Provision of a warehouse with ancillary office and staff facilities and associated development. The main structure will have a maximum height of approximately 19.1 metres with a gross floor area of 9,158 sq.m, including warehouse area (7,971 sq.m), ancillary office area (701 sq.m) and ancillary staff facilities (486 sq.m). The development will also include: 2 No. vehicular entrances to the site from Bianconi Avenue, including 1 No. for HGVs; a pedestrian entrance from the Citywest Road and Bianconi Avenue; HGV parking and yard; 45 No. car parking spaces, including 3 No. accessible parking spaces; cycle parking; level access goods doors; dock levellers; access gates; lighting; hard and soft landscaping; detention basin; boundary treatments; ESB substation, switch room and site lighting and security room; plant; and all associated site development works above and below ground.
The installation of telecommunications equipment including no. 3 ballast mounted shrouded antennas, no. 1 ballast mounted dish, remote radio units (RRU's), cable trays, GPS, cabinet and all other associated site development works on the building rooftop to provide for high-speed wireless data and broadband services.
The construction of a 31m2 shed in the rear garden to be used as a gym, and all associated site development works above and below ground.
Roof dormer to the rear aspect of the roof and construction of a single storey 18sqm rear extension with flat roof.
The installation of 1.6m x 0.87m x 0.5m (hxlxw) pressure reduction installation and 3.25m (h) vent stack with all ancillary services & associated site works.
Retention permission, of the dormer to the rear aspect of the roof, a velux rooflight to the front aspect of the roof, and planning permission for an extension to the front of the dwelling, comprising a porch, and a bay window, with standing seam zinc roof and wall finishes to match existing.
Additional 2no. fuel pumps and 2 no. islands. Retention permission is also sought for works completed. The completed works consist of the installation of 4 number underground fuel tanks (each fuel tank has a capacity of 75,000 litres and store HVO and BIO fuels), including a network of pipes and inspection manholes. These new tanks are located below ground in the Southeast corner of the site.
Relocation of 3 fuel pumps and the reconfiguration of permitted fuel islands from 1 long fuel island and 1 small fuel island to now provide for 3 small fuel islands, demolition/removal of single storey building along southern boundary and 1 new truck wash to south-western boundary of site; Planning permission is sought to remove 1 existing truck wash along the western boundary, demolition/removal of existing storage building to the western boundary and alterations to internal road layout to include directional arrows.
2 prefabricated units for use as an office (31.5sq.m) and a canteen (23.3sq.m) located adjacent to the existing permitted Retail Shop (Ref. SD16A/0239) within a 0.0125 hectare application area at the existing quarry.
Change of use of 3,397sqm of the existing interlinked complex of buildings of 18,984sqm from a mix of ancillary warehouse, packaging, logistics and research and development uses within part of the ground floor of Block E (2,952sqm) and part of the ground floor of Block G (445sqm) to office based industry that incorporates research and development, ancillary office, gym and other facilities related to the operation of the overall development. The development will include internal works only to facilitate the change of use.
Retention of the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimeter of the site with Orchard Avenue; The development also consists of the retention of 3 signs (10.94sq.m) as follows: retention of 1 sign (0.57sq.m) on plinth at the corner of Bianconi Avenue and the N82/Citywest Road; retention of 1 sign (4.58sq.m) on the eastern elevation of Block D facing the N82/Citywest Road and retention of 1 sign (5.79sq.m) on the northern elevation of Block M facing Bianconi Avenue. The development will include retention of all revisions to the permitted landscaping and site development works required.
Change of use of 6,299sq.m of the existing interlinked complex of buildings of 18,984sq.m from a mix of ancillary warehouse, packaging, logistics and research and development uses within Blocks E, G and K to an independent office based industry use that would function independently to the remaining Xilinx facility and could be sub-let and subdivided. An area of existing office space of 1,591sq.m at the second floor within Block G will also be sub-let creating an overall independent office based industry use of 7,890sq.m. The development will include the removal of the mezzanine level above the ground floor of Block G (201sq.m) that will reduce total floor area of facility to 18,783sq.m. The development will also consist of the amendment of Condition no. 6 of S94A/0344 and S99A/0908 so that the new independent office based industry use of 7,890sq.m can be sub-let and subdivided and so that the existing office space (10,893sq.m) is not integral or ancillary to the non office uses that are subject of this change of use application. Minor elevation changed are also proposed, including a new entrance within the north elevation of Block E, and additional glazing to the north, west and south elevation of Block G. The remaining Xilinx facility (10,893sq.m) will continue as per its permitted uses. The new office based industry use will be served by the reconfigured 197 car parking spaces of the 568 permitted car parking spaces serving the site with vehicular access via the existing secondary entrance off Bianconi Avenue. 371 spaces will continue to serve the remaining Xilinx facility. Retention permission is also sought for the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimter of the site with Orchard Avenue. The development will include all ancillary landscaping and site development works.
Retention of timber log cabin in back garden to rear and side of house, for use as office, gym, play room/games room and storage area along with ancillary works
Deepening of part (c. 43ha.) of the existing and permitted quarry (An Bord Pleanala refs. 301177 & QD0026) to a quarry floor level of -10mOD using conventional blasting techniques; use of mobile processing plant; product stockpiles; final restoration scheme and all ancillary works within a planning application area of 49.4ha and within the overall landholding of 241.6ha and will be accompanied by an Environmental Impact Assessment Report (EIAR).
Roof dormer to the rear of aspect of the roof and the retention of the widened vehicular access.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Construction of a detached, three bedroom dwelling at the vacant garden plot to include dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off-street parking space and all associated site works.
Detached 2 bedroom dwelling at the vacant garden plot site including dishing of existing footpath and kerb finishes allowing for vehicular access across the site boundary to enable the provision of 1 off street parking space and all associated site works.
The development will consist of a single storey rear extension to existing clubhouse. The structure will be of steel frame with external insulated cladding panels and all associated site works
Single storey extension to side of existing dwelling consisting of downstairs sanitary facilities and utility space circa 3.5sq.m and all associated site works.
Retention of single storey flat roof side extension.
Single storey domestic shed/workshop and all associated site works.
A new two storey end of terrace dwelling house with concrete tiled roof and external finishes to match existing: new driveway and vehicular access: new dished section footpath for vehicular access and associated site works.
Retention of non-habitable attic with dormer to rear and widened vehicle access to front.
Conversion of an attic to a room with a flat dormer style roof.
Construction of single storey garden room consisting of home office and gym and all associated site works
Planning Permission is sought for 1) the retention, conservation, restoration and change of use of 113sq.m ground floor portion of the existing 344sq.m two storey former barn building to restaurant dining & restaurant toilets 2) 4 no. pre-fabricated container type structures to be located in the court yard area which will accommodate Restaurant Kitchens, toilets & staff room 3) 1 no. 59sq.m, mostly glazed, prefabricated enclosed, pergola type structure to be located in the court yard area, which will accommodate restaurant seating & restaurant reception area 4) use of remaining existing internal court yard area as an outdoor cooking area with external pizza oven, restaurant service area and bin storage area 5) proposed vehicular/ service entrance in existing court yard wall from existing car park area 6) associated signage and 7) ancillary alterations to existing elevations and all ancillary site works.
Planning permission is sought for 1) the retention, conservation, restoration and change of use of the existing 344 sq.m two storey former barn building to a 2 storey restaurant of circa 311 sq.m. 2) ancillary commercial kitchen, restaurant seating area, toilets, ancillary office & staff rooms 3) ancillary alterations to all elevations 4) use of existing internal court yard area as a dining area, with external pizza oven, and restaurant service area accommodation a freezer container unit & bin area. 5) proposed vehicular / service entrance in existing court yard wall from existing car park area 6) associated signage and 7) all ancillary site works.
Construction of a 68sq.m single storey extension to the side and rear of two storey, semi-detached dwelling and all associated ancillary site development works.
Provision of a warehouse with ancillary office and staff facilities and associated development; The warehouse will have a maximum height of 13.776 metres with a gross floor area of 1,526sq.m including a warehouse area (1,391sq.m), ancillary staff facilities (113sq.m) and ancillary office area (22sq.m); A vehicular entrance/exit via Brownsbarn Drive; a pedestrian access via Brownsbarn Drive; 7 ancillary car parking spaces; bicycle parking; level access goods doors; hard and soft landscaping; lighting; boundary treatments; plant; and all associated site development works above and below ground on lands generally bounded to the north by Browns barn Drive, to the south by a ramp to the Naas Road (N7)1 to the east by a Car Sales Showroom and to the west by a Petrol Filling Station.
Proposed ground floor rear extension for use as family flat
Two storey extension to rear of 9 Ferneood Avenue Springfield Tallaght Dublin 24
Single storey side extension to southern side of dwelling with pitched roof over & 1 no. roof light.
Single storey extension to the side for extended living.
Permission to demolish the rear porch and construct a corridor to the rear of the house. Retention to retain the existing single storey structure in the rear garden and use it as a bedroom and en-suite, which will be linked to the existing house with the proposed corridor, all with associated site works.
Permission to demolish the rear porch, construct a glazed link to the rear of the house and construct a new extension for a proposed bedroom and ensuite. Retention to retain the existing single-storey structure in the rear garden and use it as a bedroom and ensuite, which will be linked to the existing house with the proposed glazed link.
Retention of single storey extension to rear (circa 12sq.m); first floor extension to rear (circa 2sq.m) and attic conversion (circa 12sq.m).
Provision of a warehouse with ancillary office and staff facilities and associated development. The warehouse will have a maximum height of 15.6 metres with a gross floor area of 4,136 sq. m including a warehouse area (3,713 sq. m) ancillary staff facilities (220 sq. m) and ancillary office area (203 sq. m). development will also include: a vehicular entrance/exit via Brownsbarn Drive; a pedestrian access via Brownsbarn Drive; 25 No. ancillary car parking spaces; bicycle parking; ancillary HGV yard; level access goods doors; dock levellers; access gates; hard and soft landscaping; lighting; boundary treatments; and all associated site development works above and below ground.
First floor side extension consisting of 2no. Bedrooms and en-suite over (previously granted) ground storey side extension including utility room and en-suite bedroom with front porch extension and all associated ancillary works.
Widen existing vehicular entrance to 3.5 metres with removal of 1.1 metre length of front garden wall and construction of new entrance pillar and ground storey front porch extension and side extension including utility room and en-suite bedroom with green garden flat roof including all associated ancillary works.
Two storey side extension; 3 front facing 'Velux' windows and a rear facing dormer window.
Retention of single storey extension with all associated site works.
Erect 1 company logo advertising sign at Unit 2 (Units 1 & 2 currently under construction as per previously granted under Ref. SD21A/0162 & SD22A/0313); The signage will consist of raised backlit company logo lettering; Total area of 12sq.m located 11.43m above ground floor level on the front (southern) elevation.
Works to existing 2 storey side Extension. Double doors in ground floor front elevation, partial ground floor front extension floor area 3msq. First floor rear balcony & double doors to access balcony. Stairs from ground floor to first floor. Change of use of 2 storey side extension to family flat with floor area 52msq
Alterations to an existing planning permission Reg. Ref. SD21A/0162 for a warehouse development of 2 units (Unit 1 & Unit 2) at the 4.04ha site comprising of reduction of 237sq.m of warehouse floor area on the ground floor due to, change of use of 63sq.m of warehouse floor area to office floor area, change of use of 91sq.m of warehouse floor to staff facilities floor area on the ground floor plan, and the remainder due to the addition of a 2.4m high perimeter blockwork wall in the warehouse area; Change of use of 14sq.m of staff facilities floor area to office floor area at the ancillary office ground floor plan; Change of use of 14sq.m of office floor area to staff facilities floor area over ist & 2nd floor plan; Reduction of 28sq.m of office over 1st and 2nd floor plan to facilitate structural alignment; Minor internal alterations to the ancillary staff facilities/office layouts with no area alterations; Elevational changes, omission of 5 dock levellers & associated canopy and addition of 1 fire escape door to the building's southern elevation; Addition of 2 fire escape doors to the building's northern elevation; Alterations to Unit 2 are as follows, omission of warehouse office/staff facilities block at the south-east & north-west corner of the warehouse resulting in, change of use of 40sq.m of office floor area to warehouse floor area and change of use of 76sq.m of staff facilities floor area to warehouse floor area on the ground floor; Addition of a 2.4m high perimeter blockwork wall internally within the warehouse area, resulting in a warehouse floor area reduction of 63sq.m; Alteration to the ancillary office/staff facilities block resulting in, a reduction of 101sq.m of office floor area and addition of llm2 of staff Facilities floor area on ground floor plan; Reduction of 104sq.m of office floor area & 52sq.m of staff facilities floor area over 1st & 2nd floor plan; Elevational changes, a reduction of 2 level doors and addition of 6 dock leveller doors & associated canopy to the building's north-eastern elevation; Associated site plan and drainage adjustments.
Construction of 2 warehouses with ancillary office and staff facilities and associated development; Unit 1 will have a maximum height of 16.35 metres with a gross floor area of 8,156sq.m including a warehouse area (7,397sq.m), ancillary office areas (362sq.m) and staff facilities (397sq.m); Unit 2 will have a maximum height of 15.35 metres with a gross floor area of 5,990sq.m including a warehouse area (5,031sq.m), ancillary office areas (536sq.m) and staff facilities (423sq.m); vehicular access/egress routes to the subject site via the existing roundabout and access road; alteration to the existing access arrangements to the subject lands to facilitate safe traffic flow to/from the proposed facilities; pedestrian access; 109 car parking spaces; bicycle parking; HGV Parking; HGV yards; level access goods doors; dock levellers; access gates; signage; hard and soft landscaping; lighting; boundary treatments; ESB substation; sprinkler tanks; pump houses; and all associated site development works above and below ground on lands bounded to the south by the N7 Naas Road, to the north and west by the National Distribution Centre and to the east by Brownsbarn Drive and the Royal Garter Stables, a Protected Structure (RPS Ref. 261).
Single storey family flat side extension and all associated site works.
Construct agricultural shed incorporating loose and storage areas; wall manure area; hardcore area and access roadway; upgrading existing entrance and all associated site works.