Planning records
Showing 301-350 of 24,264 public recordsDemolition of the existing dwelling (252sq.m) and associated domestic garage (49sq.m) and shed (12sq.m) located towards the north-west of the site and the construction of 3 warehouses with ancillary office and staff facilities and associated development as follows: Unit 1 will have a maximum height of 15.75 metres with a gross floor area of 5,619sq.m including a warehouse area (5,041sq.m), ancillary office areas (182sq.m) and staff facilities (396sq.m); Unit 2 will have a maximum height of 16.35 metres with a gross floor area of 6,724sq.m including a warehouse area (6,135sq.m), ancillary office areas (275sq.m) and staff facilities (314sq.m); and Unit 3 will have a maximum height of 18.9 metres with a gross floor area of 10,095sq.m including a warehouse area (9,335sq.m), ancillary office areas (399sq.m) and staff facilities (361sq.m); the development will also include the provision of a new vehicular access to the site from the Aerodrome Roundabout in lieu of the extinguishment of existing multiple access points from the R120 Newcastle to Rathcoole Road; internal roundabout; pedestrian access; 187 ancillary car parking spaces; bicycle parking; HGV yards; level access goods doors; dock levellers; access gates; signage; hard and soft landscaping; lighting; boundary treatments; ESB substations; sprinkler tanks; pump houses and all associated site development works above and below ground.
The development will consist of: The installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line.
(a) proposed new single storey dwelling, (b) upgrading of existing vehicle entrance, (c) treatment system & percolation area along with all associated site development and facilitating works
(a) Replacement of juvenile training pitch to all weather pitch with a 2.6m high ballstop netting to top a 2.4m high perimeter fencing with an overall height of 5m. (b) Erection of 2 No. 15.2m high Floodlighting Columns & 6no. 21.3m high Floodlighting columns to the existing main playing pitch with associated light fittings previously granted under planning file 20/487, (c) Installation of bunded diesel tank & generator; all located within a new 2.5m high fenced compound with associated site development and facilitating works previously granted under planning file 20/487
Temporary single storey prefabricated building to be linked to the existing single storey prefabricated building granted under Ref. SD19A/0075; 2 general classrooms each with toilet accommodation (one containing accessible WC); 1 store; entrance lobbies; 1 user assisted toilet; 2 staff toilets and 4 car park spaces all located to the north-rear of the existing school and existing prefabs together with all other ancillary and associated siteworks.
The installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line.
Retention for 12 metre high telecommunications support structure carrying telecommunications equipment together with existing equipment containers and associated equipment within a fenced compound as previously granted under SD10A/0180. The development will continue to form part of Eircom Limited's existing and future telecommunications and broadband network.
(a) Proposed new single storey dwelling; (b) Upgrading of existing vehicle entrance; (c) Treatment system and percolation area along with all associated site development and facilitating works
The installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line.
Demolish the existing front porch; Demolish an existing single-storey rear Utility extension; Construct a dormer extension to the front of the existing house; Construct a single-storey and two-storey extension to the rear of the house; Convert the existing attic space, Carry out general alterations & refurbishment of the existing house; Construct a new entrance gate and walls to replace the existing entrance; Relocate existing external garden sheds and Carry out associated site works
Change of use from commercial to residential. Construction of single storey extension to the rear of existing dwelling and internal modifications at ground floor level comprising of 2no. Bedrooms, en-suite, open plan Kitchen, Living and Dining area, Utility Room and Living Room. Conversion of existing attic space to 2no. bedrooms, en-suite and family bathroom comprising of modification of existing roof structure, raising of existing gables, new access stairs, flat roof dormer to the rear and 2no. A-style roof dormers to the front, Construction of front porch and all associated site works.
Change of use from commercial to residential. Construction of first floor extension comprising of 4no. Bedrooms, en-suite and family bathroom. Internal modifications at ground floor level and all associated site works.
Removal of all existing temporary accommodation and construction of a new 16 classroom part three storey, part two storey primary school (Roll No 19503H); including GP Hall, 2 classroom Special Educational Needs Unit and all ancillary site works. The proposed project also incorporates associated staff car parking, delivery aces, drop off areas, pedestrian/bicycle access, construction of 2 external ball courts, acoustic boundary wall plus additional boundary treatments, landscaping, connection to public services and all associated site works.
To retain existing dwelling house and waste water treatment system and all other associated site development works
Alterations to an existing granted planning permission (Reg. Ref. SD20A/0258) for warehousing; alterations relate to Unit 2 only on its 1.316 ha site including change of use of 24sq.m. of warehouse floor area to staff facilities due to addition of single storey staff facilities block in the south-west corner of the warehouse; change of use of 97sq.m of warehouse floor area to ancillary office (38sq.m) & staff facilities (59sq.m) due to extension of the ancillary office block on ground floor; alterations also result in increase in the overall staff facilities area by 7sq.m (from 314sq.m to 321sq.m) and increase in the overall office area by 139sq.m (from 275sq.m to 414sq.m); addition of 232sq.m of charging area (including 6sq.m change of use from warehouse to charging area) as the extension of the rear of warehouse (southern elevation); alterations result in total building area increase by 254sq.m (from 6724sq.m to 6978sq.m); associated elevational revisions; associated site plan & drainage layout adjustments due to the inclusion of the above alterations; all other details remain as per the granted application Reg. Ref SD20A/0258 such as site access, site boundaries, landscaping, external surface finishes, water supply, attenuation tank, drainage & outfalls.
Provision of a temporary primary school by way of construction of 2 prefabricated buildings (c 180sq.m & 390sq.m) on a defined site area (c 0.4Ha) to be enclosed within a 2 metre high welded mesh fencing and access gates with associated site works including provision of new site entrance, car parking, drop off area and hard surface play area. Temporary permission for a period no longer than 3 years is being sought.
Extensions to front of existing warehouse to include single storey infill enclosure over existing loading bay ramp (floor area to be 44.12sq.m with height to top of parapet of 6.2m above ground level); new single storey goods-in inspection store (floor area to be 55.98sq.m with a height to top of parapet of 4.8m above ground level); both structures complete with roller shutter access door & personnel door within the front/south elevation, together with site works.
For retention permission to retain existing dwelling house and planning permission to install a waste water treatment system to serve the house and all other associated site development works
A. The retention of the two existing unauthorised structures. b. The construction of a new link building to form a new single residential dwelling. c. Changes to the external finishes of the building. d. The retention of the existing wastewater treatment plant to serve the new single residential unit. e. Modification to existing access and all associated site works and services
Demolition of 1 residential property and 1 ancillary outbuilding. Construction of a residential development of 42 three-bedroom dwellings in a mix of terraced and semi-detached units. The proposed will comprise of 2 typologies: typology F (21 dwellings) and typology L (21 dwellings) both 2 storey with typology F having a 2nd floor loft accommodation with front dormer windows. Total residential gross floorspace is 5622sqm. Development includes 84 in curtilage surface car parking spaces (3281sqm). Public open spaces in an eastern park and a western park (including proposed play equipment), an additional large parkland to the south of the site (11797sqm) comprising the first phase of linear park. Private domestic gardens. A new vehicular, pedestrian and cycle entrance from Stoney Hill road. An internal road network, including footpaths/cycleways. 3 refuse/bin stores, public lighting, landscaping, boundary treatments, drainage and engineering works and all other associated and ancillary development works.
260 replacement Photovoltaic (PV) solar panels; 822 PV panels (total of PV area of 1939.16sq.m) at roof level of warehouse; 12.50sq.m of signage at the south-east and north-west elevations of warehouse development permitted under Reg. Ref. SD19A/0263 and SD20A/0248 and associated development works above and below ground.
260 additional Photovoltaic (PV) Solar Panels (total additional PV area of 423sq.m) at roof level of the warehouse development permitted under Reg. Ref. SD19A/0263 and associated development works above and below ground.
Amendments to Permitted P.R.R. SD22A/0096 for: a) Demolition of existing stone cottages on which works have commenced; b) reconstruction of cottages in modern materials to match existing structures in form to allow for 2 no. 2-bedroom single storey residential units; c) reuse of the existing roof slates to the front and new roof slates to the rear; d) construction of yard boundary walls within the site using reclaimed stone from the cottages; e) all ancillary landscaping and site development works necessary to facilitate the development.
A\(I) the provision of a waste transfer station facility for the storage and transfer of non-hazardous waste. The proposed facility includes: (a) construction of a two-storey office building with staff facilities, served by 55 no. car parking spaces (inclusive of 2 no. accessible parking spaces), and accessed via the existing entrance in the southern portion of the site, along the western site boundary. (b) provision of an internal one-way road in the central portion of the site, accessible from the existing entrance, located centrally along the western site boundary; (c) provision of waste storage areas in the central portion of the site, together with van/trailer parking spaces, 2 no. storage containers and 2 no. HVO tanks; (d) provision of waste storage area in northern portion of the site; (e) provision of an internal one-way road in the northern portion of the site comprising a compacted permeable hardcore surface, accessed via the existing entrance at the northern end of the site, along the western site boundary. The northern internal road will also include a weighbridge and adjacent waste storage bays. The proposal is also inclusive of (ii) landscaping, boundary treatments pedestrian paths, drainage, and all associated site development and ancillary works necessary to facilitate the development at lands on Jordanstown View (to the south of the Unipharm Group Premises), Greenough Business Park, Rathcoole, Co. Dublin. This activity will be applied for with a New Waste Facility Permit Application, under the Waste Management (Facility Permit and Registration) Regulations 2007 as amended.
Demolition of some of the existing structures on site to include a portion of an existing rubble wall; the rear extension of an existing cottage; existing structures, storerooms, and sheds to the west and north of Muldowney's Pub; the reconfiguration, renovation, and extension of the existing cottages on site to provide for 2 two bedroom units; the reconfiguration and renovation of Muldowney's Pub and storage yard; the construction of 21 residential units within 2 three storey blocks to the rear and side of Muldowney's Pub as follows: Block A will provide 6 one bedroom units, giving a total of 6 apartments in this building; Block B will provide for a mix of 3 one bedroom and 12 two bedroom units, giving a total of 15 units within this Block; private open space will be provided in the form of balconies with communal open space provided in the centre of the site. The development will also include the provision of a pedestrian access from Main Street and a pedestrian and vehicular access via the existing car-park entrance to the rear of Muldowney's Pub; Provision of 32 carparking spaces and 44 bicycle spaces, all ancillary hard and soft landscaping, boundary treatment, ESB sub-station, signage, bin and bike stores and all engineering and site development works necessary to facilitate the development.
Development of the site for purpose of operational vehicle storage, including surfacing and ancillary infrastructure.
For the existing use of the portacabins on site as a sessional pre-school / Creche
A) the part demolition of Muldowney's Pub to the rear; b) the change of use of the front portion of the pub to provide for 2no. 1-bed units; c) the construction of 8 no. own-door residential units within a single three storey block to provide 4no. 1- bed units and 4no. 2-bed units; d) enlargement of residential bin storage; reallocation of permitted car parking to the amended development; e) all ancillary hard and soft landscaping, boundary treatment, signage, engineering and site development works necessary to facilitate the development
Construction of a double height (8.5m high) industrial warehouse building for plant machinery maintenance and storage purposes; associated ancillary two storey office and staff welfare accommodation (c.501sqm Total GFA); 9 car parking spaces, 3 bicycle parking spaces and all associated site ancillary development works and drainage connections.
The use of PJ Tougher’s Garage and yard including the use of the 2.37 hectare yard for vehicle and container storage and repair, Retention permission for the following buildings: Building A) 553.3m² Workshop and Tyre storage and reception, Building B) 152.2m² Workshop and storage, Building C) 29.8m² Auto depot tyre sales unit and storage, Building D) 40.0m² Prefabricated canteen and office, Building E) 6.6m² WC, Building F) 369.1m² Workshop and storage, Building G) 29.1m² Storage Shed, Building H) 27.1m² Reception, canteen and WC, Container 1) 57.5m² steel storage container, Container 2) 12.5m² steel storage container, and Retention of increased ground levels on portion of site through the importation of inert material. The development for which Permission is sought will consist of: Visitor and staff car parking, pedestrian walkways and all associated boundary treatments, site works and services
For single-story domestic garage and storage area as constructed
Construct a new first floor side extension above existing garage together with minor internal alterations and associated site works in order to enable the provision of a new bedroom & bathroom at fist floor level.
For a two-storey dwelling serviced with an onsite waste water treatment system to current EPA guidelines, detached domestic garage, recessed entrance, and all associated site works
A new waste handling building (561sqm and 12m high); Use of an existing building (159 sqm and 7.5m high) granted retention under SD22A/0100 for waste handling; elevational treatment including signage to the northern facade of the existing building granted retention under SD22A/0100; continued use of the existing building (427 sqm and 8.2m high) granted permission under SD06A/1097 and all ancillary site works. The development will comprise an activity requiring a review of the existing waste facility permit (WFP-DS-11-0002-06). The proposed development includes an increase in the total maximum annual waste intake to 20,000 tonnes. An Environmental Impact Assessment Report has been submitted with this application.
Electric Vehicle Charging Station consisting of 5 EV charging stations, each serving 2 vehicle charging bays, a total of 10 charging points, 2 x 4 bay canopy structures incorporate circa. 84sq.m of roof mounted solar panels; The proposed development also incorporates 1 ESB substation, the use of an existing point of access / egress and all associated above and below ground ancillary works.
For a 152.2m 2 Workshop and storage building within an existing commercial yard along with all other associated site development works
Retention of existing single storey extension at rear.
Retention of existing building (159.25) currently not in use. Proposed use is intended as a recycling facility and this will be subject to a separate application.
Change of use from dry cleaners to takeaway.
(a) The retention of an 81.5 sqm single storey creche and (b) The provision of a new package wastewater and all associated site works and services
(1) Demolition of 5 no. existing dwellings and associated outbuildings on the site. (2) Construction of a 176 no. dwellings on the site to the east of Stoney Hill Road comprising 100 no. duplex units and 76 no. houses and with a mix comprising of 16 no. 1 beds, 50 no. 2 beds, 70 no. 3 beds and 40 no. 4 beds with detached, semi-detached and terraced units. The house types include two storey and three storey typologies and the duplex units are three storeys in height. (3) A total of 245 no. surface car parking spaces for the residential development (including visitor, accessible and EV charging spaces) comprising of 152 no. for the 76 no. houses and 93 no. for the 100 no. duplex units. (4) Bicycle parking comprising of 187 no spaces in total (including 3 no. cargo bicycle spaces) in sheltered bicycle stores. (5) Open space comprising of: a) 8,725 sq.m of public open space, including the main park and pocket parks. b) 2,680 sq.m of communal open space, including 100 sq.m of play to serve the duplex units, c) 4,311 sq.m of ecological open space, including landscape buffers. (6) A new vehicular, pedestrian and cyclist access from Stoney Hill Road to the north-west of the residential development site and a secondary access for emergency vehicles only further to the south on Stoney Hill Road. (7) A 2 no. storey creche building of 639.2 sq.m plus an outdoor play area of 591 sq.m located on an existing undeveloped portion of the Peyton site located to the west of Stoney Hill Road. The creche includes 10 no. car parking spaces and 20 no. bicycle parking spaces. The crèche development includes all associated and ancillary works. (8) Infrastructure works to serve the proposed development to include the internal road network, ESB substations/switchrooms, lighting, site drainage works, hard and soft landscaping, boundary treatment, and all ancillary site services and development works above and below ground. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and is submitted as part of the planning application.
For building a two-storey dwelling serviced with an onsite waste water treatment system to current EPA guidelines, detached domestic garage, recessed entrance, and all associated site works
The proposed development will consist of the widening of the existing vehicular entrance by 2 metres and extension of the existing driveway to the public road, including associated footpath dishing and ancillary site works.
(a) Constructing a single storey extension, which is split level in nature, to the rear of existing cottage. (b) Renovations and alterations to existing cottage layout and elevations. (c) Demolition of existing disused agricultural out-buildings. (d) Construction of detached single storey garage. (e) Installation of a new wastewater treatment system. (f) Construction of new vehicular entrance to replace existing vehicular and pedestrian entrances and all ancillary site works
(a) Rear extension & alterations and (b) New dormer style roof & alterations to create first floor extension to existing single storey dwelling using existing effluent treatment system & percolation area with new vehicular entrance and all associated site works
A. the retention of the conversion of an existing domestic outbuilding to accommodation. b. The construction of a new structure linking the retained building with the existing dwelling. c. Upgrading of the existing wastewater treatment system and all associated site works and services
For the construction of a new single-storey detached domestic storage/garden shed to the rear of the existing property
Change of use of a residential dining area to a kitchen for a home baking business.
Amendment to SDCC REF. SD19A/0264 comprising the omission of the 33 permitted Photovoltaic (PV) Solar Panels (53sq.m) to the ancillary office roof; provision of 400 Photovoltaic (PV) Solar Panels (717sq.m) to the warehouse roof; provision of an amended access arrangement including pedestrian and cyclist infrastructure to the staff/visitor carpark with the provision of an inter-com/FOB access point, central concrete aisle and gates; omission of 1 permitted car parking space (reducing the quantum of car parking from 152 to 151 spaces); the provision of 2 sections of strip window glazing to the northern elevation of the warehouse (each 37.4m in length and 1m in height); the provision of a soft surface outdoor exercise area; boundary treatments and all associated development works above and below ground.
The development amends a permitted warehouse development (as granted under SDCC Reg. Ref. SD19A/0264 and SDCC Reg. Ref. SD21A/0276). Retention permission is sought for the following modifications: the provision of 3 No. gas tanks (c. 1.5 metres high) with associated fencing to the north of the site, resulting in the omission of 6 No. permitted HGV spaces; the addition of a sprinkler tank (c. 29 sq m) and pump room (c. 31 sq m) to the north-west of the site; the provision of entrance and wayfinding signage as follows: 2 No. signs at the northern entrance along the eastern boundary (1 metre high) and 2 No. signs at the southern entrance along the eastern boundary (1 metre high); 2 No. signs on the northern elevation of the constructed warehouse (3.9 metres high and 1 metre high); and 2 No. signs on the eastern elevation of the constructed warehouse (3.9 metres high and 1 metre high); boundary treatments; and all associated development works above and below ground. The proposed development amendments will principally consist of: the provision of crash protection barriers (c. 1.1 metres high) to the south, east and west of the constructed gas tanks; and all associated development works above and below ground.