Conversion of existing attic space comprising of modifications of existing roof structure, raising of existing gable c/w window and 'Dutch' hip, new access stairs and flat roof dormer to rear
Ground floor extension to side and rear of existing house and new dormer window in roof to the back of the house.
Kelland Homes Ltd seeks permission for retention development, consisting of the replacement of permitted railing located to the rear of 8 no. duplex blocks under grant of permission SDZ22A/0010 with a proposed dividing wall measuring 1.8m in height sloping down to 1.1m on the overall site measuring 0.1ha located within Keepers Lock Clonburris Dublin 22.
Conversion of existing attic space comprising: modification of existing roof structure, raising of existing gable c/w window and 'Dutch' hip, new access stairs and flat roof dormer to the rear.
Single storey side and rear extension with pitched roof c/w roof lights; new front porch structure (as previously granted Ref. SD19B/0069).
Attic conversion consisting of: raising gable end with hipped roof to allow for extra head room; dormer projection to rear for playroom/office use with bathroom; kitchen/lounge extension to side and rear on ground floor and all associated site works.
Amalgamation of units F2 and F3 (with connecting doors at ground and first floor levels) and its use for warehouse and distribution with ancillary trade counter and showroom at ground and first floor levels; Retention of offices at second floor level which are ancillary to the overall warehouse operation; Retention of all signage and external illumination of the signage.
Building 4 larger houses (than the previous application), 4 houses - 2x2 storey and 2x2 storey dormer houses, with associated parking and private open space etc.
Construction of 157 dwellings within the Clonburris South-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019 consisting of, 81 houses comprising of 4 two bedroom houses, 65 three bedroom houses and 12 four bedroom houses (all two storey with associated private open space and car parking; 76 apartment units consisting of 26 one bedroom and 50 two bedroom units within Block 1 (4 storeys); Vehicular access will be provided from the permitted street under SDZ21A/0022 and the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 (Fonthill Road) to the east; All ancillary site development works including footpaths, landscaping boundary treatments, public and private open space areas, car parking (170 spaces) and bicycle parking (170 spaces), single storey ESB sub-stations, bin and bicycle stores and all ancillary site development/construction works all on wider lands bounded generally by the Dublin-Cork railway line to the north, undeveloped lands and Grand Canal to the south and undeveloped lands and the Fonthill Road (R113) to the east, in accordance with the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
(1) a new access roadway into the site from Cloverhill Road; (2) a new single-storey changing facility for Ballyfermot Utd. Sports & Social Club including new vehicular and pedestrian access gates to the club grounds from the new access road and parking for 37 cars and 2 buses and (3) residential development of 43 2-storey dwellings including 44 car spaces and comprising 4 Type A 3-bedroom semi-detached houses, 19 Type B 3-bedroom terraced houses, 16 Type C 3-bedroom terraced houses and 4 Type D 2-bedroom terraced houses. The proposed development also includes all associated landscaping, site development and infrastructural works.
Planning permission for a front entry porch
Retention of (1) conversion of existing attic space to home office / storage use. (2) Dormer window to the side hip. (3) 3 no. rooflights to the rear roof plane and all associated site works.
The development will consist of a change of roof type from hipped to pitched by raising the gable wall, including an attic conversion to a home office and storage, a window in the gable wall and a rear roof dormer
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Retention permission for the continuation of the temporary staff car park for a period of 5 years consisting of 204 spaces (previously authorised under Planning Application Reg. Ref. No. SD15A/0159) and a shop mobility structure (c. 34sq.m). Permission is also sought for a period of 5 years for a new barrier at the entrance to the temporary car park: and all ancillary site services, drainage and site development works.
Retention of coffee shop use & internal seating area within shop unit at ground (79sq.m); provision of additional internal seating area of 51sq.m; new shop opening onto shopping mall and seating area of 15sq.m within the mall directly in front of shop unit; all associated site services & development works.
Construction of an enclosed yard (8.6sq.m) and associated changes to ESB sub-station building.
Planning permission is sought for the following: (1) Conversion of existing attic space comprising of modification of existing roof structure, raising the existing gable, new access stairs and flat roof dormer to the rear.
Construction of an enclosed yard (17.2sq.m).
Construction of single storey ancillary extension to north of existing building (Block 4) along with relocation of 1 previously approved sign on north elevation.
1 freestanding and illuminated entrance signage structure (c.5.46 metres in height and c.12.15 metres in length) displaying 'Liffey Valley' located adjacent to Fonthill Road and all associated ancillary site development works.
The development will consist of the installation of 2 no. retail/food/beverage kiosks in the existing mall of Liffey Valley Shopping Centre. Each kiosk is c.15 sq.m (5m x 3m) and c.4m in height with signage of c.12.8 sq.m (2 no. signs of 5m x 0.8m and 2 no. signs of 3m x 0.8m) and an associated seating area of c. 53.8sq.m.
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
New office space at first floor level (66.sq.m); minor alterations on the road frontage elevation (southeast) to include additional windows for new offices; all works proposed are ancillary to the use of the existing building and business.
A single storey rear and side extension, minor internal alterations and all associated siteworks
The construction of new office space at ground floor level including revisions to the front and side elevations to include external windows and doors, all works proposed are ancillary to the use of the existing building and business.
The construction of new office space at first floor level including enclosing the existing access stairs (total area @ 87.915 sq./mts), all works proposed are ancillary to the use of the existing building and business.
Attic conversion to a non-habitable storage space with hip roof to gable to allow stairs access to attic with roof windows to front of existing house and frosted window to side gable all with ancillary works.
Attic conversion including a rear dormer roof extension, a new window to the gable wall, 2No. rooflights to the front elevation, new internal access stairs, and all associated site works.
The proposed development will consist of the subdivision of existing Unit 40B (c.161sq.m) into a retail unit (c. 83sqm), a storage room (c.29 sq.m), a circulation corridor (c. 37 sq.m) and a non-accessible area (c.7 sq.m), and all associated site services and development works.
Change of use of existing retail unit to use as a hot food takeaway shop with home delivery service.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Two storey extension to front, side and rear of existing house; side access pedestrian entrance to rear garden on boundary wall opening into rear garden and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Mixed use scheme which consists of: (a) 252 residential units in 3 blocks made up of 247 apartment/duplex units within 2 2-8 storey blocks (1 of which is over podium car park) comprising 119 one bed units, 125 two bed units, and 3 three bed units; 5 2 storey, three bed semi-detached/terraced house; all of the residential units will have associated private open space/balconies/terraces facing north/south/east/west; (b) a separate non-residential block measuring (total floor area c. 1118sq.m) and will comprise a creche (c.430sq.m), retail unit (c. 269sq.m), gym (c.152sq.m), community room (c. 231sq.m), and concierge (c. 36sq.m). The development will have 225 car parking spaces (145 spaces at under croft level, 70 spaces at surface level and 10 spaces at the 5 houses), 5 motorcycle parking spaces and 308 secure bike parking spaces. The site is accessed through the existing vehicular access to the west, off the unnamed road to the west. There will be a number of pedestrian entrances along St. Lomans Road, the Fonthill Road (R113) and the unnamed road to the west. In addition to all the new facilities all other site services and works to enable the development of the site will also be provided including site, bin stores, ESB substations, associated roadworks and services connections, a large quantity of public and communal open space, boundary treatment works and landscaping.
Modifications to the previously permitted Strategic Housing Development granted on the subject site (Reg. Ref. ABP-305857-19), which is currently under construction. The proposed development will provide for amendments to the permitted development as follows: • Permitted Block 1 increased in height by 1 storey and will now comprise 235 apartments in total (an increase of 21 from the permitted 214) • Permitted Block 2 layout will be reconfigured, and increased in height by 1 storey, and will now comprise 34 apartments (an increase of 1 from the permitted 33) • Replacement of permitted Block 3 (a terrace of 5 2 storey, 3-bed houses) with a new 4-5 storey apartment block comprising 28 apartments (an increase of 23 from the permitted 5) • Replacement of permitted Block 4 (a 3 storey commercial block comprising creche, gym, retail unit, community room and concierge) with a 2-5 storey block comprising 16 apartments, creche and residential amenity space (providing a gym, co-working space, a multi-use room, kitchenette and reception). The overall development, as modified, will increase from 252 permitted residential units (comprising 247 apartments/duplexes and 5 houses) to 313 apartments in four blocks (an increase of 61 units) and including 137 1-beds, 171 2-beds and 5 3-beds. The building height will now range up to 9 storeys (previously up to 8 storeys). All apartments will have associated private balconies/terraces to the north/south/east/west elevations. Permitted parking will be revised to now provide 214 car parking spaces (a decrease of 11 spaces) and 378 bicycle parking spaces (an increase of 70 spaces). All associated site services and works to enable the development including bin stores, ESB substations, associated roadworks and services connections, public and communal open spaces, vehicular access, pedestrian/cyclist connections, boundary treatment works and landscaping.
Installation of 860 Solar PV Panels over the roof of existing retail building and all associated site works and services.
The development will consist of change of use of the existing vacant ground floor retail unit 1B to a new medical centre, comprising 3 No. consultation rooms, reception and waiting area, canteen and WC facilities and to include alterations of existing double doors on North Elevation to 2 No. single doors.
The installation of a pedestrian gate at an existing pedestrian access point to a residential development.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, 2no. roof windows to the front, new access stairs and flat roof dormer to the rear.
Installation of roof mounted solar photovoltaic panels to include all ancillary works and services.
The conversion of the existing attic space including new internal stairs and proposed flat roofed dormer to the rear of the property, 2 no. rooflights & solar panels to the roof at the front of the property, plus external insulation to the existing property, amendment to the existing window at the side gable, landscaping and all other ancillary site development works required to facilitate the development.
The development consists of a two-storey extension to the side, a single-storey extension to the rear, a rear dormer roof, and necessary ancillary work to facilitate the development.
Construction of a single storey valeting building and canopy and associated site works and services.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Internal separation of the house and associated granny flat to provide for 2 permanent houses and extension of rear garden. Part of the development site is located within the Clonburris Strategic Development Zone.
Internal separation of house and associated granny flat to provide for 2 permanent houses.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Installation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.