Planning records
Showing 401-450 of 28,302 public recordsAmendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Construction of a two-storey rear extension to existing dwelling, with internal modifications to include a family flat at ground floor level and an ensuite bedroom at first floor level, the installation of a new rooflight to the front elevation, and all associated site works.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
(a) Change of use of existing unused horse stables (151.34sqm.) to a two bedroom, single storey, detached private annex dwelling to the main house on the same site. The new dwelling will be used by members of the same family and be served by existing access and car parking at the main house. No changes to the footprint of the existing building are proposed. (b) Permission is also sought for associated landscaping, foul and surface water drainage an all associated site works necessary to facilitate development.
Change of use from existing short term tourist accommodation units to full apartment type living accommodation units consisting of 10 two bed ground floor units and 10 two bed duplex type units at first floor level (20 units in total); also, include small elevational changes to facilitate balcony extensions at first floor level and new balcony areas at ground floor level in order to accommodate private amenity space for the individual units; omit Planning Condition 6 of Planning Ref. S01A/0051 (which links the use of units to the City West Hotel); new bicycle shelter and all associated site development works, parking, landscaping and boundary treatment works.
The proposed development comprises amendments to a Strategic Housing Development scheme permitted under ABP Ref. ABP-308088-20. consisting of modifications to the previously permitted development (ABP Ref. ABP- 308088-20), comprising: replacement of 2 one bedroom unit with 1 two bedroom unit and an entrance lobby / concierge at ground floor level within permitted Block C; replacement of 3 three bedroom units with 3 two bedroom units and additional residential amenity spaces at first, third and fifth floor levels within permitted Block C; replacement of 2 two bedroom units with 2 one bedroom units and additional residential amenity spaces at ground and third floor levels within permitted Block D; and the provision of an enlarged stretcher lift through all floor levels of permitted Blocks C and D. The total number of residential units proposed will decrease from 224 to 223 as a result of the proposed amendments; The proposed development will also consist of: amendments to the permitted car parking areas at basement levels resulting in a total loss of 29 car parking spaces (151 car parking spaces are provided in total at basement level); the provision of c. 275sq.m of residential amenity space (incl. reception, office, staff amenities, multi-purpose spaces, meeting rooms and lobbies) at basement level of permitted Block C and D; minor elevation amendments to permitted Block D; the provision of a new external stair well to the eastern elevation of permitted Block D providing access from the ground floor level to the basement level; reduction of the roofed area above the basement ramp of permitted Block A and B; the provision of sprinkler tank rooms, landlord plants, comms room and attenuation tanks at basement level of permitted Blocks A, B, C and D; the provision of PV solar panel at all roof levels; amendments to hard and soft landscaping areas; and all associated site excavation and development works above and below ground.
Cairn Homes Properties Limited intends to apply for planning permission for a Large-Scale Residential Development (LRD) comprising amendments to a previously permitted Strategic Housing Development (SHD) (An Coimisiún Pleanála Reg. Ref. ABP-308088-20), as amended by SDCC Reg. Ref. SD22A/0357, at Garters Lane, Saggart, Co. Dublin. The development will comprise the provision of a new single storey ESB substation with associated switch room (21.5 sq m total with maximum height of c. 3.4m to the top of the parapet) to the north east of permitted Block B, associated minor revisions to soft landscaping and all associated site development and excavation works above and below ground.
224 apartment units arranged in 4 blocks and all associated public open spaces, communal amenity spaces and private amenity spaces comprising terraces/balconies. The proposed blocks are arranged over 2 single level basements (accessed via 2 vehicular ramps to east of the site) and comprise 5 to 6 storey blocks with an 8 storey element as part of Block A. Vehicular access to serve the proposed development will be provided via a new access at Garters Lane and will also provide access to lands to the east (development permitted under ABP ref PL06S.305563). Permission is also sought for 191 car parking spaces (180 at basement level and 11 at surface level); 470 bicycle parking spaces (290 at basement level at 180 at surface level); 1 ESB substation; 1 cycle store, hard and soft landscaping, pedestrian and cycle links, boundary treatments, public lighting, bin storage areas at basement, surface water drainage infrastructure and attenuation tanks, and all associated site development and infrastructure works.
224 apartment units arranged in 4 blocks and all associated public open spaces, communal amenity spaces and private amenity spaces comprising terraces/balconies. The proposed blocks are arranged over 2 single level basements (accessed via 2 vehicular ramps to east of the site) and comprise 5 to 6 storey blocks with an 8 storey element as part of Block A. Vehicular access to serve the proposed development will be provided via a new access at Garters Lane and will also provide access to lands to the east (development permitted under ABP ref PL06S.305563). Permission is also sought for 191 car parking spaces (180 at basement level and 11 at surface level); 470 bicycle parking spaces (290 at basement level at 180 at surface level); 1 ESB substation; 1 cycle store, hard and soft landscaping, pedestrian and cycle links, boundary treatments, public lighting, bin storage areas at basement, surface water drainage infrastructure and attenuation tanks, and all associated site development and infrastructure works.
One/two storey dormer style four bedroom house; associated works and water treatment system.
3 new buildings. Block A: two storey with six industrial and office units; Block B: two storey with one industrial and office unit; Block C: three storey with ground floor café and office, first floor offices, second floor gym and ancillary areas; new perimeter wall and fence with two revised entrances and gates; surface car parking and all associated site works.
Demolition of existing sunroom, balcony, external sheds, boiler-house and decking; Construction of new part two storey, part single storey extension to rear and side of dwelling measuring a combined total of 155sq.m additional internal floor area; Construction of new garage to lower ground floor measuring a total of 71sq.m additional internal floor area; Utilisation of existing under croft located on lower ground floor for use as a non-habitable storage and associated plant measuring a total of 41sq.m internal floor area; Construction of a new dormer to front of property; Construction of new rooflights to rear of property; Installation of PV panels to rear of property; Alterations to existing entrance piers, consisting of replacement of existing signage and re-rendering; External works including provision of external patio and outdoor pergola; Construction of new external terrace to front of property; Associated site services landscaping, planting, drainage works and site services; Retention is also sought for partially complete works granted under Reg. SD04B/0030; Retention of existing dormers to front of property to include re-cladding; Retention of facade alterations.
Construction of two storey extension (55sq.m) with dormer windows to the side of existing dwelling; internal modifications to the existing structure and all associated site works.
Ten-year planning permission is sought for the expansion of existing Google Ireland Limited operations at Grange Castle Business Park South, Dublin, including the development of a 72,400m² data storage facility which will incorporate data halls with associated support areas, a high voltage compound, offices and staff facilities, a loading area, mechanical and electrical yards, internal and external utilities, security fence and gates, landscaping including acoustic screening, 2 no. stormwater attenuation ponds, additional internal vehicle and pedestrian infrastructure, together with ancillary buildings and site infrastructure. The development also includes the creation of a new active travel thoroughfare connecting Grange Castle Business Park South and Profile Park Road.
Retention of single storey client control room (248.5sq.m) associated with the planned future substation that will be located to the north-east of the permitted data centre development granted under Reg. Ref. SD18A/0134/ABP Ref. ABP-302813-18; the development will form an amendment and modification of the permission granted for a single storey transformer building (125sq.m) under Reg. Ref. SD18A/0134/ABP Ref. ABP-302813-18; no other changes to the permission granted under this decision are proposed under this application on a site within the townland of Aungierstown & Ballybane.
Demolish existing garage and connecting wall to house to modify the existing house; block window and change existing windows to large sliding door opening and form new dormer windows and ridge roof light to roof on south east elevation; demolish chimneys; form new entrance canopy and decorative piers from new dormer windows and dormer roof extension and change windows and door ope to north west elevation; raise first floor gable window head heights; new door and ground floor window to north east gable and re-roof entire house with new selected roof tile as well as change all elevation finishes to brick cladding on new external insulation; carry out internal alterations including increase first floor bedroom space into existing attic.
Move entrance & demolish existing extension to rear; construction of 1 two storey, three bedroom dwelling to adjoin existing property.
Permission for demolishing of extension to rear and provision of new entrance and porch to front. Construction of one, two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property.
For demolishing of existing extension to rear & provision of new entrance & porch to front. Construction of one two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property
(A) Construction of 1no. two storey, end of terrace 2-bedroom dwelling (76sqm) with new vehicular entrance off road. (B) All associated site development, landscaping and drainage works to facilitate the development; ancillary works for foul water to public drainage system and provision of surface water soakaway to meet BRE Digest 365 standards for the new dwelling.
The development will consist of the replacement of an existing grass training pitch with a synthetic grass 3G all-weather pitch (maximum size 74m x 34.5m), Installation of perimeter weld-mesh fencing of varying heights (1.2m to 3.0m), installation of ball-stop netting and posts behind goals, flood lighting columns and all associated hard and soft landscaping and ancillary works, including new steps and a pedestrian entrance to St. Mary's National School.
New vehicular entrance to existing farm including the construction of new 1.8 metre high pillars and the erection of a new roller gate and all associated site works; the proposed new entrance will be set back 6.5 metres from the edge of the road to allow 90 metre sightlines in both direction.
Construction of an outdoor all-weather horse arena and a building to contain stables to house horses and to contain farm machinery implements and fodder, also ancillary works (i.e concrete yards, gates and boundaries), also all for agricultural purposes only in new farmyard using existing farm & road entrances.
The proposed development consists of the construction of a dormer attic extension by converting the existing attic space for habitation, comprising of 1 no. bedroom, 1 no. en-suite and 1 no. wardrobe. The development will include alterations to the rear elevation, provision of cladding finish to the dormer exterior, and internal alterations to the existing first floor to facilitate access to the attic level.
Subdivision of a two storey apartment across second and third floors (170.12sq.m) into two separate apartments each with own door access to be known as 311 Swiftwood (second floor - 84.65sq.m) and 411 Swiftwood (third floor - 85.47sq.m).
The proposed development consists of the construction of 2 no. 3-bedroom semi-detached dwellings with private rear gardens, situated to the rear/side of the existing dwelling. The proposed +development also includes the removal of the existing front garden wall, provision of additional car parking spaces, landscaping, boundary treatments, drainage connected to existing services and all associated site works necessary to facilitate the development.
Land recontouring/infilling works on c 16,000sq.m of a folio size of c 2.4 ha (allowing buffers); the volume of material to be placed on the site is c 35,000sq.m with an average fill level of c 3.5m above existing - the material is clean, inert soil and stone from the Saggart Water Reservoir construction site located directly adjacent to the north of the proposed infill site; a small section of hedgerow (6m wide) will be required to be removed between Saggart Water Reservoir construction site and the proposed infill site to allow access for lorries and infill equipment onto the proposed infill site.
Land recontouring/infilling works on c.16,000sq.m. of a folio size of c.2.4ha (allowing buffers); volume of material to be placed on site is c.35,000m3 with an average fill level of c.3.5m above existing.
Partial change of use from warehouse/storage to office use on ground and first floor level consisting of offices, canteen and toilet facilities, internal staircases, and associated facilities; 1 dock leveller located on the south west elevation to existing loading bay; new external windows & doors for office spaces to the existing south east south west and north west elevations with formation of entrance to office space to existing south east elevation; new carparking/hardstanding to provide 27 car parking spaces inclusive of 2 disabled spaces; external ramped/stepped to approach to office entrance to south west elevation; alterations to existing perimeters gabion walls to the south west of existing site and realignment of kerbing and shrub line to south west elevation; car parking external LED lighting provided by way of lamp standards to car park; alterations to existing surface water drainage and associated site works.
Proposed partial ground floor front extension with bay window & pitched roof over to existing bungalow
Construction of 2 storey kitchen/dining/living/bedroom extension to side; Porch extension to front; Detached garage to side and all associated site works.
Provision of an electronic gate.
Single storey extension to front and side of house, new bedroom and lounge facility, planning retention also sought for attic conversion with projecting dormer window to rear roof and all associated site works.
Construction of a detached pitched roofed two storey dwelling house with a single storey pitched roofed entrance porch to the front on part of the front, side and rear garden including the demolition of existing detached storage out-buildings and changes to boundary treatments affecting the existing, including proposed new pedestrian and vehicular entrances to service the proposed dwelling and a new vehicular entrance to replace the existing to service the existing dwelling.
The proposed development primarily comprises the provision of two 110kV transmission lines and a 110kV Gas Insulated Switchgear (GIS) substation compound along with associated and ancillary works and is described as follows: The proposed 110kV GIS Substation Compound is to be located on lands to the north-east of the two storey data centre facility and associated three storey office block that was permitted under SDCC Reg. Ref. SD18A/0134/An Bord Pleanála Ref. ABP-302813-18, and within an overall landholding bound to the north by the Grange Castle South Business Park access road; to the west by the Baldonnel Road and to the south by 3 residential properties and the Baldonnel Road; and to the east by the Google data centre facility within the Grange Castle South Business Park, Baldonnel, Dublin 22. The site of the proposed development has an area of c. 0.9163 hectares. The proposed 110kV Gas Insulated Switchgear (GIS) Substation Compound includes the provision of a two storey GIS Substation building (with a gross floor area of 1,307.2sqm) (known as the Aungierstown Substation), two transformers, lighting and lightning masts, car parking, associated underground services and roads within a 2.6m high fenced compound and all associated construction and ancillary works. Two proposed underground single circuit 110kV transmission lines will connect the proposed Aungierstown 110kV GIS Substation to the existing 220kV / 110kV Castlebaggot Substation to the immediate north-east. The proposed transmission lines cover a distance of approximately 120m and 140m within the townlands of Ballybane, and Aungierstown and Ballybane. The development includes the connections to the two substations (existing and proposed), changes to landscaping permitted under SDCC Reg. Ref. SD18A/0134 / An Bord Pleanála Ref. ABP-302813-18 and all associated construction and ancillary works. An Environmental Impact Assessment Report has been prepared in respect of this application. The planning application and the Environmental Impact Assessment Report may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy) during public opening hours for a period of seven weeks commencing on the 21st January 2021 at the following locations: The Offices of An Bord Pleanála, 64 Marlborough Street, Dublin 1. South Dublin County Council, County Hall, Town Centre, Tallaght, Dublin 24. The application may also be viewed/downloaded on the following website: www.aungierstown-substation.com Submissions or observations may be made only to An Bord Pleanála ('the Board'), 64 Marlborough Street, Dublin 1 during the above-mentioned period of seven weeks relating to: the implications of the proposed development for proper planning and sustainable development, and the likely effects on the environment of the proposed development, and the likely significant effects of the proposed development on a European site, if carried out. Any submissions/observations must be accompanied by a fee of €50 (except for certain prescribed bodies) and must be received by the Board not later than 5.30p.m. on the 10th March 2021. Such submissions/observations must also include the following information: The name of the person making the submission or observation, the name of the person acting on his or her behalf, if any, and the address to which any correspondence relating to the application should be sent, The subject matter of the submission or observation, and The reasons, considerations and arguments on which the submission or observation is based in full. (Article 217 of the Planning & Development Regulations refers). Any submissions or observations which do not comply with the above requirements cannot be considered by the Board. The Board may at its absolute discretion hold an oral hearing on the application. (For further details see ‘A Guide to Public Participation in Strategic Infrastructure Development' on the Board’s website www.pleanala.ie). The Board may in respect of an application for permission/ approval decide to (a) (i) grant the permission/approval, or (ii) make such modifications to the proposed development as it specifies in its decision and grant permission/approval in respect of the proposed development as so modified, or (iii) grant permission/approval in respect of part of the proposed development (with or without specified modifications of it of the foregoing kind), and any of the above decisions may be subject to or without conditions, or (b) refuse to grant the permission/approval. Any enquiries relating to the application process should be directed to the Strategic Infrastructure Development Section of a Bord Pleanála (Tel. 01- 8588100). A person may question the validity of any such decision by the Board by way of an application for judicial review, under Order 84 of the Rules of the Superior Courts (S. I. No.15 of 1986, as amended), in accordance with section 50 of the Planning and Development Act, 2000, as amended. Practical information on the review mechanism can be accessed under the heading Information on cases / Weekly lists - Judicial review of planning decisions on the Board's website www.pleanala.ie or on the Citizens Information Service website www.citizensinformation.ie.
Permission to construct an extension to rear of dwelling to connect existing home office (22.6sq.m) to the main dwelling & all associated site development works.
Retention and change of use of one single storey detached 2.85m high home office unit to a self-contained living unit.
The following works replacement of existing grass football pitch with a synthetic grass 3G all- weather pitch to a maximum size of 139m x 87m., reprofiling the ground level in order to achieve a more level playing surface encompassing the increase. in levels in parts of the pitch by up to 1 metre. Install perimeter weld mesh fence of varying heights 1.2m-3.0m, relocated ball-stop netting and posts behind goals. All related hard and soft landscape works including extended spectators' area, goal storage area and soft landscaping and all ancillary works.
Installation of roof-mounted solar photovoltaic panels on the roofs of two existing buildings including all ancillary works and services.
Erection of a slatted livestock shed which will include slatted tanks, a creep area for calves and walkway, centre feed passage, manure pit, concrete yards and ancillary works.
The erection of an underground clean water harvesting tank under existing agricultural shed constructed under Pl. Ref. No. SD24A0033.
The proposed development includes the construction of: 6 no. Stage buildings (buildings 1,2,3,11,13 &14) ranging in height between c. 20m and c. 23 m and comprising 11 no. Internal sound stages with overhead catwalks and 2-storey ancillary production offices including office space, plant and switch rooms, toilets, ICT rooms, staff toilets and showers and rooftop plant (totalling c. 35,187 sq. m); 4 no. workshops (buildings 15,16,17 &18) ranging in height between c. 9m and c. 10.5 m and comprising internal workshop areas, staff toilets and showers, ICT, plant and switch rooms(totalling c. 18,244 sq. m); TV studio and reception (building 4) comprising 3 no. TV studios (c. 17.8m height) and various supporting spaces across 3 floors including backstage shooting area, green rooms, hair and makeup rooms, production suites with ancillary offices, wardrobe, laundry room, Technical support offices, vision dept, lighting dept, pro service, run and crew kit room, chief engineer office, studio manager office, scenic store, props store, cameras and grip room, lighting and electrical room, plant room, sound control rooms, vision rooms, recording rooms and toilets at ground floor level; standard dressing rooms, tv post production spaces, kitchen and crew area, toilets, mechanical/electrical room, technical offices, media store at first floor level; star dressing rooms, tv post production, lounge and kitchen and toilets at second floor level; Single storey reception building to include guest holding areas, VIP and Guest service, security offices, staff toilets, showers and locker rooms (c. 10,875sq. m); 2-storey Dining Hall with ancillary 100 seat theatre (building 6) comprising indoor and outdoor dining areas, kitchen, storage and mechanical rooms, toilets and 3 no. meeting rooms at ground floor level; office space and covered outdoor balconies at First floor level (c. 4,351sq. m) Standalone café (building 5) (c. 96 sq. m) 3 no. single storey production suites (buildings 7,8 & 9) comprising offices, conference room, kitchenette, communal areas and toilets (totalling c. 795 sq. m); 3-storey car parking deck (building 19) (c. 14,782.sq.m) to include 438 no car parking spaces ( including 100 no. EV and 27 no. disabled) with ancillary offices (building 20) (c. 4,307sq.m) refuse recycling area and rooftop plant; and Outdoor stage area associated with the TV Studio and Reception Building; Site landscaping to include: an amenity walkway and biodiversity area along the northern boundary of the site; public realm and planting areas in the vicinity of TV Studio and Reception Building and production suite offices; green roofs; and boundary treatments. Hard standing to include backlot area (c. 14,160 sq.m) and 'shooting lanes' (c.18,900 sq.m) to facilitate outdoor filming; Electrical Substation (c 236 sq. m); primary and secondary gate houses (buildings 10 & 12) (c. 19 sq. m each) The proposed development will include the provision of 516 no. surface car parking spaces (including 96no. EV, 13 no. disabled and 13 no. EV / disabled ); Basecamp area to provide 36 no. Large Vehicle parking spaces & 3 no. bus parking spaces to front of reception building as well as provision of Bicycle parking to include 274 no. covered spaces and 96 no. external spaces. Additional works to include removal of existing wall and vegetation at south western boundary; provision of bin store adjacent to the proposed backlot area and additional waste storage area adjacent to proposed dining hall; proposed pump station; rooftop PV panels (Buildings 17 & 18);rooftop plant; Building signage; LED video screen on eastern elevation of TV studio and reception building; public lighting; drainage and services provision; boundary treatments (including security fencing); piped site wide services; pedestrian and cycle links and all ancillary works and services necessary to facilitate construction and operation. The primary proposed vehicular, cyclist and pedestrian entrance from the newly constructed Grange Castle West Access Road will be located at the eastern boundary of the site with a secondary vehicular access at the southeastern corner of the site.
Modifications to the existing main site entrance to comprise of minor realignment of the internal access road with adjusted road marking and roadside bollards; Removal of 3 existing security traffic arms; Installation of 3 new security traffic arms and installation of 3 underground lifting security road blockers together with associated communications and electrical services; Provision of 2 set-down only parking spaces and all associated site drainage and installation works.
Proposed 3 bedroom dwelling (233.6sqm), single storey. Installation of a packaged wastewater sewage treatment system and polishing filter, stormwater harvesting tank and soakaways, weel, new vehicular access, landscaping and ancillary site works, all in association with equine business.
Erection of a four bedroom, detached dwelling house (284.1sq.m), part one and part storey and a half; installation of a packaged wastewater sewage treatment system and polishing filter; stormwater harvesting tank and soakaways well; vehicular access landscaping and ancillary site works all in association with adjoining equine business.
A residential development comprising: 526 residential units and all associated site and development works as follows: - 274 3-bed 2 storey terraced units, 185 4-bed 2 and 3 storey terraced and end of terrace units, 67 2-bed apartment/duplex units (37 2-storey, 2 bed terraced duplexes, 18 1-storey 2 bed terraced apartments and 12 1 storey 2 bed end of terrace apartments). The development also provides for a district park (4.58 ha) and a neighbourhood park (0.71 ha) in accordance with the Fortunestown Local Area Plan 2012. Permission is also sought for 789 car parking spaces, bin storage areas, ESB substations and all associated site development and infrastructural works. Vehicular access to serve the proposed development will be provided via two new access points off Garter Lane and via a new signalised junction at the southeastern corner of the site to replace the existing roundabout off Fortunestown Lane. Provision is made for a future access to Bianconi Avenue. In addition, an interim local square is proposed within the subject site providing a direct pedestrian link from the proposed development to the Saggart Luas stop. Two direct pedestrian links are proposed between the subject site and the adjoining school sites permitted under Reg Ref No SD16A/0255 providing a direct link between the school and the proposed district park and a direct link from the west of the school site to the proposed residential development. Lands identified for future development are located along the southern boundary of the current application site adjacent to Fortunestown Lane/Saggart Luas Stop. These areas will be subject of a future planning application (Phase 2) and will include the final design and layout of the local square.
Construction of a single storey shed (144sq.m) to be used as a storage area; Weights and fitness training area.
Permission for retention of a non-habitable attic conversion, including Velux windows, landscaping, upgraded sewage treatment system, extended driveway and existing gate entrance.