(A) Erect 21No. dwelling houses, consisting of 6No. 3-bedroom dwellings (House type A1), 1No. 3-bedroom dwellings (House type A2), 8No. 3-bedroom dwellings (House type B1 & B3 ) and 6No. 2-bedroom dwellings (House type B2), (B) Provision of vehicular and pedestrian access off existing Emyvale Estate Road, (C) Provision of off street car parking facilities, (D) Ancillary site works and connection to existing services
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 2 No. social housing units and all associated works. The accommodation shall consist of the following: 1 No. 2 bed and 1 No. 3 bed single storey units
A) erect 6No. dwelling houses, consisting of 6No. 3-bedroom dwellings (house type A1), B) provision of vehicular and pedestrian access, C) provision of off street parking facilities, D) Ancillary site works and connection to existing services
95 dwellings comprising 71 no. semi-detached and terrace houses with 2,3 and 4 bedrooms together with 24 apartments in 6 blocks and Creche. The development includes provision of open spaces, roads, footpaths, connection to services and all associated ancillary site development works
Construction of a single storey 'Granny Flat' to the rear of existing two storey semi detached dwelling and all associated site works
Section of building extended to make building square on north corner and elevation changes, and permission for a change of use to light industrial storage and the appropriate treatment and recycling or reclamation of metals and metal compounds from end of life vehicles, new front boundary security fencing, storage racking for up to 10 end of life vehicles awaiting depollution. The proposed development will be subject to a Waste Facility Permit and all associated works
Housing estate on a 1.6744HA site, on the north side of Coolgreany Road, Arklow, comprising of 33 units in total: (A) the construction of six no. 4 bedroom, semi detached 2 storey houses, 26 no. 3 bedroom semi-detached 2 storey houses and one no. 4 bedroom, detached 2 storey house; (B) the construction of a new access road and footpaths (cul-de-sac) and pedestrian access off coolgreaney road and all associated boundary treatment works; (C) provision of a 5,897sqm open space are comprising of 4,097sqm of usable public open space suitable for recreational use; (D) all associated ancillary site development works
Section 42 - extension of appropriate period - 19/1171 - housing estate on a 1.6744HA site, on the north side of Coolgreany Road, Arklow, comprising of 33 units in total: (A) the construction of six no. 4 bedroom, semi detached 2 storey houses, 26 no. 3 bedroom semi-detached 2 storey houses and one no. 4 bedroom, detached 2 storey house; (B) the construction of a new access road and footpaths (cul-de-sac) and pedestrian access off Coolgreaney Road and all associated boundary treatment works; (C) provision of a 5,897sqm open space are comprising of 4,097sqm of usable public open space suitable for recreational use; (D) all associated ancillary site development works
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
Alterations and additions to an existing two-storey semi-detached dwelling comprising the construction of a new single-storey bedroom & en-suite extension to the side (north-west) elevation at ground floor level, together with the provision of a new velux roof light to the north-west side of the existing main roof all connecting into existing services and including all associated site works
1) Construction of a single storey office building with an approximate gross floor area of 339 sq. m.; 2) Provision of permeable surfaced parking area, including 8 no. car parking spaces, and 6 no. bicycle spaces; 3) Provision of permeable surfaced area to front of the proposed building; 4) Provision of surface water drainage infrastructure; and 5) All associated and ancillary works, including removal of an existing fence, provision of a footpath and provision of connections to existing facility drinking water supply and wastewater collection networks
The installation of underground electrical infrastructure between the existing Arklow Gas-insulated Switchgear (GIS) 220kV Substation and the permitted Pollahoney GIS Substation. This will include the installation of approximately two underground electricity cable circuits, each at 3.12km in length and associated underground ducting, horizontal directional drilling, joint bays, communication cabling infrastructure between the existing Arklow GIS 220kV Substation and the permitted Pollahoney GIS substation, (WCC reg ref 20/1285). All associate and ancillary site development, remedial and construction works will be concentrated along the public road network, i.e. R772, L2180, L6179-0 and L-61791-0 to facilitate the underground cabling infrastructure within the townlands of Killinskyduff, Tiknock, Kilbride and Shelton Abbey. The application will include an Environmental Impact Assessment Screening Report (EIA)
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
Extend the appropriate period of 16/516 - 60 solar panels on the roof of a grain store
The installation of solar panels over the roof of an existing telecommunications cabin on a steel frame (covering an area of c.46 sq.m., to a maximum height of 4.6 metres above ground level). Works to consist of all ancillary development works, including steel uprights at
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables
1) construction of a single storey extension to existing office building. 2) construction of a single storey extension to existing production building and 3) all associated and ancillary works, including reconfiguration of existing external steps and footpaths and connections to existing surface water collection network, all at existing facility
New vehicular entrance onto R772/Old N11 and all associated site works
Increased ridge height and first floor habitable floor area along with minor alterations and revisions to the elevations and internal layout of the existing dwelling originally approved under P.R.R. 07/1500 along with retention permission for the domestic garage & site development works including the retaining wall & concrete yard
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
- 2 no. warehouse buildings with a gross floor area (GFA) of c. 3,364 sq.m each and a total height of c. 14.1m. Each warehouse includes a warehouse area of c. 2,419 sq.m, reception area, office, staff facilities, toilets, plant and storage areas at ground floor level, and office space, meeting rooms, staff facilities, toilets, plant and storage facilities at mezzanine level (c. 581 sq.m). - The provision of a service yard with a security hut (c. 34 sq.m) located at the main entrance, HGV unloading areas and 4 no. associated loading bay docks on the eastern elevation of each warehouse building. - The provision of 68 no. car parking spaces including 4 no. accessible spaces and 10 no. EV parking spaces serving staff and visitors. - The provision of 40 no. cycle parking spaces serving staff and visitors. - The provision of a sprinkler tank, sprinkler pump house (c. 13.3 sq.m), fire hydrant tank, hydrant pump house (c. 13.3 sq.m) and ESB substation (c. 25 sq.m) - Construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 15.7 ha on ground mounted steel frames, associated power trunk building (c. 539 sq.m) and 2 no. transformer compounds, underground cabling and ducting, new internal tracks for maintenance and all associated site services works. - Site access from the permitted development to south (WCC Reg. Ref.: 20/1088 as amended WCC Reg. Ref.: 23/62 and 24/88), which is subject to a current separate amendment application under WCC Reg. Ref.: 25/60350, and extension of the permitted inner relief road through the site. - The provision of a new statcom compound including a single storey control and valve building with a GFA of c. 253 sq.m and associated equipment adjacent to the permitted inner relief road to the south of the main site area. The proposed development also includes for the provision of associated landscaping and planting, berms, boundary treatments, internal road network, pedestrian and cyclist infrastructure, signage zones, site lighting, drainage works, sustainable drainage systems (SuDS) and all ancillary site development works
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
(1) Retention permission of existing garage, plant rooms and first floor pigeon loft. (2) Retention of part built single story vintage car storage building and Permission to complete same with a flat green roof. (3) All associated site works
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
Extend the appropriate period of a permission - (15/135) - the erection and operation of a semi-mobile asphalt plant and ancillary facilities (including bitumen storage tanks, fuel storage tanks and generator) on 0.3 hectares of land within the existing quarry (QY/13)
To erect a 532m2 commercial building comprising a 432m2 manufacturing/industrial unit with an ancillary 100m2 office space along with all associated site development works including storage yard, car parking and connect to the existing services
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Erect 14,500.77 m2 of photovoltaic panels on a ground mounted system with all associates site works at Servier (Ireland) Industries Limited. The development will comprise of a 2.0 MWp Solar PV farm on 3.36 hectares of land located to the south of our existing pharmaceutical manufacturing plant. The electricity generated will be used by Servier (Ireland) Industries Limited. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; 1 no. spare parts cabin; using all temporary ways and temporary construction compound / set-down area included on the application
Extension of appropriate period Section 42 on PRR 20/946 Park & Ride
Dwelling, wastewater treatment system to EPA standards, entrance incorporating revision to existing entrance and associated works
Extend the appropriate period of a permission (ABP PL27.244465 & WCC PRR 14/1234) Park and Ride facility, construction of 170 space car park with turning access lane, internal bus pickup area, bicycle storage, revised road markings including extension of existing bicycle lane to site, footpaths, fencing, landscaping including screening and fencing, public lighting, drainage and ancillary works)
Proposed development, for which a ten-year permission is sought, consists of the following: Demolition of existing outbuildings on the subject site, along with all site clearance and enabling works; Construction of 3 no. part one storey, part two storey, information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of C. 22,210 sq. m (66,630 sq. m GAF in total), and with a height (to parapet level) of c. 10.4 metres; Each of the 3 no. ICT facility buildings will accommodate ICT equipment rooms, associated electrical and mechanical equipment rooms, loading bays, maintenance and storage space, office administration areas, and staff facilities; Emergency generators (20 no. for each ICT facility building), flue stacks and associated plant are provided in fenced compounds adjacent to each ICT facility; Extension of the existing road serving Kish Business Park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway on its eastern side. The proposed roadway will form part of the inner relief road planned under Objective IT7 of the Arklow Town and Environs LAP 2018-2024; Construction of internal road network and circulation areas, footpaths, provision of 180 no. car parking spaces (60 no. spaces to serve each ICT facility) and 18 no. cycle parking spaces; Landscaping and planting, boundary treatments, lighting, security fencing, gatehouse (with a GFA of 175 sq. m), and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cables, on an application site area measuring c. 24.16 hectares. Site located to the North & Northeast of the existing Kish Business Park
45 sq.m. single storey domestic garage and 1.8m high boundary gate/barrier and associated works
45 sqm single storey domestic garage and 1.8m high boundary gate / barrier and associated works
Demolish existing single storey extension (13.72 sqm) to rear of dwelling, construct new single storey extension (60 sqm) to rear and side of existing dwelling, provide new rooflights to rear of existing dwelling and all above with associated site works
Installation of ESB Networks' compact modular MV EGIP substation to facilitate the connection of the consented Templerainey East Solar Farm (planning ref: 16/1285) to the electrical distribution system
Construction of a slatted cattle house/store, cattle handling facilities, farm roadway and farmyard entrance, together with associated concrete yards and site works
Alterations to the development permitted under Reg. Ref. 20/1088, as amended by Reg. Ref. 23/62, and will supersede the permitted information and communications technology (ICT) facility buildings permitted on site. In summary, the development comprises the replacement of the 3 no. part one and part two storey ICT facility buildings permitted on site, with 5 no. part two and part three storey ICT facility buildings with a reduced building footprint, along with an energy centre compound. The Battery Energy Storage System permitted under Reg. Ref. 23/62 and the substation and transmission line connections permitted under ABP Ref. 315200-22 will be unaffected by the proposed alterations. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning Authority with the planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development
Erection of a front porch, replace existing flat roof on rear of existing dwelling with pitched roof married into existing pitched roof by raising the height of the existing pitched roof by 800mm, to remove existing chimneys, install a solar panel on the new south facing roof, and to replace existing flat roof on existing shed/domestic garage to rear of existing dwelling with a pitched roof, together with all associated site works
Amendments to the information and communication technology (ICT) facility development permitted under Reg. Ref. 20/1088. The proposed amendments comprise the following: Provision of a three-storey Battery Energy Storage System (BESS) building with a gross floor area (GFA) of c.13,787 sq.m, located to the southeast of the permitted ICT Building 3. The proposed building will accommodate battery storage rooms and circulation areas, with photovoltaic panels at roof level, and with an overall height of c.16.8 metres. Associated buildings including a single storey power trunk building (to accommodate a control room and cable rooms, with a GFA of c.539 sq.m and an overall height of c.5.3 metres), a single storey BESS switch room building (to accommodate control rooms and a relay room, with GFA of c.396 sq.m and an overall height of c.5.3 metres) and a transformer compound area to the southwest of the proposed BESS facility. Provision of a fire water storage area and a single storey fire pump house with a GFA of c.39 sq.m to the northeast of the BESS facility. All associated amendments including new amendments to the internal access routes, landscaping and planting, boundary treatments, lighting, and all associated and ancillary works
Construction of 3 no. digesters, 2 no. digestate storage structures, a liquid feed tank and 4 no. pump houses located in the northern section of the site. 4 no. pasteurisation tanks, a post pasteurisation cooling tank and a pre fertiliser manufacturing tank, located to the southeast of the digesters, in the centre of site. Part single-storey and part two-storey reception hall to accommodate a lab, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to reception hall, located at centre of site. Single-storey solid digestate storage & nutrient recovery building located to east of reception hall, in central portion of site. Odour abatement plant and all assoc. works. Construction of ESB substation, fuel storage tank, CNG compression unit, 2 no. CO2 tanks, CO2 loading pump, CO2 auxiliaries, CO2 liqueufactor, CO2 compressor, GFA, CO2 pre-treatment skid located in eastern portion of site. Construction of emergency biogas flare, biogas treatment skid, biogas compression system, biogas upgrading module, combined heat&power unit & panel room & H2S washing tower located in eastern part of site. Construction of grid offtake skid, biomethane boiler, grid injection unit & 2 no. propane tanks located to southeast of CO2 structures, in eastern section of site. Construction of two-storey office&admin building, located in southeast of site, adjacent to main site entrance. Associated works inc. parking, 3 no. EV, 1 no. accessible parking spaces;bike storage, access arrangements incl. new access point to site from adjacent road to south, weighbridge, provision of solar panels, wwt equipment, attenuation pond in northern portion of site, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping & all assoc & ancillary works. EIAR submitted.
The installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing Shelton Abbey Open Prison, together with ducting, underground electrical cabling, and all associated site works The proposed development is considered to be within the curtilage of a protected structure (RPS No. 40-05) listed under the current Wicklow County Development Plan 2022-2028. The proposed solar array installation will have no impact on the protected structure, located over 330.00 meters away from the proposed site.
Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development works
Amendments to the Battery Energy Storage System (BESS) permitted on site, under WCC Reg. Ref.: 23/62 (an amendment to WCC Reg. Ref.: 20/1088, which was subsequently further amended under WCC Reg. Ref.: 24/ 88). The proposedamendments comprise the following: • The provision of a BESS compound with a total area of c. 1.2 ha which will accommodate self-contained batteries and integral fire suppression equipment, climate control equipment and associated electrical components (in place of the previously permitted three-storey BESS structure and adjacent ancillary structures). • A single storey BESS Switchroom located to the south of the BESS facility with a total gross floor area (GFA) of c. 191 sq.m and total height of c. 5.3m accommodating a control room, relay room, and cable basement. • Water Services Plant and Storage equipment located to the north-east of the BESS comprising a single-storey fire pump house with a total GFA of c. 39 sq.m and total height of c. 3.1m, and 2 no. fire hydrant and water storage tanks with a total height of c. 10.3m. • All associated amendments including amendments to internal access routes, landscaping and planting, boundary treatments, the provision of an acoustic barrier to the south of the BESS compound, lighting, and all associated ancillary works. The operation of the development on site will require an EPA Industrial Emissions Directive (IE) Licence
To erect circular slurry storage tank
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting business
A 12.3 square metre plant room, a 30.0 square metre shed as built, also retention for change of use from attic to 33.7 square metre storage area in attic of house, retention of rooflights, and retention for minor elevation changes to door and windows to house and garage from previous planning permission (952472) and all associated siteworks
The construction of a bungalow with garage, new entrance and driveway, new effluent treatment system to EPA current standards and all ancillary site works
Dwelling, garage, waste water treatment system to EPA standards, entrance and associated works