For Planning permission for development on land within the grounds of Ballyboughal National School Co. Dublin. The development will consist of the installation of an aircraft noise monitoring terminal on a standalone tiltable mast structure (6m in height) along with associated works including electrical connection.
The development consists of: Construction of a new private dwelling, detached garage, installation of proprietary wastewater treatment system & soil polishing filter, main water connection, a new entrance, and all associated site development works. AI received 11/06/21 Add Info deemed Significant 22nd June 2021. Revised Notices received 29th June 2021.
Permission for a front porch extension, single storey flat roof extension to rear of dwelling, and all associated site works.
Two storey detached dwelling with new vehicular entrance and off street parking to front and associated site works on site
Planning permisson is sought for the construction
The works will consist of an amendment to previously approved application no F21B/0188, defined as a widening of rear extension.
Permission sought for the following: The construction of a new two storey, 5 bedroom detached house, detached garage, plus - on site wastewater treatment unit and percolation area. Plus all associated site works including adjustment to existing entrance to the site. AI received 30/11/22 SAI received 08/12/22
The development will consist of: The construction of a single storey extension to the rear, the replacement of the existing rear door with a new window and a proposed new velux sun tunnel to the existing roof to bathroom, including all associated site and ancillary works at the address in accordance with the drawings as submitted. AI received 19/08/21
The development will consist of a 4-bedroomed detached bungalow with detached garage to include the installation of a proprietary effluent treatment system and percolation area. Vehicular access is proposed through an existing entrance off the public road R122 to the east of the site. The development will include ancillary site development, drainage & landscape works, the proposed boundary treatment to consist of timber fencing, hedgerow and trees native to the area to include all associated site works.
For a two storey detached dwelling with on-site wastewater treatment system, and new vehicular entrance and access road, on lands at rear of Middle House, Oldtown, Co Dublin.
The development will consist of (1) Blocking up existing entrance to public road servicing existing dwelling, (2) Construction of new replacement entrance onto the public road to comprise of entrance piers, fencing and lay-by area, (3) Completion of all ancillary site works and associated site structures.
NIS Mainscourt Solar DAC intends to apply for a 10 year permission for development on lands at Mainscourt, Ballyboghil, Co. Dublin. The development will consist of the construction of an extension to the solar PV farm granted permission under Register Reference F17A/0340 (PL 06F.249174) comprising the erection of photovoltaic panels on ground mounted frames within a site area of 12.92 hectares and associated ancillary development including 2 no. transformer stations, 30 no. electrical string inverters units, 6 no. CCTV security cameras mounted 4 metre high poles, perimeter security fencing (2 metres high), underground cabling and internal access tracks. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. AI Rcvd 15/05/24 SAI Rcvd 20/05/24
Permission to extend existing dwelling house at the sides and rear to include a dining room, living room, two bedrooms, one with en suite and wardrobe with all ancillary site works. Add Info recceived 7th December 2020.
The proposed development comprises:
Alterations to previously approved development (Reg. Ref. F17A/0752). The proposed development consists of: (1) the construction of an extension (12,662m²) to south elevation of existing glasshouse to provide for additional agricultural glasshouse growing area. The extension will replace the east elevation extension (10,663m²) approved under Reg. Ref. F17A/0752; (2) construction of a storage shed (600m²), outdoor storage yard and service area to the southwest of the existing structure. The development also provides for perimeter fencing to the storage yard (2.4m in height); (3) addition of 1 no. cargo door; 1 no. Ellickson Dock Leveller and 1 no. access door to the front facade of the existing building; (4) provision of a new surface water attenuation pond to southeast of existing structure and upgrade of existing onsite wastewater treatment system; (5) regrading of land to the southwest of the existing structure including reduction of site levels by approximately 1m. The subsoil will be transferred to the location of the proposed glasshouse extension area to facilitate its construction; (6) provision of 2 no. EV charging spaces and 1 no. disabled parking space at existing car park to northwest of existing structure; (7) no amendments are proposed to the laybys; car parking; and entrance gates approved under Reg. Ref. F17A/0752; and (8) permission is also sought for landscaping, SuDS drainage and all associated site development ancillary works necessary to facilitate the development.
The development will consist of provision of a new
Construction of new two storey extension (180m² new floor area in total) comprising of new living space on ground floor and bedroom accommodation on first floor, all to the side and rear of existing dwelling, with internal alterations and new porch to existing dwelling. The application includes the retention of an existing site entrance with new piers, wing walls & gates. And the widening of other existing site entrance with new piers, wing walls and gates. The application includes an onsite wastewater treatment system and new surface water soakaway. And all associated site works.
The decommissioning of an existing wastewater treatment plant (888 sq.m) located at the northern end of the M1 Business Park and replacing it with a proposed foul pumping station (317 sq.m), construction of an access road and footpath, berm embankment and landscaping with all ancillary works necessary to facilitate the site development. The proposed development also includes for the pumping of wastewater for a distance of 2.8 km approx, via a proposed 125mm diameter DN ductile iron rising main with all ancillary works along the R132 as far as the northern end of Balrothery village.
Permission for the construction of a 3 bed, 2 storey, detatched dwelling with new vehicular entrance fronting onto Dublin Road Oldtown and all associated site works on a site of 0.057Ha is being applied for by Cobia Limited at Dublin Road, Oldtown, Co. Dublin.
The development will consist of a bungalow to include the installation of a proprietary effluent treatment system and percolation area. Access to be provided via existing agricultural entrance. The proposed boundary treatment to consist of a timber fencing, hedgerow and trees native to the area to include all associated site works.
A two-storey detached house and waste water treatment system on site in rural cluster. AI received 21/05/21
Permission is sought for (i) construction of a single storey interconnected family flat (59 sqm) with lean-to roof comprising 1 no. bedroom with walk-in wardrobe and wet room, and kitchen/living/dining area accessible from the dining room of the main dwelling; (ii) internal alterations to the main dwelling to facilitate the family flat; and (iii) all ancillary works necessary to facilitate the development.
Permission for 1) The demolition of 1 no. derelict existing dwelling and 3 no, disused shed structures (Total shed area 137.7m²). 2) The construction of a residential development (Total 89 no. dwelling units) consisting of 49 no. 4-bedroom detached dwelling, 18 no.3-bedroom semi-detached dwelling, 16 no. 3-bedroom terraced dwelling, 4 no. 2-bedroom apartment and 2 no. 1-bed apartment with additional 2 no. 4-bed elderly accommodation units, a Crèche and 2 no. commercial units (Total 123m²) and the creation of 2 no. entrances off R122. Add Info received 29th November 2020.
Extension of the existing Heavy Goods Vehicles (HGV) parking area to provide an additional 55 no. HGV parking spaces for a temporary period up to the end of 2021, comprising pavement and landscaping works, and ancillary site development works including a surface water network and attenuation pond. This planning application is accompanied by a Natura Impact Statement.
Construction of a new detached, single storey dwelling house to rear of existing family home, new waste water treatment plant/percolation area, and storm water percolation area, with new/combined vehicular access from existing vehicular entrance on Ballyboughal-Oldtown Road (R129), and associated site works.
The development will consist of: A Single storey detached dwelling, new domestic entrance onto public road, septic tank and percolation area, landscaping and all associated works.
One and a half storey dormer style dwelling, and for waste water treatment system, and for detached garage and ancillary site works with access off existing vehicular entrance.
The development will consist of
The development will consist of a 4-bedroom two storey
Planning Permission is sought to (a) construct a single storey independent living unit to the rear of existing dwelling house, (b) remove existing sewage treatment unit, (c) install new sewage treatment system, and percolation area, (d) together with all associated site works. (Independent living unit to be used in conjunction with the existing disability service operating on the site).
The development consists of: Extension to existing house with all associated site works also retention of existing 12mx6mx4.7m high shed to rear of site.
New part dormer/part two storey detached dwelling with new onsite wastewater treatment plant and percolation area and all associated site development works. AI received 26/7/2022 SAI received 26/7/2022
Permission to erect a garage
Permission to erect a domestic garage and store building.
Construction of a two-storey detached dwelling, a detached garage, the installation of a proprietary effluent waste0water treatment system and percolation area and all associated site works.
The development will consist of retention permission on previously granted planning Ref. No. F23A/0662. The retention consists of alteration to first-floor windows to House No. 4 (Type B1). The works includes the closure of 2 no. windows on the north elevation and the opening of a new window on the east elevation.
Planning permission on previously approved site Reg ref F07A/0158 & F14A/0394 for development comprising the demolition of existing 2 storey detached office building (c.314m sq) and the construction of 4 no. 2 storey detached dwellings consisting of 1 no. 4 bedroom detached two storey house (Type A) & 1 no. 3 bedroom detached two storey house (Type C) to the front (west) of the site and 2 no. 4 bedroom detached two storey houses (Type B & B1) to the rear (east) of the site. The development will include all associated site development works and boundary treatments with vehicular and pedestrian access from the main street, all on site of circa 0.15 ha. Located at 1-4 inclusive Grange Court (name and numbers approved under F07A/1058, Grange Ballyboghill Co Dublin.
Permission is sought for the construction of a detached 2-storey dwelling, on-site car parking, on-site wastewater treatment unit and percolation area & associated site works, new site access off existing laneway.
I Oleg Toderici, intend to apply for Retention Permission & Permission for the following: 1. Retention permission for concrete retaining wall to front & side of site. 2. Permission to complete retaining wall, entrance piers & front boundary treatment, form low level planter, all site and ancillary works in accordance with the lodged plans and documents on this site at Balscadden, Balbriggan, Co. Dublin K32 VA89.
The development will consist of a 4-bedroom two storey detached dwelling with detached garage to include the installation of a proprietary effluent treatment system and percolation area. Works will also include for provision of a new shared vehicular access from the public road. The development will include ancillary site development, drainage and landscape works, the proposed boundary treatment to consist of timber fencing, hedgerow and trees native to the area to include all associated site works.
The development will consist of a storey and a half dwelling with detached garage to include the installation of a proprietary effluent treatment system and percolation area. Works will also include for provision of a new shared vehicular access from the public road. The development will include ancillary site development, drainage & landscape works, the proposed boundary treatment to consist of timber fencing, hedgerow and trees native to the area to include all associated site works. AI Rcvd 20/11/2024
(a) Permission to alter and extend their dwelling house and (b) Retention permission to retain their garage/home office building as and where constructed, at The Old Orchard House, Balscadden Village, Balbriggan, Co. Dublin, K32PY00, as outlined in the documents submitted to Fingal County Council.
Permission to alter and extend garage to accommodate a home office.
The development will consist of a single storey dwelling, domestic garage, waste water treatment system, existing field gate and vehicular entrance realigned and merged to form shared entrance and all associated site works. AI Rcvd 2/8/24 SAI received 28/08/24
Retention permission to retain amendments to the development boundary of palisade fenced compound permitted under Plan File Ref No. F20A/0118 (reduced from permitted 11m x 8.2m to installed 8.6m x 9.7m compound) AND, Permission to install a 6m extension to the existing 24 metre high multi-user lattice tower telecommunications structure (making a total height of 30m), carrying antenna and dishes together with associated ground equipment and associated site works.
Construct a 24 metre high multi-user lattice tower telecommunications structure carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound, together with associated ground equipment and associated site works.
Permission for an amendment to the previously permitted residential development Reg. Ref. F16A/0006 to facilitate the relocation of a ground floor bedroom to the first floor, provision for work at home space at ground floor level, ground floor kitchen extension, front porch and relocation of utility room with associated elevational modifications. The application relates to the permitted dwelling only and does not propose any modifications to the physical site layout, entrance or wastewater treatment plant with percolation area.
Planning Permission for a single storey extension to the West elevation of the existing two storey dwelling house, including all associated site works.
The development will consist of
Permission for the following: Construct new Gym & changing rooms building, foul connection to existing treatment system, & to existing waste water percolation area, relocation of existing rain water harvesting tank, surface water connection to existing attenuation pond, extending existing attenuation pond and all ancillary site works. Additional information received 02/03/2026