CONSTRUCTION OF A NEW DWELLING HOUSE, SEPTIC TANK/ETS PERCOLATION AREA, DOMESTIC SHED/STORE, BORED WELL AND ASSOCIATED SITE WORKSGrounds not yet categorised
FORMER BALLYINACARRIG MILLER'S HOUSE, BALLYNACARRIG BALLYBOY, CO. OFFALY
REFURBISHMENT AND EXTENSION OF THE EXISTING DERELICT FORMER BALLYINACARRIG MILLER'S HOUSE, TO INCLUDE A NEW WASTE WATER TREATMENT SYSTEM, PV ARRAY AND ALL SITE DEVELOPMENT WORKS AND ANCILLARY WORKS. THE DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE (REF: 42-08) AND A RECORDED MONUMENT (REF: OF032-007001 & OF032-007002) AT BALLYNACARRIG, BALLYBOY, CO. OFFALYDecision record indexed
CONSTRUCTION OF A DORMER DWELLING HOUSE WITH DOMESTIC GARAGE/FUEL SHED, EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A NEW DORMER BUNGALOW DWELLING HOUSE, NEW VEHICULAR ENTRANCE, NEW DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, SEPTIC TANK/ETS PERCOLATION AREA, DOMESTIC SHED/STORE, BORED WELL AND ASSOCIATED SITE WORKSDecision record indexed
To construct a loose sheep shed and ancillary works (concrete yards, effluent tank etc.) in extension of existing farmyard area, utilising existing farm entrance onto public roadDecision record indexed
Erecting a 30m high telecommunications lattice structure together with antennas, dishes, access track and associated telecommunications equipment, all enclosed by security fencing.Decision record indexed
(A) DEMOLITION OF EXISTING SLATTED SHED & STORAGE SHED (B) MODIFICATIONS OF EXISTING ENTRANCE (C) CONSTRUCTION OF A MILKING PARLOUR, DAIRY & ANCILLARY ROOMS, DRAFTING & HANDLING FACILITIES, WAITING YARD & UNDERGROUND SLATTED TANK (D) ERECTION OF MEAL BIN, WATER STORAGE TANK (E) CONSTRUCTION OF LIVESTOCK CUBICLE FACILITY WITH UNDERGROUND SLATTED TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
Permission to construct a new farm building for the housing of livestock with a solid concrete floor and completed with associated siteworksDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/ FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKSDecision record indexed
A DOMESTIC GARAGE/FUEL STORE TO THE REAR OF THE PROPERTY AS CONSTRUCTED AND PERMISSION TO CONSTRUCT A SIDE EXTENSION, CARRY OUT ELEVATIONAL ALTERATIONS TO THE EXISTING DWELLING, RELOCATION OF DRIVEWAY, UPGRADE/RELOCATION OF EXISTING SEPTIC TANK AND ALL ASSOCIATED SITEWORKSDecision record indexed
CONSTRUCTION OF A SINGLE STOREY DWELLING, SINGLE STOREY DOMESTIC GARAGE, BORED WELL, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
THE DEMOLITION OF EXISTING EXTENSION TO THE SIDE OF EXISTING HOUSE AND TO CONSTRUCT A NEW TWO STOREY GRANNY FLAT EXTENSION TO SIDE OF EXISTING HOUSE, NEW WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAY, AND ALL ASSOCIATED SITE WORKSDecision record indexed
LOUGH BOORA DISCOVERY PARK, LEABEG, BOORA TULLAMORE CO. OFFALY
RECREATIONAL DEVELOPMENT CONSISTING OF REPURPOSING AND REFURBISHMENT OF C.5KM OF PRE-EXISTING NARROW-GAUGE RAIL LINE FOR THE USE OF 10-15 NO. VELO RAIL CARS. THIS RAIL LINE HAD PREVIOUSLY BEEN USED BY BORD NA MONA FOR PEAT PRODUCTION AND TRANSPORTATION. IN ADDITION TO THE CONSTRUCTION OF A TERMINUS STRUCTURE, PEDESTRIAN, AND SERVICE VEHICLE ACCESS PATHS AND ALL ASSOCIATED ANCILLARY SITE WORKS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED AS PART OF THIS PLANNING APPICATIONDecision record indexed
J GRENAN & SONS TINNACROSS RATH BIRR, CO. OFFALY, R42YA49
THE INSTALLATION OF A ROOF TOP SOLAR PHOTOVOLTAIC ARRAY (2476 SQ.M) AND ASSOCIATED ELECTRICAL INFRASTRUCTURE ON EXISTING MANUFACTURING FACILITYDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE AND FUEL SHED, AND THE CONSTRUCTION OF A REPLACEMENT DWELLING COMPRISING A PART TWO-STOREY HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, SITE ENTRANCE AND ALL ANCILLARY SITE WORKS THERETO.Decision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKSDecision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKSDecision record indexed
Construction of new single/dormer type dwelling house, install septic tank with percolation area, form new entrance & all associated site worksDecision record indexed
CONSTRUCTION OF A FRONT & SIDE SINGLE STOREY EXTENSION, CARRY OUT ELEVATIONAL ALTERATIONS TO THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A TWO STOREY DWELLING AND SINGLE STOREY GARAGE, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA, NEW ENTRANCE, DRIVEWAY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS.Decision record indexed
THE CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, DOMESTIC GARAGE, WELL, SEPTIC TANK, PERCOLATION AREA, ASSOCIATED SITEWORKS & NEW ENTRANCEDecision record indexed
Existing agricultural developments and all associated siteworks at Carrigeen, Fivealley, Birr, Co. Offaly. These developments consist of Milking Parlour Shed & Silo, Cow Cubicle Sheds, Machinery/Straw Sheds, Workshop, Cow Sheds with Slatted Effluent Storage Tanks, Silage Pits, Lay-By and all associated siteworksDecision record indexed
BOORA AVENUE LEA BEG BOORA BLUEBALL, TULLAMORE, CO. OFFALY
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR POTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKSDecision record indexed
RATHMOUNT MULLANAFAWNIA, AND RUSSELLSPENN, CO. OFFALY
A 10 YEAR PERMISSION FOR DEVELOPMENT WHICH CONSISTS OF THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATIONDecision record indexed
CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKSGrounds not yet categorised
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan.Grounds not yet categorised
(1) CONSTRUCTION OF A NEW EXTENSION TO EXISTING LIVESTOCK FARM BUILDING TO CONTAIN MILKING AREA, CUBICLES, EXTENDED SLATTED UNDERGROUND SLURRY STORAGE TANKS AND ALL ANCILLARY SEPARATION & TREATMENT AREAS, AND TO INSTALL CUBICLES IN THE EXISTING BUILDING; ALL COMPLETED WITH ASSOCIATED SITEWORKS. (2) PERMISSION TO CONSTRUCT A NEW FARM BUILDING TO CONTAIN DAIRY, PLANT ROOM, FARM OFFICE, STORAGE AREA AND EXTERNAL MILK STORAGE SILO; ALL COMPLETED WITH ASSOCIATED SITEWORKSDecision record indexed
Construction of a dwelling house and domestic garage, to include a septic tank and percolation area, connection to local group water scheme water supply, new site entrance and all associated site worksDecision record indexed
(1) CONSTRUCTION OF A NEW FARM BUILDING TO CONTAIN MILKING PARLOUR, DAIRY, ANCILLARY ROOMS, SLATTED AREAS OVER UNDERGROUND EFFLUENT STORAGE TANKS, DRAFTING & HANDLING FACILITIES, (2) ERECTION OF EXTERNAL MILK SILO & WASH BUILDING (3) ERECTION OF EXTERNAL MEAL BIN, (4) CONSTRUCTION OF UNCOVERED LIVESTOCK CUBICLES AREA, (5) CONSTRUCTION OF NEW FARM ROAD; (6) ALL COMPLETED WITH ASSOCIATED SITE WORKS AND FOR THE PURPOSES OF AGRICULTURE ON FARM LANDSDecision record indexed
A slatted cubicle shed with slurry tank, revisions to existing farm access road to accommodate new building, new slurry tank in existing bedded livestock shed, concrete yards and ancillary worksDecision record indexed
A CHANGE OF USE OF THE ORIGINAL DOMESTIC GARAGE TO STUDY, AN EXISTING GARAGE/FUEL STORE (51.33M2) LOCATED AT THE REAR OF THE SITE. ALSO A KITCHEN/DINING EXTENSION TO THE REAR OF EXISTING DWELLING (23.8 M2) AND ALL ANCILLARY WORKSDecision record indexed