SD15A/0061/EP2

10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

Grange Castle Business Park, Clondalkin, Dublin 22South Dublin County CouncilExtension Of Duration Of Permission0 reasons0 conditions1.6 km away
Granted23 January 2025
SD15A/0061/EP

10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

Grange Castle Business Park, Clondalkin, Dublin 22South Dublin County CouncilExtension Of Duration Of Permission0 reasons0 conditions1.6 km away
Refused21 October 2024
SD23A/0079

Alterations to a previously approved development (Reg. Ref. SD15A/0061 and Reg. Ref. SD16A/0398) which relates to a 10-year permission for the construction of a Peaker Power Plant in a single storey building with a mezzanine level, together with associated plant equipment including water & fuel tanks. The alterations to the previously approved development (Reg. Ref. SD15A/0061 & SD16A/0398) include the following: (i) alterations to the previously approved building within the eastern portion of the site as follows: (a) an increase in the overall footprint of the building to the north-west to include office space, and staff facilities at ground floor level; and to the north-east to include a boiler room at ground floor level; (b) revised roof footprint to the rear of the building, with the roof being lowered to the rear; (c) relocation of stair cores and updates to building elevations, including the introduction of additional glazing; (d) amendments to the external open service yard to the north of the building including the removal of the previously approved transformer rooms, addition of containerised plant and minor alterations to the location of shaft towers; (e) a minor increase in the height (by 600mm) of the screen to the service yard. Alterations to the western portion of the site include; (ii) minor amendments to the positioning of the internal roadway; (iii) amendments to the tank bund area and tank arrangement to the west of the site, and the addition of contained plant and a pump house building; (iv) minor amendment to the location of the approved tanker unloading area; (v) relocation of car parking spaces from the south of the site to the north of the main bund areas, with the exception of the approved accessible parking space; (vi) provision of a gas skid & support structure to the south-west of the site; (vii) provision of an enlarged plant compound to the west of the bund area and relocation of transformers to this compound; (viii) revisions to the positioning and an increase in size of the approved pipe bridge to align with services; (ix) provision of a new bicycle parking shelter comprising 8 no. parking spaces; (x) amendments to soft landscaping to accommodate the revised layout and; (xi) drainage, boundary treatments, site lighting, EV car charging ports; and all associated site development and ancillary works necessary to facilitate the development. The capacity of the plant will be 115MW as approved under Reg. Ref. SD15A/ 0061. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

A 1.233 hectare Site Located at Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.6 km away
Granted14 June 2023
SD20B/0043

Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs and flat roof dormer to the rear.

3, Corkagh View, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.6 km away
Granted23 April 2020
SD25B/0116W

Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.

1, Corcagh View, Clondalkin, Dublin 22, D22 R1W2South Dublin County CouncilPermission0 reasons0 conditions1.6 km away
Granted06 May 2025
SD21B/0356

Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window; access stairs and flat roof dormer to the rear.

29, Pinewood Estate, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.6 km away
Granted12 October 2021
SD21A/0304

Detached house and septic tank.

Kilmatead, Green Isle Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.6 km away
Refused13 January 2022
SD24B/0152

Conversion of existing attic into non-habitable room including a new dormer window to the rear. The development will also consist of building up the existing side gable wall to form a pitched roof with a gable end and will include a window to the side elevation of the dormer. This is all together with associated site works

50, Hazelwood Crescent, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.6 km away
Granted23 July 2024
SD22A/0349

Modifications to the existing main site entrance to comprise of minor realignment of the internal access road with adjusted road marking and roadside bollards; Removal of 3 existing security traffic arms; Installation of 3 new security traffic arms and installation of 3 underground lifting security road blockers together with associated communications and electrical services; Provision of 2 set-down only parking spaces and all associated site drainage and installation works.

Dublin Google Data Centre, Grange Castle Business Park South, 22, Baldonnel Road, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.6 km away
Granted28 October 2022
SDZ22A/0017

Construction of 157 dwellings within the Clonburris South-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019 consisting of, 81 houses comprising of 4 two bedroom houses, 65 three bedroom houses and 12 four bedroom houses (all two storey with associated private open space and car parking; 76 apartment units consisting of 26 one bedroom and 50 two bedroom units within Block 1 (4 storeys); Vehicular access will be provided from the permitted street under SDZ21A/0022 and the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 (Fonthill Road) to the east; All ancillary site development works including footpaths, landscaping boundary treatments, public and private open space areas, car parking (170 spaces) and bicycle parking (170 spaces), single storey ESB sub-stations, bin and bicycle stores and all ancillary site development/construction works all on wider lands bounded generally by the Dublin-Cork railway line to the north, undeveloped lands and Grand Canal to the south and undeveloped lands and the Fonthill Road (R113) to the east, in accordance with the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.

Within the townland of Cappagh, Clonburris, Dublin 22South Dublin County CouncilSDZ Application0 reasons0 conditions1.6 km away
Granted16 May 2023
SD24B/0330W

Retention of an existing porch at the front elevation of the house and permission to widen the driveway from 2.84m to 3.5m width.

12, Church View, Clondalkin, Dublin 22, D22 F4W6South Dublin County CouncilPermission and Retention0 reasons0 conditions1.6 km away
Granted16 September 2024
SD21B/0374

Conversion of existing attic space to non-habitable storage/office area with new revised roof profile (from hipped to half hipped gable roof) to side/rear with new dormer window extension to rear roof with 2 'Velux' rooflights to front roof elevation; new window to side gable; internal modifications and associated site works.

40, Hazelwood Crescent, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted13 October 2021
SD24A/0019

Amendments to a previously permitted development (Ref. SD21A/0203 which amended Ref. SD20A/0283); Amendments relate to the permitted Gas Skid Compound to provide layout details which will include the provision of a boiler house kiosk, Electrical & Instrumentation kiosk, regulators/meters kiosk, gas analyser kiosk and all associated infrastructure and site development works; The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Licence; The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.

Microsoft, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted25 March 2024
SD25A/0017W

Microsoft Ireland Operations Ltd. intend to apply for permission for development at the Microsoft Campus, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22. The development will consist of the temporary provision of 9 No. generators (fuelled with Hydrotreated Vegetable Oil (HVO)) and associated site development works for a period to run concurrently with the lifespan of the permitted development under South Dublin County Council (SDCC) Reg. Ref. SD20A/0283 and SD21A/0203. The maximum height of the flue stacks associated with the generators is c. 30.95m. The temporary works will be removed when the permission expires. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.

Microsoft Campus, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22, D22 F1W8South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted27 March 2025
SD20A/0264

Change of use of existing convenience shop to include part off-licence use (gross floor area for off-licence use 22sq.m) and associated works.

Unit 5, Greenpark Shopping Centre, St Johns Drive, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted14 December 2020
SD24B/0019

The development will consist of the construction of two small dormer windows in the main roof to the rear of the property

72, Saint John's Wood, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted14 March 2024
SD25A/0285

Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank to be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame erected over the proposed generator and existing telecoms equipment, (covering an area of approximately 36 sq.m., to a maximum height of 4.6 meters above local ground level.) Works to include all ancillary development works, all located within an existing fenced compound.

ESB Telecoms Ltd Telecommunications Compound, ESBs Grange Castle 110kV Substation, Grange Castle International Business Park, Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted23 January 2026
SD20B/0420

Single storey extension at side.

53, Oakwood Grove, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted11 January 2021
SD25B/0561W

Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.

28, Hazelwood Lane, Clondalkin, Dublin 22, D22 W802South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted13 November 2025
SD20A/0227

Retention for conversion of retail premises to (a) first floor 1 bedroom apartment and (b) ground floor 1 bedroom apartment.

Millstone House, Old Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilRetention0 reasons0 conditions1.7 km away
Refused08 February 2021
SD19A/0378

Retention for conversion of retail premises to first floor two bedroom apartment and ground floor one bedroom apartment.

Millstone House, Old Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilRetention0 reasons0 conditions1.7 km away
Refused13 February 2020
SD21A/0132

Retention of 2 apartments previously used as a two storey retail premises comprising a 1 one bedroom apartment at ground floor level and 1 two bedroom apartment at first floor level; Permission for internal amendments and minor elevational alterations at first floor level to the southern and western elevations along with proposed new bin storage, bicycle parking and all other ancillary site development works.

Millstone House, Old Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilPermission and Retention0 reasons0 conditions1.7 km away
Granted07 February 2022
SD24B/0580W

Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and 2no. roof windows to the front and flat roof dormer to the rear

43, Oakwood Grove, Clondalkin, Dublin 22, D22 H7Y4South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted18 February 2025
SD23B/0314

Alteration and extension of the existing two storey semi-detached house comprising demolition of the existing single storey garage and front porch screen and construction of a new single storey extension with clerestory roof and a new single storey flat roof front porch extension, plus alteration to existing fenestration and associated internal alterations and site Development

30, Hazelwood Lane, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted12 September 2023
SD22A/0087

Install a new LPG Safety Installation in a caged enclosure 1.8m x 1.2m x 1.2m (LxWxH) servicing the existing LPG storage installation with all ancillary services and associated site works.

Lynch's Park, Lucan, Co. DublinSouth Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted09 November 2022
SD22B/0079

Retention for detached single storey shed/gym/office to the rear of the garden with ancillary works.

23, Churchview, Gibraltar, Dublin 22South Dublin County CouncilRetention0 reasons0 conditions1.7 km away
Granted13 January 2023
SD24A/0164W

Ten-year planning permission is sought for the expansion of existing Google Ireland Limited operations at Grange Castle Business Park South, Dublin, including the development of a 72,400m² data storage facility which will incorporate data halls with associated support areas, a high voltage compound, offices and staff facilities, a loading area, mechanical and electrical yards, internal and external utilities, security fence and gates, landscaping including acoustic screening, 2 no. stormwater attenuation ponds, additional internal vehicle and pedestrian infrastructure, together with ancillary buildings and site infrastructure. The development also includes the creation of a new active travel thoroughfare connecting Grange Castle Business Park South and Profile Park Road.

Grange Castle Business Park South and Profile Park, Baldonnell, Dublin, D22 X602South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Refused22 August 2024
SD25B/0165W

Planning permission is sought attic conversion with projected dormer window to rear roof, storage, games room facility, permission also sought for single storey kitchen to rear of existing house, permission also sought for new single storey building to rear garden for home office / gym use and all associated site works

37, Oakwood Grove, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted21 May 2025
SD21A/0203

Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted10 November 2021
SD20A/0121

Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the Grange Castle South Business Park and includes the residential property of Ballybane, Old Nangor Road on land within the townlands of Milltown; Ballybane and; Aungierstown and Ballybane; and bounding Baldonnel Road to the west; both the Old and New Nangor Road to the north; and Grange Castle South Access Road to the South, Baldonnel, Dublin 22. The development will consist of the following: (1) The demolition of the existing two storey dwelling of Ballybane and associated farm buildings (565sq.m) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq.m on an overall site of 16.5hectares. (2) 1 two storey data centre (Building A) that will be located to the south-west of the site and will have a gross floor area of 28,573sq.m. and will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (Building B) which will be located to the north-west of the site, and to the immediate north of Building A and will have a gross floor area of 21,725sq.m and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (Building C) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq.m. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) Each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) The overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq.m). (8) 3 single storey MV buildings (each 249sq.m - 747sq.m in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings A and B, and to the south of the generator compound withing building C. (9) 8 prefabricated containerised electrical rooms (65sq.m each and 520sq.m overall) that are stacked in pairs to the immediate south of the temporary substation. (10) Ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under Baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq.m), security hut (30sq.m) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the Grange Castle South Access Road from the south via the Baldonnel Road. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.

Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted29 July 2020
SD22A/0283

Retention permission for 3 No of storage units / valeting bays, with car parking car storage area with all associated site works

Block C, Kingswood Business Park, Unit B18, Dublin 22South Dublin County CouncilRetention0 reasons0 conditions1.7 km away
Granted18 August 2022
SD25A/0097W

The installation of solar carports and a ground mounted solar PV array. The proposed development will consist of solar carports (three and five panel versions) over existing surface car park areas, solar panels on ground mounted frames, 1 no. single-storey low voltage / medium voltage transformer (skid) unit, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for carport areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via existing site entrances from the existing Grange Castle Business Park internal road network.

Takeda Ireland Limited facility, Grange Castle Business Park, Nangor Road, Grange, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.7 km away
Granted11 August 2025
SD20A/0109

2 storey modular classroom building and a single storey toilet building, steel framed covered walkway structure linking to the existing school, relocation of existing bicycle shelters and all associated site development works.

Kishoge Community College, Thomas Omer Way, Lucan, Co. DublinSouth Dublin County CouncilSDZ Application0 reasons0 conditions1.7 km away
Granted16 July 2020
SDZ21A/0006

Wastewater pumping station comprising of (a) below ground 24-hour emergency storage tank; (b) below ground inlet, wet well, flow meter and valve chambers; (c) control and welfare building with green roof and 2 odour control units; (d) boundary wall, fencing, entrance gate and landscaping; (e) site drainage system including a swale; (f) all associated ancillary and enabling works including hardstanding and access, located within the Clonburris Strategic Development Zone.

Lands to the east of Fonthill Road (R113) and west of Cappaghmore, Cappagh, Clondalkin, Co. DublinSouth Dublin County CouncilSDZ Application0 reasons0 conditions1.8 km away
Granted08 November 2021
SD19B/0445

Construction of single storey extension to side and rear of existing dwelling with rooflights and all associated site works.

84, Saint John's Wood, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted17 January 2020
SD24A/0122W

The installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electrical connection on land adjacent to the Skatepark at Clondalkin Leisure Centre, Old Nangor Road, Clondalkin, Co Dublin.

Clondalkin Leisure Centre, Old Nangor Road, Clondalkin, Dublin 22.South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted10 July 2024
SD19A/0379

Detached four bedroom house with shared vehicular access; shared parking and all associated development works.

21, Bushfield Lawns, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Refused15 May 2020
SD21A/0029

Detached three bedroom dormer bungalow house with shared vehicular access; shared parking and all associated development works.

21, Bushfield Lawns, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Refused08 April 2021
ABP-309146-21

The proposed development primarily comprises the provision of two 110kV transmission lines and a 110kV Gas Insulated Switchgear (GIS) substation compound along with associated and ancillary works and is described as follows: The proposed 110kV GIS Substation Compound is to be located on lands to the north-east of the two storey data centre facility and associated three storey office block that was permitted under SDCC Reg. Ref. SD18A/0134/An Bord Pleanála Ref. ABP-302813-18, and within an overall landholding bound to the north by the Grange Castle South Business Park access road; to the west by the Baldonnel Road and to the south by 3 residential properties and the Baldonnel Road; and to the east by the Google data centre facility within the Grange Castle South Business Park, Baldonnel, Dublin 22. The site of the proposed development has an area of c. 0.9163 hectares. The proposed 110kV Gas Insulated Switchgear (GIS) Substation Compound includes the provision of a two storey GIS Substation building (with a gross floor area of 1,307.2sqm) (known as the Aungierstown Substation), two transformers, lighting and lightning masts, car parking, associated underground services and roads within a 2.6m high fenced compound and all associated construction and ancillary works. Two proposed underground single circuit 110kV transmission lines will connect the proposed Aungierstown 110kV GIS Substation to the existing 220kV / 110kV Castlebaggot Substation to the immediate north-east. The proposed transmission lines cover a distance of approximately 120m and 140m within the townlands of Ballybane, and Aungierstown and Ballybane. The development includes the connections to the two substations (existing and proposed), changes to landscaping permitted under SDCC Reg. Ref. SD18A/0134 / An Bord Pleanála Ref. ABP-302813-18 and all associated construction and ancillary works. An Environmental Impact Assessment Report has been prepared in respect of this application. The planning application and the Environmental Impact Assessment Report may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy) during public opening hours for a period of seven weeks commencing on the 21st January 2021 at the following locations: The Offices of An Bord Pleanála, 64 Marlborough Street, Dublin 1. South Dublin County Council, County Hall, Town Centre, Tallaght, Dublin 24. The application may also be viewed/downloaded on the following website: www.aungierstown-substation.com Submissions or observations may be made only to An Bord Pleanála ('the Board'), 64 Marlborough Street, Dublin 1 during the above-mentioned period of seven weeks relating to: the implications of the proposed development for proper planning and sustainable development, and the likely effects on the environment of the proposed development, and the likely significant effects of the proposed development on a European site, if carried out. Any submissions/observations must be accompanied by a fee of €50 (except for certain prescribed bodies) and must be received by the Board not later than 5.30p.m. on the 10th March 2021. Such submissions/observations must also include the following information: The name of the person making the submission or observation, the name of the person acting on his or her behalf, if any, and the address to which any correspondence relating to the application should be sent, The subject matter of the submission or observation, and The reasons, considerations and arguments on which the submission or observation is based in full. (Article 217 of the Planning & Development Regulations refers). Any submissions or observations which do not comply with the above requirements cannot be considered by the Board. The Board may at its absolute discretion hold an oral hearing on the application. (For further details see ‘A Guide to Public Participation in Strategic Infrastructure Development' on the Board’s website www.pleanala.ie). The Board may in respect of an application for permission/ approval decide to (a) (i) grant the permission/approval, or (ii) make such modifications to the proposed development as it specifies in its decision and grant permission/approval in respect of the proposed development as so modified, or (iii) grant permission/approval in respect of part of the proposed development (with or without specified modifications of it of the foregoing kind), and any of the above decisions may be subject to or without conditions, or (b) refuse to grant the permission/approval. Any enquiries relating to the application process should be directed to the Strategic Infrastructure Development Section of a Bord Pleanála (Tel. 01- 8588100). A person may question the validity of any such decision by the Board by way of an application for judicial review, under Order 84 of the Rules of the Superior Courts (S. I. No.15 of 1986, as amended), in accordance with section 50 of the Planning and Development Act, 2000, as amended. Practical information on the review mechanism can be accessed under the heading Information on cases / Weekly lists - Judicial review of planning decisions on the Board's website www.pleanala.ie or on the Citizens Information Service website www.citizensinformation.ie.

Grange Castle South Business Park, Clondalkin, Dublin 22South Dublin County CouncilStrategic Infrastructure Application0 reasons0 conditions1.8 km away
Granted19 July 2021
SDZ24A/0019W

The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ22A0018 comprising in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows: A) Reconfiguration of internal arrangement in Block E to allow for the replacement of 5 no. permitted 1 bedroom apartments with 5 no. 2 bedroom apartments at first floor to fifth floor levels within Block E (facing internal courtyard), and the replacement of 2 no. 1 bedroom apartments with 2 no. 2 bedroom apartments at ground floor level of Block G and H to result in an overall mix of 257 no. 1 bedroom apartments, 318 no. 2 bedroom apartments and 32 no. 3 bedroom apartments (no change to overall no. of permitted apartments) and all associated elevation changes; B) Reconfiguration and amendment to floor areas of retail/café/retail service units and associated alterations to internal podium level to result in an overall increase of c. 51 sq. m of Gross Floor Area (an overall increase from 1,150 sq. m to 1,201 sq. m), and all internal reconfigurations; C) Inclusion of green roof in place of pitched roof along portion of Block A (eastern block - no change to internal arrangements or profile fronting onto external street); D) Amendments to undercroft car parking arrangements to now provide 378 no. car parking spaces (compared to 385 no. car parking spaces permitted) and alterations to cycle parking in bike stores and surface spaces to now provide 1,620 no. cycle spaces (compared to 1,548 no. cycle spaces permitted) and all internal/external reconfigurations.

Within the townland of Cappagh, Clonburris, Dublin 22South Dublin County CouncilSDZ Application Clonburris0 reasons0 conditions1.8 km away
Granted02 September 2024
SDZ22A/0018

Construction of a mixed-use development comprising 594 apartments, office floorspace, 4 retail units, a creche and urban square in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows, 594 apartments (255 one bedroom apartments, 307 two bedroom apartments and 32 three bedroom apartments (all apartments to have terrace or balcony; ancillary communal amenity spaces for residents) as follows; Block A (4 and 6 storeys with undercroft) comprises 96 apartments consisting of 36 one bedroom apartments, 48 two bedroom apartments and 12 three bedroom apartments (with creche c. 609sq. m at ground and first floor as well as play area; Block B (6 storeys with undercroft) comprises 77 apartments consisting of 44 one bedroom apartments, 28 two room apartments and 5 three bedroom apartments; Block D (5 and 7 storeys with undercroft) comprises 71 apartments consisting of 39 one bedroom apartments and 32 two bedroom apartments; Block E (6 storeys with undercroft) comprises 100 apartments consisting of 47 one bedroom apartments, 48 two bedroom apartments and 5 three bedroom apartments; Block F (5 and 7 storeys with undercroft) comprises 124 apartments consisting of 57 one bedroom apartments, 61 two bedroom apartments and 6 three bedroom apartments; Block G (1, 2 and 4 storeys with undercroft) comprises 65 apartments consisting of 16 one bedroom apartments, 45 two bedroom apartments and 4 three bedroom apartments; Block H (4 storeys with undercroft) comprises 61 apartments consisting of 16 one bedroom apartments and 45 two bedroom apartments; Mixed use development comprising, commercial office development in Block C of 6 storeys with parapet above to 7 storey equivalent on elevations (c. 4,516sq.m), 1 retail unit at ground floor of Block B (c.147.5sq. m) and 3 retail units at ground floor of Block E as follows (c.106.2sq.m, c.141.6sq.m and c.492.2sq.m respectively) as well as a creche (c. 609sq. m) at ground floor and first floor of Block A; Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R 113 to the east; Public Open Space/landscaping of c. 0.52 hectares (urban square) and linear open space (0.72 hectares) as well as a series of communal open spaces to serve apartments over undercroft level (and internal communal open space c. 685 sq.m; The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (396 no. spaces in a mixture of undercroft spaces Block A, Block B&D and Block E&F) and bicycle parking (1,232 spaces at undercroft and surface levels), single storey ESB substations/bike/bin stores, green roofs, solar panels at roof level of apartments, plant areas within blocks and all ancillary site development/construction works; Permission is also sought for connection to water supply, and provision of foul drainage infrastructure. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area ' as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.

Within the townland of Cappagh, Clonburris, Dublin 22South Dublin County CouncilSDZ Application0 reasons0 conditions1.8 km away
Granted31 October 2023
SD20A/0147

Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the construction of a circa 2,155sq.m, two storey biopharma production facility to a maximum height of circa 14.9m to be located to the south of the existing P3 building; single storey administration extension of circa 210sq.m to a maximum height of 4m to the north of the existing P3 building and internal modifications to the existing P3 building in addition to all associated site works including delivery area; courier pick up/drop off area with 5 parking spaces (including 1 accessible parking space and 1 E-car space); extension to existing external utilities yard (circa 485sq.m) for 3 heat pumps and other ancillary equipment; new internal site circulation road and re-alignment of existing circulation road; 48 additional car parking spaces (including 3 accessible parking spaces and 5 E-car spaces); 24 covered bicycle stands, hard and soft landscaping and external lighting; there will be temporary site entrance and associated temporary access road located to the south east of the site during the construction phase all on 3.68 Hectare application site located within the Takeda Ireland facility at Grange Castle Business Park; an EIAR (Environmental Impact Assessment Report) is submitted with the application and relates to development comprising of an activity which requires and Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted08 October 2020
SD21B/0377

Demolition of the existing single-storey pitched roof play room to the side of the existing dwelling house; construction of a single-storey pitched roof extension to the side of the existing dwelling house; construction of a single-storey flat-roof extension to the rear of the existing dwelling house; construction of a single-storey pitched roof extension to the existing porch to the front of the existing dwelling house and all associated site, drainage and structural works.

6A, Saint John's Avenue, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted30 August 2021
SD20B/0165

Conversion of the attic space to a bedroom and ensuite. This will involve the construction of a dormered extension with two windows to the rear section of the existing roof.

132, Millpark, Old Nangor Road, Clondalkin, Dublin, 22South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted27 July 2020
SD25A/0290W

Retention permission for as constructed single storey house and ancillaries.

Tralee, St. John's Avenue, Dublin 22, D22 RY66.South Dublin County CouncilRetention0 reasons0 conditions1.8 km away
Granted26 January 2026
SD24A/0148W

Change of use of the existing shed / garage structure to provide for a 2 bedroom dwelling and garage.

Fonthill Lodge, St. John's Avenue, Dublin 22, D22 PV07South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted11 September 2024
SD24B/0307W

Proposed porch extension and garage conversion with tiled roof.

42, Cappaghmore, Clondalkin, Dublin 22, D22 V4H3South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted27 August 2024
SD23A/0183

To change condition No. 4 of Planning Application SD20A/0062 to increase the number of children attending any one session from 16 to 20

58, Cappaghmore, Clondalkin, Dublin 22.South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted26 September 2023
SD20A/0062

Revision of previously approved planning SD09A/0313 including increase the number of children attending the playschool to 16 (maximum) in any one session; change opening hours to 9am - 12pm (morning session) and 12:30pm - 3:30pm (afternoon session), Monday to Friday; minor internal changes to the playschool; all associated site works.

58, Cappaghmore, Clondalkin, Dublin 22.South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted22 June 2020
SD21A/0051

The continuance of use of the existing 3 buildings and all associated external areas for storage and warehousing of motor vehicles, plant, machinery and other durable products for the sale by public auction, all associated ancillary uses including support staff and office facilities and all associated site and development works comprising hard and soft landscaping areas, roads and footpaths, car parking, boundary treatments/ fencing, signage and water services infrastructure. The development described above was previously permitted under Reg. Ref. SD18A/0126 and the duration of the permission was limited to two years by condition 9 of that permission. A Protected Structure - Former Gun Powder Store (RPS Ref. 205) - is located within the application site.

Wilsons Auctions, Green Isle Road, Corkagh, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions1.8 km away
Granted24 January 2022
Showing 151-200 of 29,610
Page 4 of 20