To construct a four bay shed which will consist of cubicles, slatted area with slurry holding tank underneath and also construct a silage pit with retaining walls and all associated site works
For the erection of a dormer style extension to front of existing dwelling, alterations to plans and elevations of existing dwelling, alterations to site boundaries, sewerage treatment facilities and all associated and ancillary works
For the erection of a fully serviced detached single storey dwelling, new site entrance, waste water treatment system, percolation area and all ancillary site works
To erect a fully serviced part two storey, part single storey dwelling, entrance, boundary walls and piers, waste water treatment facilities and all ancillary works
To erect fully serviced dormer style dwelling with detached domestic garage, entrance, sewerage treatment facilities & all ancillary works
To (i) widen existing entrance, (ii) upgrade to new sewerage treatment system & percolation area.
For the infilling of lands (using imported inert material consisting of natural materials of clay, sub soil & stone in order to raise the levels and improve the land for agricultural purposes) together with all ancillary structures and all associated site works (to include upgrading of the existing entrance). Significant further information and revised plans have been submitted.
For the infilling of lands (using imported inert material consisting of natural materials of clay, sub soil & stone in order to raise the levels and improve the land for agricultural purposes) together with all ancillary structures and all associated site works (to include upgrading of the existing entrance)
Construct single storey extension to existing dwelling house, together with all associated site development works
Construct two storey type dwelling house with detached garage, entrance, boundary wall / fence, wastewater treatment system with percolation area and all ancillary site works
To construct a six bay shed which will consist of slatted area with slurry holding tank underneath, cubicles and all associated site works
To erect fully serviced two storey dwelling with detached domestic garage, form a new entrance, install sewerage treatment unit and percolation area and all associated works
To replace existing sewerage treatment system with new on-site treatment unit and new percolation area with revised site boundary and all ancillary site works
For (1) RETENTION of alterations made to floor plans and elevations of dwelling previously approved under Pl. Ref. 9734, (2) PERMISSION to carry out alterations to existing dwelling to provide a first floor level with associated alterations to plans & elevations and all ancillary site works.
For the installation of a new wastewater treatment system and sand polishing filter and all site works associated with the development
To retain the following, (A) Two storey fully serviced extension to rear of existing two storey dwelling, (B) existing shop & store with associated yard and all associated works (previously known as John McKiernan's of Corlismore Shop)
To construct a three bay slatted shed with slurry holding tank underneath and all associated site works
For the infilling of lands (using imported inert material consisting of natural materials of clay, sub soil & stone in order to raise the levels and improve the land for agricultural purposes) together with all ancillary structures and all associated site works (to include upgrading of the existing entrance) - SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
To retain revised dwelling position, alterations & extension to living room, changes to windows, door openings, additional roof lights and PERMISSION to complete construction and install a treatment system & percolation area (Previous planning ref. no. 05/771). Retain 2 no. existing machinery store and concrete slabs. Retain concrete base for domestic machinery store with PERMISSION to erect same. Retain domestic store/wendy house ref planning ref. no. 05/1455
For alterations & extension to existing dwelling house to include ground floor kitchen, utility room, shower room & bedroom, first floor bathroom & 3 no bedrooms, erect domestic garage, upgrade entrance with new sewerage treatment system & percolation area. Significant further information and revised plans have been received.
To renovate existing two storey dwelling house and RETENTION to retain and refurbish existing single storey to side and rear of same, upgrade existing septic tank to new sewerage treatment unit and all ancillary works
Of the construction of a part two storey, part storey and a half style dwelling with a detached domestic garage, install a proprietary wastewater treatment system and percolation area, form new entrance gates and piers from the public road, together with all associated site works
To construct a new entrance walls, piers and fencing, and all ancillary site works
To erect a fully serviced single storey dwelling, detached domestic garage, install sewage treatment system & percolation area and to upgrade existing agricultural entrance and laneway to access same, and all ancillary siteworks
To decommission 2 no existing houses and to construct 2 no weaner/grower houses, in accordance with animal welfare regulations, together with all ancillary structures and all associated site works, (to include upgrading of the existing site entrance), on the site of existing pig farm This application relates to a development, which is for the purposes of an activity requiring a licence under part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013,
To erect fully serviced dormer type extension to existing dwelling, alterations to elevations, new sewerage treatment facilities, alterations to site boundaries, site entrance & all ancillary works
To construct part two storey, part single storey extensions to the existing dwelling and make alterations to the existing elevations and layout, together with all associated site works
To remove the existing hay shed and replace it with an agricultural shed which will consist of slatted area with slurry holding tank underneath, cubicles and calving pens. Also construct an underground slurry holding tank and all associated site works
To (1) Construct new single storey extensions to front, rear & side of existing dwelling house, and (2) To upgrade existing septic tank system to a new approved proprietary wastewater treatment system & percolation area, together with all associated site development works
To erect fully serviced storey & half type dwelling with detached domestic garage, entrance, sewerage treatment facilities & all ancillary works
Sought for extension & alterations to existing dwelling to include ground floor kitchen/dining/living area, first floor 2 en-suite bedrooms with treatment system & its percolation area
To replace existing open slurry holding tank with a five bay slatted shed with slurry holding tank underneath and all associated site works
For construction of a dormer type dwelling, domestic garage, formation of new site entrance onto public road, installation of proprietary wastewater treatment unit and percolation area and completion of all ancillary site works
Demolish existing dwelling and detached domestic garage and all associated works
To erect fully serviced two storey dwelling and detached domestic garage, form new entrance, install sewerage treatment unit, percolation area and all associated works
For the erection of a two storey dwelling house, detached domestic garage, entrance gates and piers, waste water treatment system and percolation area and all associated site works
Construct a three bay slatted shed with slurry holding tank underneath and all associated site works
For the renovation of a dwelling including the incorporation of an agricultural barn, and it’s change of use to residential use, and a storey and a half extension. Also included is the demolition of a single storey lean-to structure, elevational changes to the existing buildings, a new wastewater treatment system and percolation area, proposed parking area and all associated site works
For proposed extension to existing dwelling house, to include: (i) At ground floor: entrance hall, kitchen-dining-living area, sitting room, utility, pantry, and plant room (ii) At first floor: 2 no. ensuite bedrooms with walk-in wardrobes, landing, and office. (iii) With new entrance from existing private avenue (iv) With permission to upgrade the existing sewerage system to a new treatment system and percolation area. (v) With connection to existing services and all associated site works
Erect new dwelling house, domestic garage, entrance, boundary walls, piers with sewerage treatment system and percolation area
For the development of infilling of land, using imported inert material consisting of natural materials of clay, sub soil & stone in order to raise the levels and improve the land for agricultural purposes together with all ancillary site works. The total quantity of material will not exceed 48000 metres cubed (class 5 material as per third schedule part 2). The lands will be covered with topsoil and reseeded with grass when complete and will include all ancillary and associated site. A Natura Impact Statement (NIS) has been prepared and accompanies this application
For a 20-year permission for quarrying and extraction of rock that will include drilling, blasting, crushing and screening along with alterations to boundaries & all associated site works. Works will also include for the provision of new settlement ponds and installation of associated site drainage infrastructure and surface water pump to proposed new settlement ponds along with provision of discharge outlet via a Klargester Interceptor. Ancillary site works to include for landscape works, planting restoration of the quarry perimeter and reprofiling of overburden as required to facilitate development of the quarry and restoration of the associated site area. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and accompanies this application, significant further information has been received
To construct fully serviced dwelling, incorporate wastewater treatment system and percolation area, new entrance arrangement and carry out associated site works
For the construction of a Training Centre to new Block G. Works include associated site development works, connection to existing site services and effluent treatment plant and percolation area/polishing filter
Is sought for alteration and extension to rear of Block C. Works include associated site development works and replacement of existing effluent treatment plant and percolation area in accordance with conditions on Planning Permission Ref 20/186
To (A) install an LNG Plant compound with 2 no. 131m3 horizontal tanks with 2 no. associated ambient vapourisers, regulation station, electrical control room including all other associated ancillary site works (B) new service road from existing site, site boundaries, landscaping & site development works at existing Farragh Proteins site for Farragh Proteins. This installation will bring the site under the Major Accidents Directive (a Seveso Site). A Natura Impact Statement will be submitted with this Application. The existing Development has an IPPC EPA Licence. Significant further information and revised plans including revised/updated Natura Impact Statement has been submitted
For renovation of the existing cottage and outbuildings, and construction of a two-storey extension to the rear of the existing cottage, new site vehicular entrance, relocation of the existing entrance for agricultural purposes and all associated site service works
For alteration and extension to Block F. Works include replacement of existing effluent treatment plant, replacement of existing percolation area with a new polishing filter in accordance with EPA guidelines, installation of pumping main to new polishing filter located to adjoining lands and associated site development works
To construct cubicle shed incorporating underground effluent tank and all associated site works
To construct cubicle shed incorporating underground effluent tank and all associated site works