1 ESB Substation and MV Switch room to serve warehouse development Block A; ESB substation and MV Switch room have a total internal floor area of 28sq.m and are 3.6m high; Block A development, currently under construction, was originally granted under South Dublin County Council planning permission Reg. Ref SD18A/0265 and SD21A/0082.
Permission to construct a domestic garage beside their existing home
Single storey dwelling and double garage with an Oakstown treatment plant with an ecoFlo coconut filter and soil polishing filter and a bored well along with construction of a new entrance and all associated site works
Demolition of an existing utility room to the west/rear and the construction of a new single storey flat roof extension to the west/rear of the property comprising of new dining and living spaces along with all associated ancillary drainage, landscaping and site works.
The construction of a sun-room extension at the side of the house, a rooflight in the main roof to the front of the house, a home gym / office in the rear garden and repositioning of the previously approved vehicular entrance and driveway from the eastern boundary to the western boundary
Alterations to existing house, raising roof profile to allow attic space to be converted to 3 bedroom facilities, new 2 storey extension to front, side and rear, internal changes and all associated site works
Retention of 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.
The development will consist of retention of as built 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.
Permission to construct an extension to rear of dwelling to connect existing home office (22.6sq.m) to the main dwelling & all associated site development works.
Retention and change of use of one single storey detached 2.85m high home office unit to a self-contained living unit.
Retention of single storey extension to rear (circa 12sq.m); first floor extension to rear (circa 2sq.m) and attic conversion (circa 12sq.m).
The construction of a 31m2 shed in the rear garden to be used as a gym, and all associated site development works above and below ground.
Single storey extension to the left hand side; extension to the front at ground and first floor level in order to straighten the front building line; addition of a two storey extension to the front which will act as a porch at ground floor level and a bathroom at first floor level; to face the central portion of the front elevation in natural stone over its full height; extend the existing garage on the right hand side to the front and rear; remove the existing garage roof and build a first floor extension over the entire extended garage area; existing ground floor area including the garage is 152.38 sq.m & the proposed ground floor extensions will add 101.05 sq.m.; the existing first floor are is 68.95sq.m. & the proposed first floor extension will add 115.59sq.m.; all ancillary site works required to complete the project.
A. Construction of sunroom to the south west gable. B. Construction of garage and ancillary rooms to the north east gable. C. Conversion of previous car port to habitable area. D. Enclosure of porch area
Construct a dwelling house, domestic garage, onsite secondary sewerage treatment system, bored well, alterations to existing entrance and all ancillary site works
Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.
Signage for Unit E including the provision of 1 halo illuminated sign to the north eastern elevation; and all associated works. (Development site at Unit E in the townland of Collegeland, Baldonnel Business Park, Dublin 22; the site is under construction and located between Casement Aerodrome and the N7 national route)
Alterations to existing granted Planning Permissions (Reg. Ref. SD23A/0317 & SD24A/0140) for development at Site N, Jordanstown Road, Aerodrome Business Park, Rathcoole, Co. Dublin. The subject alteration proposal incorporates the following: Alteration at Ground Floor Plan as follows: Change of Use of 12m2 of Ancillary Office area to Staff Facilities area. Alterations at First Floor Plan as follows: Change of use of 34m2 of Ancillary Office area to Staff Facilities area. Mezzanine Plant Area increased by 252m2. Addition of 62m2 of External Plant Area. Overall building height reduced from 13m to 9.8m due to clear internal headroom reducing from 10m to 6.8m plus roof lights now omitted from Roof Plan. Building elevation revisions due to the related layout changes. Relocation of ESB Substation (total area of 32.95m2) on the site. Site Plan and associated drainage updates based on all the above adjustments. NOTE: All other previously granted elements remain as per existing granted Planning Permissions described above.
Construction of an outdoor all-weather horse arena and a building to contain stables to house horses and to contain farm machinery implements and fodder, also ancillary works (i.e concrete yards, gates and boundaries), also all for agricultural purposes only in new farmyard using existing farm & road entrances.
Alterations to an existing granted Planning Permission (Reg. Ret SD23A10317) for development at Site N, Jordanstown Road, Aerodrome Business Park, Rathcoole, Co. Dublin. The subject alteration proposal incorporates the following: 1. Change of Use of Warehousing use to Light Industrial use. 2. While the building footprint will remain as per the above referenced granted planning application (with minor position relocation on site), the overall building area changes from 89lsqm to 1,24Osqm following the proposed floor areas breakdown: A. Ground Floor Light Industrial Area: 557m2 B. Ground Floor Ancillary Office and Staff Facilities: 283m2 C. First Floor Ancillary Offices and Staff Facilities: 283m2 D. Mezzanine Level Plant Area: I I7m2 E. Overall building height reduced from 15m to 13m due to clear internal headroom reducing from 12m to 10m. F. Building elevation revisions due to internal layout changes. 3. Site plan revisions to facilitate the specific Light Industrial use as follows: A. Carparking layout revisions, previously 3, now 10 spaces. B. Site access and egress location will remain as per the granted planning application with the access gate now reduced from 9m to 7.5m. C. The facility will no longer require HGV goods doors, so van access and an associated goods door are now included in this revision to suit this new specific use with the previously granted HGV goods door being removed. D. Site landscaping adjustments to reflect the related adjustments. E. Site drainage adjustments to reflect the related adjustments.
The land is bounded to the North by undeveloped land, to the South by warehousing development, to the East by Jordanstown Road and to the West by warehousing development. The development will comprise the provision of a Warehouse with Ancillary Office and Staff Facilities and associated site development. The building will have a maximum external height of 15m with a gross floor area of 891 sqm including warehouse area (789 sqm), ancillary staff facilities (51 sqm) and ancillary office area (51 sqm). The development will also include: vehicular access/egress via Jordanstown Road; a pedestrian access via Jordanstown Road; 3 no. ancillary car parking spaces including EV and accessible parking spaces; level access good doors; external canopies; hard and soft landscaping; external lighting; boundary treatments; and all associated site development works above and below ground.
Retention permission for the following: (a) Dwelling house as constructed. Dwelling as constructed differs slightly from that which was previously permitted under Planning Register Reference No. S01A/0032, (b) Revised site layout including position of dwelling on site also previously permitted under Planning Register Reference No. S01A/0032, (c) Re-aligned entrance / driveway avenue with additional vehicular entrance gateway at subject dwelling. As constructed entrance / driveway avenue and additional vehicular gateway differs slightly from that which was previously permitted under Planning Register Reference No. S01A/0032 and also differs from amended driveway and avenue which was previously permitted under Planning Register Reference No. SD06A/0659, (d) Connection to mains foul services and all associated development works at Skylark Hill House, Newcastle, Co. Dublin. Eircode D22 K2E2
The proposed development will consist of modifications to the elevational design and floor plan layout of the previously permitted 3 storey creche/ community centre building (approved under Reg. Ref. SD22A/0398) resulting in a reduction in overall floorspace from 1610sqm to 1596.8sqm. Revisions are proposed to the approved site layout plan including: removal of the pedestrian bridge and relocation of the external play space area from the open space located to the west of the stream to an outdoor deck play space adjacent (west) of the main building and an enclosed play space at ground floor level on the southern elevation. Permission is also sought for modifications to adjoining cycle track and set down car parking spaces; revised hard and soft landscaping, bin storage and cycle parking and all associated site and development works
Construction of a three storey creche and community centre facility of 1,610sq.m gross floor area with associated external play area; car & cycle parking, hard and soft landscaping, bin storage, a revised layout to the northern edge of Cuil Duin Avenue to accommodate access to the proposed development including amendments to the existing footpath and cycle track and provision of set down car parking spaces and all associated site and development works.
Amendment to SDCC Reg. Ref. SD20A/0279 to amend the floor area of the permitted single storey dwelling house and associated site development works above and below ground. The amended scheme will result in: the reduction of floorspace from 279.8 sq.m to 208 sq.m; internal reconfiguration; associated elevational amendments; and hard and soft landscaping amendments.
Construction of a single storey, three bedroom dwelling house (279.8sq.m); repositioned entrance and upgraded access road from Tay Lane which includes the partial demolition (109sq.m) of the existing stables and closing up of the existing entrance, hard & soft landscaping; boundary treatments; all associated site development works above and below ground.
Construction of a single storey three bedroom dwelling house (279.8sq.m); repositioned entrance and upgraded access road from Tay Lane which includes the partial demolition (109sq.m) of the existing stables and closing up of the existing entrance; hard and soft landscaping; boundary treatments and all associated site development works above and below ground.
Provision of additional facilities at the existing Greenogue Equestrian Centre (permitted under SDCC Reg. Ref. SD16A/0417 and as amended under Reg. Ref. SD18A/0035) to create a sport horse Centre of Excellence comprising a new indoor sand arena (3,759sq.m); the extension of the existing main outdoor jumping sand arena 800sq.m (resulting in a total of 4,000sq.m); the extension of the existing indoor sand arena by 250sq.m (resulting in a total of 1,625sq.m); a 2 storey training and administration facility (1,300sq.m); a veterinary shed (572sq.m); a hay shed (1,209sq.m); a 2 storey visitor toilets, lockers and storage facility (200sq.m) and a single storey building (673sq.m) to accommodate a laboratory for an Assisted Reproduction Programme. The proposed development also includes the provision of 50 car parking spaces within the existing yard; 20 bicycle parking spaces; plant; hard and soft landscaping; boundary treatments; increased hard standing areas for parking and turning of horse boxes and lorries; and all associated site development works above and below ground at this 7.88 Ha (c.78,800sqm) site.
Construction of 1 warehouse with ancillary office and staff facilities and associated development. The warehouse will have a maximum height of 16 meters with a gross floor area of 22,966sq.m including a warehouse area (21,113sq.m), ancillary office areas (1,163sq.m) and staff facilities (690sq.m); the provision of a new vehicular access to the site from Jordanstown Road including 2 additional access gates from this new road to the existing Site E to the north; pedestrian access; 210 ancillary car parking spaces; bicycle parking; HGV yards; level access goods doors; dock levellers; access gates; hard and soft landscaping; lighting; boundary treatments; ESB substation; plant; extinguishment of the existing vehicular access (farm gate) in lieu of a proposed pedestrian access gate at the southern portion of the site from the R120; and all associated development works above and below ground; all on a site of 5.67 on lands that are bounded to the west by Blocks A - D Jordanstown Road, to the south and east by greenfield lands and to the north by greenfield lands and Block E. The site abuts the R120 Newcastle Village to Rathcoole Road to the south.
Change of use of 4sq.m of warehouse floor area to Staff Facilities floor area at the ground floor plan and minor adjustments to the internal Staff Facilities layout to accommodate Part M requirements (no associated area alterations); elevational changes, addition of 2 level access doors to the building's northern elevation and 2 level access doors to the building's eastern elevation; addition of 1 fire escape door from the ancillary office block to the building's eastern elevation; associated site plan & drainage adjustments.
The development will consist of internal alterations to the existing retail units to facilitate an amalgamation of the units into a single unit of approximately 234 sq.m and a change of use of the amalgamated unit from its permitted Retail use(s) (under planning Ref. SD03A/0857), to a Sports Facility (Gym).
Extensions to front of existing warehouse to include single storey infill enclosure over existing loading bay ramp (floor area to be 44.12sq.m with height to top of parapet of 6.2m above ground level); new single storey goods-in inspection store (floor area to be 55.98sq.m with a height to top of parapet of 4.8m above ground level); both structures complete with roller shutter access door & personnel door within the front/south elevation, together with site works.
The development will consist of a cemetery including: 8,047 No. traditional burial plots; Columbarium walls; 1 single storey reception building (214.7m2 Gross Floor Area (GFA)) comprising a reception, 1 office, 1 reception store, WC, kitchenette with photovoltaic (PV) solar panels at roof level; and the provision of an ancillary maintenance shed, bin and battery storage structures; The development includes a new vehicular access road from Garters Lane to the N7 /M7 Naas Road, with 2 vehicular access points serving the proposed cemetery; 110 car parking spaces (25 spaces to the east of the reception building and 85 within overflow car park areas to the south of the development); 8 bicycle parking stands; and all associated hard and soft landscape and boundary treatment works including the reshaping of an existing lake and provision of a footbridge; provision of SUDS measures, associated lighting, associated signage, site services (foul and surface water drainage and water supply); and all other associated site excavation, infrastructural and site development works above and below ground.
Planning permission and retention permission for a Large-scale Residential Development (LRD) consisting of amendments to a Strategic Housing Development (SHD) permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref’s SD22A/0299 and SD22A/0422 at a site at Citywest Shopping Centre, Fortunestown, Dublin 24. The proposed amendments for which permission is sought, include the following: (i) External alterations to Block F, comprising the relocation of a plant room door at ground floor level from the south elevation to the northern elevation along with the relocation of balconies at the eastern end of the building at 2nd to 6th floor levels together with a reconfiguration of the design of the balconies; (ii) Omission of 3 no. permitted on-street bin stores and replacement of same with a single consolidated bin store near the south-western corner of the shopping centre, together with a reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net loss of 1 no. on-street car parking space in this area; (iii) alterations to the design and configuration of the permitted single storey staircore structure leading to the basement level that is situated at the south-eastern corner of the shopping centre. The amendments for which retention permission is sought, include the following: (iv) Alterations to the permitted siting, design and size of the permitted ESB Substation and Switchroom at Block D together with the reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net gain of 1 no. on-street car parking space in this area; and (v) Internal and external alterations to the layout, design and configuration of the permitted single storey plant room and associated ESB substation / switch rooms at the south-eastern corner of the shopping centre, together with a slight re-siting of the reconfigured plantroom structure. In the interest of clarity, it should be noted that the proposed amendments and amendments to be retained will not result in any change to the total number of residential dwellings permitted on site, or the total number of on-street car parking spaces, as previously permitted. A dedicated website has been set up for this LRD application which can be viewed at: www. Carrigmorewoodsamendment1.ie
Amendments to the residential development permitted under An Bord Pleanála Reference ABP-305556-19 comprising of the omission of a permitted vehicular access ramp from ground to basement level of the existing Citywest Shopping Centre along the southern elevation; The permitted entrance to the ramp is proposed to be replaced at surface level with 5 car parking spaces, with associated amendments to the parking layout, pedestrian paths and landscaping in the immediate vicinity; An increase in the area of a permitted surface to basement level circulation core in the south-eastern corner of the existing Citywest Shopping Centre (to incorporate a lift and revised stairwell design), together with associated amendments to pedestrian paths and landscaping in the immediate vicinity; The relocation of permitted demountable bollards further eastwards along a permitted roadway to the south-east of the Citywest Shopping Centre; The enlargement of a permitted hammerhead circulation area to the south-east of the Citywest Shopping Centre and the provision of a standalone ESB Substation to the south-east of Block D; These amendments are provided to reprove the operational efficiency of the vehicle circulation and parking arrangement to service the permitted apartment buildings and to meet the requirements of ESB to serve the site.
The development will consist of amendments to the Strategic Housing Development permitted under An Bord Pleanála Reference TA065.305556. The proposed amendments comprise the provision of photovoltaic panels on the roofs of all 6 no. blocks, the provision of roof plant at Blocks A, B, C and D, the provision of an ESB substation at Block O that requires the relocation of no. 1 carparking space, and the reconfiguration of the ground floor of Block E to provide an enlarged plant room. These amendments are necessary to service the permitted blocks, improve the energy efficiency of the development, and to meet the requirements of ESB to serve the site. At Block A it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; and a screen plant area accommodating an internal plant room of 13.24 sqm and an external plant area of 34.72 sqm surrounded. The proposed screened plant rises approx. 1 metre above the permitted lift overruns. At Block B it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 5-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 4-storey section of the building; and a screened external plant area of 29.2 sqm on the 4-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block C it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 6-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 5-storey section of the building; and a screened plant area of 32 sqm on the 5-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block D it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; a screened with an internal plant room of 13.5 sqm and an external plant area of 24.33 sqm; a c. 3-metre-high red brick ESB substation with LV switch room to the southwest of the Block D, and the ancillary relocation of 1 no. car parking space. The proposed screened plant rises approx. 2 metre above the permitted parapet level. At Block E it is proposed to provide the following; 18 no. photovoltaic panels arranged in 3 no. rows; and the reconfiguration of the ground floor to replace 1 no permitted retail unit with an enlarged Plant Room (117.15 sqm}, ESB substation (13.6 sqm), a Generator Room (21.82 sqm}, and a Low Voltage (L V} switchroom (13.71 sqm}. These works require the removal of existing windows and doors at the permitted retail unit. At Block F it is proposed to provide 18 no. photovoltaic panels arranged in 2 no. rows. These, and all associated site works including landscaping at a site of 2.9 hectares.
The installation of Photovoltaic Panels (PV) to be mounted on the rooftop of an existing warehouse building. the proposed development includes the provision of 630 kWp of photovotaic solar panels, fixing & mounting systems, inverters, underground cabling and ducting and all associated ancillary infrastructure. PV panels will not extend above parapet line. The installation and operation of the proposed development will facilitate the generation of renewable electricity which will be utilised on - site
Construction of a residential development of 463 dwellings comprising 353 apartments, 89 houses and 21 duplex apartments, creche (c.587.8sq.m) and community building (c.141sq.m) as follows: (A) 353 apartments in 7 apartment buildings (with balconies or terraces [including communal terraces] as follows: Block 1 (6 storeys with a part 7 storey level) of 57 apartments; Block 2(6 storeys with a part 7 storey level) of 47 apartments; Block 3 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 4 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 56 apartments with car parking and ancillary plant/storage at basement level; Block 5 (6 storeys with a part 7 storey level) of 47 apartments; Block 6 (6 storeys over undercroft/semi-basement with a part 7 storey level) of 58 apartments with car parking and ancillary plant/storage at basement level; Block 7 is 6 storeys of 32 apartments (creche at ground and first floor) with outdoor play area. (B) 89 houses; House types 1A, 2A, 4, 4A- 3 storey to front [2 storey to rear] remainder of house types 2 storey. (C) 21 duplex apartments in 2 3-storey buildings. (D) Single storey community building including management office, 3 single storey ESB substations, single storey bicycle and bin stores. (E) 401 car parking spaces (including 3 car sharing spaces) to serve overall development and 364 bicycle spaces ([for apartments] with apartment bicycle storage provided internally at ground floor level for apartment blocks 1-7). (F) Provision of public open space areas within the development (including playground areas and communal open space areas); all ancillary landscape works, public lighting, planting and boundary treatments including regrading/re-profiling of site where required as well as provision of footpaths and cycle paths. (G) Vehicular access to the proposed development will be from the Citywest Road (N82) and will include pedestrian crossings and works to facilitate access (including vehicular and footpath/bridges over stream/ditch), secondary vehicular and pedestrian access to boundary to lands to north (currently under construction) and pedestrian to boundary to Magna Drive. (H) Provision of surface water and underground attenuation and all ancillary site development work. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant SDCC Development Plan.
Retention of single storey extension with all associated site works.
A residential development comprising: 526 residential units and all associated site and development works as follows: - 274 3-bed 2 storey terraced units, 185 4-bed 2 and 3 storey terraced and end of terrace units, 67 2-bed apartment/duplex units (37 2-storey, 2 bed terraced duplexes, 18 1-storey 2 bed terraced apartments and 12 1 storey 2 bed end of terrace apartments). The development also provides for a district park (4.58 ha) and a neighbourhood park (0.71 ha) in accordance with the Fortunestown Local Area Plan 2012. Permission is also sought for 789 car parking spaces, bin storage areas, ESB substations and all associated site development and infrastructural works. Vehicular access to serve the proposed development will be provided via two new access points off Garter Lane and via a new signalised junction at the southeastern corner of the site to replace the existing roundabout off Fortunestown Lane. Provision is made for a future access to Bianconi Avenue. In addition, an interim local square is proposed within the subject site providing a direct pedestrian link from the proposed development to the Saggart Luas stop. Two direct pedestrian links are proposed between the subject site and the adjoining school sites permitted under Reg Ref No SD16A/0255 providing a direct link between the school and the proposed district park and a direct link from the west of the school site to the proposed residential development. Lands identified for future development are located along the southern boundary of the current application site adjacent to Fortunestown Lane/Saggart Luas Stop. These areas will be subject of a future planning application (Phase 2) and will include the final design and layout of the local square.
Mixed use residential scheme (total GFA 26,929sq.m) comprising 6 blocks with balconies/terraces to be provided on all elevations at all levels for each block, to provide 290 apartment units and associated residential amenity facilities, a childcare facility, 4 retail units and 2 café/restaurant units. A total of 153 car parking spaces (including 2 car club spaces) are proposed at surface level and existing basement level of the Citywest Shopping Centre to serve the development to include the reallocation of 37 existing surface level spaces; 67 new surface level spaces and the reallocation of 49 spaces from commercial to residential use at existing basement level of the Citywest Shopping Centre.
(a) a 46.36 sq.m. single storey extension to rear of dwelling & a 87.38sq.m. 'granny flat' extension to side of dwelling & permission sought to (b) re-roof the existing house changing the roof pitch to 35 degrees and (c) to upgrade the wastewater treatment system with all ancillary works
1.Full planning permission to upgrade existing septic tank system to treatment plant and soil polishing filter along with 2. Retention permission for sheds to rear of dwelling and all associated site works
Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.
Change of floor plans and elevations from granted Ref. SD20B/0455 - first floor extension to existing house, new garage to side; Change in roof profile to parapet style flat roof; New sewage treatment system with percolation area; Relocation of site entrance.
First floor extension to existing house; new garage to side; change in roof profile to parapet style flat roof; new sewage treatment system with percolation area.