Vehicular access to public road as constructed, retention of pedestrian gate to laneway to the east, retention of revised elevations to dwelling from those granted under planning ref. no. P92/96 and associated works
1. new single storey detached house. 2. new vehicular entrance from Harbour Court housing estate. 3. new hammer head/turning area from Harbour Court housing estate. 4. new pedestrian footpath linking existing footpath from Gussett Lane to Harbour Court housing estate. 5. connections to existing services. 6. all above with associated siteworks
Dwelling house with services, domestic garage and all associated site works and permission for proposed improvements to the roadside boundary to create a new shared entrance to the field and dwelling house
To complete planning application 13/610019. The construction of external door entrances with stairs and associated site works to existing Scout Den
The following: 1. New two storey detached house 2. New vehicular entrance from Harbour Court Housing Estate 3. New pedestrian footpath linking existing footpath from Gussett Lane to Harbour Court Housing Estate 4. Connections to existing services 5. All above with associated siteworks
Single storey extension to side of house and associated works
Demolition of existing shed on site and proposed two storey apartment building consisting of eight apartments of 6 x two bedroom, and 2 x one bedroom units with connection to services, boundaries, extension of existing public footpath, walled compound for bin and bicycle storage, and associated works on site
(A) Erect 21No. dwelling houses, consisting of 6No. 3-bedroom dwellings (House type A1), 1No. 3-bedroom dwellings (House type A2), 8No. 3-bedroom dwellings (House type B1 & B3 ) and 6No. 2-bedroom dwellings (House type B2), (B) Provision of vehicular and pedestrian access off existing Emyvale Estate Road, (C) Provision of off street car parking facilities, (D) Ancillary site works and connection to existing services
Demolition of 17.4sqm section of existing building, change of use of part (123.8sqm) of existing commercial building to residential apartment, velux windows and living space upstairs, internal changes to existing commercial area, new entrance to commercial section from St. Michael's Terrace, new entrance onto St. Michael's Terrace for proposed apartment and associate works
Retain velux roof windows to attic storage space, front and rear of property and associated site works
Construction of a building to display historic Coastguard horse drawn carriages previously used for rescue and ancillary works
Existing single storey extension with a floor area of 15.8sqm to the side and rear of the existing two storey dwelling compromising of a bedroom, shower room and a side entrance hall all connecting into the existing services
Retain attic conversion to habitable rooms including velux roof lights to front and rear of property and associated site works
7 no units (7 no 2 bed houses) and all associated site works
Extension of appropriate period of PRR17/517 (change of use of first floor commercial facility to two first floor apartments. Development consists of a 96.3 sqm (two bedroom apartment) and a 53.3 sqm (one bedroom apartment). Additionally, planning permission is sought for the change of use of a single storey creche/office facility to a 73sqm single storey dwelling. All of the above together with ancillary works)
(1) the change of use of 226.10 m2 section of the existing structure to provide School Aged Childcare rooms, a pre-school room and an Early Intervention ASD classroom, (2) the provision of raised parapet walls and a glazed guarding to the existing (front) single storey section to provide a 100.00 m2 play-area, (3) a window in lieu of a window (as access to the play-area) on the upper front (north)elevation, (4) the provision of a ramped access to the side (west) and (5) all associated works
Hoarding/scaffold
A hoarding, fence or scaffold
Amendment to previous approved planning Ref. No. 21/557 for change of use of existing structure to childcare use, with increase in occupancy for approved 50 to 66, between hours of 7am & 7pm, with revised layout to include for the enclosure of approved first floor play-area to form additional ECCE room, relocation of play area to ground floor, with removal of section of roof, and amendments to elevations and all associated works
Extension 46.6sq metres to rear of existing mid terrace house 88.6 sq metres and demolish outhouse (coal bunker) 5.9 sq metres and alterations to existing mid terrace house and associated site works
The removal of condition 15 (b) of the previously approved planning permission (reg. ref. 12/13) with the proposal to increase the total number of children to be catered for in the existing pre-school facility by 5-9 children; not to exceed 42 children maximum at any one time
Demolition of the existing two-storey school building and single-storey extensions (c. 2570 sq.m) and removal of temporary classrooms on site (c. 120 sq.m); construction of a three-storey school building (c. 7535 sq.m) including general and specialist classrooms, a special education needs (SEN) unit, offices, general purpose hall, PE hall, fitness suite, staff room, library, social spaces, sanitary facilities and ancillary spaces with solar photovoltaic panels at roof level; upgrading of the existing vehicular entrance to the sports pitch and the creation of a new vehicular entrance on Coolgreaney Road to provide dedicated vehicular entrance and exit points as part of a new one-way traffic system through the site; removal of the existing main vehicular entrance and provision of a new pedestrian/cyclist entrance on Coolgreaney Road; provision of a car set-down area within the school grounds and construction of a 56m bus set-down area along Coolgreaney Road; provision of a new pedestrian/cyclist access from John Paul Avenue; removal of 32 no. existing car parking spaces and provision of 70 no. car parking spaces including 1 no electric vehicle parking space and 4 no. accessible parking spaces; provision of 100 no. sheltered bicycle parking spaces; provision of external play and amenity areas including a SEN play area and 3 no. multi-use game areas; provision of landscaping, boundary treatment, site lighting, provision of a covered work area, bin stores and storage shelters; provision of associated drainage, attenuation and other site services including an ESB substation and switch room (c. 25 sq.m); and all related site development works.
Domestic garage on concrete base and associated works
Extension of operating hours to include an afternoon session from 1.30 p.m. to 4.30 p.m. Monday to Friday
Proposed single storey private garage (23sq.m) to side of this property
1. Demolition of existing structures on site. 2. Construction of a new two storey modular office building. 3. Amendments to existing shed on site. 4. New vehicular entrance, car parking, storm and foul drainage and all associated site works
Fully serviced dormer dwelling house with detached domestic garage and associated site works, and access drive to existing shared entrance
First floor apartment and the existing separate access to the upper floor of the building and permission for change of use of the ground floor from a café to a one-bedroom apartment along with all associated site development works
A scaffold
Change of use from a café to a one-bedroom ground floor apartment along with all associated site development works
Change of use from commercial offices to 1 bedroom residential unit
Change of use of existing vacant ground floor retail unit to one bedroom apartment and all associated site works
(1) erect a standalone information sign to the front of the building and (2) provide a new disability wheelchair access entrance to the front of the church as opposed to that approved under P.R.R. 21/1045 along with all associated site development works (The property is a protected structure)
Restoration of existing windows, reconfiguration of internal non-original partitions, provision of a new accessible entrance to the rear of the church, the provision of a new platform lift, provision of a raised floor to one portion of the main church space to unify the floor levels, provision of toilets, an accessible toilet and an associated lobby space, provision of a tea station, provision of a door into the courtyard garden, provision of a new access gate to the choir balcony and the addition of a safety handrail on the existing choir balcony.
Demolition of existing walkway building (60sqm), removal of external storage structure(65sqm), and construction single storey extension (Gross Area 326 Sqm) to east end of existing unit and all associated site works
As-built commercial storage shed in lieu of the original substandard shed along with all associated site development works
Change of use from retail to a residential studio apartment to the ground floor along with minor alterations and revisions to the elevations and internal layout and all associated site development works
(1) retain structure as an independent dwelling unit (2) to retain alterations to building design as a change to that permitted under P14/91 (3) to retain revised boundaries as a change to that permitted under P14/91 and all associated site and ancillary works
A) erect 6No. dwelling houses, consisting of 6No. 3-bedroom dwellings (house type A1), B) provision of vehicular and pedestrian access, C) provision of off street parking facilities, D) Ancillary site works and connection to existing services
The widening of the existing pedestrian gate entrance to accommodate a vehicular entrance and the construction of an automated gate, on the South West boundary to the rear of the property at Mainifolds Lane together with associated site works
Change of use from 2 No. vacant commercial units to 2 No. residential studio apartments along with all associated site development works
Permission for change of use from 2 no. commercial units to 2 no. residential studio apartments along with all associated site development works
Construction of a two storey detached dwelling, new boundary treatments, new site entrance and all associated site works
The development will consist to demolish existing sub-standard shed/store of 28 sqm metres and to replace it with a new steel pvc coated shed/store of 39.6 sqm metres and associated works
Demolition of existing building & structures and removal of existing syncrolift at the water's edge. Development to the south of South Quay will comprise the erection of a new building with a 4 storey element to the front, to a 2 storey at rear, to provide operation & maintenance facilities to support the operation of an offshore windfarm. The proposed building will consist of office, warehousing & welfare facilities & other ancillary uses associated with the offshore windfarm operation. Landscaped terraces are proposed at roof level at the 2 storey and 3 storey levels of the proposed building. A c. 40m lattice communication mast, associated with the proposed use, is proposed for the southern corner of the site. Car parking for 60 vehicles along with cycle parking for 26 bicycles & 5 motorcycles. An ESB substation is proposed to the south of the building. Waste & recycling storage is proposed on site. Vehicular & pedestrian entrance gates onto South Quay & pedestrian & bicycle entrance to the west. Security fencing around the site. Development to the north of South Quay will comprise a general area for the berthing of vessels to service the offshore windfarm. A pontoon is proposed along with up to 4 cranes for loading & unloading of vessels. Shore side storage is also proposed including 2 shipping containers, a bunded waste oil tank, a grey water tank, a treatment unit/equipment kiosk & 2 bunded fuel storage tanks. A blackwater tank is proposed below ground. Parking for 6 vehicles to the north & west of the site. A flood wall. Vehicular and pedestrian entrance gates onto South Quay & pedestrian emergency entrance to the west are proposed. Proposed to construct a ramp on the section of South Quay to tie in with flood wall. Access between the areas to the north & south of South Quay will be via a raised ramp along South Quay with controlled crossing across South Quay. New paving at this location and to the west of the building. Wastewater on site will be stored underground and removed to a treatment plant. Also proposes the dredging of approx. 6,000m3 of material from the nearshore area to provide for navigational depth, berthing area and manoeuvring area for vessels. Landscaping, utilities & other services proposed throughout the site & all other associated works. Applicant seeks 10 years in which to construct the development. An Environmental Impact Assessment Report & a Natura Impact Statement have been prepared.
Change of use from existing holiday apartment to permanent residence as apartment. Including all associated site works. This building is a protected structure NIAH Ref No. 16322033
(S254) for a scaffold
Demolish an 8 sqm substandard structure to the rear of the existing building and erect a 6 sqm single storey rear extension to the ground floor and a 18 sqm first floor extension, make alterations and revisions to the elevations, roof and internal layout of the existing building and for change of use from all commercial to 1 no commercial unit and 2 no studio apartments along with all associated site development works
Change of use of existing first floor function room to offices and all associated site works
Change of use of existing commercial building into 2x2 bedroom apartments, changes to all elevations and all ancillary site works