Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
Construction of a new two storey dwelling house, vehicular entrance onto Westbrook park on a site located at 11 Meadowview Grove and 73 Westbrook Park and all associated site works.
The development which is in a strategic development zone will consist of removing section of grass margin extend existing concrete apron, install accessible kerb, relocate existing litter bin, and erect a proposed new stainless steel and glass bus shelter, 5.2 m x 1.85 m x 2.8 m high on public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area.
Retention of 1 standby diesel generator with an associated flue (15m high) within the permitted generator compound located to the east of the data centre granted under SDCC Reg. SD16A/0345 increasing the number of standby diesel generators from 5 to 6 within the permitted compound.
A new single storey ground floor extension at rear of dwelling, comprising of a kitchen and utility room with flat roof and new roof windows, and all associated site works
Demolition of existing detached shed (c. 6m sq.) and construction of a single storey detached laundry/ storage shed (c.24.5m sq.) to side (south east) of existing nursing home for use incidental with the nursing home and with all finishes to match existing building, including all associated site works.
Conversion of existing attic space comprising modification of existing roof structure; raising existing gable c/w window and 'Dutch' hip; new access stairs and flat roof dormer to the rear.
Single storey garden room with 2no roof windows to the rear and side of existing dwelling and all associated site works within a Strategic Development Zone
Permission sought for a single storey extension to the side/rear and also a new pedestrian access gateway to the existing eastern boundary wall to the side onto the public footpath. All for 2 Moy Glas Wood Lucan, Co Dublin K78P5D2 for Caroline and Shane Belton
First Floor Internal Alterations. Hip build up into dutch hip with window in gable wall at attic level, Attic conversion &1 no rooflight on rear slope of roof at attic level
Construction of a 30.6 sq./m single storey extension to the side of existing dwelling.
Conversion of existing attic space comprising of modification of existing roof structure; raise gable c/w window and 'Dutch' hip; new access stairs and flat roof dormer to the rear.
The development will consist of the development of "Central Boulevard Park" (one of four main parks proposed for the Adamstown SDZ). Works will involve detailed landscaping (hard and soft) of the new Park including provision of the following: · A variety of play areas (including Toddler Play Area, Teen Space (with basketball half-court and informal seating), Play Hillock, Earth Mounded Play Areas with Natural Play Elements). · Calisthenics area. · Flexible lawn spaces. · Seating and street furniture. · Bicycle parking (covered and uncovered). · SuDs features. · Retention of existing hedgerows and Oak tree within the application site with provision of new bridge link through the main hedgerow. Additional native hedgerow, tree and ornamental planting. · Paving, new accesses, and boundary treatments. · All associated site development, landscaping and services works to facilitate the development. The development will also comprise amendments to extant permission Ref. SDZ23A/0026 (as amended by Ref. SDZ24A/0011) to facilitate an integrated shared entrance plaza between the new park and the adjoining Aderrig 4 development to the north (and as per Condition 7 of Ref. SDZ23A/0026).
Amendments to the electrical substation compound and structures permitted under Reg. Ref. SD19A/0042 and ABP Ref. 305948-19 comprising of amendment to the layout and extent of the permitted substation compound, to include an extension of the compound area to c. 0.77 hectares; reorientation of the Gas Insulated Switchgear (GIS) substation building to a northsouth orientation, and associated amendments to the building footprint, layout, and elevations, providing for a two storey building with a gross floor area (GFA) of c. 1,456 sq.m; alterations to the permitted single storey Client Control Building to provide for the substitution of this structure with 5 single storey modular client control units, with a combined total GFA of c. 231 sq.m (GFA of c. 46.2 sq.m per module); associated amendments to the permitted substation access arrangements (3 gated access points provided), transformers, security fencing (to be 2.6 metres high in place of the 2.4 metre high fencing permitted), lighting, services, MV substation, parking, utility cabling, amendments to permitted landscaping and berms adjoining the substation compound and associated and ancillary works.
Conversion of existing attic space comprising of modification of existing roof structure; raise gable c/w window and 'Dutch' hip; new access stairs and flat roof dormer to the rear.
The Development will consist of the installation of sustainable energy compounds to host 1 no. LPG tank and 5 no. modular heat pumps, and all associated site development works.
A single storey extension to rear & side of existing dwelling, an attic conversion including change of roof profile from hip to gable, a dormer window to rear and a new window to side elevation at attic level.
Part single part two storey extension to the side.
Removal of a portion of existing boundary wall; provision of new side gate and section of concrete footpath to facilitate access to part single storey and part two storey extension to side of existing dwelling housing a new bedroom, office, utility room, den and bathroom with rooflight to the rear of the two storey section and existing street sign affected by works relocated and all associated site works.
Erect a 24 meter high lattice telecommunications support structure together with antennae, dishes and associated telecommunications equipment, all enclosed in security fencing; The proposed development is located within the curtilage of a Protected Structure.
The installation of 18 no. telecommunication antennas, together with 9 no. dishes, 3 no. equipment cabinets and all associated equipment on the building's rooftop plantroom. The development will provide high speed wireless data and broadband services for all 3 of Irelands mobile operators, namely Eircom (t/a eir), Three Ireland and Vodafone Ireland. This application relates to part of the lands within Adamstown Strategic Development Zone.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and 4no. roof windows to the rear within a Strategic Development Zone.
Conversion of existing attic space comprising of modification of existing roof structure; raising of existing gable c/w window and 'Dutch' hip; new access stairs and flat roof dormer to the rear.
Retention of a pitched roofed entrance porch.
Conversion of attic space comprising of modification of roof structure; raise gable c/w window and 'Dutch' hip; access stairs and flat roof dormer to the rear.
Minor amendments to the development permitted under Planning Permission Reg. Ref. SDZ20A/0008 comprising the following: repositioning of landscaped communal courtyard of Block B and Block E from first floor level to ground floor level and the consequential relocation of 52 car parking spaces overall to on street locations immediately adjacent to the Blocks, including ancillary site development and landscape works; minor adjustments to the footprint of 6 retail, retail/cafe restaurant units at ground floor level in Block B, including their ancillary servicing arrangements; minor adjustments to the footprint of 6 retail, retail/cafe restaurant units at ground floor level in Block E, including ancillary servicing arrangements; adjustments to the location of the bicycle and waste stores serving both Block Band Block E; modification of 97 apartments (8 studios, 21 1-bedroom units, 34 2-bedroom units and 34 3-bedroom units) and 10 duplexes (all 2 bedroom units) arising from adjustments to ground floor circulation and floor to ceiling heights in Block B and Block E consequent to repositioning of the landscaped courtyards; minor reduction of the floor to ceiling heights of the ground floor of Block Band Block E by 700mm, affecting all residential and retail, retail/cafe/restaurant units at ground floor, with consequential reduction in the overall heights of Blocks Band E by 700mm; one additional apartment added to Block B, facilitated by replacing 1 2-bedroom apartment with 2 1-bedroom apartments; there is no change to the overall number of car parking spaces or to the number of retail, retail/cafe/restaurants permitted.
Two storey side extension consisting of ground floor car garage and store with first floor ensuite bedroom.
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
The installation of 1.81m x 1.42m x 0.51m (h x l x w) pressure reduction installation and 3.25m (h) vent stack with all ancillary services & associated site works.
The development will consist of the amendment of Condition no. 3 (ii) and 3 (iii) of the permission granted under Reg. Ref. SO21A/0042 that related to the Gas Plant of the overall permitted development only, so that these aspects of the new condition shall read as follows: Condition no. 3(ii) Within four (4) years from the date the first Gas Plant commences operation, the applicant or operator shall undertake a review with GNI of the ability to serve the Gas Plant with green gas and / or hydrogen (or similar fuels) shall be Investigated and reported to the Planning Authority. Any ability for the Gas Plant to be operated with green gas and/ or hydrogen (or similar fuels) shall be implemented within an agreed timeline agreed with GNI. Condition no. 3(iii) If the applicant receives a firm offer from Eirgrid under which the Gas Plant is not required, and the connection has been realized with capacity onsite from Eirgrid, then the Gas Plants shall be removed from the entire site within a year of the ceasing of operation. The nature and extent of the permitted Gas Plants, or any other element of the parent permission granted under Reg. Ref. SD21A/0042 will otherwise not be amended by this application. An EPAIndustrial Emissions (IE) licence will be applied for to facilitate the operation of the Gas Plant that Is subject of this amendment application.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and Dutch hip, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear
Construction of single storey extensions to rear and side of existing dwelling; new detached domestic shed to side of dwelling; all associated site works.
Conversion of Existing Attic Space comprising of modification of existing roof Structure, Raising of existing gable c/w window and Dutch hip new access stairs and a flat roof dormer to the rear
Amendments to a previously permitted development (Reg Ref SDZ23A/0026, known as 'Aderrig Phase 4') at a site of approximately 2.16 HA in the townland of Finnstown, Adamstown, Lucan, Co. Dublin. The site is generally bound as follows: to the east by the Adamstown Boulevard and planned Central Boulevard Amenity Area; to the south by Adamstown Way' to the west by Aderrig Avenue (beyond which is Aderrig Phase 1); and to the north by Airlie Park Road (beyond which is Aderrig Phase 1); and to the north by Airlie Park Road (beyond which is Arlie Park Amenity Area ). This application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to proposed amendments to Phase 4 of development within the Aderrig Development Area of Adamstown Strategic Development Zone. The proposed development will principally consist of the following amendments to the previously permitted development, and includes 5 No. additional apartment units (1 No. studio, 2 No. 1-bed and 2 No. 2-bed), thereby increasing Aderrig Phase 4 from 350 No. units to 355 No. units, with gross floor area decreasing by 49 sq.m: At Block A - omission of the internal residential amenity space at ground floor level and addition of 3 No. apartment units (1 No. 1-bed and 2 No. 2-bed) with west- and south- facing terraces, as well as minor changes to the internal circulation; omission of communications room in the undercroft and enlargement of car parking space; reconfiguration of rooftop plant; and changes to the landscaping and open space to the south of Block A. At Block B - omission of the standalone generator/sub-station/meter room building in the centre of the Block; omission of the sprinkler tank room and addition of 1 No. apartment unit (1-bed) with west-facing terrace in the previous location of the cycle store; relocation of ground floor level terrace of Unit B-06 from northern elevation to eastern elevation; reconfiguration of the internal access and parking layout (no net loss of spaces); and changes to the landscaping within the central communal amenity space area. At Block C - omission of the ground floor level water tank room and addition of 1 No. apartment unit (studio) with east-facing terrace; redesign and reconfiguration of the standalone cycle store/sub-station/generator building, which will now comprise of a cycle store/sub-station-switch room building; omission of the ground floor level sprinkler tank and increase in area of 1 No. apartment unit to facilitate a change from it being 1-bed to 2-bed; and changes to the landscaping within the central communal amenity space area. the development will also include: changes to elevations to accommodate the above amendments; changes to cycle parking layouts, including an increase in provision of 12 No. spaces; changes to the proposed taking in charge areas; and all associated site and development works above and below ground.
Construction of 350 No. residential apartment units (6 No. studios, 169 No. 1-bed and 175 No. 2-bed) set out in 3 No. blocks (A, B, C) ranging in height from 1 No. to 7 No. storeys. The development will also include: internal residential amenity space (Block A); vehicular junctions and internal road, cycle and pedestrian network; minor alterations to the south-east junction with Adamstown Way (previously permitted under Aderrig Phase 1 (Reg. Ref. SDZ20A/0017) adjacent to the planned Central Boulevard Amenity Area; 210 No. car parking spaces; cycle parking (including standalone cycle store at Block C); bin storage areas; plant (inc. standalone plant buildings at Blocks B and C); hard and soft landscaped areas including public, communal and private open space areas (with balconies and terraces facing all aspects); boundary treatments; public lighting; 3 No. sub-stations; rooftop PV arrays; and all associated site and development works above and below ground.
Change of roof profile from hip end profile to Dutch Hip profile attic conversion incorporating dormer extension to rear 1 No 'Velux' roof light to the front All associated site works.
Conversion of existing attic space comprising of modification of existing roof structure new gable window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising existing gable, c/w window and Dutch hip, new access stairs and flat dormer to the rear.
Conversion of existing attic to non-habitable storage use; remodel of existing hip roof profile to half 'Dutch' hip to the side; provision of dormer to the rear.
The proposed development will consist of the conversion of the existing attic space for use as a study and for additional household storage, the construction of a dormer window to the rear roof plane, the installation of a window in the existing gable to improve natural light, the raising of the existing chimney, Plus all associated site works.
The conversion of an existing attic space, comprising of domestic spaces, new stairs, 2 no. roof light windows to the front, 3 no. roof light windows to the rear and all associated works within a Strategic Development Zone
Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the construction of a circa 2,155sq.m, two storey biopharma production facility to a maximum height of circa 14.9m to be located to the south of the existing P3 building; single storey administration extension of circa 210sq.m to a maximum height of 4m to the north of the existing P3 building and internal modifications to the existing P3 building in addition to all associated site works including delivery area; courier pick up/drop off area with 5 parking spaces (including 1 accessible parking space and 1 E-car space); extension to existing external utilities yard (circa 485sq.m) for 3 heat pumps and other ancillary equipment; new internal site circulation road and re-alignment of existing circulation road; 48 additional car parking spaces (including 3 accessible parking spaces and 5 E-car spaces); 24 covered bicycle stands, hard and soft landscaping and external lighting; there will be temporary site entrance and associated temporary access road located to the south east of the site during the construction phase all on 3.68 Hectare application site located within the Takeda Ireland facility at Grange Castle Business Park; an EIAR (Environmental Impact Assessment Report) is submitted with the application and relates to development comprising of an activity which requires and Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
The construction of a new single storey extension to the side of the existing house to facilitate family flat
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access Stairs, and flat roof dormer to the rear
Conversion of existing attic to non-habitable storage use; remodel of existing hip roof profile to half 'Dutch' hip to the side; provision of dormer to the rear.
The conversion of an existing attic space, comprising of domestic spaces, new stairs, 2 no. roof light windows to the front, 3 no. roof light windows to the rear and all associated works within a Strategic Development Zone
To erect 6 no. telecommunications antennas enclosed within 6 no. antenna shrouds together with 3 no. dishes and 2 no. equipment cabinets and associated equipment with the relocation of 3 solar panels. The application relates to part of the lands within Adamstown Strategic Development Zone.
Conversion of existing attic space comprising of: modification of existing roof structure; raising of existing gable c/w window; new access stairs and flat roof dormer to the rear.