To decommission the existing septic tank and install new wastewater treatment system with all necessary ancillary services
To construct dwelling house, garage, widen existing entance and connect to public water and sewer services plus all ancillary site works
Of the following changes to the existing dwelling house; a) alterations to front elevation, b) construction of rear conservatory and c) other elevational alterations
For development comprising an increased wind turbine blade length and associated reduction in turbine hub height, creation of a splayed junction, and all associated cabling, services and ancillary works at land at the site of the consented Crossmore Wind Farm. This site is located approximately 4km north of Kilmurry McMahon, 4.5km southeast of Kilmihil and 15km east of Kilrush in the townlands of Crossmore and Derrnageeha, Co Clare. The development will consist of: 1. An increase in the blade length of the previously-consented 7 no. wind turbine Crossmore Wind Farm, consented under planning application Ref: P09/123, from 45 metres to up to 57.5 metres; 2. Associated reduction in turbine hub height of up to 12.5m to maintain the previously approved overall turbine tip height of up to 125m (the previously approved hub height was 80m) 3. Creation of a splayed junction at the wind farm entrance on the Ballyduneen Road, off the N68, necessary to facilitate the proposed turbine / blade configuration; 4. All associated services and ancillary works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the renewable energy development.
To construct a dwelling house and garage, with effluent treatment system, and all associated site works, accessed by an existing private road
To retain and widen existing farm entrance plus all ancillary site works
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
For a machinery/storage shed & planning PERMISSION to construct a slatted shed incorporating a calf creep along with all associated works
To make the following alterations to the existing dwelling house: a) demolish existing front conservatory and rear extension; b) construct new replacement extension to rear of house; c) construct new front porch; d) make elevational changes to the house; e) upgrade existing wastewater treatment system; and f) all associated site works and services. A Natura Impact Statement (NIS) will be submitted with the application
For the subdivision of an existing derelict townhouse into two single townhouses, construction of a first floor apartment, archway & access to rear parking, development of parking spaces along with all associated site works
To convert the former shop and residence at the above address into two number townhouses. The proposed development will consist of internal modifications to the existing building including closing up internal access between the two areas as well as the formation of a new front entrance
To demolish the existing sub-standard dwelling house and to construct a replacement dwelling house with minor elevational and internal layout changes along with a new private on-site domestic wastewater treatment system and all other associated ancillary site works.
To make the following alterations to the existing dwelling house. a) demolish existing front conservatory and rear utility; b) construct new orangery extension to the house; c) make elevational changes to the house and adjoining stables and outbuilding; d) convert existing stables/outbuildings to residential use ancillary to the main dwelling; and e) all associated site works and services
For the proposed extension to the side of existing dwelling house currently under construction and as granted under planning ref P17/389
For the following a) to change the use of 2 No. ground floor commercial units into 2 No. ground floor apartments b) to add a single storey rear extension to each ground floor apartment c) to alter the ground floor front elevations along with associated site works
For material change of use and alterations of existing public house and dwelling into two townhouses including all ancillary works at existing site
Of three no. cooling units to the rear of the premises along with all associated site works
For development of a livestock slatted unit and a silage slab with apron and associated ancillary site works
To construct an additional afterschool room along with all associated works
To construct an extension to the rear of an existing dwelling house along with alterations to the existing house and ancillary works
Of changes to the design of private garage/ store previously authorised under planning reference number P13/51 along with all other necessary ancillary and associated works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a new dwelling house, outbuildings and garage, new entrance, access road, and install a new wastewater treatment system along with all associated works
The development works on a 1.79ha /4.43 acre at St John of Bosco Community College, Quay Road, Cahercon, Kildysart, Co Clare V95 TXF1. The development will consist of planning permission for development of: (i) School Building Extension (1,203m²) over 2 levels, incorporating General and Specialist Classrooms, Social Spaces, two classroom Special Education Needs Unit, Reception, Offices and Ancillary accommodation. (ii) Internal road realignment incorporating bus set down, 6no. new car parking spaces and 2no. wheelchair accessible parking spaces. (iii) Services to include solar panels (125m²), Boiler House, Gas & Heat Pump Compounds. (iv) Onsite treatment plant prior to discharge to existing council foul mains. (v) 14no. car parking spaces and hardstand to serve the existing community playground. (vi) All ancillary site works including drainage, landscaping, site lighting and construction compound. (vii) a Construction, Environmental Management Plan (CEMP) is provided in support of this application, (viii) take note that following a requirement of the Planning Authority a Natura Impact Statement (NIS) will be submitted to the planning authority with the application,
For the erection of a meteorological mast in the townland of Crossmore, Co Clare at the location of the consented Crossmore Wind Farm (planning Ref: 09/123). The site is located approximately 4.2km north of Kilmurray McMahon, 4.8km southeast of Kilmihil and 15km east of Kilrush. The development will consist of: - The erection of a free-standing, lattice meteorological mast of up to 80 metres in height,- Associated works, services and hardstanding area. The mast will be in place for the operational period of consented wind farm.
For demolition of an existing side conservatory. Construction of a single storey side extension and first floor rear dormer. RETENTION of revised site boundaries different to those as granted und Pl. Ref. No. P01-1703. RETENTION of a change of use of an existing garage to a home gym/ playroom and minor elevational changes to same and for an existing rear garden shed, and all associated works
To part demolish, reconstruct and extend existing dwellinghouse and to construct domestic garage plus all ancillary site works
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
To construct a new dwelling house, new entrance, private garage, to provide connections to sewerage and water facilities along with all associated works
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
To (a) demolish an existing garage and (b) permission to construct extensions to the front and side of an existing dwelling house along with alterations to the existing dwelling including lifting the roof to incorporate first floor living accommodation and (c) permission to construct a new garage, along with ancillary works
For development which will consist of modifying the extensions from those previously granted under Planning Application P21/1113 along with ancillary works
To construct an agricultural machinery shed along with associated site works
To construct an agricultural machinery shed along with associated site works
To carry out alterations and extension to the existing dwelling and add a storage shed along with all associated works
To a). construct a single-storey extension to the side and rear of existing dwelling house, including an astro turf play area to rear of extension, and new private garage; b). demolish the existing private garage; c). close off existing front site entrance and create new site entrance from side road; d). upgrade existing wastewater treatment system; e). provide new stone wall boundary treatment along main and side road frontage; f). all associated site works and services; and RETENTION permission for demolished cottage on site
To construct a dwelling house, entrance, driveway, wastewater treatment system and all associated site works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To change the design of dwelling as granted under existing planning permission number P20-627, and all associated site works
To construct a dwelling house and garage, with effluent treatment system, accessed by means of an existing shared entrance and driveway from the public road and all associated site works
For development in the townlands of Crossmore, Derrynageeha, Ballyduneen, Carrowreagh West, Corraige, Knockalough, Crag, Furroor, Boolynamweel, Illaunatoo or Sorrelisland, Boolynaknockaun, Glenmore and Booltiagh. The Development will consist of: 1. A 38kV electrical connection over a total of approximately 11km, from the permitted Crossmore Wind Farm (planning ref: P09/123, as extended under planning ref: 19/388 and altered by P20/824) to the existing 110kV Booltiagh substation. This connection will consist of approximately 10km of overhead line and associated 97 no. wooden polesets (single, double and triple structures with approximate heights between 14-19 metres), and approximately 1km of underground cabling. The cable will travel underground within the wind farm site (in the townlands of Cross More and Derrynageeha), underground on private lands (in the townlands of Boolynamweel, Illaunatoo and Boolynaknockaun) and under the public road prior to entering the Booltiagh substation (in the townlands of Boolynaknockaun and Booltiagh). 2. Roads and access arrangements/works consisting of: a) Creation of new permanent access gate into private lands off the L6180 local road; b) Construction of new access roads to facilitate provision of the grid connection, to be retained for permanent use; and c) Upgrade of the existing public road network for turbine delivery including; I. Junction improvement works at the N68 and L6180; II. Widening along the L6180. 3. The proposed development also incorporates construction of the following elements at the site of the permitted 7-turbine Crossmore Wind Farm (ref: P09/123, as extended by P19/388, and altered by P20/824) which will have a 25 year operational lifespan from the date of commissioning: a) Provision of a permanent 38kV substation north of permitted Turbine 5 in lieu of previously approved substation located south of Turbine 2; b) Redesign of permitted turbine hardstand areas consisting of additional temporary hardstand areas for blade storage; c) Provision of 2 no. temporary construction compounds; d) Proposed upgrade of existing access road and proposed new areas of access road between permitted Turbines no. 5 and no. 6, in lieu of permitted upgrade of existing access road between permitted Turbines no. 2 and no. 5; e) All associated underground cabling between permitted turbines and relocated substation, and; To view remainder of description please view newspaper notice.
To RETAIN the developed attic space, additional velux roof lights and front boundary wall as constructed
To demolish existing shed and barn, construct a new dwelling house and garage, construct a new entrance and modify existing farm entrance, install a new sewerage treatment system along with all associated works
To renovate and extend an existing cottage, demolish an existing haybarn, alter the existing entrance to provide a separate access for the dwelling and farm, setback the existing roadside boundary to improve the sight distance for the existing entrance and install a new wastewater treatment system along with all associated works
To reorientate an existing private road away from his dwelling house along with all necessary ancillary works
Of the construction of an extension to an existing dwelling and extension to existing sheds along with all associated works
To construct a 3 bay slatted shed, underground slurry storage tank along with all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from the public road, and all associated site works
For the refurbishment of and extension to an existing cottage along with all associated site works
For change of design to the dwelling house granted under planning P24-60266 along with all associated works