Of the development which consists of: 1) a single storey, masonry constructed extension to the rear of existing dwelling, 2) conversion of attic to storage space with Velux window to roof on front elevation of existing dwelling and 3) a single storey, flat roof outbuilding to the of existing dwelling
To revise Location of private garage previously authorised under planning permission P21/1256 along with all associated site works
To construct a new dwelling house, private garage, site entrance and on-site wastewater treatment system along with all other associated site works and services
To renovate and extend an existing cottage, construct a private garage, new entrance and driveway and install a new wastewater treatment system along with all associated works
For development which will consist of A, Retain ground floor rear extension, first floor conversion, external shed and B, to construct a garage and canopy to rear of house including all associated site works and services
Of the following development consisting of the construction of an entrance and front boundary wall to dwelling
Of the following which are at variance from that granted under Planning Ref. P97/805. (A) Revised location and finished floor level of existing dwelling plus 3 no. enlarged windows on norther gable and wheelchair accessible ramp to front elevation. (B) Revised location, design and finished floor level of existing private garage. (C) Revised site boundary. (D) All associated ancillary siteworks
For construction of an easy feed slatted house comprising underground slatted slurry tanks, feed area for cattle, agitation point, calf penning area, central passage, walled in manure pit, and cattle crush on site of old cubicle house to be demolished and all ancillary site works
To construct a new dwelling house, access road, entrance, and install a new wastewater treatment system along with all associated works
To demolish existing out-offices and construct a private art/music studio with associated ancillary siteworks
For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South, Caheraghacullin and Drummin, together with the development of an underground grid connection cable to the National Grid in the townlands of Cahermurphy, Drummin, Doolough, Glenmore, and Booltiagh. The development will consist of 1. Construction of up to 10 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hard strand areas. 2. 1 no. permanent meteorological mast with a maximum height of up to 100 metres. 3. 1 no. 38kV permanent electrical substation which will be constructed at one of two possible locations on site: either Option A in Carrownagry South townland or Option B in Cahermurphy townland. The electrical substation will have 1 no. control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works. 4. All associated under-ground electrical and communications cabling connecting the turbines to the proposed on-site substation. 5. All works associated with the connection of the proposed wind farm to the national electricity grid via an underground cable to the existing Booltiagh 110kV substation. 6. Upgrade of existing tracks, roads and provision of new site access roads and hardstand areas. 7. Junction access road works. 8. 2 no. borrow pits. 9. 1 no. temporary construction compound. 10. Site Drainage. 11. Forestry Felling to facilitate construction and operation of the proposed development; and 12. All associated and ancillary site development works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed developemnt
To RETAIN an extension comprising a kitchen, dining room, 1st floor bedroom and a porch. PERMISSION for construction of a two bedroom ancillary residential flat strictly for family use and associated groundwork including change of use of 1st floor bedroom to attic storage
For the erection of a meteorological mast in the townland of Crossmore, Co Clare at the location of the consented Crossmore Wind Farm (planning Ref: 09/123). The site is located approximately 4.2km north of Kilmurray McMahon, 4.8km southeast of Kilmihil and 15km east of Kilrush. The development will consist of: - The erection of a free-standing, lattice meteorological mast of up to 80 metres in height,- Associated works, services and hardstanding area. The mast will be in place for the operational period of consented wind farm.
To construct a new dwelling house, new entrance, access road, private garage and install a new wastewater treatment system along with all associated works
To construct an extension to an existing dwelling, install a new wastewater treatment system, demolish existing flat roof sheds and all other ancillary site works
To upgrade existing entrance to forest lands and to construct forest access road with all ancillary site works
For (A) the construction of a porch to the rear of the dwelling and (B) the construction of a detached building, incorporating a private garage, open shed, and green house and for PERMISSION to construct an extension to the side of the dwelling, all with associated site works
For development of a livestock slatted unit and a manure pit with associated ancillary site works
For a new machinery shed
For the construction of a new dwelling house and garage, complete with a sewage treatment system and ancillary works
For development, the development consists of the construction of a slatted unit and associated site works
To build a new Dwelling House, Garage, install a wastewater treatment system & all other associated site and ancillary works
To renovate and extend the existing dwelling house to include the provision of a new sewage treatment system together with all necessary ancillary services
For the construction of a sunroom to the side of an existing dwelling, construction of a domestic and alterations to the house granted under P8-14484 along with all associated works
To refurbish, alter and extend an existing dwelling house along with all associated works
Of the following a) extension to side of dwelling house, b) velux rooflights to dwelling house and c) detached private garage to side of dwelling house along with associated site works
To erect dwelling house, garage, foul sewer system, percolation area and new site entrance
To construct a new one and a half storey dwelling house, install on-site water treatment system, percolation area, site entrance and all associated site works
Of the relocation of house, garage, entrance, site boundaries and septic tank along with all associated works
To extend and renovate an existing derelict cottage, relocate an existing entrance along with all necessary ancillary work
The development will consist of renovation and extension to the existing cottage
For development comprising an increased wind turbine blade length and associated reduction in turbine hub height, creation of a splayed junction, and all associated cabling, services and ancillary works at land at the site of the consented Crossmore Wind Farm. This site is located approximately 4km north of Kilmurry McMahon, 4.5km southeast of Kilmihil and 15km east of Kilrush in the townlands of Crossmore and Derrnageeha, Co Clare. The development will consist of: 1. An increase in the blade length of the previously-consented 7 no. wind turbine Crossmore Wind Farm, consented under planning application Ref: P09/123, from 45 metres to up to 57.5 metres; 2. Associated reduction in turbine hub height of up to 12.5m to maintain the previously approved overall turbine tip height of up to 125m (the previously approved hub height was 80m) 3. Creation of a splayed junction at the wind farm entrance on the Ballyduneen Road, off the N68, necessary to facilitate the proposed turbine / blade configuration; 4. All associated services and ancillary works. The application is seeking a ten year planning permission and 30 year operational life from the date of commissioning of the renewable energy development.
To renovate and extend an existing cottage, demolish an existing haybarn, alter the existing entrance to provide a separate access for the dwelling and farm, setback the existing roadside boundary to improve the sight distance for the existing entrance and install a new wastewater treatment system along with all associated works
To alter existing dwelling, construct an extension to existing dwelling and install a new sewage treatment system along with all ancillary works at existing site
To RETAIN the following: a) retain changes to existing dwelling elevations and floor areas, b) retain the change of use of part of the existing farmhouse as short-term accommodation ancillary to ongoing agricultural tourism on the site
The development will consist of demolition of existing calving pens, construction of an agricultural shed over an existing slatted tank and feed passage with the addition of an underground slatted slurry and soiled water storage tank with cubicles and all associated site works
To demolish existing shed and barn, construct a new dwelling house and garage, construct a new entrance and modify existing farm entrance, install a new sewerage treatment system along with all associated works
For development to extend existing livestock slatted unit with cubicles and associated ancillary site works
For development of a livestock slatted unit and manure pit with associated ancillary site works
For the following development: a) Construct a new two storey dwelling to the front of the existing single storey dwelling house; b) Construct a linking passageway between both dwelling houses such that the existing dwelling becomes a family flat / independent living unit; c) renovate the existing dwelling house including elevational changes; d) decommission existing septic tank system and installation of new wastewater treatment unit and percolation area to serve both units; e) all associated site works and services
For development in the townlands of Crossmore, Derrynageeha, Ballyduneen, Carrowreagh West, Corraige, Knockalough, Crag, Furroor, Boolynamweel, Illaunatoo or Sorrelisland, Boolynaknockaun, Glenmore and Booltiagh. The Development will consist of: 1. A 38kV electrical connection over a total of approximately 11km, from the permitted Crossmore Wind Farm (planning ref: P09/123, as extended under planning ref: 19/388 and altered by P20/824) to the existing 110kV Booltiagh substation. This connection will consist of approximately 10km of overhead line and associated 97 no. wooden polesets (single, double and triple structures with approximate heights between 14-19 metres), and approximately 1km of underground cabling. The cable will travel underground within the wind farm site (in the townlands of Cross More and Derrynageeha), underground on private lands (in the townlands of Boolynamweel, Illaunatoo and Boolynaknockaun) and under the public road prior to entering the Booltiagh substation (in the townlands of Boolynaknockaun and Booltiagh). 2. Roads and access arrangements/works consisting of: a) Creation of new permanent access gate into private lands off the L6180 local road; b) Construction of new access roads to facilitate provision of the grid connection, to be retained for permanent use; and c) Upgrade of the existing public road network for turbine delivery including; I. Junction improvement works at the N68 and L6180; II. Widening along the L6180. 3. The proposed development also incorporates construction of the following elements at the site of the permitted 7-turbine Crossmore Wind Farm (ref: P09/123, as extended by P19/388, and altered by P20/824) which will have a 25 year operational lifespan from the date of commissioning: a) Provision of a permanent 38kV substation north of permitted Turbine 5 in lieu of previously approved substation located south of Turbine 2; b) Redesign of permitted turbine hardstand areas consisting of additional temporary hardstand areas for blade storage; c) Provision of 2 no. temporary construction compounds; d) Proposed upgrade of existing access road and proposed new areas of access road between permitted Turbines no. 5 and no. 6, in lieu of permitted upgrade of existing access road between permitted Turbines no. 2 and no. 5; e) All associated underground cabling between permitted turbines and relocated substation, and; To view remainder of description please view newspaper notice.
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services
To carry out alterations and extension to the existing dwelling and add a storage shed along with all associated works
To retain and widen existing farm entrance plus all ancillary site works
For development of a livestock slatted unit with associated ancillary site works
For development of a Livestock Slatted Unit with associated ancillary site works
For development of a livestock slatted unit and concrete silage slab with associated ancillary siteworks
To construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works
To construct a new dwelling house, new entrance, private garage and install a new wastewater treatment system along with all associated works
To construct a new dwelling house and garage complete with a sewage treatment system and ancillary works