Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
Construction of single storey garden room. Consisting of home office & gym & all associated site works.
Retention for internal mezzanine storage area (132sq.m); single storey compressor room extension (12sq.m) to rear of existing building and single storey packaging shed extension (38sq.m) to side of existing building.
The refurbishment of Katherine Tynan House, or ‘Whitehall’, a Protected Structure (RPS ref.197), with change of use from disused dwelling to community centre. Works will entail refurbishment of the roof and external walls; reinstatement of windows and external doors; ceilings and floors; reinstatement of a conservatory and glazed porch (10sq.m and 5sq.m respectively); new internal stairs and doors; new services and sanitary accommodation; two new single storey open-fronted structures on part of the footprint earlier outbuildings with an enclosed area for toilets (534sq.m); refurbishment of historic garden walls and gates; upgrading of the existing non historic entrance and approach from the Ballymount Road; and provision for parking on site.
Construction of a single storey one bedroom dwelling attached to the existing dwelling with new vehicular entrance to both existing and proposed dwellings; new boundary walls and all associated works.
The reconfiguration of 47No existing staff car parking spaces to allow for safer movement of vehicles and temporary storage of materials elsewhere in the existing yard, including new staff vehicular and pedestrian entrances and other associated minor works which are similar to what is currently permitted as part of a more substantial development Reg Ref SD19A/0222
Two side-facing Velux windows on the front dormer and a Velux window on the front roof slope. New front-facing fenestration on the front dormer. A new dormer to the rear at attic level. A flat-roof single storey extension to the rear.
Single storey front & side porch extension with tiled roof over, demolition of existing concrete roof over the existing side bedroom and replaced with new tiled roof with roof lights, conversion of attic space into study with a dormer roof window extension to the side of existing hipped roof. Dishing of public footpath verge & kerb. New permeable driveway paving. Retention of 4.3m wide driveway entrance and retention of single storey 34sq.m recreation room in rear garden and all associated site works.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached dormer bungalow in rear garden with partial 2 storey area, alterations to existing driveway, construction of new vehicular entrance with partial dishing of kerbs & all ancillary site work.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached dormer bungalow in rear garden with partial 2 storey area, alterations to existing driveway, construction of new vehicular entrance with partial dishing of kerbs & all ancillary site works.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached Dormer Bungalow in rear garden with partial 2 storey area, alterations to existing driveway, constriction of new vehicular entrance with partial dishing of kerbs & all ancillary site works
On a site bound by Belgard Road (R113) to the east, Belgard Square North to the North, Belgard Square East to the west and Clarity House to the south, demolition of all existing structures on site (with a combined gross floor area of c. 3625sq.m); The construction of a mixed-use residential development set out in 3 blocks including a podium over a basement, ranging in height from 2 to 13 storeys (with core access above to roof terrace), comprising 334 residential units of which 118 will be Build to Rent (BTR) residential units, with associated amenities and facilities across the development; 4 retail/café/restaurant units and 3 commercial spaces associated with the 3 live-work units (723sq.m combined); Childcare facility (144sq.m); 670 bicycle parking spaces including 186 visitor spaces; 117 car parking spaces (including 6 disabled spaces) are provided at ground floor and basement level; Communal space in the form of residential courtyards and roof terraces; Public open space provision including Homezone/tertiary route along the south of the site between Belgard Rd and Belgard Square East; The overall development has a Gross Floor Area of 29,784 sq.m; Of the total 334 residential units proposed, unit types comprise Block A (Build-to-Rent), 91 one bed units; 1 two bed 3 person units; 26 two bed 4 person units; Blocks B & C, 2 live-work studio units; 102 one bed units; 12 two bed 3 person units; 88 two bed 4 person units including 5 duplex units; 1 two bed 4 person live-work unit; 11 three bed units; A portion of the proposed residential development is a 'Build to Rent' scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments (December 2020); All associated works, plant, services, utilities, telecommunications infrastructure, PV panels and site hoarding during construction; A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
Attic conversion for storage. Single storey front and rear extension. Widening of front vehicular access. Two Velux windows to the front roof area. Demolition of existing shed.
Single storey CNG (compressed natural gas) compressor installation with a floor area of 19sq.m; covered shelter with a floor area of 30sq.m and a 2.6m high boundary wall around the site with all ancillary services and associated site works.
The change of use from warehouse to data repository facility, alterations to external facades, provision of a new 1100mm parapet, reclad roof, internal alterations, refurbishment of the existing office space, solar panels at roof level, external plant at ground and roof levels and equipment to include 12 condenser modules, an emergency back-up generator and associated fuel storage tank, transformer, extension to the existing sub-station (c. 13sq.m), 2 sprinkler tanks and pumphouse, bin store, 22 parking spaces including 2 electrical vehicle charging points, bicycle parking shelter, landscaping, planting, new security fence, external lighting, CCTV, altered vehicular gates, permeable hard surfaces, alterations to internal foul sewerage and water supply networks, provision of SuDS compliant surface water drainage system and all associated site works.
Divide existing dwelling into two separate houses; 1 four bedroom bungalow and 1 three bedroom, two storey dormer type house. The new house will incorporate a previously approved ground floor granny flat extension and first floor games room (Reg. Ref. SD10B/0218) and will involve raising the existing ridge/roof level by 300mm and fitting 4 'Velux' rooflights; off-street car parking to both houses will be provided by existing vehicular entrances; all at front and side.
Dishing of public footpath, verge and kerb. Retention of widening of vehicular entrance and all associated site works.
Construct a single storey extension to the rear of the existing warehouse unit including alterations to the existing to accommodate same; All ancillary site works and services.
Construct a single storey extension to the rear of the existing warehouse unit, including alterations to the existing to accommodate same, all ancillary site works and services.
Replacement pitched roof over garage and courtyard; single storey utility, toilet and lobby extension to courtyard; single storey sunroom to the rear; single storey glazed porch to the front, at the Old Rectory, Belgard Road, Dublin 24
Change of use of c.12.25sq.m of floorspace within the existing warehouse building on site, from warehouse use to use for the temporary storage of shredded electrical & electronic equipment and components.
Front entrance porch.
For the construction of single storey extension to the front of existing dwelling which will include new bay window, new pitched roof, and front elevation alterations/change of materials. Retention permission is also sought for the change of use of attic space to storage space including rear rooflights and all associated ancillary site works
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
The demolition of three existing apartment units (c. 239sq.m) and bin store (c.18sq.m) and the construction of a residential development arranged in two building blocks (Block A & Block B) ranging from 3 to 6 storeys in height over basement level (c. 3,728sq.m, including basement). Block A comprises 11 residential apartments (c. 1256sq.m) in a 5 to 6 storey building and including a ground floor level cafe (c. 93sq.m) at the buildings south eastern corner; Block B comprises 15 residential apartments (c.1393sq.m) in a 3 to 5 storey building; The proposed development will comprise 26 new residential units (5 studio apartments, 6 1-bedroom apartments, 7 2-bedroom apartments & 8 3-bedroom apartments) with associated balconies and terraces. The proposed development will comprise a total of 40 apartment units derived from 26 new apartments and 14 existing apartments; relocation of existing basement access on Old Greenhills Road and the upgrade and extension of the existing basement level; provision of internal footpaths; landscaped communal open space (including outdoor gym equipment, children's play area and 'working from home' area); public open space; 13 car parking spaces and 74 long-stay bicycle parking spaces and 1 motorcycle parking spaces at basement level; 2 shared car parking spaces and 20 short-stay bicycle parking spaces at surface level (15 car parking spaces, 94 cycle parking spaces and 1 motorcycle parking in total); all piped infrastructure and ducting; elevation treatments; plant room; lift access and stair cores; hard and soft landscaping and boundary treatments; changes in level; waste management areas; attenuation tank; backup generator; solar photovoltaic panels; lighting; and all associated site development and excavation works above and below ground. The subject site is currently partly developed with an existing residential scheme known as Greenhill's Court comprising 17 apartment units in 4 apartment blocks ranging in height from 2 to 4 storeys, including basement car park all on a site of approximately 0.23ha. on lands bounded to the north by St Basil's Training Centre, to the east by Greenhills Road, to the west by Old Greenhills Road, and to the southeastern corner by Main Street, Tallaght, Dublin 24
The amendments to the permitted development will consist of: 1. Reduction in the overall height and internal and external re-configuration of permitted development resulting in the omission of 1 no. floor in Block A and C, and 2 no. floors of Block B to comply with Condition 2 of the permitted development. This will result in an overall reduction in units in the permitted development by 55 no. units from 252 no. units to 197 no. units; 2. Omission of 41 no. studio apartments which will be replaced with 15 no. 1-beds, 13 no. 2-beds and 2 no. 3-bed units including any associated elevational changes to balconies and window openings; 3. Revised layout at ground floor to remove podium courtyard, parking and service area which will be replaced with a new underground car park, entrance and service area; 4. Relocation of permitted creche to the ground floor corner of Blocks B and C and inclusion of an associated outdoor play area resulting in the omission of apartment no. 40 and relocation of tenant amenities/ community space to Block A to comply with Condition 2 of the permitted development; 5. Inclusion of plant equipment at roof level; and, 6. Inclusion of a blue roof drainage system at roof level of all permitted apartment blocks. 7. The development also includes all site development works necessary above and below ground necessary to facilitate the development.
Single storey porch and kitchen extension to the front, convert existing garage to a study, erect a single storey extension to the rear and widen the existing vehicular entrance from 2.5 metres to 4.0 metres.
Garage conversion; single storey rear extension; 2 'Velux' rooflights to the rear roof slope and all associated site works.
(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
Single storey front extension to living room and hall; new tiled roof over existing garage to match roof over living room and hall; widening of vehicular entrance and all associated site works.
Retention permission is sought for an existing free standing advertisement sign located within the subject grounds fronting onto the junction of Upper Ballymount Road and Calmount Road Dublin 24.
Demolition of industrial shed attached to existing industrial building.
Provision of off licence subsidiary to the main retail use.
Change of use from existing office accommodation (53.67sq.m) to new Sushi Take-Away shop consisting of new service counter with hatch to customer area at front, new internal kitchen, cold store, dry goods store & staff w.c., together with new shopfront signage to front elevation and all associated site works.
Two storey side extension (ridge height 6.71 metres) which consists of a ground floor kitchen and dining area, first floor consists of two bedrooms with one ensuite; new first floor window to the front of the existing house and new ground floor window to the rear of the existing house and associated site works.
Provision of 1 approx. 100sq.m single storey temporary prefab (prefab 01 comprising 1 classroom & 3 resource rooms) adjacent to the south-east boundary of the site and 1 approx. 70sq.m single storey temporary prefab (prefab 02 comprising 1 classroom) adjacent to the north-west boundary of the site and all associated site works.
Construction of a new approx. 592 sqm single storey extension to the Junior National School to provide a new SEN suite comprising 2 no. classroom bases, a central activities space, shower & WC facilities, ancillary spaces and a new external play areas and a new approx. 345 sqm part-two storey extension to the Senior National School comprising 3 no. en-suite new mainstream classrooms and 2 no. resource rooms. Along with a remodelled car park increasing the number of car spaces from 35 no. to 45 no. and associated site works.
(i) Demolition of existing single storey ESB substation (3.5sq.m) on the north western site boundary; (ii) South building ranging from 5 storeys to 8 storeys (max. height c.26.40m) with a total gross floor area of 2663sq.m comprising; (a) 28 residential units comprising 17 1-bedroom apartments, 10 2-bedroom apartments and 1 3-bedroom apartment; (b) At ground floor and with frontage onto Main Road, 3 commercial units to facilitate a range of uses: Unit B (73sq.m) - Class 1, shop (newsagent, parcel delivery drop store) or Class 10 (Community Centre); Unit C (49sq.m) - Class 1 shop (cycle store/Charity Shop); Unit D (74sq.m) - Class 1, shop, Class 2 (financial/professional services) or Class 8 (Healthcare); (c) Also at ground floor, a management office (17sq.m), a maintenance office (12.5sq.m), ESB substation and switch room (combined 22sq.m) and commercial bin storage area (12.5sq.m); (iii) West building ranging from 4 storeys to 5 storeys (max. height c.16.07m) with a total gross floor area of 1441sq.m comprising (a) 15 residential units including 4 studio units; 5 1-bedroom units, 3 2-bedroom units and 3 3-bedroom units; (b) tenant amenity floorspace (42sq.m) at ground floor;(c) 1 92sq.m commercial unit (Cafe/restaurant/Deli) at the corner of Old Greenhills Road and Main Road; (iv) A communal amenity courtyard (459sq.m) and public open space in the form of a new civic plaza (337sq.m) at the corner of Old Greenhills Road and Main Road and public realm improvements at the southern end of Old Greenhills Road including improvement works to the Katherine Tynan memorial (505sq.m); (v) A basement (1298sq.m) incorporating 25 residents car parking spaces (including 4 Go-Car spaces, 2 electric vehicles spaces and 2 accessible spaces), residents long stay cycle parking (50 spaces) and residents waste management facilities (49sq.m); (vi) A new vehicular entrance from the Old Greenhills Road to the proposed basement; (vii) A total of 24 surface level short stay cycle parking spaces comprising 4 spaces at the Katherine Tynan Memorial, 8 spaces within the residents communal courtyard and 12 spaces at the new civic plaza; (viii) Removal of 2 on-street car parking spaces on Old Greenhills Road to facilitate access to the proposed basement and installation of a raised pedestrian crossing at the southern end of Old Greenhills Road and (ix) All ancillary site development works including installation of drainage and water supply infrastructure, installation of rooftop solar photovoltaics panels (128sq.m) and lighting.
Single storey attached metal storage unit floor area of 11sq.m and metal canopy to front elevation; Internal extension of first floor area by 50sq.m
A) Retention permission for the retention of the existing 45m high monopole telecommunications support structure together with all associated antennas, dishes, RRU’s, cabling and equipment to include ground based equipment all enclosed in security fencing. (Permission previously granted under SD12A/0152 on a 5 year temporary permission) and B. Permission for the addition of support steelwork at the top section of the 45m high monopole telecommunications support structure to accommodate ComReg receive antennas, dish, and radio receiver together with associated works bringing the overall equipment height to 48.44m (49.45m including lightning finial)
Amendments to previously granted permission (SD20A/0017) comprising of alterations to façade; installation of roof lights and PV panels.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
Installation of roof mounted solar panels over an existing Waste Transfer/Recycling building and all associated site works and services; the proposed development relates to an activity covered by an existing Waste Licence issued by the Environmental Protection Agency.
Retention of partial change of use from warehouse to office space to include Retention of additional first floor, second floor offices and meeting rooms also to include all associated site works to facilitate the development.
2 number signs (1 main fascia sign & 1 menu sign) to the front elevation of the oriental take away business
Permission for retention of 2 no signs (main sign & menu sign) to the front elevation of the oriental take away business.
Change of use of existing single storey library to retail use with part off-licence at the former public library; demolition of the existing projecting entrance porch and alterations to the front elevation to provide shopfront glazing and signage.
Sliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
Carry out external works for the removal of an ATM, to be infilled with panelling to match the existing; The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised lettering shop signs and the removal of the Ulster Bank general blue signage; Carry out internal works for the removal of the ATM's in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors.