worksDecision record indexed
Demolition of open slurry pit and construction of a cattle house to include; (1) slatted cattle house section, complete with associated underground slurry tank and a roofed feed passage; (2) straw-bedded calf/cattle house section, (3) manure pit and all associated site worksDecision record indexed
The construction of a single storey dwelling house detached domestic garage, front boundary entrance walls, install a mechanical aeration unit and polishing filter system with all associated site worksDecision record indexed
(A) DEMOLISH EXISTING SLATTED CUBICLE HOUSE (EXISTING SLATTED TANKS TO REMAIN) (B) CONSTRUCT IN ITS PLACE A NEW EASY FEED SLATTED LIVESTOCK UNITDecision record indexed
(A) CONSTRUCT A NEW MILKING COMPLEX INCORPORATING COVERED DRAFTING AREA, FLOW CHANNEL AND COLLECTING YARD. COLLECTING YARD TO INCORPORATE SLATTED TANK WITH EXTERNAL AGITATION (B) ERECT A MEAL BINDecision record indexed
(a) construction of single storey detached dwelling and single storey detached domestic garage, (b) new on site waste water treatment system, (c) forming new vehicular entrance and (d) all associated site works at siteDecision record indexed
An extension at the rear of the existing dwelling, new roof with the attic converted into living space, two new skylights to the front elevation, new porch to the front elevation, new size front windows and all associated site worksDecision record indexed
RETAIN EXTENSION TO DWELLING HOUSE WITH ATTIC DEVELOPMENT ALSO FOR PLANNING PERMISSION TO COMPLETE SAME AND PERMISSION TO CHANGE USE OF THE EXISTING DWELLING HOUSE TO A DOMESTIC STORAGE AREA ALL ON HIS SITEDecision record indexed
RETAIN PART OF HIS CUBICLE SHED WITH FEED PASSAGE AND UNDERGROUND SLURRY TANKS WITH SLATS AS CONSTRUCTED ALSO FOR PLANNING PERMISSION TO COMPLETE SAME SHED ALL ON HIS FARMYARDDecision record indexed
(A) A HIGH INTERTIA SYNCHRONOUS COMPENSATOR (HISC) COMPOUND CONTAINING 1 NO. HISC UNIT ENCLOSED WITHIN A STEEL CLAD FRAMED STYLE STRUCTURE (12.1M MAX HEIGHT) AND SUPPPORTED BY 8 NO. ELECTRICAL EQUIPMENT CONTAINERS (CONTAINING ANCILLARY POWER SUPPLY PRODUCTS INCLUDING A STATIC FEQUENCY CONVERTS, MV SWITCHGEAR, EXCITERS, LV DISTRIBUTION, CONTROL ROOM, WELFARE AND OFFICE), MAIN AUXILIARY AND START-UP ELECTRICAL TRANSFORMERS, GENERATOR CIRCUIT BREAKER, SWITCHGEAR EQUIPMENT, EXTERNAL COOLER UNITS AND 1 NO. BACK UP DIESEL GENERATOR AND ASSOCIATED DIESEL STORAGE TANK; (B) A 220KV HIGH VOLTAGE GAS INSULTATED SWITCHGEAR (GIS) SUBSTATION COMPOUND CONTAINING A GIS SUBSTATION BUILDING WITH ALL CONTROL AND HV EQUIPMENT WITHIN A SINGLE STOREY BUILDING (13.2M MAX HEIGHT). THE BUILDING WILL BE SURROUNDED BY A COMPOUND ROAD AND CONTAINED WITHIN A 2.6M HIGH GALVANISED STEEL PALISADE FENCE; (C) A BATTERY STORAGE COMPOUND CONTAINING 5 NO. BATTERY STORAGE CONTAINERS, ENCLOSED IN STEEL CONTAINERS OF DIMENSIONS APPROXIMATELY 13M BY 2.5M BY 3M, HOUSING INDIVIDUAL BATTERY COMPONENTS WITH 2 NO FITTED EXTERNAL HVAC SYSTEMS FOR EACH UNIT AND SUPPORTED BY 13 NO. INVERTER STATIONS, 14 NO. AUXILIARY TRANSFORMERS AND CONTROL CONTAINER; (D) 220KV UNDERGROUND CABLE TO THE EXISTING ADJOINING EIRGRID SUBSTATION; (E) ASSOCIATED ELEMENTS COMPRISING VARIOUS UNDERGROUND CABLES AND DUCTS, EQUIPMENT PLINTHS, BOUNDARY SECURITY FENCE, COMPOUND LIGHTING AND PALISADE GATES AND FENCING, SECUIRTY LIGHTING, CCTV, INTERNAL ACCESS ROADS, HARDSTANDING AREAS AND ALL NECESSARY FOUNDATIONS WORKS FOR THE ABOVE COMPOUNDS. THE PLANNING APPLICATION IS ON LANDS WHERE GRID STABILISATION FACILITY WAS PREVIOUSLY PERMITTED UNDER PLANNING REGISTER NO 19/115. PLANNING PERMISSION TO CONSTRUCT THE DEVELOPMENT IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT AND ACCOMPANIES THE APPLICATIONDecision record indexed
THE DEVELOPMENT WILL CONSIST OF A GRID STABILISATION FACILITY COMPRISING OF: THE CONSTRUCTION UP TO 4 NO. ROTATING STABILISERS, 5 NO. BATTERY STORAGE CONTAINERS, 1 NO. CONTROL ROOM, 2 TRANSORMERS AND ANCILLARY EQUIPMENT WITHIN A SITE AREA OF APPROX. 1.46 HECTARES. IT IS PROPOSED TO CONNECT THE PROPOSED DEVELOPMENT TO THE ADJACENT EIRGRID SUBSTATION BY UNDERGROUND CABLE WHICH WILL TRAVERSE THE PERMITTED AND UNDER CONSTRUCTION PEAKING PLANT. THE ROTATING STABILISERS WILL BE SUPPORTED BY 10 NO. ELECTRICAL EQUIPMENT ROOMS WHICH WILL CONTAIN ANCILLARY POWER SUPPLY PRODUCTS INCLUDING A STATIC FREQUENCY CONVERT (SFC), MV SWITCHGEAR, EXCITERS AND LV DISTRIBUTION, AND STEP-UP / DOWN TRANSFORMERS. A HEATING VENTILATION AND AIR CONDITIONING SYSTEM (HVAC) WILL BE ATTACHED TO EACH ROTATING STABILISER, 4 NO. AUXILIARY TRANSFORMERS ARE ALSO PROPOSED. THE BATTERY CONTAINERS WILL HOUSE INDIVIDUAL BATTERY COMPONENTS WITH 2 NO. FITTED EXTERNAL HVAC SYSTEM FOR EACH. 13 NO. INVERTER STATIONS AND 14 AUXILIARY TRANSFORMERS ARE PROPOSED FOR THE BATTERY CONTAINERS. THE ENTIRE SITE WILL CONSIST OF VARIOUS UNDERGROUND CABLES AND DUCTS, BOUNDARY SECURING FENCE, COMPOUND LIGHTING AND PALISADE GATES AND FENCING, NEW INTERNAL ACCESS TRACK, SECURITY LIGHTING, CCTV, HARDSTANDING AREAS AND ALL NECESSARY FOUNDATION WORKS. PERMISSION IS ALSO SOUGHT FOR 2 ELECTRICAL TRANSFORMERS (UP TO 220KV), ASSOCIATED HV EQUIPMENT AND UNDERGROUND ELECTRICAL GRID CONNECTION CABLING AND DUCTING CONNECTING THE DEVELOPMENT TO THE NATIONAL GRID AT THE ADJACENT ESB/EIRGRID SUBSTATION. PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
RETAIN ALTERATION OF GROUND LEVELS, UNDERGROUND SLURRY TANKS, SLATS, CUBICLES AND STEEL COLUMNS AND FULL PLANNING PERMISSION FOR THE COMPLETION OF EASY FEED SHEDDecision record indexed
FOR CHANGES TO THE PREVIOUSLY PERMITTED PEAKER POWER PLANT DEVELOPMENT (PLANNING REF. 13/138). IT IS PROPOSED TO CHANGE THE ENERGY SOURCE FOR THE CHARGING OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) CONTAINERS FROM DIESEL TO CHARGING OFF THE NATIONAL GRID AND TO CHANGE THE PERMITTED LAYOUT FOR ELECTRICAL EQUIPMENT BASED ON THE CONSEQUENCE OF THE PROPOSED CHANGE IN ENERGY SOURCE AT AN AREA LOCATED WITHIN THE PERMITTED DEVELOPMENT. IT IS ALSO PROPOSED TO INCLUDE A SMALL METERING ENCLOSURE ADJACENT TO THE CONSTRUCTED SUBSTATION BUILDING WITHIN THE PERMITTED DEVELOPMENT. A FIVE YEAR PLANNING PERMISSION IS BEING SOUGHT FOR THE PROPOSED DEVELOPMENTDecision record indexed
RETAIN EXISTING ATTIC DEVELOPMENT AND ALL ASSOCIATED WORKS, RETENTION PLANNING PERMISSION TO RETAIN DEVELOPMENT WITHIN REVISED SITE BOUNDARIES AND PLANNING PERMISSION TO REMOVE EXISTING VELUX WINDOWS AND INSTALL REPLACEMENT FIRE ESCAPE VELUX WINDOWS AND ALL ASSOCIATED WORKSDecision record indexed
The renovation and extension of an existing dwelling house. The works include elevational changes to the original house to include a new roof with roof windows, a new front door, a new rear extension, the decommissioning of existing septic tank system and installation of a new replacement packaged wastewater unit and percolation area and all ancillary site worksDecision record indexed
ERECT A 24M HIGH TELECOMMUNICATIONS LATTICE STRUCTURE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT ALL ENCLOSED BY SECURITY FENCINGGrounds not yet categorised
(A) EXTEND EXISTING MILKING COMPLEX BY ERECTING A SHED CONSISTING OF A CALVING AREA, CUBICLES WITH AUTOMATIC SCRAPERS, A SLURRY DUCT AND AN UNDERGROUND SLATTED SLURRY TANK (B) PROVIDE A CATTLE CRUSH AND FEED PASSAGES (C) EXTEND EXISTING MILKING COMPLEX AND EXTEND EXISTING CUBICLE SHED (D) REMOVE EXISTING CANOPY AND PROVIDE A ROOF OVER EXISTING FEED PASSAGE ALSO REUSE EXISTING CANOPY ON NORTH WEST ELEVATION (E) CONSTRUCT A CATTLE UNDERPASS AND ALL ASSOCIATED WORKS ON PUBLIC ROAD ADJACENT TO FARMYARDDecision record indexed
DEMOLISH FLAT ROOF EXTENSION TO THE REAR OF DWELLING HOUSE, ALSO FOR PERMISSION TO ERECT EXTENSIONS TO THE REAR AND SIDE OF HOUSE, AND TO INSTALL A WASTEWTER TRETMENT UNIT WITH A SOIL POLISHING FILTER, ALSO FOR PERMISSION TO ERECT A DOMESTIC GARAGE, ALL ON HIS SITEDecision record indexed
Full planning permission for a change of dwelling house design to that previously granted under planning reg. no: 22/647 at Moyvane North, Moyvane, County KerryDecision record indexed
CONSTRUCT (1) A DETACHED DWELLING HOUSE (2) A DETACHED DOMESTIC GARAGE (3) A NEW CONNECTION TO THE EXISTING PUBLIC SEWER (4) RELOCATION OF EXISTING VEHICULAR ENTRANCE AND (5) ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
DEMOLISH EXISTING REAR EXTENSION TO COTTAGE AND BUILD NEW EXTENSION TO REAR OF COTTAGE AND CONSTRUCT NEW TERTIARY TREATMENT SYSTEM AND INFILTRATION/TREATMENT AREADecision record indexed
For the Construction of a Single Storey Detached Studio Building to rear of dwelling site include Lobby, Office, Toilet & Open Plan Studio area including connection to services, Also for permission for RETENTION of Garden Room Building with raised deck & also Extension and alteration to existing outbuildings to create Storage Shed IncludingDecision record indexed
Construction of a single storey dwelling house, detached domestic garage, front boundary wall and entrance, mechanical aeration unit with polishing filter system with all associated site worksDecision record indexed
Planning permission to construct 8 No. units, three-bed two-storey dwellings, 16 parking spaces a new connection to water and sewage mains and all associated site works all at Moyvane North, Moyvane, Co.KerryGrounds not yet categorised
(1) DEMOLISH EXISTING RUIN OF EXISTING DWELLING AND FRONT GARDEN STONE WALL AND ALL ASSOCIATED SITE WORKS (2) FOR PLANNING PERMISSION TO CONSTRUCT A DWELLING HOUSE AND ALL ASSOCIATED SITE WORKSDecision record indexed