Demolition of the Speaker Connolly Public House including the part single part two storey public house, and ancillary stores and structures (c. 411sqm), on a development site of 0.323 Hectares (overall site area 0.332 Ha). The proposed development with a total gross floor area of c. 8,813 sq.m will consist of 85 residential units and associated balconies for all units in one block ranging in height from 5 to 6 storeys in height over round floor and part basement, comprising: 36 One Bed Apartments, 48 Two Bed Apartments, One Studio Apartment. The development will also consist of non-residential uses at ground floor level (c. 596 sq.m), including: 1 no. Public House (c. 143 sq.m), 1 no. Restaurant (c. 169 sq.m) 1 no. Health Care Unit (c. 91.8 sq.m), 1 no. Cafe (c. 55.4 sq.m) 2 no. Micro Enterprise Units (c. 93.6 sq.m and 43.4 sq.m, respectively). The existing basement will be used as a plant room (c. 110.5 sq.m), Vehicular access to the site will be from the existing vehicular access on Ballycullen Avenue, the proposal works include alterations to the existing access and public footpath, including the provision of enhanced pedestrian infrastructure. The development will also consist of the provision of communal open space (c. 653 sq.m) at podium level and related play areas; public open space (c. 300 sq.m) including hard and soft landscaping, internal access road including a vehicular link between Ballycullen Avenue and the Firhouse Shopping Centre, boundary treatment, street furniture, car parking along the internal access road (11 spaces in total including 1 accessible space), below podium car parking (32 no. spaces in total, including 4 accessible spaces); electric vehicle charging points (9 no of spaces); bicycle parking (155 long stay and 58 short stay spaces); ESB substation, piped infrastructural services and connections to existing public services; ducting; plant; waste management provision; SuDS measures including Green/Blue roofs; stormwater management; signage; public lighting; solar panels as well as telecommunications infrastructure including 18 no. antennas enclosed in 9 no. shrouds and 6 no. transmission dishes, together with all associated equipment and all ancillary site development and excavation works above and below ground.
Single storey extension to the western side of the pub to extend the public area comprising a retractable canopy with fixed side panels (75sq.m in area); 2 double door entrances and associate site works.
The development seeking retention consists of the construction of a garden structure circa 37sqm for home office and gym use with utility area.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Demolition of single storey attached garage to side of dwelling; construction in side garden of end of terrace, two storey three bedroom dwelling with attic conversion with dormer roof to rear; new vehicular entrance and partial dishing of kerb and all associated site works.
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Retention of single storey extension & planning permission for proposed subsequent alterations all to rear with associated site paving & landscaping.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Attic conversion with dormer roof to rear plus changing existing roof profile from hipped to new mini Dutch roof plus removal of chimney stack and 2 Velux rooflights to front roof slope and all associated site works.
Attic conversion, raising of gable end to change roof profile with dormer projecting window to rear for playroom use, removing chimney from attic location and roof and all associated site works.
Ground floor extension to the rear of the house with pitched and flat roofs. Associated internal modification and site works.
Change of use from Betting Office to Beauty Salon with proposed opening hours of Monday to Sunday, 9:30 a.m. to 8:00 p.m.
To remove existing front porch and replace with new front porch tiled roof; remove existing front window, block up part front structure with new double glazed window and associated site works.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
The erection of a lean-to open canopy and associated signage along the north elevation of the Firhouse Shopping Centre.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
Retention of existing 2 storey extension to the rear of existing dwelling and all ancillary site works.
2 storey extension to the rear of existing dwelling and retention of existing 2 storey extension to the rear of existing dwelling and all ancillary site works.
Construction of a single storey extension to the side and rear and a 2 storey extension to front of existing dwelling, new first floor front extension to form an enlarged bedroom, ground floor extension to form larger sitting room and hall and all ancillary site works.
Construction of a single storey (staff room) extension to the front (southeast) of the school (including a rooflight); construction of a single storey classroom extension to the rear (northwest) of the school; All associated elevational changes, internal alterations, site, landscaping and ancillary works.
The development consists of the change of use of the ground floor unit from retails use to cafe/patisserie shop including the sale of hot and cold beverages. The following works are proposed: (1) Internal configuring of unit including fit out of unit to facilitate development with provision of serving counter, store, W/C and seating area at ground floor level internally and externally (2) Alterations to ground floor level facade including new glazed door and window, new awning to shopfront, new signage and projecting signage to front facade. (3) All associated site works and ancillary works at this address in accordance with plans as submitted
Proposed first floor extension over existing single storey extension to side of 75 Woodlawn Park Avenue, Firhouse, Dublin 24
Demolition of extension to side and for two storey two bedroom house with new vehicular entrance and modifications to existing vehicular access.
Demolition of extension to side and construction of two storey three bedroom house to side.
Ground floor side and rear extension; Attic conversion with dormer roof window on rear slope of roof and window in gable wall all at attic level.
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
Amendments to previously permitted Planning permission SD23B/0040. Amendments consist of alterations to roof profile from hip to hip/flat roof and associated site works all at 82 Woodlawn Park Drive, Dublin 24
Reinstatement of Fire-damaged 2-storey 3 bed detached dwelling (S00A/0221). Permission is also required for removal of disused chimney stack to side dwelling, internal alterations and associated siteworks
Conversion of existing attic to non-habitable space, raising of existing gable to form mini hip roof, window to side, velux to front & dormer to rear of existing dwelling.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
Amendments to previously granted permission (SD20A/0017) comprising of alterations to façade; installation of roof lights and PV panels.
Construction of 2 grass playing pitches: pitch No.1 will measure some 145m long by 90m wide and pitch No.2 will measure some 133m long by 80m wide; club facilities including 4 changing rooms measuring 51sq.m each; storage facilities; function rooms; meeting rooms; physiotherapy facilities; kitchen facilities; wc and circulation space; site works include removal of existing hedgerows and trees; replanting areas; formation of a new pedestrian and vehicular entrance on Firhouse road; 67 car parking spaces; 24 bicycle spaces; perimeter pathway; fencing and attendant landscaping works.
The Installation of 6no. floodlights on 18m high columns around the previously consented Pitch One (Planning Reference SD20A/0140)
Extension of existing dwelling to include first floor extension over existing single storey side extension, 2no. dormer roof windows to rear of the existing roof structure, 2no. roof-light windows to rear of roof, 2no. roof-light windows to front of roof, internal alterations to existing layout, alterations to front, rear and side elevations and all associated site works.
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
Extend ground floor rear and side living spaces, kitchen and utility rooms; replace existing front garage door with new windows scaled to match existing front windows.
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
Retention of original garage converted into a hair dressing salon; internal alterations and part front elevation.
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
The construction of a single storey 1 bedroom house (approx. 52 sq./m) with associated private open space and private car parking for social / older persons use on undeveloped lands of 0.192 hectares located off Old Bawn Way, Tallaght, Dublin 24. The development will also provide for all associated service connections and site works above and below ground.
Construction of an extension at first floor level to the front (north) elevation providing an additional 2 bedrooms to the property together with a single storey rear extension providing an additional living room area and wc; with all associated removal works to the existing roof, removal of wall sections, removal of existing windows, site development works, drainage and landscaping.
Conversion of Attic Space to non-habitable space dormer to rear, 2no Velux to front, door to side, single storey extension to rear and all associated site works
The proposed development includes the conversion of the existing attic. Alteration of the existing roof profile from hipped to full apex, Insertion of a gable window. Removal of the existing chimney. Construction of a dormer window to the rear roof plane and insertion of two roof windows to the front, plus all associated site works.
The alterations to the existing roof profile to convert it from a hipped roof profile to gable wall with apex roof, removal of the external chimney stack, conversion of the existing attic space into a home office/study with a dormer window to the rear, 2 roof lights to the front elevation roof plane and a new window in the new gable wall at second floor level.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Single storey front porch and alterations to old garage front wall (2.52 Sqm), Rear single storey extension to form living room (18.9 Sqm) and side first floor level extension with new roof as an extension of old main roof slope (20.8 Sqm)
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Retention of a single-storey flat roof garden room to the rear of the dwelling, with ancillary use and existing connections to water & electricity, all for purposes incidental to the enjoyment of the main dwelling.
Construction of an attic level dormer window with increased ridge height on existing house located to the rear roof plane and all associated site works.