Permission for 16 semi-detached 2 storey 3-bedroom 113.5m2 dwellings to the rear of an existing dwelling on a 0.545 hectare site, with ancillary services, roads, landscaping and associated works.
Permission is sought for the construction of a 43 sqm
Permission for development. The development will consist of: A single storey ground floor extension to the rear, with 1 no. velux type rooflight. Attic conversion with 1 no. dormer type window and 2 no. velux type rooflights to the rear of the main roof and 3 no. velux type rooflights to the front of the main roof.
Planning permission for the construction of a two-storey extension, increasing ridge height of pitched roof to rear, provision of concealed balcony, with new wastewater treatment system and all associated site works
Retention Planning for single storey extension to side and rear.
Full permission. The proposed development relates to the provision of a two-storey building comprising a café unit (135 sq.m) and public restrooms at ground floor level, with administration / office space (218 sq.m) provided at first floor level. The proposed building will provide a total gross floor area of 491 sq.m over two storeys, with a maximum height of c. 8 metres. The development includes the removal of three existing car parking spaces, hard and soft landscaping, plant, signage associated with the proposed café unit, waste management facilities, relocation of an existing pedestrian crossing, and all associated and ancillary works.
Planning permission for (A) alterations to existing dwelling comprising (i) the extension of the existing rear dormer and the provision a new dormer to the front. (ii)the change of existing roof profile from hipped roof to gable roof. (iii) the removal of 2 no. chimneys (1 no. chimney at eastern elevation and 1 no. chimney at western elevation) and (iv) the provision of 5 no. rooflights. The alterations will facilitate an extended first floor level (87sqm) comprising 1 no. master bedroom (with en-suite and walk in wardrobe). 2 no. en-suite bedrooms with wardrobes, and hallway with staircase. (B)permission is also sought for all ancillary works necessary to facilitate development.
Retention permission for the erection of a single storey pergola structure adjacent to the existing pitch and putt clubhouse building to serve as a covered seating area for the club cafe and the provision of a single storey prefabricated timber kiosk adjacent to the cafe, with outdoor seating operating as a waffle cafe, within the carpark.
Permission for development. The Development will consist of partial demolition of existing side porch, rear extension, garage and shed, provision of new garage at road level with rear garden access stair, new part single storey part two storey extension to side and rear with roof lights and refurbishment of existing cottage with roof lights, together with new wastewater treatment system and soil polishing filter and associated site works.
(A) The demolition and replacement of an existing single storey extension with a part storey & half and part two-storey extension to the front of the existing dwelling; (B) a single storey extension to the side of the existing dwelling; (C) Dormer windows to the front and rear roof slopes; (D) Minor alterations to existing elevations, (e) The relocation & widening of the site entrance on the public road, (F) All associated site and landscaping works to serve the development.
Permission for the installation of automatic
Permission for the following works
Planning permission is sought for an extension to the existing Leopardstown Park Hospital, Foxrock, Dublin 18, D18 XH70. The proposed development on a 5.97 ha. site at Leopardstown Park Hospital which includes the Protected Structure Leopardstown Park House (RPS no. 1634) will comprise of the following: • The demolition of existing buildings comprising c. 248 sqm. of space including: existing single storey estates stores/ground staff building (c. 186 sqm. gross floor area) and the existing link building (c. 62 sqm. gross floor area) that connects the Glens building to the existing hospital. • The construction of a new c. 8,997 sqm. gross floor area extension to be developed to the south of the existing Leopardstown Park Hospital building which will consist of 2 no. residential care building blocks providing 125 no. single en-suite bedrooms (1 no. 2 storey residential care block containing 50 no. bedrooms and 1 no. 3 storey residential care block containing 75 no. bedrooms) along with day rooms, dining rooms, activity and therapy rooms, staff support rooms and kitchen facilities connected by a new single, 2 and 3 storey central circulation street which links back to the existing hospital at ground floor level. The new development will also include minor refurbishment to the existing hospital to accommodate the connection point to the new link for the proposed central circulation street. • The construction of a new single storey MEP Compound which will contain the replacement single storey estate stores and workshop (c. 457 sqm. gross floor area) with an enclosed external area of c. 595 sqm. The MEP Compound also contains a new ESB Substation. • Alterations to the existing 16 no. car parking spaces surrounding Leopardstown Park House (Protected Structure) and replacement with 66 no. car parking spaces, including 3 no. disabled and 12 no. EVC spaces. The addition of 3 no. car parking spaces and the realignment of the existing 30 car parking spaces to the north of the existing hospital (adjacent to the main entrance), including 3 disabled spaces and 5 P&T spaces. The addition of 10 new car parking spaces to the west of the main hospital building. The scheme proposes a total of 109 car parking spaces within the application red line boundary. •A new single storey, secure bicycle store enclosure (c. 27 sqm.) located to the east of the main entrance providing 12 no. long-stay bicycle spaces. Provision of 21 no. short-stay bicycle spaces (20 no. existing and 1 no. new cargo-bike space). •The demolition of a 16.5m section of the Walled Garden wall and a 14m section of the low-level garden wall (1990's construction), reduction in height of a 5m section of the garden wall, the creation of a new 3.5m window opening, the re-opening of an existing closed-up door way within the wall, and the relocation of a 33m section of gates and railings within the walled garden •The planting of 150 new trees to mitigate the removal of 106 trees (net increase of 44 trees). •Proposed modifications to the existing road network within the campus to access the new extension and associated MEP Compound, planted perimeter landscaping with fence along the north and west boundaries (c.1.8m high on northern boundary and 2.4m high on western boundary), temporary construction compound and construction road to the west of the hospital and general landscaping modifications including tree removal. •The proposed development also includes all ancillary site clearance, enabling, construction, site development and landscaping works, which include but are not limited to: temporary haul road and temporary construction compound, the diversion and upgrade of existing hospital campus site services, new infrastructural services, attenuation, watermains and communications networks, the upgrade of surface water services along the access road to the north of the hospital and all required phasing, sequencing and site development works. The Protected Structure stables building (RPS no. 1630) is outside, but immediately adjacent to, the application red line boundary. An Environmental Impact Assessment Report (EIAR) and a screening for Appropriate Assesment Report have been prepared in respect of the proposed development.
The proposed development will consist of: i) The demolition of existing buildings comprising c.104 sqm. of floor space including: the existing link building (c.62sqm. gross floor area) that connects the Glens building to the existing hospital, and three existing rooms to the south side of the main spine corridor, adjacent to the Day Care Centre (c.42 sqm); ii) The construction of a new c. 9,284 sqm. gross floor area extension to be developed to the south of the existing Leopardstown Park Hospital building which will consist of 2 no. residential care building blocks providing 125 no. single ensuite bedrooms (1 no. 2 storey residential care block containing 50 no. bedrooms and 1 no. 3 storey residential care block containing 75 no. bedrooms) along with day rooms, dining rooms, activity and therapy rooms, staff support rooms and kitchen facilities connected by a new single, 2 and 3 storey central circulation street which links back to the existing hospital at ground floor level. The new development will also include minor refurbishment to the existing hospital to accommodate the connection point to the new link for the proposed central circulation street. No works are proposed to Leopardstown Park House (A Protected Structure). iii) The construction of a new single storey Mechanical and Electrical Compound (c. 370 sqm. gross floor area).The Mechanical and Electrical Compound also contains an ESB Substation; iv) Reconfiguration of existing car parking layout to provide a total of 109 car parking spaces within the red line boundary, comprising: 99 standard spaces, 6 accessible spaces, and 5 parent and child spaces. A total of 22 spaces will have electric vehicle charging points, and ducting will be provided for an additional 44 electric vehicle charging points. A total of 5 motorcycle parking spaces will be provided. v) A new single storey, secure bicycle store enclosure (c. 27 sqm.) located to the east of the main entrance providing 12 no. long-stay bicycle spaces. Provision of 21 no. short-stay bicycle spaces (20 no. existing and 1 no. new cargo-bike space); vi) The relocation and repair of a 33m section of walled garden boundary railings and gates to replace the low-level garden wall (1990s construction), the reopening of an existing closed-up door way within the wall, and repair and refurbishment works to the original walled garden wall; vii) The planting of 4,940 new trees (168 semi-mature trees, 4,772 small trees) to mitigate the removal of 39 trees (net increase of 4,901 trees), and relocation of 5 existing orchard trees into woodland; viii) Proposed modifications to the existing road network within the campus to access the new extension and associated Mechanical and Electrical Compound, planted perimeter landscaping with fence along the north and west boundaries (c. 1.8m high on northern boundary and 2.4m high on western boundary), temporary construction compound and construction road to the west of the hospital and general landscaping modifications including tree removal and compensatory planting; ix) The proposed development also includes all ancillary site clearance, enabling, construction, site development and landscaping works, which include but are not limited to: temporary haul road and temporary construction compound, the diversion and upgrade of existing hospital campus site services, new infrastructural services, plant, SuDS drainage and attenuation measures, watermains and communications networks, the upgrade of the combined sewer and a new watermain along the access road to the north of the hospital and all required phasing, sequencing and site development works; x) An Environmental Impact Assessment Report (EIAR) and a Screening for Appropriate Assessment Report have been prepared in respect of the proposed development.
Permission is sought for development consisting of
New Covered Bin Store to Existing Bin Storage Location.
The development consists of the installation of 4 no. rooflights to the front and side pitches of the existing roof.
Retention permission for a new open aluminium glazed canopy structure at ground floor level to the east side and the rear of the existing house.
Attic conversion with dormer to rear roof to accomodate stairs to allow conversion of attic into non habitable storage space with roof windows to front roof, all with associated ancillary works.
Permission. The development will consist of installation
Permission for the change of use of the existing kitchen
A single storey extension to the side of the existing house (circa 66 Sq/M). The proposed extension consists of a new master bedroom with flat roof construction and a mono pitched roof over a new open plan living space & a link hallway with flat roof construction & all associated works.
Retention Permission is sought for the replacement
Permission for the construction of single storey side extension to existing detached bungalow and all associated site works.
Change of use of a single storey 135sqm wing at the south-east corner of Whelan House from medical clinic to Early Year Childcare and Preschool Services for children with Autism from 3 years to 6 years old.
Change of use of a portion of Whelan House, a single storey 135sqm wing at the south-east corner of Whelan House from office use to a medical clinic.
Permission is sought for development consisting of
Planning Permission for construction of a double storey extension to the side; rooflight at the front; internal alterations, and all associated site works.
Permission to remove 3No. single storey prefabricated
The proposed development will consist of the construction of a new two storey extension on the north/west side of the campus to accommodate 2No.new 80sq.m. classrooms. The works will also include modifications to the internal layout of the original school building on the eastern side to form 2No classrooms and a resource room at both ground and first floor levels within the same footprint as the existing 3No small classrooms at each level.
Permission for development. The proposal consists of the construction of 3 no. office buildings ('N1'; 'N2' and 'N3') ranging in height from 6 to 8 storeys, over lower ground floor and basement level. The total GFA of office floorspace proposed is c.47,216 sq.m. The proposal includes plant areas at basement, lower ground and roof level. The proposal includes a wellness pavilion building (GFA of c. 148 sq.m), public open space, sunken gardens, shared entrance plaza, upper level / roof terraces to buildings and all associated works. The proposal includes 474 no. car parking spaces at basement and lower ground floor level. 474 no. cycle parking spaces are proposed at lower ground and surface level. The associated site and infrastructural works include site access and internal roads, entrance ramp to car park, cycle path, footpaths, 4 no. ESB substations, bin stores, plant rooms, foul water drainage, surface water drainage including attenuation tank watermains including water storage tank, utilities, hard and soft landscaping, public lighting, boundary treatments and all ancillary works on an application site area of c. 1.97 hectares.
Permission for development. The proposal consists of the construction of 3 no. office buildings ('N1'; 'N2' and 'N3') ranging in height from 6 to 8 storeys, over lower ground floor and basement level. The total GFA of office floorspace proposed is c.47,216 sq.m. The proposal includes plant areas at basement, lower ground and roof level. The proposal includes a wellness pavilion building (GFA of c. 148 sq.m), public open space, sunken gardens, shared entrance plaza, upper level / roof terraces to buildings and all associated works. The proposal includes 474 no. car parking spaces at basement and lower ground floor level. 474 no. cycle parking spaces are proposed at lower ground and surface level. The associated site and infrastructural works include site access and internal roads, entrance ramp to car park, cycle path, footpaths, 4 no. ESB substations, bin stores, plant rooms, foul water drainage, surface water drainage including attenuation tank watermains including water storage tank, utilities, hard and soft landscaping, public lighting, boundary treatments and all ancillary works on an application site area of c. 1.97 hectares.
2 No. additional surface car parking spaces within the existing parking area and associated site works.
Permission is sought for demolition
Permission for a new shopfront & associated
Permission for a part Build to Rent (BtR) and part Build to Sell (BtS) Strategic Housing Development. The demolition of the existing structures at Ashwood Farm is permitted under the extant Dun Laoghaire-Rathdown County Council planning permission (Reg. Ref: DA21/0143). The development, with a total gross floor area of c.28,145 sq.m, will consist of: i.the construction of 305 residential units including; 289 Build to Rent apartments across 5 blocks (A-E) ranging in height from 6 to 7 storeys over basement incorporating: 142 1-bed and 147 2-bed apartments, all with private amenity space in the form of balconies and/or ground floor terraces; and, 16 Build to Sell three-storey 5-bedroom houses incorporating 12 semi-detached and 4 detached houses, all with private amenity space in the form of rear gardens and 2 on-curtilage parking spaces per dwelling. 1,098 sq.m of residential amenities and facilities are proposed in the BtR blocks including a resident’s gym, co-working space, meeting room, café, residents lounge, a concierge space, a parcel room, cleaner’s rooms and waste facilities; A childcare facility is proposed in Block E with a gross floor area of 489sq.m., together with a dedicated external play area of 250sq.m and 2 set-down parking spaces for drop-offs/collections; A total of 295 car parking spaces are proposed including 34 spaces for the houses comprising 32 on-curtilage parking spaces and 2 visitor parking spaces, and 261 car parking spaces are proposed to serve the apartment units (211 at basement level and 50 at surface level) including 13 universal access parking spaces and 6 car sharing spaces, 5 staff car parking spaces and 2 set-down spaces are also provided to serve the creche. 53 (20%) of the car parking spaces are to be fitted with electric vehicle (EV) charging facilities. 10 motorcycle spaces are also provided at basement level; v.520 cycle parking spaces are proposed, comprised of 428 long-stay and 80 short-stay cycle parking spaces for the residential units and 8 long-stay and 4 short-stay cycle parking spaces are proposed to serve the creche; Vehicular access will be via the existing access off the Glenamuck Road South. 2 pedestrian/cycle access points are proposed off the permitted Glenamuck District Distributor Road (ABP Ref: PL06D.303945) and 1 pedestrian/cycle access point is proposed to connect the site to the Willow Glen development; and, The development will also consist of all ancillary development works required to facilitate the development including but not limited to plant rooms, a substation, landscaping, boundary treatments, PV panels and lighting. The 289 ‘Build to Rent’ apartments will be constituted as a long-term rental housing scheme, and this planning application is accompanied by a proposed covenant or legal agreement further to which appropriate planning conditions may be attached to any grant of permission to ensure that the development remains as such. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire-Rathdown County Development Plan 2022-2028 and the Kilternan-Glenamuck Local Area Plan 2013 - 2019 [extended to 2023]. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.ashwoodfarmshd.com
Permission for a Large-scale Residential Development (LRD) at a site measuring c.2.8 hectares known as Ashwood Farm located on Glenamuck Road South, Carrickmines, Dublin 18. The site also has direct frontage to the Glenamuck District Distributor Road, which forms the north-west boundary. The development will consist of: i) Demolition of an existing dwelling and removal of a building ruin with a total combined area of 291sq.m; ii) Construction of 144 residential units: A) 70 apartments in a single block, 6-storeys in height, incorporating 35 no. 1-bed units and 35 no. 2-bed units, all with private amenity space in the form of ground level terraces or balconies at upper levels; B) 16 duplexes 3-storeys in height, including 8 no. 2-bed units and 8 no. 3-bed units, all with private amenity space at ground or first floor terraces; and C) 58 houses of 3-storeys in height, including 36 no. 3-bed townhouses and 22 no. 4-bed houses, all with private amenity space in the form of rear gardens and/or second-floor terraces; iii) Provision of c.5,015sq.m of public open space, and a communal amenity area of c.607sq.m; iv) Vehicular access to the development will be via the existing access at Glenamuck Road South, and vehicular access will be provided or facilitated to neighbouring properties east of the site; v) The provision of new pedestrian and cycle connections to Glenamuck Road South and the Glenamuck District Distributor Road, as well as a new pedestrian link to the adjoining Willow Glen estate to the east, with potential future pedestrian links to the west also facilitated; vi) A total of 318 bicycle parking spaces and 135 car parking spaces; vii) Provision of surface water attenuation, SuDS measures and connections to facilitate services including to the existing watermain at Glenamuck Road South and to the existing foul drainage network at the Glenamuck District Distributor Road; viii) All associated site and infrastructural works, inclusive of drainage and utilities infrastructure, ESB substation, bike and bin stores, hard and soft landscaping, boundary treatments, internal roads, cyclepaths and footpaths, and public lighting.
Demolition of the existing free standing car garage and workshop and of the existing attached single storey extension to the side of the existing dwelling. Construction of a new single storey freestanding car garage and workshop, construction of a new single-storey utility/plant room to the side of and adjoining the existing single storey dwelling house. Construction of a new single storey garden pavilion to the rear of the property and realignment of the existing entrance pillars to Slate Cabin Lane, all with associated site works and landscaping.
Dwyer Nolan Developments Ltd. are applying for Permission and Retention Permission for development, by way of a planning application for a Large-Scale Residential Development (LRD), which have modified a permitted Strategic Housing Development (SHD) under (Ref.s ABP-303978-19 & ABP-312216-21), within the permitted “Glenamuck Manor” development, located at Glenamuck Road South, Kilternan, Dublin 18, on an overall site area of 4.28Ha. 1. Permission is sought for: (a) landscaped play area in public open space in southern part of the overall development and (b) creation of pedestrian access to adjoining lands to south, at link No. 2. 2. Retention permission is sought for: (i) realigned pedestrian path through public open space, (ii) changes to previously approved layout and levels in public open spaces, (iii) omission of previously approved steps in public open spaces, iv) relocated and extended retaining wall, partially along southwestern boundary and alterations to material finishes to same, (v) an increased play area of 60sq.m to rear of creche, (vi) reconfiguration of approved external steps at pedestrian link No. 2, (vii) alterations to landscaping and path layouts to front of Block G1 and (ix) overall revisions to landscape design.
Permission, to retain development, which has modified a permitted Strategic Housing Development (SHD) (Ref.s ABP-303978-19 & ABP-312216-21) by way of a planning application for a Large-Scale Residential Development (LRD), within the permitted “Glenamuck Manor” development (currently under construction), located at Glenamuck Road South, Kilternan, Dublin 18. Permission is sought to retain development consisting of the following: (i) relocated and extended retaining wall, partially along southwestern boundary, (ii) an increased play area of 60sq.m to rear of creche, (iii) reconfiguration of approved external steps at pedestrian link No. 2 and (iv) all associated site development works, all as previously approved under planning Ref.s ABP-303978-19 & ABP-312216-21, on an overall site area of 4.28Ha. Application can be viewed online at www.glenamuckmanorlrd.ie.
Permission for a strategic housing development consisting of the construction of 112 No. Build to Rent Apartments (72 No. one-bedroom apartments; and 40 No. two-bedroom apartments) arranged in 2 No. Apartment Blocks. Block A is principally 4 No. stories in height with a 6 No. storey element, Block B is principally 4 No. stories in height with a 5 No. storey element. This includes c.320 sqm of residential amenity space in 2 No. dedicated spaces located in the Ground Floor of Blocks A and B, together with: post and parcel storage facilities; waste storage facilities; 144 No. secure bicycle parking spaces; and, 1 No. external ESB substation/ switch room (c. 27 sqm). The development will also consist of the provision of: private open spaces (including balconies), communal and public open space areas (including the creation of a public pedestrian link between Leopardstown Road to the north, via the proposed development, to an existing area of open space at Leopardstown Heights south); a communal courtyard and play area; 51 No. car parking spaces and 32 No. external bicycle parking spaces; 2 No. motorbike spaces; boundary treatments and street lighting; the provision of Sustainable Urban Drainage systems (SuDS); changes in levels across the site and associated site excavation works; hard and soft landscaping works; and, all other works and services necessary, above and below ground, to facilitate the construction and operation of the proposed development. The development will also be served by an upgraded vehicular and pedestrian entrance from Leopardstown Road. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire-Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and South Dublin County Council. The application may also be inspected online at the following website set up by the applicant: www.rocklawnshd.ie
The proposed development comprises of amendments to operating hours at the existing Links Creche and Montessori from 7am to 6pm Monday to Friday as per Condition 4(c) of ABP30984621 (Strategic Housing Development which included the subject creche) to 7am to 6.30pm Monday to Friday.
Permission for development to consist of the
Permission and retention permission for development to consist of the construction of a new single storey storage/plant room to the side of the existing dwelling and retention permission for the construction of a new garden room/home office to the rear of the existing dwelling along with associated site works.
Permission is sought for a single storey flat roof home office (69sqm) including all associated site works to the rear.
Permission is sought for alterations to existing single storey bungalow including removal of hipped roof to gabled roof, convert existing garage into habitable space, extending part of front facade, dormer window to front, two storey extension to the rear with stepped back attic level extension, single storey extension to side of existing house, internal alteration, modification to entrance driveway piers to increase sightlines and all associated site works.
Full permission for the following: Permission is sought
Permission is sought for the material change of use of the existing first floor residential apartment into veterinary clinic accommodation ancillary to the existing ground floor veterinary clinic, replacement window to the front and associated internal modifications.
Permission for a) construction of a single storey extension
Permission for development at a site to west of the junction of Ballyogan Road and Northfield Road (Ballyogan Link Road). The development will consist of: A residential apartment development (gross floor area 4,744 sq.m.) ranging in height from 3 to 6 storeys and consisting of 46 apartments (8 no. Studio, 11 no. one bed, 19 no. two-bed and 8 no. three bed). The scheme also provides for: The demolition of 4 houses at Nos.4,5, Saol Nua and Mountwood, Ballyogan Road. Community room and public cafe at ground floor. Roof terraces and balconies provided on south, east and west elevations of the block. 27 car parking spaces (23 under-croft and 4 external visitor spaces), 113 cycle spaces and 1 motorbike parking space. A new vehicular entrance will be provided onto Ballyogan Road. All associated site development, landscaping, boundary treatment works, public lighting, ESB sub-station/switch room, communal storage space, Solar P.V. panels at roof level, landscaped communal open spaces, services provisions and ancillary site works.