To extend the appropriate period of Planning Permission P17/583 for the further completion of construction of Westpark Business Campus with the construction of Block 6000, (immediately south of existing Block 7000), a mixed use, multi-storey block, similar to that granted under parent planning permission under Clare County Council PA Ref: P01-1066 and APB Ref: PL03.130244. Block 6000 will have a total gross internal area of 12,045 sqms with offices at upper floors 300-500 and data centre/light industrial / storage/ Research and Development uses at lower levels 100-200. The construction of an ancillary, multi-deck carpark (MDCP) located to the South of Block 4000 within the Campus. The MDCP will accommodate 580 spaces and will replace the existing, 101 at grade, split level, car park located to the South of Block 4000. The car park will also replace the 500 spaces MDCP to the South of the Campus, granted by Clare County Council under Ref: P01-1066 and APB Ref PL03-130244. The proposed development will use existing drainage services in place within the overall campus and the existing road network. The development includes, landscaping, ancillary parking adjacent to Block 6000, ESB Substation, service areas for goods vehicles. The application includes all other ancillary site development works as required to complete the block
The development consists of the construction of a slatted unit and associated site works
To demolish existing substandard garage and Permission for the construction of a domestic garage and store including ancillary site works
To construct an extension to rear and side of existing cottage and associated works to include renovation of cottage, installation of a wastewater treatment system and site works
To make amendments to a previous granted planning Ref No. P21-738 which included (1) Demolition of an existing bungalow (2) Construct a new ESB Substation and (3) Construct mixed use industrial units with office accommodation for industrial, light industrial, storage, warehouse and logistic usage including ancillary siteworks all at Western Business Park, Caherteige and Drumgeely Shannon, Co Clare. The amendments to the previous granted planning include the following: (a) relocating the ESB substation from the eastern elevation of Unit 7 to the western elevation of Unit 6, (b) revising the internal layout and elevation of Unit 6 and raising the height of Unit 6 from 16.4m OD to 18.4m
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
For the construction of a fenced enclosure containing a dark fibre POP cabin with all associated site works adjacent to Building 156, Shannon Free Zone, Shannon, Co Clare
To renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works
For the following: (1) Demolition of an existing bungalow (2) Construct a new ESB Substation and (3) Construct mixed use industrial units with office accommodation for industrial, light industrial, storage, warehouse and logistic usage including ancillary siteworks
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works
For 4 No face illuminated wall signs to replace existing 1 No non-illuminated freestanding sign to replace existing and 1 No new non-illuminated freestanding sign
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
To construct a dwelling house, domestic garage, waste-water treatment system and soil polishing filter together with all associated site development works and connections to public services
Of a) retain entrance as constructed. b) PERMISSION to install roadside pipe / culvert under entrance together with all associated site development works and services
For the following development on the site, consisting of; construction of a new 47 m2 bunded modular extension including an underground bund, A new external covered solvent storage area and bund, New concrete yard, New access landing, ramp, steps & railings, Removal of an existing LPG tank, and All ancillary site development works and services to facilitate the development including drainage, and utility connections. The proposed development site is controlled by an Industrial Emissions Licence (No. IEL P0020-03) authorised by the Environmental Protection Agency
For construction of an external refuse store at Bay 89.1, Shannon Free Zone West, Shannon, Co. Clare. The proposed works will include construction of a louvred refuse enclosure to the south of the existing building together with all ancillary site works and servies
For the construction and operation of a concrete batching plant which will produce up to 50,000 m3 of ready-mix concrete annually over an area of circa 1.6 hectares within the southern portion of Bunratty Quarry, in the townland of Bunratty West, Co. Clare. The proposed concrete batching plant will include concrete plant (x 1), 100 tonne storage silos (x 4), 50,000L water tank1 (x 1), 80 tonne storage bins (x10), control cabin, admixture building, conveyor system, washout lagoons, attenuation tank, an access ramp and associated drainage infrastructure including a settlement tank. The proposed development will involve the utilisation of both virgin aggregates and recycled aggregates. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
To construct a single dwelling house, advanced water treatment system and ancillary site works.
To construct a dwelling house, garage, entrance, installation of a wastewater treatment system and associated site works
To construct a dwelling house, garage, entrance, wastewater treatment system, and associated site works
For a single storey extension and alterations to existing school including all associated site works
For the installation of a portacabin to be used as a Classroom & Sensory room with connection to existing services including ancillary site works
Of a portal frame type shed and all associated development works
For the Demolition of existing industrial/office buildings within Bays 77 and 79 of the Shannon Industrial Estate and associated site clearance works along with all other associated site works to allow for future development on the site at Caherteige and Drumgeely Td
For development which will consist of alterations and amendments to the elevations, external finishes and site works previously permitted under Planning Reference No P20/575
To: construct of 1 no Advanced Technology Manufacturing Unit. The building consists of a single storey high-bay industrial floor with ancillary office area and roof plant. Site works consists of the provision of an enclosed service yard with dedicated plant and refuse storage compound, rainwater harvesting tank and new sub-station, cycle parking and external landscaping, along with all associated site works, services and signage. Demolition of existing sub-station. The Building will replace the existing structures on site, the demolition which was granted under planning reference no P19-822.
Proposes to carry out the following development; The refurbishment of Drumgeely Neighbourhood Centre. The proposed development will include: 1) Removal of all existing walls, flower beds and hard surfaces. 2) Install new level access surfaces to the entire public realm area including paving, low level vegetation and grass lawn areas, incorporating Sustainable drainage system (SuDS). 3) Installation of seating areas, benches, covered canopy area and bicycle parking stands. 4) Provision of two Accessible Disabled Parking Spaces and ten car parking spaces on the perimeter of the site. 5) Provision of public lighting and low-level ambient lighting. 6) Construction of a raised flower bed re-using the natural stone from the existing raised grass area. 6) Connect to existing onsite drainage services. 7) The installation of associated signage. 8) All ancillary site works. In accordance with the Habitats Directive, Clare County Council has carried out Appropriate Assessment Screening on the project. An Environmental Impact Assessment (EIA) screening determination has been made and Clare County Council concludes that there is no real likelihood of significant effects on the environment arising from the proposed development and as such an EIA is not required.
For the installation of smart traffic lights and pedestrian crossings with all associated site works, at the four-way junction between Blocks N, O, Q & P
For development at Precision Engineering Ltd., Block O109, Shannon Industrial Estate, Shannon, Co. Clare. The development will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and all associated siteworks
For the construction of works to include, reconfiguration of the existing South West elevation to provide an external canopy, signage on the building, roof level plant enclosure, a new pedestrian door to northwest elevation and a single storey switchroom and substation to rear of building in the yard space with all associated site works
To change the site boundaries as granted under P99-780, demolish 2 existing on-site sheds, and to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For the following works, (a) Modify the internal layout and make changes to the elevations of both the existing dwelling and granny flat. (b) Construct extension to rear and porch to front of dwelling, and (c) Construct extension to side of granny flat, all with associated site works
The development consists of the demolition of an existing carparking area and the relocation of an existing ESB substation to facilitate the construction of a four-storey office building with a gross floor area of 5636m2. Other works include the provision of 317no. carparking spaces including accessible spaces, EV charging areas and set-down areas, a relocated vehicular access to the site, an additional vehicular access point to ancillary parking on the opposite side of the road with a pedestrian crossing connecting both. Secure bicycle parking spaces, refuse store and plant and services building, incorporating the relocated substation. Signage and wayfinding, services plant and photovoltaic units to roof level with all landscaping and associated site works & services The planning application is accompanied by a Natura Impact Statement
For development which will consist of the provision of, overall c.521 Sq. M. or 145. kWp output of roof mounted Solar PV array. A glint and glare assessment will be submitted with the application
For the demolition of existing industrial / commercial building within Bay 70 of the Shannon Industrial Estate and associated site clearance works along with all other associated site works to allow for future development on the site
For an extension to the existing metal fabrication workshop together with all ancillary works. A Natura Impact Statement (NIS) will be lodged as part of this application
The development consists of the demolition of an existing common overflow carparking area to facilitate the provision of a light industrial facility with ancillary office space, yard spaces, refuse stores with carparking, bicycle parking, ESB substation, switch room and associated site works. PERMISSION is sought for the industrial and office facility to have the flexibility to be subdivided as follows: Option A: One No. Unit (Area: 5886m2) with Ancillary Yard and Refuse Store. Option B: Two No. Units (Units 01 Area: 3913m2) (Unit 02 Area: 1973m2) with Two No. Ancillary Yards and Two No. Refuse Stores. Option C: Three No. Units (Area Unit 01: 1973m2 / Area Unit 02: 1940m2 / Area Unit 3: 1973m2) with Three No. Ancillary Yards and Three No. Refuse Stores. Other works include the provision of 156 no. carparking spaces which include accessible spaces, EV charging areas and set-down areas with vehicular and HGV access points to the perimeter of site. Secure bicycle parking spaces, refuse stores with roof level and site level external services areas, building signage with all ancillary landscaping and associated site works and services. The planning application is accompanied by a Natura Impact Statement
For the RETENTION and COMPLETION of relocation of the single storey services building with a generator/transformer compound and the alterations to the previously granted permission (Planning Ref: P24 – 60531) comprising of revisions: Extension to existing yard, removal of car spaces to adjacent carpark and relocating existing palladian fence to the new yard space edge. The proposed development also includes the addition of 2 No. external dock ports, minor amendments to internal configuration and omission of previously proposed external mezzanine plant decks. Note: there is no increase in floor area. Works also include all associated site development works
The development consists of the alterations to the previously granted permission (Planning Ref: P21 – 503) comprising of revisions including: a reduced office area with new production floor welfare facilities (77sqm), relocating external palladian fence to the yard space, new single storey services building with a generator/transformer compound adjacent to existing substation. The proposed development also includes the addition to the existing service yard of a new sprinkler tank and pump station, 2 no. new dock levellers, two new roller doors, alterations to internal road, two no. external packaged plant units (16m x 3.8m each) and a new two storey external plant structure to house air handling units, plant and containment enclosure. Note: there is no increase in floor area, the mezzanine grid floor supports additional plant only. Works also include all associated site development works with minor amendments to existing carparking layouts.
Is sought for the proposed works: 1) removal from site and decommissioning of existing 3 No. overground fuel tanks and existing underground fuel tanks; 2) removal from site of existing washing machines facility and removal of unauthorised disused manual car wash; 3) removal of existing forecourt canopy and 4 No. fuel pumps; 4) proposed change of use from storage area to customer toilets, on the ground floor of the existing building, to include minor changes to elevations; 5) construction of new 3 No. dispenser pump islands, dispensing fuel on each side, with new canopy over; 6) installation of new underground fuel tanks, and all associated fuel pipework, off-fill points and vents and installation of new truck/HGV fuelling pump; 7) alterations to existing parking areas to provide new car parking layout, with provision of EV charging spaces and bicycle stands; 8) construction of new ESB sub-station; 9) concrete slab surfacing, asphalt surfacing and associated drainage with the provision of new Class A Petrol interceptor; 10) alterations to existing site entrances, to provide 2 No. vehicular site entrances to and from the site from public road, including alteration/extension of existing front boundary wall; 11) construction of all associated site features including public lighting and all associated ancillary site works. Planning permission for RETENTION is also sought for the existing works as constructed: 12) existing totem sign; 13) existing signage on front and side (east) elevation of amenity building; 14) existing block boundary walls along eastern and western site boundaries; 15) existing single-storey storage rooms to rear of amenity building, as constructed; 16) change of use from tea room use to residential use to provide 1 No. apartment at first floor level, inclusive of access stairs, as constructed; 17) change of use from storage areas to retail area at ground floor level of existing amenity building, as constructed; 18) existing outdoor seating areas, as constructed; 19) elevational changes to existing elevations, as constructed
Of additional internal floor area and alterations to the side and rear elevations of existing dwelling
To erect 3,074.00 m2 or 564.64 kWp of photovoltaic panels on four roofs of our campus, with all associated site works. We are going to install solar panels on the roof, of Block T (55-56), Block T(57-59), Block V (160-161) and the new existing building of our campus, A glint and glare assessment will be submitted with the panning permission application
For the Construction of a Single Storey Dwellinghouse, New Vehicular Entrance & Proprietary Waste Treatment Plant including all ancillary site works
To construct a new dwelling house and private garage, new entrance and install a new wastewater treatment system along with all associated site works
For the construction of a new lift facility and all associated works
To construct 4 dwelling houses together with all associated site works and services
For demolition of existing dwelling house, construction of a new dwelling house and garage along with all associated works
To make the following changes to the existing dwelling house a) demolish existing rear extension; b) construct new rear extension; c) elevational changes; d) all associated site works
The development consists of alterations to the existing elevations of:- Bay 135, with the construction of 15sqm new floor area with subdivision into 3 no. Advanced Manufacturing Units- Consisting of a single storey high industrial floor with ancillary office area - bay 137 with subdivision into 4 no Business Technology and Innovation Units. Other works include alterations to the existing site layout with a new access road to serve Bay 135 units, the provision of 25 no new car parking which include accessible spaces, set down area with vehicular and HGV access point to the perimeter of site. Secure bicycle parking spaces, refuse stores with roof level and site level external service areas, building signage with all ancillary landscaping and associated site works and services. The Planning Application is accompanied by a Natura Impact Statement