To construct a residential development as follows: (1) Erect 33 No. fully serviced dwellings as follows: - Four, 2 storey, 4 bed semi-detached dwellings, - One, 2 storey, 4 bed detached dwelling, - Four, 2 storey, 3 bed semi-detached dwellings, - One, 2 storey, 3 bed detached dwelling, - One, 2 storey, 2 bed terraced dwelling, - Four, 2 storey, 1 bed duplex dwellings, - Eighteen, 3storey, 6 unit block duplex units consisting of 1 bed units on ground floor and 2 bed untis on first and second floor terraced dwellings. (2) Access of existing Ashbrook housing development road. (3) With associated service road, site boundaries and open space. (4) Connection to public services & all associated site works. A Natural Impact Statement (NIS) will be submitted to the Planning Authority with this application at Ashbrook Housing Estate. Significant further information and revised plans have been submitted.
To alter previously approved planning application (PL23/113) to construct a residential development alterations to be as follows: (1) Erect 31 No. fully serviced dwellings as follows: - Ten, 2 storey, 4 bed semi-detached dwellings - Two, 2 storey, 4 bed detached dwellings - Six, 2 storey, 3 bed semi-detached dwellings - Four, 2 storey, 3 bed terraced dwellings - Nine, 2 storey, 2 bed terraced dwellings (2) Alterations to service road, site boundaries and open space. (3) Connection to public services & all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application in accordance with the plans submitted with the application- SIGNIFICANT FURTHER HAS BEEN RECEIVED
To retain 1) extended storage area to rear of shop, 2) dining area to front of shop, 3) alterations to elevations and all associated ancillary site works
To erect a part single storey, part two storey extension to the rear and side of their dwelling, together with all associated site works
For the erection of a single store extension to rear/side of existing dwelling with associated alterations to plans and elevations, connection to existing services and all associated and ancillary works. RETENTION also sought for alterations to floor plans and elevations of previously approved planning permission (reference 18/43) and all associated and ancillary works
To erect single storey extension to the rear of existing dwelling, alterations to elevations & all ancillary works. RETENTION also sought to retain change of use of previously approved attached domestic garage to living accommodation with associated alterations to elevations and all ancillary works. Planning reference 06/883 applies
To erect new storage unit to rear of Moynehall Retail Park with connection to all existing services and ancillary site works
To alter previously approved storage unit (Pl. Ref. 21/741) to rear of Moynehall Retail Park. Alterations to include changes to site layout and boundary, extension of proposed floor area, new dock leveler & associated alterations to elevations, with connection to all existing services and all ancillary works
For development consisting of: erection of a part two storey and part single storey extension to the side and rear of existing two storey dwelling along with an attached carport, alterations to existing floorplans & elevations, decommission existing septic tank & install new wastewater treatment system & percolation area and all ancillary site works
For Retention for a Mobile Coffee shop and associated structures. The associated structures refers to 3no storage containers. Vehicular entrance off the public road is as existing. Off road vehicle parking is provided. The trading hours are Monday - Friday 8.30am-4pm and Saturday and Sunday 9am-4pm. The Mobile Coffee shop is currently not trading
To change house type from split level type dwelling (previously approved under planning application 14/243, and extension of duration granted under application 19/419), to single storey dwelling and all ancillary site works. Site entrance, wastewater treatment system and percolation area all as per previously approved application.
To retain (a)existing detached storage shed, (b) existing maintenance store to the north elevation of the existing factory unit, (c)existing effluent plant building to the south elevation of the existing factory unit and all associated works and site works. This development comprises of an Integrated Pollution Prevention & Control Licence
To erect 5,539.00m2 or 1,053.00kWp of photovoltaic panels on the roof of shed 1 building and on the roof of shed 2 building in our factory with all associated site works
For (1) alterations to previously approved development under planning reference 18/525, (2) alterations to floor plans and elevations of proposed factory unit with new high level connection link to existing storage unit, (3) Removal of previously approved detached office block. Office accommodation is now proposed attached to the proposed factory unit, (4) New first floor area within proposed factory unit, (5) New extension to loading bay of existing storage unit, (6) Alterations to site layout and site boundaries, (7) Revised wastewater treatment facilities, (8) water tank and associated pumphouse, (8) all associated site development/construction works required to facilitate the proposal along with connection to existing storm water and service networks, (10) Ancillary works will also include for - bicycle shelter, storage silos, external plant, gas compound, security kiosk, perimeter fencing, roof solar panels, car parking including electric vehicle charge spaces and signage
For RETENTION of alterations to floor plans and elevations of previously approved application ref: 2384. RETENTION of alterations to site layout, including alterations to ground levels. PERMISSION is also sought for: Enclosing existing open-sided loading bay and associated alterations to plans and elevations. 1 no. additional silo Additional building signage. All associated works
For development consisting of the construction of a 30 metre high monopole type communications structure and its associated antennae, communication dishes and associated ground equipment, within a 2.4m high palisade fence compound
To erect a fully serviced storage extension to side of existing waste handling unit (waste permit WFP-CN-21-0003-01 relates to this facility) and all ancillary site works
Of development from previously granted planning reference no.s 17/467 & 15/142 to consist of: (1) retention of alterations to office extension (2) retention of ESB substation and associated plant (3) retention of Rainwater harvesting tanks and associated infrastructure (4) retention of alterations to parking areas, landscaping and all associated and ancillary works
To alter location of previously approved attenuation tank (Pl. Ref. 11/326) and all associated works
For: 1) Alterations to the Waste Processing Building, including: 1.1) Repositioning of the southernmost loading door at the front of the building by one bay to the left/southwest. 1.2) Construction of a below floor level outgoing loading ramp for the southernmost loading door measuring 17m (L) x 4.5m (B) x 2.15m (D). 1.3) Construction of a below floor level skip intake pit within the eastern corner of the building measuring 12.8m (L) x 12.5m (B) x 3.8m (D). 2) Extension of the Front Yard southeast by 15m. 3) Repositioning of the Site Entrance 5m south. 4) Repositioning of the Weighbridges and Weighbridge Kiosk east-northeast by up to 43m. Reconfiguration of the Weighbridge Kiosk. 5) Construction of an Entrance Ramp measuring 44.4m (L) x 14.1m (B) x 2.4m (H) from the Site Entrance to the Weighbridges. 6) Construction of a Retaining Wall measuring 44.4m (L) x 0.35m (B) x 2.7m (H) between the Front Yard and Entrance Ramp. 7) Repositioning and reconfiguration of the Administration and Welfare Facility and car parking areas. 8) Construction of a Storage Building measuring 3.0m (L) x 2.9m (B) x 2.5m (H). 9) Repositioning of the Lorry Parking Area from south boundary to the east boundary and increase in parking spaces from 9 No. to 10 No. 10) Repositioning of the Odour Control Unit 25m northeast and reconfiguration of the unit. 11) Installation of a Baler and construction of Shed Over measuring 36.2m (L) x 8.5m (B) x 13.5m (H). 12) Recontouring of an embankment area to the north of Rear Storage Yard to be level with the Rear Storage Yard covering an area of 730m². 13) Construction of a Firewater Storage Tank measuring 3m (radius) x 8.0m (H) and Pump Building measuring 12.2m (L) x 2.4m (B) x 3m (H) located within the recontoured area. 14) Repositioning of approximately 40m of northwest boundary fence by 8m inwards towards the centre of the site. 15) Repositioning of the Substation from within Waste Processing Building to 13m west outside of the building. The Substation measures 11.2m (L) x 4.4m (B) x 3.0m (H). 16) Installation of 2 No. Generators. 17) Repositioning of 2 No. diesel tanks from northeastern boundary of the Waste Processing Building to 10m west of the building. 18) Additional area of landscaping along the western boundary of the site measuring 600m². This application is accompanied by an EIA Screening Report, AA Screening Report, Planning and Environmental Report and Drawings
To erect 15 No. holiday chalets (7 No. detached storey and a half-style barnhouses and 8 No. semi-detached single storey cabins), connect to all associated existing site services and all ancillary site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application. Significant further information and revised plans have been submitted.
EXTENSION OF DURATION OF Planning Reg. No. 15/160- to erect fully serviced two storey dwelling, detached storey and a half domestic garage, install sewerage treatment unit, provide access off existing driveway and all associated works
To resume & complete construction of partially completed two storey dwelling (Pl.Ref 08/985). PERMISSION also sought to RETAIN conversion of domestic garage to living accommodation & all associated and ancillary works
To erect 20 no. fully serviced 2-storey dwellings. The development will consist of 10no. 3-bed semi-detached dwellings, 2no. 3-bed detached dwellings and 2no. two storey terraced blocks of 4no. 2-bed units, extension of existing service road, connection to existing services and all ancillary works at development known as ‘Oldtown Manor’
To construct a granny flat extension to the side & back of an existing 2 storey residence. The granny flat also incorporates the domestic conversion of the existing garage and other alterations to the dwelling elevations, site services connections to the existing mains and other associated site development works
Of detached single storey building incorporating outdoor garden room, toilet and store, outdoor decking area and connection to services
For change of use of existing industrial unit to 'Supply chain, Logistics & Procurement' training centre, signage, parking & all ancillary works
For erection of 1no. 3-bedroom 2 storey detached dwelling, connection to existing services and all ancillary works
For alterations to front elevation and associated alterations to plans
To alter the rear boundary treatment for dwellings 16-44 as previously granted under planning reference no. 22/530 & 23/60337 and all ancillary works at development known as 'Oldtown Manor'
For Permission for development of a 38kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (c. 1.929 Ha) located at Cavan Business & Technology Park, Dublin Road, Killygarry, Cavan, Co. Cavan. The site is generally bound to the north by a private site access road; to the east by the Cavan Business & Technology Park private access road; to the south by unoccupied greenfield land; and to the west by an existing industrial property. The proposed development will consist of the provision of a new 38 kV / MV Gas Insulated Switchgear (GIS) Electrical Substation and will include the following elements: 1. Removal of existing MV timber poleset and associated overhead line 2. Construction of: i. A new substation compound (c. 1,999 sq.m) with a 2.6 m high palisade fence ii. 1 No. prefabricated 38 kV GIS module and foundation (c.31 m2 and c.5.139 m high); iii. 1 No. prefabricated MV GIS module and foundation (c.34 m2 and c.4.64 m high); iv. 1 No. prefabricated Control Room module and foundation (c.34 m2 and c.4.64 m high); v. 2 No. 38/20 kV 18.75 MVA transformers and associated bunds (c.4.67 m high ea.); vi. Telecommunication SCADA pole of c. 12 m in height; vii. Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; viii. All associated site development works including provision of access roads, lighting, boundary fences, landscaping, site services including drainage and all ancillary site development works
For (i) A 13sqm extension to the front (new entrance lobby) and a 40sqm extension (dry store) to the rear of the existing service station amenity building, with an ancillary outdoor storage compound of 25sqm in southeast corner enclosed by a 2500mm high security fence; (ii) Modifications to the existing internal floor layout of the service station, incorporating revised and relocated seating, storage and till areas, resulting in an increase in the net retail floor area of 24.8sqm; (iii) Elevational changes including new glazing and access doors and removal of existing signage; (iv) Revisions to existing site layout to include for 10no. car parking spaces, incorporating 2no. EV charging spaces and 2no. disabled spaces, and a pedestrian walkway, and (v) All other associated road tie, boundary treatment and site development works. RETENTION is sought for the existing 50.9sqm extension to the rear and 1 no. food offer (‘Chopped’ 19.5sqm in area) within the permitted retail unit
To (1) Construct extension to rear of existing CVRT Testing Building to incorporate enlarged CVRT test area and ancillary storage area, (2) Complete all ancillary site works and associated site structures
For a 24m high lattice telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing
To demolish existing farm buildings and replace them with a five bay shed which will consist of a milking parlour, dairy and motor room. Also to construct an unroofed slatted area with slurry holding tank underneath and all associated site works
For 14 no. Type 'A' 3-bed semi-detached dwellings, 2 no. Type 'B' 3-bed semi-detached dwellings and a two-storey terraced block on 4 no. 2-bed units, extension of existing service road, connection to existing services and all ancillary works at development known as 'Oldtown Manor'
For completion of partially completed dwelling (previously approved under planning ref: 09/32 and 19/369) from DPC Level to Completion and all ancillary works
For completion of partially completed dwelling (planning ref: 09/32) from DPC Level to completion and all ancillary works
For 21m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing
To alter the site layout and site boundary to approved 96-bedroom two storey nursing home application (Pl. Ref. No. 15/270 & Pl. Ref. No. 20/588) and all associated & ancillary site works
For the removal of existing car wash sump and jet wash unit and the construction of an electric vehicle charging hub and associated infrastructure consisting of the following: (i) installation of 4no. electric vehicle charging bays and 2no. charging units, (ii) new modular sub-unit and CT metering cabinet with mini pillar, (iii) EV banner signage. The proposed development also comprises of new services area along southern boundary and the installation of above ground 4,750 litre Adblue tank along eastern boundary and all other associated site development and surface water drainage works
To construct a new two-storey dwelling house with detached domestic garage, form new vehicular site entrance, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works
EXTENSION OF DURATION OF Planning Reg. No. 15/270; to erect fully serviced 96 bedroom two storey nursing home with new entrance, access roadway, car parking, landscaping, detached refuse compound, with connection to public services and all associated & ancillary works
For retention of alterations to site levels to form existing ground levels and permission is also sought for: • The erection of a fully serviced single storey factory unit to be used as a manufacturing facility incorporating 2 storey administration & staff facility areas to include meeting rooms, office space and a canteen. • New vehicular entrances off the existing service roads. • Site works to consist of car parking, landscaping, lighting, the provision of a bicycle shelter and boundary treatments to the site. • Connection to the public sewer, surface water network, watermain and utility services • Detached ESB substation building. • Alterations to existing service road. • All ancillary and associated site works.
For RETENTION of a) alterations to site layout, entrance and site boundaries, b) external plant and gas tanks, c) 2 no. temporary storage vessels and d) all associated and ancillary works at site 7, IDA Cavan Business Park, Killygarry, Cavan. PERMISSION is also sought to erect 1 no. permanent storage vessels to replace existing temporary storage vessels and for the relocation of the previously approved bicycle shelter within the site
For the construction of an ESB substation building and all ancillary site development works
For alterations to previously approved unit under planning reference 18/477 to include - a) reduction in building height, b) additional floor area, c) associated alterations to floor plans and elevations, d) alterations to site layout & boundaries, e) alteration to site entrance and f) all associated and ancillary works
For alterations to existing dormer dwelling to include extensions to the north and west of the dwelling and associated site works. Permission is also being sought for the RETENTION of the upgraded wastewater treatment system and percolation area
Retain and continue use of existing detached prefab / modular unit for Montessori / Creche use at existing Montessori / Nursery and all associated works (previously approved planning reg 17/324 relates)
Of cafe/takeaway trailer, with external tables/seating, with signage in front of trailer, with change of use of part of the car park to use as a cafe/takeaway. With permission for 6 no. car parking spaces. With use of existing entrances