The construction of a two storey dwelling incorporating a garage, a bored well, septic tank & percolation area, new entrance and all associated site works
The proposal consists of the following; 1. The construction of a detached storey and a half style dwelling and a detached single storey domestic garage. 2. The installation of a certified wastewater treatment system and a percolation area, to all appropriate standards. A bored water well will be constructed and located to the front area of the site, at a significant distance from the dwelling and the wastewater treatment system. 3. The construction of a site entrance, driveway, forecourt, parking areas, footpaths, patio and hard landscaping areas. A detailed proposal has been made for the site entrance to include, entrance gates, hedging, walls and piers and drainage measures. 4, The comprehensive landscaping of the site to consist of new grass areas, planting beds, trees and shrubbery, earth banks and mounds, a walled garden and all associated site works. Notes: The proposed dwelling will primarily consist of a storey and a half style elements. The dwelling and the garage will be located on the lower elevation of the site and additionally, the dwelling will be partially recessed/sunken into the landscape
A garage and concrete apron
A single-room dog grooming studio in the yard behind the existing dwelling house, a sign at the existing site entrance and associated site works.
A ten-year planning permission for a solar energy development with a total site area of 77 hectares comprising (i) photovoltaic solar panels on steel mounting frames; (ii) electrical inverters; (iii) electrical power stations; (iv) underground electrical and communications cabling; (v) containerised battery energy storage facility; (vi) the upgrade of 2 no. disused site entrances, decommissioning of 2 no. existing site entrances and development of 1 no. new site entrance; (vii) on-site access tracks; (viii) a temporary construction compound; (ix) security fencing and security gates; (x) pole-mounted security cameras; and (xi) all associated site and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report
The change of usage from holiday home use to permanent residential use
Alterations to previously approved planning reference 25/60008 (single storey extension to provide additional accommodation to our existing Childcare Facility). The alterations consist of a revised extension layout to include revised elevations, reduced extension floor area, internal alterations to the existing building and all associated site works
Development for a single storey extension to provide additional accommodation to existing Childcare Facility and all associated site works
A single storied dwelling, garage, new entrance/driveway, effluent disposal system to comply with current EPA code of practice, provision of a well and associated site works
(a) Retention permission of alterations to permitted planning permission No. 04/133 for bungalow and domestic garage/shed. Alterations include revised external window arrangement to dwelling house, alterations to house position and entrance position on site layout and retention of domestic garage/shed with concrete yard as built. (b) Planning permission is also sought for conversion of existing attic storage space to habitable space together with installation of new windows in each gable end of dwelling house
Temporary standalone prefabricated structure containing 1 no. classroom, 1 no. SET room and sanitary facilities (floor area = 100.0sqm) to the front of existing school building, together with all associated site works
The demolition of existing single storey link building and erection of a two storey extension incorporating 4 no. mainstream classrooms, 2 no. SET rooms and link corridor to rear of existing single storey school building and erection of a single storey extension to front of existing school building incorporating an entrance lobby and staff accommodation, also to include internal alterations to East Wing of existing school building to provide a 2 no. classroom ASD Unit and the provision of a secure external play area to rear (total floor area of existing school = 630sqm, total floor area to be demolished = 35sqm and total floor area of extension = 660sqm), extension of existing car parking area to provide an additional 6 no. car parking spaces, together with internal alterations and minor elevational amendments to existing school building, decommissioning of existing septic tank and percolation area with proposed new connection to public waste water treatment system, revised site boundaries and all associated site works
The development will consist of:- Internal reconfigurations at ground floor level to provide an additional 11 no. bedrooms, enlarged beauty salon, treatment room, nurses station and relocated toilets, stores and staff areas. Ancillary alterations to elevations and all associated site works and services.
The construction of a fully serviced dwelling house and domestic garage, all with ancillary site works. A Stage 1 Appropriate Assessment Screening Report enclosed.
For a ten-year planning permission for a renewable energy development comprising the construction of a c. 63MW solar farm of 118.9ha and associated works in the Townlands of Rathrush, Emlicon and Bendinstown, Co Carlow. The proposed development will consist of: • A c. 63MW solar farm comprising ground mounted solar photovoltaic panels. • 15 No. Invertor Combiner Kiosk /Transformers and hardstands. • 1 No. Ring Main Unit. • 2 No. spare parts storage containers. • Provision of site access tracks and upgrading of existing tracks. • Underground cabling within the solar farm site, in private lands and under the L7111, L7114, L7115 local roads to connect the solar farm field parcels, and to connect the solar farm to the permitted Garreenleen Substation. • 3 No. temporary construction compounds. • Demolition of derelict agricultural building and disused silage storage structure. • Upgrading and widening works at Site entrances. • All ancillary development including such as an up to 2.4m high stock proof fence, CCTV and drainage infrastructure. This application is seeking a ten-year permission and a 35-year operational period from the date of overall commissioning of the solar farm. This application is accompanied by a Natura Impact Statement (NIS)
The construction of a new dwelling, domestic garage, wastewater treatment unit and polishing filter, new well, upgrade existing entrance onto public road, new section of driveway and associate works
A material change of use to the existing dwelling to renovate it back to a habitable condition, an extension to provide an additional en-suite bedroom and additional kitchen area, the reconstruction of a draught lobby and a new septic tank and percolation area, a new front entrance and all other associated site works
The construction of a one & Half Storey Style extension with attached garage and associated ancillary works
Construct 1) slatted cattle shed and 2) an extension to existing machinery shed in existing farmyard and all associated site works
To construct 2 no. silage pits, concrete aprons and all associated site works
Permission to construct a single storey dwelling, a single storey garage, new entrance, bored well, treatment system and percolation area with all associated site works
Permission for the demolition of an existing uninhabitated dwelling, for the construction of a new 185.73m2 single storey four bedroom split level dwelling, waste water treatment system, new site entrance, plus all associated site works
Construct a two-storey dwelling house, garage, new site entrance, bored well, septic tank and associated percolation area, all ancillary site works and services
The installation of a 15 metres monopole carrying antennas, Dish, RRU's (Remote Radio Units), Cabinet, Fencing and Access gate together with Ground-based equipment and all associated site development works for wireless data and broadband services
Permission to erect a fully serviced dwelling house, domestic garage and associated site works
1. retention permission for a domestic shed as constructed, 2. permission for completion of same and all associated site works
No 1. Retention Permission for a mobile home used as a dwelling for a period not exceeding 3 years, No. 2. Permission for demolition of an existing single storey dwelling in ruins, permission for the construction of a replacement single storey dwelling, connection to services, septic tank, & percolation area and all associated site works
For an unauthorised mobile home used as a dwelling, connection to services and all associated works
Renovate existing cottage including a single storey extension, new bored well, septic tank, percolation area, upgrade existing entrance and all associated site works
The restoration of an existing farm cottage and a two storey extension, domestic well, onsite waste water treatment system, percolation area and all associate site and landscaping works
The erection of 8 no. 21m high flood lights to the perimeter of the existing football pitch and all associated site works. There will be 4no. Lighting column of each side of the pitch to provide enough luminance on the pitch to allow football/hurling matches to be played.
The change of use from Agricultural Land to 1 No. GAA Pitch
A treatment system and percolation area, 1 no. log cabin ( general storage) and a garage to the rear of existing dwelling and retention for a dormer style extension and single storey extension to the original single storey cottage, retention for a change of use from original attached garage to domestic use and retention for porch area to the front and all associated site works
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kV substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number Battery Energy Storage System units comprising 22 modules (ca. 21.9m x ca.5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca.2.7m), 12 number inverter units (ca. 6.0m x ca.2.4m), 7 number CCTV cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a PV development on ca/65.6ha of the site (Planning Permission Ref No. 21/23) that will be superseded by this application if approved
To 1) reinstate & refurbish existing traditional cottage / dwelling with altered floor plan and minor changes to external facades 2) extend the main cottage / dwelling pitched roof over the existing garage on the side elevation & convert garage to living accommodation and 3) install new on site effluent disposal system and all associated site works
Construction of a bungalow dwelling, domestic garage, packaged waste water treatment system and sand polishing filter & all associated site works
For revisions to previously granted planning reference number 18/174, which consists of the following (a) revised house type from dormer to storey and half type dwelling, (b) alterations to previous dwelling design and layout. Planning permission will also consist of single storey garage, wastewater treatment system and percolation area, bored well, new entrance and all ancillary site works
PL18-296 for the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewage treatment sewage, percolation area and all associated site and landscaping works
10 Year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area will be ca. 65.6 ha, the construction of a 38kV substation (ca 114.4m2 x 4.75 tall) a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2), along with ancillary development including; 24 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 10 no. CCTV cameras mounted on 4m high poles, perimeter security fencing, site access, site egress and all ancillary works. Permission currently exists for a PV development on part of the site (Planning Permission Ref No. 16325). An Natura Impact Statement will accompany the planning application.
Retention permission for the construction of a single storey extension to the North elevation of existing dwelling connecting to domestic garage, the Change of use of the afore mentioned domestic garage to use as a habitable part of dwelling, Alterations to elevations, the construction of a roofed decking area to the rear elevation, the construction a domestic shed and all associated site works
The construction of a single storey extension to the North elevation of my existing dwelling connecting to my domestic garage, the Change of use of the afore mentioned domestic garage to use as a habitable part of my dwelling, Alterations to elevations, the construction of a roofed decking area to the rear elevation, the construction a domestic shed and all associated site works
Demolition of existing front porch, rear extensions and garage/storage sheds to side of existing house, Construction of extension to side of existing house with new front porch and all associated site works
A new single-storey kitchen, dining area and solarium and a new waste water treatment system
Vegetable store and polytunnels, proposed new entrance, gravelled yard and all associated site works
To construct a single storey dwelling, detached single storey garage, new entrance and associated landscaping, bored well, waste treatment system, percolation area and all associated site works.
Retention is sought for existing installed Eurotank Wastewater Treatment System and associated 90 square meters fully pumped soil polishing filter as a change to that permitted under PL21/138 and all associated ancillary works
Permission to erect a dwelling with services and domestic garage and all associated site and ancillary works
For change of garage design to existing planning ref PL20/173 to include a reduction in size of floor area, increase in ridge height and to incorporate use for a home office and all associated site works
For new private dwelling with detached garage, wastewater treatment unit and percolation area, private well, new site entrance and all associated site works
Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm. c. 3m high) 6 No. modular containers to house electrical and control equipment (total area of c. 195 sq m c. 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999