Modifications to the parent permitted application Reg. Ref. SD20A/0037 and subsequent amendments application Reg. Ref. SD20A/0343; Modifications will consist of the infill of the first-floor void space to provide an additional storage room of approx. 30sq.m; No alterations are made to the external elevations.
Amendments to a previously permitted development (Reg SD20A/0037); relocation of the staff welfare and ancillary office accommodation to a new approx. 192sq.m first floor mezzanine level within the permitted anchor supermarket unit; relocation of the staff welfare and office accommodation to mezzanine level will allow for additional warehouse floor space at the ground floor level (approx. 150sq.m increase; there is no proposed increase to the net retail floor space; external amendments to the permitted elevations including glazing and material changes; 2 roof lights will also be provided at roof level; no other changes are proposed to the anchor supermarket unit or the remainder of the development permitted under Reg. SD20A/0037.
Construction of a double height (8.5m high) industrial warehouse building for plant machinery maintenance and storage purposes; associated ancillary two storey office and staff welfare accommodation (c.501sqm Total GFA); 9 car parking spaces, 3 bicycle parking spaces and all associated site ancillary development works and drainage connections.
Construction of a detached pitched roofed two storey dwelling house with a single storey pitched roofed entrance porch to the front on part of the front, side and rear garden including the demolition of existing detached storage out-buildings and changes to boundary treatments affecting the existing, including proposed new pedestrian and vehicular entrances to service the proposed dwelling and a new vehicular entrance to replace the existing to service the existing dwelling.
Single storey extension to front and side of house, new bedroom and lounge facility, planning retention also sought for attic conversion with projecting dormer window to rear roof and all associated site works.
Demolition of 3 existing structures on site (total c.226sq.m) comprising of 1 habitable house and 2 associated outbuildings/sheds (permitted under Ref. ABP-305343-19), and the construction of 1 double storey (c.9.2m overall height) retail development in the form of a convenience supermarket (GFA c.1,759sq.m); 1 two storey mixed-use building (c.10.7m overall height) comprising of a café (c.225sq.m) at ground floor and a community centre at the first floor (c.140sq.m) with associated ground floor access (total GFA c.468sq.m); an ESB sub-station (c.22sq.m); the anchor supermarket unit will provide for a net retail sales area of c.1,222sq.m; a warehouse of c.200sq.m; welfare area of c.190sq.m including ancillary office accommodation; a delivery and loading dock; service yard; customer lobby and wc and entrance lobby; the development shall also provide for 98 car parking spaces and 50 bicycle parking spaces; advertising structures and signage (totalling c.81sq.m); new pedestrian and cyclist connections; public realm areas; refuse storage; a trolley shelter; new priority controlled junction at Main Street; a new access road and shared pedestrian/cyclist greenlink from Main Street (permitted under Ref. ABP-305343-19); vehicular entrances to the surface car park and service yard; all associated site development, site services and landscape works at Lands at Main Street, Newcastle, Co. Dublin, bordered by Main Street to the north, Orchard Grove to the east, greenfield land to the south and residential properties fronting Main Street to the west (new road will be adjacent to 1 Main Street, Newcastle, Co. Dublin.)
Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.
Construction of an outdoor all-weather horse arena and a building to contain stables to house horses and to contain farm machinery implements and fodder, also ancillary works (i.e concrete yards, gates and boundaries), also all for agricultural purposes only in new farmyard using existing farm & road entrances.
Erection of 228 photovoltaic solar panels with an area of 398sq.m (with average size of 1.3sq.m per panel) on the existing roof slope and all associated alterations to existing elevations, site, drainage and ancillary works.
Retention permission at site 514, Greenogue Industrial Park Rathcoole, Co Dublin for the First Floor Ancillary Offices measuring 216m2. All other development details remain as per granted planning permission Reg. Ref SD05A/0281
Construction of two storey extension (55sq.m) with dormer windows to the side of existing dwelling; internal modifications to the existing structure and all associated site works.
Charles River Microbial Solutions International Limited intend to apply to South Dublin County Council for retention permission at unit no. 648, Jordanstown Drive, Greenogue Business Park, Rathcoole, Co Dublin. The retention permission consists of: Retention of minor alterations to elevations associated with changes to the window on the First Floor Level. Retention of an increase in Floor Area of the External Cold Store/freezer compound with an associated increase of size to the Cold Store and the Freezer Units, and all associated works.
Retention permission consists of 1. Retention of existing mezzanine floor at first floor level within unit 648 totalling 453 sqm. 2. Retention of additional car parking spaces within the site, some of which are utilised to serve the adjacent unit 649. 3. Retention of existing pedestrian access point between units 648 and 649. Permission is sought for 1. Change of use of unit 648 from waste metal transfer facility to provide for use of the building as a pharmaceutical warehousing building with provisions for storage, offices, laboratories and staff facilities. 2. Reconfiguration of existing offices and all associated elevational changes proposed. 3. Provision of a bicycle shelter along with an external freezer building, external cold store building, bin compound building, air handling unit and heat rejection plant. 4. Provision of an additional 18 no. car spaces for unit 648. 5. Provisions of all associated and ancillary site works. 6. Provision of new pedestrian entrance. 7. Connection to existing services. 8. Provision of associated signage.
Retention of the ancillary, two storey, office space (123.92sq.m) to the western elevation of the warehouse building and continuation of use of this space as a training facility. This space was built smaller than the ancillary office space (289.9sq.m) granted planning under S01A/0301; retention of a three storey extension built within the existing warehouse area (178.79sq.m) and continuation of use of this space as a training facility.
Planning permission Sought for to extend existing concrete ridge tiles and tiled roof to form a new Dutch type Roof Structure extend existing side structure to new soffit level with new obscure glazed window' new dormer roof structure and rooflight to existing rear tiled roof; conversion of existing attic area in to a new non-habitable area and internal alterations
Construction of 2 storey kitchen/dining/living/bedroom extension to side; Porch extension to front; Detached garage to side and all associated site works.
Construction of 1 two bedroom, single storey detached short let self-catering tourist accommodation Unit A; 2 two bedroom single storey, semi-detached short let self-catering tourist accommodation Unit B; use of the existing two bedroom bungalow as caretaker residential accommodation and all ancillary landscape and site services works.
Change of use of the permitted pharmacy unit (approx. 251sq.m net) as granted under parent planning ref. S020A/0037 and previous change of use planning ref. SD21A/0311 to use as part Pharmacy (approx. 75 sq.m net) and part Medical Centre (approx. 176 sq.m.) with all associated internal and external layout alterations to facilitate this change of use; internal layout changes at ground floor include the partitioning of both units, external layout changes include the provision of an additional window on the south elevation and additional signage on north, south east and west elevations totalling 13 sq.m. with proposed opening hours 7am-7pm 7 days a week.
Change of use of the permitted cafe unit (approx. 225sq.m net) as granted under ref. S020A/0037 to use as a pharmacy (approx. 251sq.m net) and all associated internal and external layout alterations to facilitate this change of use; internal layout changes at ground floor include the removal of the internal escape stair and internal lobby from the permitted layout; inclusion of an accessible WC at first floor level within the permitted community use space (area not affected by subject application); external alterations include amendments to the external glazing to replace permitted access doors with solid glazing (no alteration to appearance) and the provision of an external plant space at first floor level with a 1200mm high louvre screen.
Installation of freestanding traditional style heritage trail information signs at Newcastle Community Centre opposite Tower House on Athgoe Road, bottom of new school road, Ballynakelly bus stop, top of Grant's Drive in Greenogue Ind. Estate, outside Peamount FC, St. Finian's GAA club access road, outside Glebe estate on Peamount Road; wall mounted traditional style heritage trail information signs on boundary wall of original St. Finian's National School and of St. Finian's Catholic Church (both protected structures).
Permission for 4 bed dormer house, new site entrance and septic tank with percolation area and all associated site works. Retention for existing horse boxes.
Permission for a new 4 bed dormer house, new site entrance, new septic tank with percolation area and all associated site woks and retention permission for existing horse stables
Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.
Construction of a ground floor single storey domestic extension (30sq.m) to the side; first floor dormer domestic extension (62sq.m) to the rear.
Signage for Unit E including the provision of 1 halo illuminated sign to the north eastern elevation; and all associated works. (Development site at Unit E in the townland of Collegeland, Baldonnel Business Park, Dublin 22; the site is under construction and located between Casement Aerodrome and the N7 national route)
Permission Is Sought For Demolition Of Existing Site Entrance, Dog Kennel, Prefab House, Walls And Decommissioning Of Existing On-Site Treatment System And Percolation Area. New Detached, 4 Bed, Dormer House, New Site Entrance, New Septic Tank With Percolation Area And All Associated Site Works. Retention Permission Is Sought For Existing Single Storey Horse Stables
Installation of external insulation with smooth render finish to front & gable Facade. Ground floor & first floor rear extension with flat roofs over. Window in gable wall at first floor level.
The development will consist of a single storey garden room/storage shed (approx. 30m²) to rear garden of existing 2 storey dwelling and all associated site development works.
Change of use of 148sq.m of warehouse floor area to ancillary use as research & development room and warehouse & logistics station, including internal fire escape stairs; provision of 137sq.m of additional ancillary conference/presentation room at the first floor directly over the area defined in item above. The above alterations result in 137sq.m of new floor area thus increasing the building area from 2683sq.m to 2820sq.m. The works are fully internal therefore no elevation changes or other external alterations are required. All other details remain as per granted planning applications Reg. ref SD07A/0171, SD07A/0993 and SD17A/0358.
Construction of a single storey shed (144sq.m) to be used as a storage area; Weights and fitness training area.
The erection of a 156sq.m single storey dwelling house, three stable buildings to accommodate 18 horses, feed shed and equestrian store totalling 267sq.m, an equestrian courtyard, sand arena, horse wash bay, platform for storing equestrian waste, domestic proprietary waste water treatment system and polishing filter and ancillary site works to include the drilling of a well, creation of a link to the mains water supply, construction of a driveway and site landscaping. The existing agricultural entrance is to be retained and used for both domestic and equine traffic.
1,444 sq m of factory warehouse space including a link building to an existing adjacent warehouse, 486 sq m of ancillary office space, 21 new car parking spaces, and associated site works.
The development will consist of the replacement of an existing grass training pitch with a synthetic grass 3G all-weather pitch (maximum size 74m x 34.5m), Installation of perimeter weld-mesh fencing of varying heights (1.2m to 3.0m), installation of ball-stop netting and posts behind goals, flood lighting columns and all associated hard and soft landscaping and ancillary works, including new steps and a pedestrian entrance to St. Mary's National School.
A new hazardous medical waste processing facility, including a change of use of the existing building (Building B) on site from general waste disposal to hazardous medical waste processing, and the extension of the current operating hours to 24/7 The demolition/removal of the existing outbuildings/structures including 2 no. storage units, an office and staff room canteen; The construction of an extension (c. 966 sqm) to the existing building c.1,577 sqm on site (Building B) and associated outbuildings including a new boiler house and storage areas; The construction of a new building (c. 984 sqm) to the northwest of the site (Building A); The construction of a new 2 storey office building (c. 287 sqm) to the southeast of the site; Provision of 26 no. car parking spaces, 5 no. truck parking spaces and 18 no. bicycle stands (30 no. spaces) to serve the proposed development; All ancillary landscaping, boundary treatments, associated infrastructure, internal roads, associated processing and treatment plant, weighbridges, pv panels, and site development works to support the development. The operation of the proposed development will require an Industrial Emissions Licence (IEL) from the Environmental Protection Agency. A Review of the existing IEL relating to the site will be sought from the Environmental Protection Agency in relation to the proposed development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.
Erect a 24m telecommunications lattice structure together with antennas, dishes, headframe and associated telecommunications equipment enclosed by security fencing.
The proposal comprises the 2nd phase (phase 2B) of a 2 phase development (first phase [phase2A] under planning reg. ref SD23A/0136 will comprise 48 no. duplex dwellings and phase 2 of Taobh Chnoic public park of c.1.74 hectares of open space, along with car parking and ancillary infrastructure) to result in an overall Phase 2 development of 179 no. dwellings (consisting of 119 no. 2 storey houses and 60 no apartments / duplex apartments in 5 no. 3 storey duplex buildings, and ancillary infrastructure). The phase 2B development will consist of the construction of 131 no. dwellings and open space as follows: A) 119 no. 2 storey houses (10 no. 2 bedroom houses, 95 no. 3 bedroom houses, 13 no. 4 bedroom houses and 1 no. 5 bedroom house. B) 12 no. apartments / duplex apartments in 1 no. 3 storey building - (6 no. 2 bedroom apartments and 6 no. 3 bedroom duplex apartments) all with terrace. C) Open space (c. 1.34 ha. in a series of open space areas) hard and soft landscaping (including public lighting & boundary treatment), communal open space for duplex apartments and apartments; along with single storey bicycle/bin stores and ESB substations; D) Vehicle access from the Athgoe Road from a new signalised junction along with upgrades to footpath and pedestrian crossing (on the Athgoe Road) as well as provision of vehicular/pedestrian/cycle link to permitted 'Graydon' (TA06S.305343) 'Newcastle Boulevard' to the East as well as 237 no car parking spaces and 94 no. bicycle spaces (4 no. motorcycle space) and all internal roads, cycleways, green routes and paths. E) Provision of surface water attenuation SuDs measures connection to water supply and provision of foul drainage infrastructure as well as an underground local pumping station (in northern pa rt of site) to Irish Water specifications and all ancillary site development / construction / landscaping works. F) The proposal also includes upgrades (to provide surface water pipe upgrades) to the surface water network along Athgoe Road and Hazelhatch Road (for c. 1.2 km).
First floor extension over single storey to front, side and rear of existing house with new hipped roof; Single storey extension to front lounge with new roof canopy over and providing an open porch; Single storey extension to rear of house; Attic conversion with projecting dormer window to rear and all associated site works.
Mixed use development consisting of 44 no. residential units and 6 no. commercial units in 3 no. blocks as follows, (A) Block V1 accommodates 16 no. units consisting of 8 no. two bed ground floor apartments & 8 no. three bed duplex units at first and second floor level, (B) Block V2 accommodates 1 no. coffee shop and 1 no. local scale shop at ground floor level and 12 no. apartments at first, second & third floor levels consisting of 6 no. one bed apartments and 6 no. two bedroom apartments, (C) Block V3 accommodates 4 no. local scale shops at ground floor level and 16 no. apartments at first, second and third floor levels consisting of 6 no. one bed apartments, 6 no. two bedroom apartments and 4 no. three bed duplex apartments, (D) Undercroft car parking, bin storage, bike storage, landscaping & planting, outfall drainage and all associated site development works.
The following works replacement of existing grass football pitch with a synthetic grass 3G all- weather pitch to a maximum size of 139m x 87m., reprofiling the ground level in order to achieve a more level playing surface encompassing the increase. in levels in parts of the pitch by up to 1 metre. Install perimeter weld mesh fence of varying heights 1.2m-3.0m, relocated ball-stop netting and posts behind goals. All related hard and soft landscape works including extended spectators' area, goal storage area and soft landscaping and all ancillary works.
Detached two storey house, single storey domestic garage, connection to foul sewer, entrance and all associated site works.
(1)Demolish existing garage; (2) erect new garage with solar PV panels on the south facing roof and (3) all ancillary site services.
Retention of: (1) conversion of attic space at first floor level for habitable use; (2) minor alterations to fenestration; (3) outdoor swimming pool and (4) all ancillary site services.
Single storey extension to front, east side and rear comprising a family flat; one and two storey dormer style extension to side and rear, incorporating dormer windows to front and rear; 2 rooflights to existing front roof.
Retention of development comprising 638sqm extension to existing warehouse with canopy to front and 68sqm of portable ancillary office Space
Erect a 24 metre high monopole telecommunications support structure with antennas, dishes and associated telecommunications equipment; all enclosed in security fencing.
Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.