to
to

Planning records

Showing 1-3 of 3 public records
PreviousPage 1 of 1Next
F23A/0636

In the townlands of Pickardstown, Coultry, Huntsown, Forrest Great, Forrest Little, and Collinstown; and to the east of the airfield in the townlands of Cloghran, Corballis, Commons, Toberbunny, Stockhole and Clonshagh. The proposed development includes upgrades to existing drainage infrastructure and construction of additional drainage infrastructure to improve performance of the surface water management system at Dublin Airport and will consist of: a. a contamination detection and response (CD&R) system comprising detection devices, network decision points (DPs), control kiosks, and ancillary infrastructure including local access roads, local drainage and communications and power ducts; b. clean water supply pipelines consisting of large diameter trunk pipelines; c. airfield contaminated pipelines consisting of large diameter trunk pipelines; d. upgrades to the West Apron surface water collection network including reconfiguration of the existing network, construction of an underground attenuation tank, installation of a local CD&R system, network DPs and a control kiosks, construction of an underground pollution storage tank, a pumping station, and ancillary development including local ductwork, local access roads and local drainage; e. upgrades to the existing surface water collection network in the vicinity of the South Apron including reconfiguration of the existing network, construction of network DPs, upgrade of the existing flow diversion structure (FDS) and reconfiguration of the existing Cuckoo supply channel; f. a central pollution control facility (CPCF) consisting of underground pollution control storage tanks, a pumping station, a discharge pipeline to the Uisce Eireann network, mechanical and electrical equipment, a control building, an electrical substation, and ancillary development including a local access road, enhanced flood bund, local drainage and ducting; g. a CPCF pipeline consisting of a large diameter trunk pipeline; h. a central supervisory control and data acquisition (SCADA) system comprising kiosks and associated electrical power and signal connections; i. repurposing of the central section of the existing Airfield Trunk Culvert (ATC) as a contaminated pipeline; and j. ancillary and associated development including pipework, mechanical and electrical service connections and upgrades, temporary compounds and site works. This planning application is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement. AI received 13/06/24 SAI received 27/06/24

Dublin Airport, Swords, Co. DublinFingal County CouncilPermission0 reasons0 conditions
Granted21 August 2024
F22A/0460

We, daa plc intend to seek planning permission for development on 4no. sites located entirely within lands in the ownership of Dublin Airport, including 2no. sites at the Airfield in the townlands of Collinstown, Coultry, and Huntstown, Co. Dublin, 1no. of which incorporates part of Pier 3 and surrounding aircraft stands, aircraft stands to the south of Pier 2, Apron Taxiway 4, Taxiway F-2, Runway 16/34 (the crosswind runway), Taxiway W1 and W2, West Apron; and 1no. of which incorporates an existing airside site compound, south of the West Apron; 1no. area of land to the west of the existing Western Compound, south of the R108, north-west of the Airport, in the townland of Pickardstown, Co. Dublin, also to be known as the Western Compound; and 1no. an area of existing hardstanding to the south-west of the Airport, north of the R108, to be known as the Southern Compound, in the townland of Portmellick, Co. Dublin. The proposed development will consist of the construction of a subterranean Underpass of Runway 16/34, a critical airfield operational safety project, which will comprise: a) A twin-cell enclosed tunnel with 2 no. lanes in each direction, linked to the surface by ramps, portals, and light attenuation screen (1.8m in height above existing ground level at the west ramp and 3.3m in height above existing ground level at the east ramp). The enclosed section will be approximately 0.7 km long, with an overall alignment of approximately 1.1 km in length from top of ramp to top of ramp. It will be approximately 24m in external width, and approximately 5.5m in internal height from road to tunnel ceiling. It will be up to 17.5m below existing ground level; b) Plant room, of approximately 625m2, which will comprise housing for transformers, pumps, controls and communications equipment, located underground at the portal of the east ramp, a parking layby and utilities corridor crossing; c) Demolition (approximately 23,741m2) and reinstatement (approximately 16,216m2) of part of the pavement surfaces of Apron Taxiway 4, Taxiway F-2, Runway 16/34 (the crosswind runway), Taxiway W1 and W2, and the West Apron; d) Access roads to tie in with the existing airside road network at each end of the proposed Underpass (at Pier 3 on the Eastern Campus and the West Apron on the Western campus respectively), and 31no. car parking spaces at surface level at Pier 3; e) Demolition (approximately 97m2) of fixed links (elevated enclosed passenger walkways leading from the Pier to Aircraft Nodes) and Nodes (structures which provide support for the fixed links and internal pedestrian access cores to ground level) serving 3 no. aircraft stands and associated airbridges (passenger boarding bridges) at Level 20 (departure gates) of Pier 3. To the south of Pier 3, an existing airbridge is to be removed and an existing fixed link is to be adjusted to service existing stands in that area; f) Replacement of the demolished fixed links and nodes with 3no. new fixed links, A (approximately 356m2), B (approximately 227m2) and C (approximately 170m2) and of approximately 150m, 95m and 70m in length respectively and approximately 2.2m in width and approximately 3.2m in height, at a maximum height of approximately 7.1m above the surrounding apron; 3no. two-storey Nodes A, B and C, approximately 157m2, 154m2 and 148m2 in area respectively; and 2 no. airbridges (1no. at Node A and 1no. at Node B). g) Modifications to the elevations of Pier 3 at Level 20 to accommodate the links and airbridges, including part replacement of the existing glazing with new glazing/cladding, and a new cladded portal with new doors and access control at each new fixed link location; rearrangement of part of the internal floorspace of Level 20, including a new partition between the entrance/ exits of proposed fixed links A and B; new surface water drainage network; and 31no. car parking spaces at surface level; h) Realignment of stands on the Eastern Campus resulting in the net loss of three Narrow Body Enabled (NBE) stands and net gain of one Wide Body (WB) stand at Pier 3; i) Realignment of aircraft stands in the West Apron (involving rearranging /relocating stands by way of new paint markings on the apron pavement) to accommodate the portal and Underpass access roads (no net change in number of stands); j) Modifications to existing drainage network in the vicinity of the proposed Underpass including replacement of existing attenuation system, and construction of a new drainage network for the proposed Underpass, including sump pit with pumps, interceptors, and new attenuation tank; k) Temporary diversion of the Airfield Trunk Culvert during construction and its reinstatement at the existing alignment and level; I) Construction of a new underground pipe network (6no. new pipes) to allow for future drainage infrastructure/surface water management measures; m) Realignment of stands at Pier 2 on the Eastern Campus (no net change in number of stands); n) All ancillary airport infrastructure including additional apparatus/equipment including jet blast fencing, Fixed Electrical Ground Power (FEGP), Advanced Visual Docking Guidance System (AVDGS), Stand Number Indicator Board (SNIB), Fuel Hydrants, High Mast Lighting (HML), electrical charging facilities, and miscellaneous ground service equipment (GSE) parking and storage areas; o) The proposed development also includes (i) a new Western Compound adjacent to the existing Western Compound located south of the R108, north­ west of the Airport, with a new access off the R108, to be used for pre-screening for deliveries going airside, and to include an airside pass office, parking for construction staff, as well as storage areas, and general logistics; (ii) the provision of a new Southern Compound to the north of the R108, to the south west of the Airport, to be utilised as a lorry waiting area for HGVs. No works are required at this Southern Compound; and (iii) the use of an existing airside site compound adjacent to the proposed Underpass, south of the West Apron, for concrete crushing, batching plant, the storage of non-hazardous materials and equipment, as well as offices, workshop, welfare facilities, and parking. The proposed development does not propose any increase in passenger, cargo or operational capacity at Dublin Airport. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura lmpact Statement (NIS). The planning application, EIAR and NIS may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin, during its public opening hours of 9.30 - 16.30 Monday - Friday (Cash Office opening hours are 9.30 - 15.30), and a submission or observation may be made to the Planning Authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the Planning Authority in making a decision on the application. The Planning Authority may grant permission subject to or without conditions, or may refuse to grant permission. AI Received 22/12/2022

Townlands of Collinstown, Coultry, and Hunstown Co. Dublin, and in theFingal County CouncilPermission0 reasons0 conditions
Granted27 February 2023
F20A/0295

Permission for a single-storey free standing c.5m tall substation (approximately 18m x 21m), within which will be enclosed; a medium voltage ring main unit room; a medium voltage switch gear distribution room; a communications room; a transformer room; a generator change over panel room; a generator room; a main distribution room; and an entrance lobby. The substation will be built on a new area of hardstanding consisting of approximately 1,600 sqm of pavement. At the eastern elevation of the substation, a bunded fuel tank area is proposed which will have a maximum height of approximately 3.5m. At the south-east corner of the sub-station a single high mast light with a maximum height of 23m above the ground floor level is proposed. The substation will be linked by underground cables to the internal electrification of the airport. This will replace the exiating temporary substation located to the east of Apron 5G. Access to the new substaion will be from the North Apron. The application includes all associated site deverlopment works and services. Add Info received 31st August 2020.

Airfield, Dublin Airport, Townland of Collinstown, Co DublinFingal County CouncilPermission0 reasons0 conditions
Granted25 September 2020
Showing 1-3 of 3
PreviousPage 1 of 1Next