Modifications to the existing main site entrance to comprise of minor realignment of the internal access road with adjusted road marking and roadside bollards; Removal of 3 existing security traffic arms; Installation of 3 new security traffic arms and installation of 3 underground lifting security road blockers together with associated communications and electrical services; Provision of 2 set-down only parking spaces and all associated site drainage and installation works.
Change of use for existing ground floor single storey side extension only from Doctor's Surgery to residential use. A new front porch, a first floor front, side and rear extension over existing single storey side extension, a new single storey rear extension with roof window and all associated site works.
Alterations to previously granted planning, Ref. SD20B/0488; the alterations are to remove existing side elevation wall at ground floor level; extend the front, side and rear walls by 1 metre at ground & first floor levels; extend roof to match new walls; new windows added to side & rear elevations at ground floor level; new roof window added; relocate windows to front & rear elevations at ground & first floor levels; all associated site works.
2 storey extension to side. Rear attic storage with dormer window to rear. Roof window to the front. Garage conversion for extended living.
Construction of a two storey, detached three bedroom dwelling in the side garden area to include off street parking for two cars using the existing vehicular access driveway; proposed new vehicular access driveway for the existing house; ancillary site works and connections to all services.
For the continued use for a period of 4 years of the existing 30 metre high, free-standing lattice communications structure carrying associated communication equipment to be shared with third party operators, all within a 2.4m high palisade compound following parent permission SDZ22A/0001. The proposed development is located within the Clonburris Strategic Development Zone.
For the continued use for a period of 3 years of the existing 30 metre high, free-standing lattice communications structure carrying associated communications equipment to be shared with third party operators, all within at 2.4m high palisade compound following parent permission SD23A/0033. The proposed development is located within the Clonburris Strategic development zone
The continued use for a period of 3 years of the existing 30 metre high, free-standing lattice communications structure carrying associated communication equipment to be shared with third party operators, all within a 2.4m high palisade compound following parent permission SD18A/0378. The proposed development is located within the Clonburris Strategic Development Zone.
Alterations to the previously approved SD24B/0131. A first floor extension to the Front side and rear over the existing Converted Garage. Alterations to the existing hipped roof and the roof be extended over the proposed extension. With conversion of the enlarged Attic and Dormer window to the rear
An attic conversion. Alterations to the existing hipped roof and dormer window to the rear
The installation of solar carports and a ground mounted solar PV array. The proposed development will consist of solar carports (three and five panel versions) over existing surface car park areas, solar panels on ground mounted frames, 1 no. single-storey low voltage / medium voltage transformer (skid) unit, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for carport areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via existing site entrances from the existing Grange Castle Business Park internal road network.
Kelland Homes Ltd. seeks permission for development, consisting of elevational changes and alterations to an apartment building (known as Block A) permitted under Ref. SDZ22A/0010. Permission is sought to (I) replace previously approved recessed balconies on the east and west facades with proposed cantilevered balconies and associated elevational and internal amendments, (ii) incorporation of ESB substation & meter room into the ground floor plan of the building and associated internal modifications, (iii) revisions to external materiality, and (iv) all associated site development works, car parking, open spaces & landscaping etc., all on a site measuring c.0.27Ha, located at "Keepers Lock", Clon Burris, Dublin 22, within the Clon Burris Strategic Development Zone (SDZ). This application is being made in accordance with the Clon Burris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clon Burris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
A new single storey ground floor extension to side & rear of property with flat & pitched roofs and new roof windows, comprising of a bedroom, en-suite, walk-in wardrobe & family room. New roof window to rear of existing roof and all associated site works.
Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.
Construction of new attic dormer window to the rear of existing roof; conversion of existing attic to habitable space; change existing hipped roof to mini-hipped/gable style roof and all associated site works.
A social housing development comprising of 10 one bed units in a three storey apartment building, associated car parking and bicycle parking, bin store, new vehicular access onto Old Nangor Road, new pedestrian access to replace existing vehicular entrance, landscaping, boundary treatments and all associated site and engineering works necessary to facilitate the development.
Social housing development consisting of 10 one bed units in a two to three storey apartment building, associated car parking and bicycle parking, bin store, water pump house, new vehicular access onto Old Nangor Road, new pedestrian access onto Old Nangor Road, landscaping, boundary treatments, public lighting and all associated site and engineering works necessary.
Planning Permission for (1) Construction of a two storey pitched roof side extension to the existing dwelling (2) Construction of a single storey flat roof rear extension to the existing dwelling and extending for the width of the two storey extension. (3) Works to the existing house (a) Internal alterations at ground and first floor level to facilitate the new extension (b) Alterations to existing ground floor window on the front elevation (4) Increased width vehicular entrance of the public road and (5) All necessary ancillary site development works to facilitate this development
Demolition of the existing side extension 34sq.m; New side/rear extension to be built (rear extension to be two-storey), total new extension 72sq.m.
New Ground Floor Extension to front with new metal clad canopy over existing porch and new extension with internal modifications and associated site works
New dormer type window extension to side elevation for existing bedroom, new metal clad canopy over existing bay window and entrance door to replace existing tiled canopy, with internal modifications and associated site works.
Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the construction of a circa 2,155sq.m, two storey biopharma production facility to a maximum height of circa 14.9m to be located to the south of the existing P3 building; single storey administration extension of circa 210sq.m to a maximum height of 4m to the north of the existing P3 building and internal modifications to the existing P3 building in addition to all associated site works including delivery area; courier pick up/drop off area with 5 parking spaces (including 1 accessible parking space and 1 E-car space); extension to existing external utilities yard (circa 485sq.m) for 3 heat pumps and other ancillary equipment; new internal site circulation road and re-alignment of existing circulation road; 48 additional car parking spaces (including 3 accessible parking spaces and 5 E-car spaces); 24 covered bicycle stands, hard and soft landscaping and external lighting; there will be temporary site entrance and associated temporary access road located to the south east of the site during the construction phase all on 3.68 Hectare application site located within the Takeda Ireland facility at Grange Castle Business Park; an EIAR (Environmental Impact Assessment Report) is submitted with the application and relates to development comprising of an activity which requires and Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
New dormer roof to rear.
Convert existing side garage from storage space to living space; single storey extension to the rear of dwelling with skylights; change existing hipped roof to an apex roof with gable; new roof to have a skylight to the front elevation and a new dormer window to the rear elevation; convert existing attic space to living space; widen existing entrance to accommodate off-street parking; internal alterations and all associated site development works.
Parking area to the front with dropped kerb for access; new folding wrought iron gates in keeping with the existing.
Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the Grange Castle South Business Park and includes the residential property of Ballybane, Old Nangor Road on land within the townlands of Milltown; Ballybane and; Aungierstown and Ballybane; and bounding Baldonnel Road to the west; both the Old and New Nangor Road to the north; and Grange Castle South Access Road to the South, Baldonnel, Dublin 22. The development will consist of the following: (1) The demolition of the existing two storey dwelling of Ballybane and associated farm buildings (565sq.m) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq.m on an overall site of 16.5hectares. (2) 1 two storey data centre (Building A) that will be located to the south-west of the site and will have a gross floor area of 28,573sq.m. and will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (Building B) which will be located to the north-west of the site, and to the immediate north of Building A and will have a gross floor area of 21,725sq.m and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (Building C) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq.m. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) Each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) The overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq.m). (8) 3 single storey MV buildings (each 249sq.m - 747sq.m in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings A and B, and to the south of the generator compound withing building C. (9) 8 prefabricated containerised electrical rooms (65sq.m each and 520sq.m overall) that are stacked in pairs to the immediate south of the temporary substation. (10) Ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under Baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq.m), security hut (30sq.m) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the Grange Castle South Access Road from the south via the Baldonnel Road. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Ten-year planning permission is sought for the expansion of existing Google Ireland Limited operations at Grange Castle Business Park South, Dublin, including the development of a 72,400m² data storage facility which will incorporate data halls with associated support areas, a high voltage compound, offices and staff facilities, a loading area, mechanical and electrical yards, internal and external utilities, security fence and gates, landscaping including acoustic screening, 2 no. stormwater attenuation ponds, additional internal vehicle and pedestrian infrastructure, together with ancillary buildings and site infrastructure. The development also includes the creation of a new active travel thoroughfare connecting Grange Castle Business Park South and Profile Park Road.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs; flat dormer roof to the rear.
Retention permission for 3 No of storage units / valeting bays, with car parking car storage area with all associated site works
Change of use of area of single storey detached timber cabin in rear garden, previously wc (3sq.m) & timber cabin (23sq.m) to family flat (26sq.m); construction of single storey shed (5sq.m) & wc (3sq.m) in rear garden.
A single storey ground floor extension to side/ rear, including, demolition of part of existing kitchen extension, removal of existing rear sheds, drainage works and a gate to existing side boundary wall, into the existing garden.
Removal of two existing prefabricated classrooms and construction of a four classroom, two storey extension to the west of the existing school buildings, together with connections to services and all associated site works.
Kelland Homes Ltd seeks permission for retention development, consisting of the replacement of permitted railing located to the rear of 8 no. duplex blocks under grant of permission SDZ22A/0010 with a proposed dividing wall measuring 1.8m in height sloping down to 1.1m on the overall site measuring 0.1ha located within Keepers Lock Clonburris Dublin 22.
Retention of rear dormer extension and attic conversion to existing two storey, end of terrace dwelling including: rear dormer extension with a roof light to facilitate stair access to the attic; attic conversion to include storage space and a playroom; 3 roof lights to the rear of existing roof; all associated ancillary site works.
Change of roof profile from hip end to full gable end profile to accommodate dormer extension to the rear (b) 1 No. velux roof light to front elevation (c) All associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear
Conversion of attic to storage including changing existing hipped end roof to a gable end roof; dormer window to the rear and a window to the new side gable wall, all at roof level.
Planning Permission for (1) The construction of 1no. 3 bedroom 5 person detached two storey pitched roof dwelling (no 18A St Johns Road) located within side garden of existing dwelling (no 18) and fronting onto St Johns Road (2) New vehicular entrance of the public road to provide off road parking and (3) Connection to all public services and all necessary ancillary site development works to facilitate this development. Note: Demolition of the existing garage attached to the side of the existing dwelling is as per previous Planning Ref: SD23B/0447 at18.
(1) Demolition of the existing garage attached to the side of the existing dwelling (2) Construction of a two storey pitched roof side extension, and with the two storey extension projecting beyond the rear of the existing dwelling (3) Single storey flat roof rear extension for the width of the existing dwelling (4) Internal alterations at ground and first floor level within the existing dwelling to facilitate the new extension (5) increased width vehicular entrance of the public road to provide additional off road parking and (6) all necessary ancillary site development works to facilitate this development
Construction of a new detached single storey pitched roof shed building within the rear garden off the existing house. Part of the new shed building will be used as a home office. Connections to all services and all necessary ancillary site development works to facilitate this development.
The continuance of use of the existing 3 buildings and all associated external areas for storage and warehousing of motor vehicles, plant, machinery and other durable products for the sale by public auction, all associated ancillary uses including support staff and office facilities and all associated site and development works comprising hard and soft landscaping areas, roads and footpaths, car parking, boundary treatments/ fencing, signage and water services infrastructure. The development described above was previously permitted under Reg. Ref. SD18A/0126 and the duration of the permission was limited to two years by condition 9 of that permission. A Protected Structure - Former Gun Powder Store (RPS Ref. 205) - is located within the application site.
(i) Partial demolition of the existing boundary wall; (ii) provision of a new vehicular entrance accessed off Convent View; (iii) associated driveway works; (iv) construction of a new dividing boundary wall and (v) all ancillary works inclusive of dished kerbing, landscaping boundary treatments, necessary to facilitate the development. Outline Permission is sought for: (i) Construction of 1 detached single storey dwelling, and associated drainage, to the side (north) of existing dwelling at 1 Convent View, Boot Road, Clondalkin, Dublin 22. (D22 YV78).
The construction of a 2-storey extension and any associated site works to the south elevation of the existing engineering stores in the administration offices building which comprises of construction of circa 34sq.m area with a maximum height of 9.4m to accommodate two storey units at Grange Castle Business Park, Grange Castle, Dublin 22. The application relates to development which comprises of an activity, which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
The proposed development primarily comprises the provision of two 110kV transmission lines and a 110kV Gas Insulated Switchgear (GIS) substation compound along with associated and ancillary works and is described as follows: The proposed 110kV GIS Substation Compound is to be located on lands to the north-east of the two storey data centre facility and associated three storey office block that was permitted under SDCC Reg. Ref. SD18A/0134/An Bord Pleanála Ref. ABP-302813-18, and within an overall landholding bound to the north by the Grange Castle South Business Park access road; to the west by the Baldonnel Road and to the south by 3 residential properties and the Baldonnel Road; and to the east by the Google data centre facility within the Grange Castle South Business Park, Baldonnel, Dublin 22. The site of the proposed development has an area of c. 0.9163 hectares. The proposed 110kV Gas Insulated Switchgear (GIS) Substation Compound includes the provision of a two storey GIS Substation building (with a gross floor area of 1,307.2sqm) (known as the Aungierstown Substation), two transformers, lighting and lightning masts, car parking, associated underground services and roads within a 2.6m high fenced compound and all associated construction and ancillary works. Two proposed underground single circuit 110kV transmission lines will connect the proposed Aungierstown 110kV GIS Substation to the existing 220kV / 110kV Castlebaggot Substation to the immediate north-east. The proposed transmission lines cover a distance of approximately 120m and 140m within the townlands of Ballybane, and Aungierstown and Ballybane. The development includes the connections to the two substations (existing and proposed), changes to landscaping permitted under SDCC Reg. Ref. SD18A/0134 / An Bord Pleanála Ref. ABP-302813-18 and all associated construction and ancillary works. An Environmental Impact Assessment Report has been prepared in respect of this application. The planning application and the Environmental Impact Assessment Report may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy) during public opening hours for a period of seven weeks commencing on the 21st January 2021 at the following locations: The Offices of An Bord Pleanála, 64 Marlborough Street, Dublin 1. South Dublin County Council, County Hall, Town Centre, Tallaght, Dublin 24. The application may also be viewed/downloaded on the following website: www.aungierstown-substation.com Submissions or observations may be made only to An Bord Pleanála ('the Board'), 64 Marlborough Street, Dublin 1 during the above-mentioned period of seven weeks relating to: the implications of the proposed development for proper planning and sustainable development, and the likely effects on the environment of the proposed development, and the likely significant effects of the proposed development on a European site, if carried out. Any submissions/observations must be accompanied by a fee of €50 (except for certain prescribed bodies) and must be received by the Board not later than 5.30p.m. on the 10th March 2021. Such submissions/observations must also include the following information: The name of the person making the submission or observation, the name of the person acting on his or her behalf, if any, and the address to which any correspondence relating to the application should be sent, The subject matter of the submission or observation, and The reasons, considerations and arguments on which the submission or observation is based in full. (Article 217 of the Planning & Development Regulations refers). Any submissions or observations which do not comply with the above requirements cannot be considered by the Board. The Board may at its absolute discretion hold an oral hearing on the application. (For further details see ‘A Guide to Public Participation in Strategic Infrastructure Development' on the Board’s website www.pleanala.ie). The Board may in respect of an application for permission/ approval decide to (a) (i) grant the permission/approval, or (ii) make such modifications to the proposed development as it specifies in its decision and grant permission/approval in respect of the proposed development as so modified, or (iii) grant permission/approval in respect of part of the proposed development (with or without specified modifications of it of the foregoing kind), and any of the above decisions may be subject to or without conditions, or (b) refuse to grant the permission/approval. Any enquiries relating to the application process should be directed to the Strategic Infrastructure Development Section of a Bord Pleanála (Tel. 01- 8588100). A person may question the validity of any such decision by the Board by way of an application for judicial review, under Order 84 of the Rules of the Superior Courts (S. I. No.15 of 1986, as amended), in accordance with section 50 of the Planning and Development Act, 2000, as amended. Practical information on the review mechanism can be accessed under the heading Information on cases / Weekly lists - Judicial review of planning decisions on the Board's website www.pleanala.ie or on the Citizens Information Service website www.citizensinformation.ie.
Alterations to an existing house including a first floor extension to the rear
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Revision to existing permission (SD24B/0194) to include enlargement of single storey extension to rear with internal modifications and associated site works.
Planning permission for attic conversion to non-habitable storage space with metal clad dormer and Velux to rear roof. Permission to alter roof profile from hip roof to gable roof. Relocation of existing window on side gable. Proposed single storey extension to existing extension to rear with all associated ancillary works. at 16 St Patricks Road, Ballymanaggin Dublin 22
Retention Planning Permission for detached single storey gym/shed & outdoor canopy seating area to rear garden with associated ancillary works.
Demolition of an existing lean-to shed and construction of a single storey domestic extension to the side and to the rear of house.