For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables
86 no. residential units with a mix of detached, semi-detached, terraced houses and duplex apartments ranging in height from 2 to 3 storeys; comprising of 8 no. 1-bed and 8 no. 2-bed duplex apartments, 10 no. 2-bed houses and 60 no. 3-bed houses; all residential units will have associated private open spaces facing north/south/east/west; alterations to Kilbride Road (L6179) to provide a section of the new road into the wider Kilbride Masterplan lands with vehicular, pedestrian and cycle access provided; a new dedicated pedestrian and cyclist access will also be provided to the south-east of the development connecting via the Marshland's sports club lands, and through Avondale Crescent to the Dublin Road; landscaping, public open spaces and all associated site development works to enable the development including boundary treatments, attenuation storage area and other service provision
Demolition of existing shed on site and proposed two storey apartment building consisting of eight apartments of 6 x two bedroom, and 2 x one bedroom units with connection to services, boundaries, extension of existing public footpath, walled compound for bin and bicycle storage, and associated works on site
To complete planning application 13/610019. The construction of external door entrances with stairs and associated site works to existing Scout Den
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Construction of a building to display historic Coastguard horse drawn carriages previously used for rescue and ancillary works
Erect a 6m² extension along with alterations and revisions to the elevations and internal layout of the existing 73m² storage shed and for change of use to residential and erect an 8m² extension link to connect to the 120m² existing dwelling along with all associated site development works
Demolition of the existing three storey detached office building (646 sqm) and single storey outbuilding (30 sqm); and the construction of a new five storey apartment block (3,196 sqm GFA) comprising of 34 No. apartments (14 No. one-bed apartments and 20 No. two-bed apartments, all with balconies on the southwest façade) The development will also consist of: ESB substation and switchroom; waste storage areas; plant; bicycle parking; 34 No. car parking spaces; SUDs (including green roof); associated hard and soft landscaping; the creation of 2 No. new entry/egress points off North Quay; all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments, and associated site servicing (foul and surface water drainage and water supply)
Hoarding
Demolition of existing walkway building (60sqm), removal of external storage structure(65sqm), and construction single storey extension (Gross Area 326 Sqm) to east end of existing unit and all associated site works
Construction of a single storey extension to north (rear) of the dwelling with 1 no. rooflight and the construction of sun room to the east (gable) of the dwelling and all associated site works
Dwelling house and associated site works
Change of use of offices at first floor level to use as gym
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works
New single-storey bathroom extension to the side (south west) elevation of the existing two-storey semi-detached dwelling all connecting into existing services and including all associated site works.
Alterations to the development permitted under Reg. Ref. 20/1088, as amended by Reg. Ref. 23/62, and will supersede the permitted information and communications technology (ICT) facility buildings permitted on site. In summary, the development comprises the replacement of the 3 no. part one and part two storey ICT facility buildings permitted on site, with 5 no. part two and part three storey ICT facility buildings with a reduced building footprint, along with an energy centre compound. The Battery Energy Storage System permitted under Reg. Ref. 23/62 and the substation and transmission line connections permitted under ABP Ref. 315200-22 will be unaffected by the proposed alterations. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning Authority with the planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development
Saw enclosure(Gross Area 145 Sqm) to end of Unit 2 and all associated site works
Amendments to the information and communication technology (ICT) facility development permitted under Reg. Ref. 20/1088. The proposed amendments comprise the following: Provision of a three-storey Battery Energy Storage System (BESS) building with a gross floor area (GFA) of c.13,787 sq.m, located to the southeast of the permitted ICT Building 3. The proposed building will accommodate battery storage rooms and circulation areas, with photovoltaic panels at roof level, and with an overall height of c.16.8 metres. Associated buildings including a single storey power trunk building (to accommodate a control room and cable rooms, with a GFA of c.539 sq.m and an overall height of c.5.3 metres), a single storey BESS switch room building (to accommodate control rooms and a relay room, with GFA of c.396 sq.m and an overall height of c.5.3 metres) and a transformer compound area to the southwest of the proposed BESS facility. Provision of a fire water storage area and a single storey fire pump house with a GFA of c.39 sq.m to the northeast of the BESS facility. All associated amendments including new amendments to the internal access routes, landscaping and planting, boundary treatments, lighting, and all associated and ancillary works
Demolition of existing building & structures and removal of existing syncrolift at the water's edge. Development to the south of South Quay will comprise the erection of a new building with a 4 storey element to the front, to a 2 storey at rear, to provide operation & maintenance facilities to support the operation of an offshore windfarm. The proposed building will consist of office, warehousing & welfare facilities & other ancillary uses associated with the offshore windfarm operation. Landscaped terraces are proposed at roof level at the 2 storey and 3 storey levels of the proposed building. A c. 40m lattice communication mast, associated with the proposed use, is proposed for the southern corner of the site. Car parking for 60 vehicles along with cycle parking for 26 bicycles & 5 motorcycles. An ESB substation is proposed to the south of the building. Waste & recycling storage is proposed on site. Vehicular & pedestrian entrance gates onto South Quay & pedestrian & bicycle entrance to the west. Security fencing around the site. Development to the north of South Quay will comprise a general area for the berthing of vessels to service the offshore windfarm. A pontoon is proposed along with up to 4 cranes for loading & unloading of vessels. Shore side storage is also proposed including 2 shipping containers, a bunded waste oil tank, a grey water tank, a treatment unit/equipment kiosk & 2 bunded fuel storage tanks. A blackwater tank is proposed below ground. Parking for 6 vehicles to the north & west of the site. A flood wall. Vehicular and pedestrian entrance gates onto South Quay & pedestrian emergency entrance to the west are proposed. Proposed to construct a ramp on the section of South Quay to tie in with flood wall. Access between the areas to the north & south of South Quay will be via a raised ramp along South Quay with controlled crossing across South Quay. New paving at this location and to the west of the building. Wastewater on site will be stored underground and removed to a treatment plant. Also proposes the dredging of approx. 6,000m3 of material from the nearshore area to provide for navigational depth, berthing area and manoeuvring area for vessels. Landscaping, utilities & other services proposed throughout the site & all other associated works. Applicant seeks 10 years in which to construct the development. An Environmental Impact Assessment Report & a Natura Impact Statement have been prepared.
Change of use from approved restaurant use (never operational) back to residential use as a studio apartment to the ground floor to No. 46 Ferrybank and a 3-bed apartment to the first floor at No. 45 & 46 Ferrybank along with all associate site development works
Construction of a new one bedroom, one and a half storey dwelling. The proposed dwelling will be accessed by laneway off Seaview Avenue
Change of use from a commercial shop to residential use as a two-bed apartment to the ground floor along with alterations an revisions to the elevations and internal layout and the erection of a front boundary wall/railing and all associated site development works
The installation of 2 No. support poles on the existing rooftop which will support 2No. Telecommunications Antennae in total at a maximum height of 21.10m together with the installation of 1 No. 0.3m Dish, RRUs, Handrails, Cable Ladder and all associated site works
Construction of a new single storey industrial unit with ancillary 2 storey office accommodation (Total Floor Area 2310 sq.m) and all associated site development works
Conservatory constructed to the rear elevation of existing house and detached domestic garage shed / store constructed in the rear garden
1. Demolition of existing structures on site. 2. Construction of a new two storey modular office building. 3. Amendments to existing shed on site. 4. New vehicular entrance, car parking, storm and foul drainage and all associated site works
Construction of internal estate road and all associated site works
(i) Single storey industrial unit (Gross area 3150 Sqm) infill extension between existing buildings. (ii) New car park and timber storage compound (0.7 Ha) and all associated site works
To demolish an existing substandard 32m2 rear extension & erect a 64m2 single storey extension to the rear with new dormer structures to provide stairs and a habitable 24m2 attic area along with minor alterations and revisions to the elevations and internal layout of the existing 132m2 dwelling with all associated site development works
Directional sign
(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site works
(1) Retention permission for alterations and revisions to the elevations and layout of the as built 187m2 extension to the rear of the original 82m2 dwelling as opposed to that granted under PRR 17/214 and (2) Retention Permission for the as built vehicular gates and pillars to the rear of the site along with all associated site development works
The proposed development will consist of: I.Installation of new 1,350lt Aboveground Self Bunded AdBlue Tank with Integrated Dispenser, II.All associated site development works
Single storey industrial unit (Gross Area 945 Sqm) and all associated site works
(i) the demolition of existing buildings, roadside fuel forecourt and associated canopy. (ii) The construction of a new forecourt amenity building with net retail area (100sqm max), ancillary restaurant/café area with hot and cold meals and refreshments for sale for consumption on and off the premises, associated customer seating, ancillary off licence (7.8sqm), customer WCs and ancillary office, staff facilities, storage and plant areas. (iii) The construction of a new 2-island fuel forecourt, associated illuminated canopy and underground and over-ground fuel infrastructure. (iv) The construction of a car wash with associated underground water storage tanks, drainage and plant room. (v) Associated revisions to the site layout including revised entrance and exit arrangements, new footpath and boundary treatment to R772 Dublin Road, car and bicycle parking, site lighting and refuse compound and (vi) all associated signage and site development works
Change of use from commercial use to residential use
(i) demolition of existing roadside fuel forecourt and associated canopy (ii) demolition of southern part of existing premises, (iii) construction of a new 3 island fuel forecourt associated illuminated canopy, underground and overground fuel infrastructure, (iv) internal and external alterations and Change of Use of existing premises to provide a new forecourt amenity building with retail area (100 sq.m max), ancillary restaurant/café area with hot and cold meals and refreshments for sale for consumption on and off the premises, associated Customer seating, ancillary Off-Licence, Customer WCs, Back of House with ancillary office, staff welfare facilities, storage and plant areas, (v) Operator Signage, (vi) associated revisions to site layout including revised entrance and exit arrangements, new footpath and boundary treatment to R772 Dublin Road, car and bicycle parking, site lighting and refuse compound, and (vii) all associated site and development works
Modifications to the permission granted under application register reference 21/1193, which approved the redevelopment of the service station. The modifications proposed to the approved scheme comprise: 1. The inclusion of solar PV panels and associated fixtures and fittings on the roof of permitted station building. 2. An extension of 8.44m to the width of the permitted forecourt canopy. 3. The inclusion of an additional fuel dispenser island, to bring the total number to three 4. associated revisions to the permitted site layout, including the removal of 4 no. previously permitted car parking spaces and relocation of air and water services 5. All associated site development works
Replacement (and repositioning) of 1 No. 6.4m x 3.35m advertising display with 1 No. digital 6.28m x 3.4m advertising display adjacent to the Dublin Road, Arklow (West side of R772 road adjacent to Circle K Service Station and opposite junction with Briggs Lane) and reposition display 3.9m towards the road with an increase in overall height from 4.9m to 5.8m, and all associated site works and services
Demolition of an existing single-story extension located at the rear (south-east) elevation and the proposed construction of a part two-story, part single story extension having a roof height 5.43m, internal amendments/renovations together with all associated site works
Entrance onto North Quay / Marina Road to the rear of their existing premises and all associated site works
Subdivision of existing site, erection of a new fully serviced two-storey dwelling house having a ridge height of 9.1 meters, new connection to public mains sewer, and all associated site works
Prefabricated structure, 31.2sqm in area and comprising a service station shop and office, for a temporary period of 3 years
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Installation of 109.08 KW (512.9M2) of ground mounted Solar PV Array and associated site works and services. Included in this application is a Landscape visual impact assessment (LVIA),an appropriate assessment screening (AA), a site specific flood risk assessment, and a glint & glare assessment
Construction of 14 storage units, for active registered fishers (under license agreement), with internal dimensions of approximately 35 sq metres and associated siteworks including provision for connection to services and two concrete slab work areas approximately of 8 metres by 4 metres
The construction of a bungalow, a new entrance off existing driveway and connecting to mains services and all ancillary site works
Detached storage shed no. 1 (388.50m2), detached tool / battery shed no. 2 (38.9m2), 2 no. sprinkler tanks and pump house (13.95m2) located north of building no. 1. Retention sought for detached storage shed no. 3 (224.60m2) located north of building no. 2 and all associated works
Single storey extension to building no. 1 (728 m2) and 2 no. battery storage kiosks and 2 no. invertors to northern façade of building no. 1, removal of ground mounted solar panels and construction of detached single storey building (120m2) to the south of building no. 1. single storey extension to building no. 2 of (152 m2) and all associated site development works