The development consists of the change of use of the ground floor unit from retails use to cafe/patisserie shop including the sale of hot and cold beverages. The following works are proposed: (1) Internal configuring of unit including fit out of unit to facilitate development with provision of serving counter, store, W/C and seating area at ground floor level internally and externally (2) Alterations to ground floor level facade including new glazed door and window, new awning to shopfront, new signage and projecting signage to front facade. (3) All associated site works and ancillary works at this address in accordance with plans as submitted
Build-up of existing hip in roof to side of roof into gable end at attic level; attic conversion with dormer roof with window in rear slope of roof all at attic level & raising of chimney height by 600mm.
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
The amendments to the permitted development will consist of: 1. Reduction in the overall height and internal and external re-configuration of permitted development resulting in the omission of 1 no. floor in Block A and C, and 2 no. floors of Block B to comply with Condition 2 of the permitted development. This will result in an overall reduction in units in the permitted development by 55 no. units from 252 no. units to 197 no. units; 2. Omission of 41 no. studio apartments which will be replaced with 15 no. 1-beds, 13 no. 2-beds and 2 no. 3-bed units including any associated elevational changes to balconies and window openings; 3. Revised layout at ground floor to remove podium courtyard, parking and service area which will be replaced with a new underground car park, entrance and service area; 4. Relocation of permitted creche to the ground floor corner of Blocks B and C and inclusion of an associated outdoor play area resulting in the omission of apartment no. 40 and relocation of tenant amenities/ community space to Block A to comply with Condition 2 of the permitted development; 5. Inclusion of plant equipment at roof level; and, 6. Inclusion of a blue roof drainage system at roof level of all permitted apartment blocks. 7. The development also includes all site development works necessary above and below ground necessary to facilitate the development.
Proposed first floor Extension at side to form new single bedroom to include associated internal alterations and elevational changes
The proposed development will consist of conversion of existing garage to living space, first-floor side extension above the existing structure, redesigned porch / entrance & ground floor extension to the rear and all associated site works.
Demolition of the existing entrance porch and single storey converted garage to side; construction of a new single storey extension to front, side and rear; rooflight to side; front gate and associated external works.
Provision of 527.2 sqm of photovoltaic solar panels on the roof of the existing building.
Planning permission for conversion of attic to non-habitable storage space with partial Extension of ridgeline to accommodate a contemporary dormer to rear roof. Single Storey extension to rear of existing house, single storey porch extension and extended bay extension to front of existing house all with ancillary works
Extension to side and rear and internal alterations and upgrade of existing group residence with related care facilities for accessible bedrooms and bathrooms and all associated site works
Permission for change of use of part of ground floor and entire of first floor of domestic garage for habitable use with internal and minor external elevation modifications and complete all ancillary site works in relation to above with all to be classed as one residential unit part of existing dwelling.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
Retention permission for a single-storey, flat roof structure in the private rear garden for use as a small dog grooming business, and all associated works necessary to facilitate the development.
The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.
Demolition of single storey detached garage in rear garden; construction of detached, two storey three bedroom dwelling with attic conversion in rear garden; new vehicular entrance & partial dishing of kerb.
Demolition of existing garage to side; construction of new 2 storey dwelling to the side of the existing dwelling; new storm water percolation area to rear; new car parking provision for 2 vehicles accessible from Heatherview Avenue; associated site works.
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.
Planning permission sought for a new two storey end of terraced dwelling to the side of the existing two storey dwelling with concrete roof tiled & external finishes to match existing; new driveway with new vehicular access with dished footpath & associate site works.
Change of use from Betting Office to Beauty Salon with proposed opening hours of Monday to Sunday, 9:30 a.m. to 8:00 p.m.
Full planning permission for the following: (a) replacement of existing roof including raising ridge height over existing single storey detached dwelling house, (b) new single storey extension to side / rear of said existing dwelling house, (c) decommissioning and backfilling of existing sewage treatment system and replacement of same with a new on-site domestic wastewater treatment system, (d) modifications to existing window openings along front elevation, (e) internal modifications, connection to all other existing on-site services, landscaping and all associated development works at Sycamore Cottage, Blessington Road, Boherboy, Saggart, Co. Dublin. Eircode D24 XY46
Installation of 2 x 3 meter high extract flues from proposed laboratories; construction of a covered boat storage compound within a secured parking area formed with a new 3 metre high security fence with access gates to the rear (north-west) side of the site, internal alteration within the existing building and all associated site works.
Proposed build-up of existing hip in roof to side of roof into gable end with window in proposed gable wall at attic level; proposed attic conversion with wc; dormer roof with window in rear slope of roof all at attic level & raising of chimney height by 600mm.
Single storey attached metal storage unit floor area of 11sq.m and metal canopy to front elevation; Internal extension of first floor area by 50sq.m
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Ground floor rear extension with flat roof over & dormer roof window on rear slope of roof at attic level.
Two-storey, 4 bedroom detached dwelling with vehicular access and 2 off-street, parking spaces and all associated site works at side garden plot.
Construct a single storey extension to the rear of the existing warehouse unit including alterations to the existing to accommodate same; All ancillary site works and services.
Construct a single storey extension to the rear of the existing warehouse unit, including alterations to the existing to accommodate same, all ancillary site works and services.
Front side and rear first floor extension with flat roof over for extended living accommodation; rear ground floor extension with flat roof over for extended kitchen and living room accommodation.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
Conversion of existing attic space to non-habitable office/storage area, alterations to existing roof type from hipped roof to raised gable and mini hipped type roof, with a new window to the side gable with internal modifications and associated site works.
For the conversion of existing garage structure, new porch extension to the front elevation, new first floor extension over garage, new canopy roof alongside passage, new wall on party line on front elevation, new single storey Granny Flat Structure with new link to original house and all associated works. The Granny Flat space will consist of kitchen/living area, WC and bedroom.
Amendments to previously granted permission (SD20A/0017) comprising of alterations to façade; installation of roof lights and PV panels.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
6 two storey, 3 bedroom semi-detached houses and all associated site works on a 0.19 hectare site bound by Silken Park to the north, an existing office development to the south, undeveloped residential zoned lands to the east and Kingswood Road to the west.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
Ground floor rear extension with pitched roof over with 2 roof lights over and dormer roof window on rear slope of roof at attic level.
Construct a single storey flat roofed kitchen extension to the rear of my property and a single storey pitched roofed side extension (granny flat side) and associated site works.
Build-up of existing hip in roof to side of roof into gable end with window in proposed gable wall at attic level; Attic conversion with W.C. dormer roof window and 1 roof light in rear slope of roof all at attic level.
Two storey detached house, new vehicular access and car parking in front gardens and associated works.
Two storey detached house, new vehicular access and car parking in front garden and associated works.
For the construction of first floor side extension over previously converted garage, construction of new dormer structure to the rear and conversion of attic space to home office and a games room. Works at first floor will consist of construction of bedroom with en-suite and associated works.
Construction of first floor side extension over previously converted garage. Works will consist of construction of bedroom with en-suite and associated works
Amendments to granted planning permission SD20A/0185 to reduce the width of proposed dwelling due to site conditions; to alter proposed main roof to comply with the updated contiguous elevation; revise window positions on all elevations to match the existing dwelling.
Construction of a new 3 storey, 4 bedroom dwelling to include dormer roof to rear, off street parking, new blockwork flat roofed shed/home office to rear of garden, new pedestrian access to side of rear garden, reconfiguration of vehicular entrances to existing dwelling and proposed dwelling and all ancillary site works.
Construction of a three storey creche and community centre facility of 1,610sq.m gross floor area with associated external play area; car & cycle parking, hard and soft landscaping, bin storage, a revised layout to the northern edge of Cuil Duin Avenue to accommodate access to the proposed development including amendments to the existing footpath and cycle track and provision of set down car parking spaces and all associated site and development works.
Construct a two bedroom single storey detached dwelling house, area 68.3sq.m with a new vehicular entrance area and associated site works.
Ground floor front extension with pitched roof over; ground floor internal alterations & window in gable wall at ground floor level.