Permission for the decarbonization by erecting a new single storey, free-standing energy centre, comprising biomass fuel store and enclosed plant room with flue, together measuring 70 sqm in area, and three open-air liquid petroleum gas tanks in a fenced enclosure; installing cowls on elevations of existing school to enable operation of new internal heat recovery units; replacing the existing windows to Tyrrelstown Community Centre and Tyrrelstown Educate Together National School, and the external doors to all existing buildings, with ones matching in appearance but improved in performance; fitting photovoltaic array on the roofs of the existing buildings, relocating two existing open-air bicycle shelters and erecting two new ones in front of Tyrrelstown Educate Together National School; and constructing a new metal fence to protect the existing soft landscaping along part of the western boundary of the site. The project will be carried out in conjunction with remediation of the existing buildings on the site. AI Rcvd 02/05/24
The development will consist of retention permission for
Development will consist of a 2480 sq.m logistics warehouse building, the height of which will not exceed 12.5m. This is inclusive of a reception area, wheelchair accessible toilet facilities and a plant room. Photovoltaic panels along the southern aspect of the roof structure not exceeding 150 sq.m. A new heavy goods vehicular entrance along Damastown Rise, 29 car parking spaces, 3 no. disability access parking spaces, cycle parking and a service yard to the rear (north) of the proposed building. Vehicular access for staff shall be via the existing vehicular entrance along Damastown Avenue, associated with the adjoining DG McArdle International Ltd site to the west of the proposed development. New boundary walls and railings detailing to the eastern and southern boundaries, all associated signage, lighting, landscaping and site development works. AI received 22/11/21
The proposed planning permission will consist of: Demolition of existing single storey building, removal of existing containers and partial demolition of boundary wall to Parnell Green. Relocation of existing street light pole. Construction of a 2 storey apartment block containing 6 no. one bedroom apartments, new access road to connect to Parnell Green, connection to existing watermain, surface water and foul sewer system, stormwater soakaways, boundary treatments, landscaping and all associated site works. AI Rcvd 21/11/2024 SAI Rcvd 29/11/2024
EIAR NIS The development will consist of all site buildings and infrastructure required to support the new facility including; (a) A 2-storey Biopharmaceutical Development and Manufacturing Building sized approximately 11,670 square metres and approximately 15.5 metres high, with roof-mounted plant and equipment, including solar panels. (b) The refurbishment and extension of the existing 2-storey Laboratory, to include ground-mounted and roof-mounted plant and equipment, including solar panels and an extension to the existing plant room at roof level sized approximately 115 square metres and approximately 9.1 metres high. (c) A single story pedestrian and materials link sized approximately 420 square metres and approximately 7 metres high from the proposed Production Building to the existing Warehouse. (d) A single story pedestrian canopy from the proposed production building to the existing administration building, sized approximately 520 square metres and approximately 8.3 metres high. (e) A single storey pedestrian canopy from the proposed production building to the existing laboratory building, sized approximately 234 square metres and approximately 8.3 metres high. (f) Provision of new car parking spaces including an additional 185 car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the R121. (g) Proposed site infrastructure includes bunded tanks, pipe-bridges, sprinkler and water tanks, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, heat-pumps, underground pumping facilities, internal roads and paths, fencing and site lighting, and the use of the existing BMS site entrances for heavy goods vehicles. (h) The development includes modifications to the existing internal road network. (i) Proposed new landscaping includes new landscaped and planted areas, modifications, replacement and reinforcement of the existing landscaping. (i) Proposed New Signage based at ground level and on the proposed building façade. (k) The works will include temporary contractor compounds including temporary construction cabins, temporary car parking and the temporary use of existing site entrance road (currently not in use) to the north of the site from the Cruiserath Road, during construction activities. (l) Proposed new surface water management infrastructure for the site, consisting of Sustainable Drainage features including a detention basin, rainwater harvest cisterns and distribution pipework. (m) Modifications to existing buildings in the Development and Manufacturing Campus including elevational alterations and modifications to the existing satellite administration, canteen and laboratory buildings to the south of the site, adjacent to the proposed development. (n) All Associated Site Works. The proposed development will be built in 2 phases, with phase 2 comprising of approximately half of the proposed administrative floor area and the proposed pedestrian canopies to the existing administration and laboratory buildings. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application, and they will be available for inspection or purchase at the office of the Planning Authority.
Construction of a 2-storey apartment block consisting of a 1 No. bedroom apartment at ground floor and first floor. All with associated site works, bin and bike store.
Intend to apply for Planning Permission, A. Attic Conversion Incorporating dormer extension to rear, B. All associated site works on site.
Planning permission to construct a two storey extension to the rear north eastern side of the existing property consisting of ground floor kitchen/first floor bedroom & replace utility window with a side entrance door, new first floor window at the north western side & associated site works. AI received 7/6/2023
Permission has been requested to convert the garden into a combination of storage space, an enclosed pergola, and a smaller garden.
The development will consist of
The development will consist of a 2.4m high four stack dipole antenna on a 1.2m high existing support structure located on the roof of the existing 3 storey MPCC Building. The antenna will have an overall installed height of 27.0m off the ground. The development will be used to boost existing radio network coverage on site. The proposed development is for modifications to an establishment which includes an activity requiring an Industrial emissions licence.
Permission for the erection of a 15,705m2 commercial facility with 163 no. staff & visitor parking spaces and 28 no. lorry parking spaces with 1, 581m2 two storey office accommodation to include ancillary office space, reception area, staff rooms and all associated site development works including new access toads off Damastown Close & Damastown Avenue. AI received 16/11/21
For the erection of a 14,515m2 commercial facility with
Proposed single-storey Security Gate House (13.2 sq.m.) comprising of an Observation Room and WC, the height does not exceed 4.0m complete with security gates and fencing, all located adjacent to an existing site and it's proposed extension to which the Chemical Act (control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.
The diversion of an existing watercourse, (Powerstown Stream) into an existing drainage channel located adjacent to the north, west and east boundaries of the site. The diverted watercourse will incorporate the provision of a riparian zone (approx. 18-26 metres in width) and a series of swales and ponds. The proposed development will also comprise the provision of 3 No. pedestrian/cyclist bridges on the north, west and east site boundaries; hard and soft landscaping; boundary treatments; signage; changes in levels; and all associated site development works. The proposed development will enable the future development of the subject site. AI received 26/01/23
Permission for a permanent construction compound, located to the centre of the BMS site consisting of 4 no. single storey workshops sized 70 square metres and 4.1 meters high, 1 no. toilet facility sized 50 meters square and 3.1 meters high and office/canteen facility sized 50 square meters and 3.1 meters high, all previously granted permission under planning ref: FW17A/0097 but not constructed within the period of validity as set out under condition 2 (ii) of the Grant requiring that the life of the permission is limited to previously approved planning application, planning ref: FW15A/0043. The proposed development is for modifications to an establishment which includes an activity requiring an industrial emissions licence.
Planning permission for conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and 2 no. roof windows to the front.
Permission sought for an attic conversion to include revised roof profile with a dormer style design to the side roof area to allow for adequate headroom to access the attic space. Works to include flat rooflights to the front & rear roof surfaces and also a single storey extension to the side and rear.
The construction of: a) extensions on the western elevation of 'Building1' and on the northern elevation of 'Building 2'; b) an external vertical carousel storage structure (enclosed with cladding) on the southern elevation of 'Building' 2; c) 2 no. single storey security buildings, one to the north of 'Building 2' and one adjacent to the existing entrance to the site from Damastown Close; and d) an 80 space surface car park (including 4 no disabled spaces) on land to the north of 'Building 2' accessed from the existing internal road; and all other site development works including landscaping, additional cycle parking stands and perimeter boundary treatments.
The demolition of the existing two storey public house premises, and the construction of a new building consisting of 3 No. Commercial Units (2 No. Retail Units, 1 No. Licenced Public House) and 40 No. Apartments, (4 No. Studios, 14 No. 1 Beds, 17 No. 2 Beds and 5 No. 3 Beds) all accross lower ground to fourth floor, with associated 84 No. surface car parking spaces, utilizing the existing vehicular and pedestrian site access. All with associated landscaping, public open space at roof level, bin storage, bike storage, signage and site works.
The development will consist of a bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Blanchardstown campus, between the Áras Croí Building and the Áras Ceangail Building; associated landscaping, site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
The development will consist/consists of: Planning Permission is sought for a first floor Extension over Dining Room to side/rear to enlarge existing master bedroom and all associated site works 0.092.
The proposed development shall provide for the construction of a 90m3 Underground Fire Fighting Storage Tank.
Planning permission to (a) convert attic space to storage space with a rear roof Dormer (b) To Remove existing north facing hipped gable roof and extend to a full gable with fitted window at attic level.
The development will consist of demolition of an existing single storey extension and construction of a new two storey extension to the rear of existing house, including the internal alterations, refurbishment and all associated site works. Development will also include an extension to the existing garden shed and conversion of same to a home gym.
Conversion of existing second floor attic into a habitable space, to facilitate two new bedrooms and ensuite. Works will include alterations to existing first floor layout to facilitate new access stair and the installation of four new roof lights to the front elevation, six new roof lights to the rear elevation and one new window to the gable elevation. It is also proposed to widen the existing single gate to the side of the property to incorporate a new double gate and all associated site works.
For Retention Planning Permission for a 2 storey extension to side (East) of existing house comprising of ground floor study, bathroom and shed & first floor storage room. Single storey extension to side (West) of existing house comprising of gym and office all with associated ancillary works at 1 Warrenstown Drive, Blanchardstown, Dublin 15
Retention permission for the retention of use of premises
Construction of a roof terrace room for use as leisure and activity space in place of existing open roof terrace area, construction of new enclosed corridor to connect to existing lift/stair core and all associated site works. AI received 05/01/23
2.4m and partially 3m tall security railing inside the sites northern gate, eastern and western boundary with 2 no. vehicular security entrance gates - one on the northern boundary and one on the eastern boundary - both at the site of existing entrances. 1no. pedestrian gate is proposed to the northern boundary adjacent to the existing and proposed entrance. Berming and planting to the boundaries will be partially reshaped and removed as required to allow a level surface for the construction of the fence and all associated site works. AI received 28/09/2022
The proposed development will consist of Alterations to the exterior of an existing office and telecoms operation centre building to provide additional area for the provisional upgrade of plant. An extension to an existing plant area to the south and west of the building, and a new plant area to the east of the building, will together provide 890 m2 additional plant space. The plant areas will be visually and acoustically screened by a c.5m new acoustic plant screen to match the existing screening. An extension of 13 m2 is proposed to the substation to the east of the building and an extension of 18 m2 is proposed to the transformer to the south of the building to facilitate upgrade efficiencies. The addition of the western plant will result in the removal of 9 car parking spaces reducing the provision on site from 53 to 44. And all other associated works.
Permission for change of use of existing ground floor retail unit to Montessori/pre-school/creche. AI received 23/08/21
A new warehouse of approx. 2,260sqm with 420sqm of ancillary office space to include a reception area, meeting rooms, staff room, WC and shower facilities, plus 29 car parking spaces, 26 bicycle spaces, landscaping and associated site development and drainage works. AI Received 18/03/2025
A ground floor extension to the side and rear of existing house for purposes of sessional use as a montessori pre-school.
Permission for ground floor extension to the side and rear of existing house for purposes of sessional use as a Montessori pre-school.
For (A) retention permission and (B) planning permission for development at Parkside, Main Street, Old Navan Road, Mulhuddart, Dublin 15, (A) The retention permission consists of: retention of modifications to existing structure and existing additional floor space to rear of unit granted under Reg Ref. FW09A/0013, (B) The proposed planning permission will consist of: change of use of an existing retail unit into a chip shop/takeaway, proposed signage and all associated works.
Planning Permission is sought for: 1. To demolish existing garden wall and gate. 2. For alterations to existing elevations of side extension to semi-detached dwelling, currently in use as group residential accommodation. 3. For proposed new single storey side extension to existing extension to semi-detached dwelling to include accessible living and kitchen space associated with proposed accessible single-occupancy ancillary accommodation. 4. For proposed new pedestrian gate to rear garden in south boundary wall from public footpath. AI Rcvd 21/05/2025
Permission for the construction of a 1 no. additional floor as an extension to the existing 4 no. storey apartment development (5 storeys in total) at Canterbury Gate, Old Navan Road, Mulhuddart, Dublin 15. The development will provide 7 no. apartments (3 no. 1-bed units and 4 no. 2-bed units) accessed via the building's existing stair and lift (providing an overall total of 35 no units, 36 no. additional bicycle parking spaces within a new single storey bicycle store, 11 no. additional car parking spaces using the existing site access off Old Navan Road together with associated site development and engineering works, necessary to facilitate the proposed development. AI received 20/10/23
Permission is sought for the change of use from part light/industrial/production, facility and part recycling & bailing facility to new use as Warehouse and distribution facility with the existing ancillary offices remaining for the new use. AI received 25/05/21
Planning permission is sought for construction of a single-storey flat-roof extension to the front incorporating a rooflight, and a single-storey flat-roof extension to the rear.
The development will consist of: (i) Construction of 91 no. Build to Rent apartments (comprising 52 no. one bed apartments and 39 no. two -bed apartments) across 2 no. blocks (C & D) ranging in height from six to ten storeys over lower ground floor car park. The lower ground floor does not form part of this application. Each apartment is provided with its own private balcony and has access to a landscaped communal open space (4,399sqm) which forms part of phase 1. Residents also have access to communal amenity spaces, comprising a concierge, parcel drop box, fitness suite, residential common rooms, laundry at ground and first floor level in Block D; a residential amenity area, a parcel drop box and laundry at ground floor level in Block C; (ii) Car and bicycle parking is being provided in Phase 1 of this development (98 no. car spaces and 414 no. bicycle spaces to serve both phases); (iii) Access is provided via a new vehicular and pedestrian access serving residents of the apartments off Old Navan Road to the east of the site off Old Navan Road. As proposed in Phase 1 planning application; (viii) Provision of 1120 sqm of public open space comprising landscaped areas and play areas (included in Phase 1); and (x) all associated site, landscaping and infrastructural works, including tree planting, boundary treatments, street lighting, internal roadways, footpaths and shared surfaces, ESB substations, foul and surface water drainage, and potable water supply necessary to facilitate the development. This application is accompanied by a Natura Impact Statement (NIS). This application represents Phase 2 (91 no. units) of an overall development of 190 no. units on the subject lands (Phase 1 and Phase 2). Phase 1 (99 no. units) was submitted to the Planning Authority as a separate application under Reg. Ref. FW22A/0228.
The development will consist of: (i) Construction of 99 no. Build to Rent apartments (comprising 12 no. one bed apartments and 87 no. two-bed apartments) across 2 no. blocks (A&B) ranging in height from six to eight storeys over lower ground floor car park. Each apartment is provided with its own private balcony and has access to a landscaped communal open space (4,399sqm). Residents also have access to 467.4 sqm of communal amenity spaces, comprising a residential amenity area, parcel drop box, laundry and a 270 sqm creche at ground floor level in Block A; a residential amenity area, parcel drop box and laundry at ground floor level in Blocks B; (ii) Provision of 98 no. car parking spaces at lower ground floor level to serve the apartments in both Phase 1 and Phase2 (including 4 no. limited mobility spaces, 2 no. Go-Car spaces ( at grade level) & 10 no. electirc charging spaces) accessible from pedestrian entrances on northern facade and vehicular entrance off Old Navan Road; (iii) Provision of 7 no. at grade car parking spaces to serve creche (including 1 no. limited mobility space) accessible from the existing entrance off Old Navan Road on western boundary off the site; (iv) Provision of 414 no. bicycle parking spaces (406 no. bicycle parking spaces at lower ground floor level and a covered bicycle stand catering for 8 no. bicycle parking spaces at grade level at the sites western boundary adjacent to the public open space and play area) and 9 no. cargo bicycle parking spaces at lower ground floor level to serve the apartments; (v) Provision of a covered bicycle stand catering for 8 no. bicycle parking spaces at lower ground floor level of Block A to serve the Creche; (vi) Provision of a new vehicular and pedestrian access serving residents of the apartments off Old Navan Road to the east of the site and vehicular and pedestrian access serving the creche will be provided via existing entrance off Old Navan Road to the east of the site. A set down area for the creche will also be provided; and (vii) Provision of 2 no. new pedestrian crossing on Old Navan Road linking the proposed development with the Tolka Valley Park and footpath network to the northwest; (viii) Provision of 1120 sqm of public open space comprising landscaped areas and play areas; (ix) Road, and streetscape upgrade works along Old Navan Road, Damastown Close, and Damastown Road, to facilitate the provision of a shared footpath/cycle lane and pedestrian crossings to improve links to public transport & local facilities in Mulhuddart; and (x) all associated site landscaping and infrastructural works, including tree planting, boundary treatments, street lighting, internal roadways, footpaths and shared surfaces, ESB substations, foul and surface water drainage, and potable water supply necessary to facilitate the development. The application is accompanied by a Natura Impact Statement (NIS). This application represents Phase 1 (99 no. units) of an overall development of 190 no. units on the subjects lands (Phase 1 and Phase 2). Phase 2 (91 no. units) will be submitted to the Planning Authority as a seperate application.
ABP-311771-21 The development will consist of: (i) Construction of 189 no. Build to Rent apartments (comprising 63 no. one bed apartments and 126 no. two-bed apartments) across 4 no. blocks (A-D) ranging in height from five-storey over lower ground floor car park to ten storeys over lower ground floor car park. Each apartment is provided with its own private balcony and has access to a landscaped communal open space (4268sqm). Residents also have access to 773.4 sqm of communal amenity spaces, comprising a residential amenity area, parcel drop box, laundry and a 270 sqm creche at ground floor level in Block A; a residential amenity area, parcel drop box and laundry Creche at ground floor level in Blocks B & C; a concierge, parcel drop box and fitness suite with changing facilities at ground floor level in Block D; and a laundry, 3 no. common rooms, beverage prep area, toilets and cleaner's store at first floor level in Block D; (ii) Provision of 96 no. car parking spaces at lower ground floor level to serve the apartments (including 4 no. limited mobility spaces, 2 no. Go-Car spaces & 10 no. electric charging spaces) accessible from pedestrian entrances on northern facade and vehicular entrance to west of subject site; (iii) Provision of 7 no. at grade car parking spaces to serve the creche (including 1 no. limited mobility space) accessible from existing entrance off Old Navan Road on western boundary of the site; (iv) Provision of 410 no. bicycle parking spaces and 7 no. cargo bicycle parking spaces at lower ground floor level to serve the apartments; (v) Provision of a covered bicycle stand catering for 8 no. bicycle parking spaces at lower ground floor level of Block A to serve the Creche; (vi) Provision of a new vehicular and pedestrian access serving residents of the apartments off Old Navan Road to the west of the site and vehicular and pedestrian access serving the creche will be provided via existing entrance off Old Navan Road to the east of the site. A set down area for the creche will also be provided; and (vii) Provision of new pedestrian crossing on Old Navan Road linking the proposed development with the Tolka Valley Park; (viii) Provision of 1120 sqm of public open space comprising landscaped areas and play areas; (ix) Road, and streetscape upgrade works along Old Navan Road, Damastown Close, and Damastown Road, to facilitate the provision of a shared footpath/cycle lane and pedestrian crossings to improve links to public transport & local facilities in Mulhuddart; and (x) all associated site, landscaping and infrastructural works, including tree planting, boundary treatments, street lighting, internal roadways, footpaths and shared surfaces, ESB substations, foul and surface water drainage, and potable water supply necessary to facilitate the development. The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal Development Plan 2017-2023. A Natura Impact Statement has been prepared in respect of the proposed development.
To view details of this application please visit www.hollystown2shd.ie Submissions/observations to An Bord Pleanala, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie ABP 312271 A 10 year planning permission for a strategic housing development at a site of c. 25.3 ha at the townlands of Hollystown, Kilmartin, Hollywoodrath, Cruiserath, Yellow Walls, Powerstown, and Tyrrelstown, Dublin 15, which includes lands in the former Hollystown Golf Course and lands identified under the Kilmartin Local Area Plan 2013 (as extended). The lands are bound by the R121 and Hollywoodrath residential development to the east, the under construction Bellingsmore residential development to the south and north, the former Hollystown Golf Course to the north, Tyrrelstown Educate Together National School, St.Luke's National School and Tyrrelstown Community Centre to the west and south and the existing Tyrrelstown Local Centre to the south. The proposed development will consist of the development of 548 no. residential units, consisting of 147 apartments/duplexes and 401 houses, ranging in height from 2 to 5 storeys and including retail/café unit, 2 no. crèches, 1 no. Montessori, 1 no. community hub, car and bicycle parking, open space and public realm, over a site area of c. 25.3 ha, as follows: 1. On lands to the north of the application site (referred to as Sites 2 & 3) the proposed development includes for 428 no. houses and apartments comprising 27 No. 1-bed apartments, 97 No. 2-bed houses, 267 No. 3-bed houses and 37 No. 4-bed houses set out in 401 no. houses (373 no. 2-storey and 28 no. 3-storey) and 9 no. 3-storey apartment buildings (27 no.). A total of 792 no. car parking spaces will be provided for this part of the scheme, of these, 761 no. spaces will be provided for residents with 30 no. spaces provided as visitor parking and 1 no. space for disabled parking. In terms of bicycle parking, a total of 225 no. cycle parking spaces are provided, comprising 180 no. spaces for terraced units (located in 9 no. bike stores with 20 no. bikes in each) plus 45 no. spaces for the apartments. 2. On lands to the south of the application site and north of the Tyrrelstown Local Centre (referred to as Local Centre) the proposed development includes 120 no. apartment/duplex units in 4 no. blocks ranging in height from 3 to 5 storeys (32 no. 1 bedroom, 68 no. 2 bedroom and 20 no. 3 bedroom) all of which have balconies or terraces set out as follows: • Block A, is a 4 storey building, providing 12 no. units with proposed balconies, with a café/retail unit of 154sq.m and community hub of 144.5 sq.m proposed at ground floor. • Block B, is a 3-5 storey building, providing 34 no. units with proposed balconies and ground floor terraces. • Block C, is a 3-5 storey building, providing 44 no. units with proposed balconies and ground floor terraces. • Block D, is a 4 storey building, providing 30 no. units with proposed balconies and ground floor terraces, with a crèche of 500 sq.m with an external play space of 200 sq.m and a Montessori of 280.3 sq.m with an external play space of 185 sq.m proposed at ground floor. • External communal amenity space is provided at ground podiumterrace levels throughout the scheme. • A standalone 2-storey crèche unit is also provided of 529.6 sq.m with an external play space of 243 sq.m, to the south of the site. • Car Parking is provided in a mix of undercroft in Blocks B & C and at surface level with 108 spaces for residential use and 5 no. creche/Montessori staff spaces, 10 no. creche/Montessori set down spaces, 6 no. visitor spaces and 9 no. public spaces on the Link Street. A total of 300 no. bicycle parking spaces are proposed as part of the development comprising 230 no. long stay spaces for residents and 70 no. short stay spaces for both visitors and the non-residential activity. 3. Vehicular access to Sites 2 & 3 to the north of the application site is through the construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha) as well as via an extension to Hollystown Avenue link road south of the permitted Bellingsmore development. Vehicular access to the Local Centre to the south of the application site is via the existing access point along Hollystown Avenue and the north-south link route from the existing Tyrrelstown Local Centre which is partially completed and partially under construction. Pedestrian and cycle access is also provided along the R121, through existing roads within the application site and through the creation of a new pedestrian/cycle route to the north at the existing entrance to the clubhouse of the former Hollystown Golf Course. 4. The development of proposed Class 1 public open space of 2.77ha and Class 2 public open space of 1.69ha including pedestrian/cycle routes, seating areas, kick about area, playgrounds, dog park, associated landscaping works including planting, changes in level and boundary treatments. In addition 3.21 ha of linear park under the existing power lines and 2.11ha of ancillary linear open space which includes for SUDS and hedgerow features is provided in the scheme. The proposed Class 1 open space is provided as a north south pedestrian and cycle connection to the north an connecting the site to the Ratoath Road and the future Dublin GAA facilitites at this location. 5. The construction of a new foul outfall sewer, approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 6. The development will also provide for all associated ancillary site development infrastructure including landscaped areas and sustainable urban drainage systems under the existing ESB powerlines, and all associated ancillary site development infrastructure including: demolition of an existing shed, ESB sub-stations, public lighting, and foul and surface water drainage; internal roads & footpaths; landscaping; and all associated engineering and site works necessary to facilitate the development. The proposed scheme is designed to integrate with the previously permitted development at Bellinsgmore (Ref FW13A/0088/E1) which is currently under construction and recently permitted residential development on lands to the north east known as Site 1 (FCC Reg. Ref.: FW21A/0042). The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended). The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended), other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with an Environmental Impact Assessment Report, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application may also be inspected online at the following website set up by the applicant: www.hollystown2shd.ie
General upgrades of the existing external site area to include A) New entrance off private entrance to a new car park containing 18 spaces including 2 electrical spaces, bicycle & smoking shelter, B) Enhanced landscaping area of soft and hard spaces for staff, C) Demolition to existing entrance lobby to be replaced with new glazing and vestibule (7.13 sq.m), D) Change of facade colour scheme & E) Modifications to main existing entrance.
The realignment of a 450 m-long section of the Old Navan Road (R121) between Canterbury Gate Apartment and M3 Mulhuddart Service Station, Navan Road, Dublin 15. The overall development comprises the realigning of the exsting road to provide a 6.5m road and all associated footpaths, verges, cycle tracks, street lighting, signage, road markings, pedestrian crossing points, landscaping, boundary treatments, drainage works, piped and other services, and other ancillary works necessary to facilitate the development. Add Info received 21st October 2020. Add Info deemed Significant 27th October 2020. Revised Public Notices received 4th November 2020.
19,151 sqm of warehousing within 6 No. units for the storage and distribution of materials including chemicals within a proposed secure 33 Acre site. The height of which does not exceed 16.0m. This is inclusive of MHE (Mechanical Handling Equipment) areas, clean rooms, warehouse office, link corridors and associated amenities. • 917 sqm Individual standalone administration office (710 sqm) & staff amenities buildings (302 sqm) • 230 sqm security offices (Hub), • 1,205 sqm of associated plantrooms, stores and ancillary buildings • Provision for 182 No. of car parking spaces for warehousing office staff • Plus 3 No. disability access car parking spaces • Including provisions for 8 No. Electric Vehicle car parking spaces • An external ISO tank & container storage pad complete with associated circulation space (the area of which is circa 9.5 Acres or 38,450 sqm) • A perimeter attenuation channel (the area of which is circa 3,045 sqm with a capacity of over 5,045 cum) • A perimeter security fencing 2.4m high. • Associated landscaping • 6 No. access points • Facility identification signage • Associated ancillary site and civil works at Damastown Rise, Damastown Industrial Estate, Macetown North, Dublin 15, all located within the boundaries of the secure 33 Acre site. This is a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies. Add Info received 5th October 2020. Clarification of Add Info received 22nd December 2021.
Ground floor extension to front/side, with internal modifications, new boundary wall to side boundary and associated site works.
The development will consist of: Retention of single-storey, flat-roof extension to the side of the existing dwelling. Additional Information Received 11/02/2026
The construction of a Data Centre comprised of 4 no. buildings consisting of (a) Data Hall Building, (48,303 sq.m) 4 storey building with plant room over (b) Generator Building, (4,064 sq.m) 4 storey building over a single basement level, (c) Sprinkler Pump House building, (119 sq m.) single storey building, and (d) Security Hut, (21 sq.m.) single storey building with associated security barrier system, and the formation of a new vehicular entrance onto Damastown Avenue, 102 no. car parking spaces including 6 no. disabled car parking spaces, 30 no. cycle spaces, internal site roads and hardstanding, site lighting, perimeter security fencing and gates, site signage, soft landscaping, SUDS drainage system, and all other associated site works, on a 2.6709 hectare site at Damastown Avenue, Damastown Industrial Park, Macetown Middle, Mulhuddart, Dublin 15. Additional Information Lodged on 22nd May 2020 Clarification of Add Info received 27th August 2020