Retain alterations to existing dwelling to include extension to rear and velux to roof to front elevation and all associated ancillary site worksDecision record indexed
Change design on previously approved Planning Reg Ref 24/60537 for now to (a) Demolish unstable existing front & side walls & (b) construct a Two-Storey Type Dwelling with Effluent Treatment System & Percolation and all associated site works.Decision record indexed
(a) Demolish unstable existing front & side walls & (b) construct a Two-Storey Type Dwelling to Include Off-Licence with Effluent Treatment System & Percolation and all associated site worksDecision record indexed
Construct a new dwelling house, domestic garage, new site entrance, septic tank and percolation area and all associated site works.Decision record indexed
Commercial building to accommodate two auction rooms, a shop/showrooms, offices toilet block, canteen/coffee shop, restoration workshop and storage area, also to install a septic tank and percolation area, all associated and necessary site works using existing access road and full planning permission for signageDecision record indexed
Construct a bungalow type dwelling with effluent treatment system & percolation area with new vehicular entrance and all associated site worksDecision record indexed
Construct a proposed dwelling house, domestic garage, septic tank treatment system, percolation area, new site entrance and all associated site worksDecision record indexed
Demolish existing derelict dwelling and build replacement storey and a half dwelling with garage, entrance and all associated site worksDecision record indexed
(a) Retain Dwelling as Constructed & (b) Permission to Complete/Finish Dormer Dwelling Construction with Effluent Treatment System & Percolation Area and all associated site works.Decision record indexed
Construct two storey type dwelling with domestic garage, new vehicular entrance, new connection to public water mains, new Oakstown BAF wastewater treatment unit with polishing filter and all associated site worksDecision record indexed
Construct a 2 storey extension to the side of the existing dwelling house and single storey porch extension to the front of the existing dwelling house and to include all associated site worksDecision record indexed
For works associated with the proposed uprate of the existing 110 kV Overhead Line (OHL) between the existing Cushaling 110 kV substation in the townland of Ballykilleen, Co. Offaly & the existing Portlaoise 110 kV substation in the townlands of Clonminam & Kylekiproe, Co. Laois. The replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor incl. installation of a new fibre communication connection; Replacement of 8 no. steel towers & their foundations; Replacement of steel members at 1 no. tower; Full tower painting required at 3 no. locations; Shear block remedial works (raise & cap) at 6 no. tower locations; Replacement of wooden poles only at 15 no. locations; Replacement of wooden poles & crossarm at 5 no. locations; Replacement of crossarm only at 14 no. locations; Replacement of existing danger notices at various locations, as required; Replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware and anti-climbing guards at various locations as required; Replacement of suspension clamps, vibrations dampers and compression assemblies at all locations as required; All associates temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly & reassembly of gate posts/piers & removal & re instatement of existing fencing; other temporary associated & ancillary development works required for the purpose of the existing circuit, including temporary items, such as; guard poles, construction compounds (located in the townlands of Bracklone, Tullaghan, Morett, Clonaddodoran and Kyletalesha), clearance or management of vegetation, installation of silt traps, silt fences, stone tracks, ground protections mats & watercourse crossings. No additional structures are proposed along the existing circuit. Structure 203,which will be relocated approx. 101m back towards structure 202 due to its existing position on top of a gravel mound & there being potential for subsidence of the gravel in the long term. No alteration to the nature, extent, alignment, character, or voltage of the existing electricity infrastructure is proposed. In addition, works to support this uprate also include the Cushlaing-Portlaoise 110KV bay lead-in conductor uprate at the Portlaoise 110KV station. A Natura Impact Statement (NIS) has been submitted with this application. Full description of all works within Site Notice.Decision record indexed
Construct a Dormer Type Dwelling with Effluent Treatment System & Percolation Area with New Vehicular Entrance and all associated site works.Grounds not yet categorised
Construct a two storey dwelling house, car port and attached domestic garage, a proprietary wastewater treatment system and polishing filter, new entrance onto a shared private access onto the public road and all associated site worksDecision record indexed
Construct a new dwelling house with garage, treatment system with percolation area, new well, new site entrance and all associated site worksDecision record indexed
Construct a dormer style dwelling house, domestic garage, septic tank and percolation area, new entrance and all associated and necessary site worksDecision record indexed
Construct New Commercial Unit with storage space, office and associated accommodation, car parking, hardstanding, septic tank and percolation area, ancillary site services and all associated site works worksGrounds not yet categorised
Townlands of Morett Killone, Cappakeel Rossmore and Raheennahown North, Co. Laois.
Develop at this site within the Townlands of Morett, Killone, Cappakeel, Rossmore and Raheennahown north, Co. Laois. The development will consist of a 10-year permission and 40-year operational life for a solar farm on 5 no. land parcels as described herein: West Parcel (A) (Morett townland), Central West Parcel (B) (Morett & Cappakeel. townlands), Centre Parcel (C) (Morett & Cappakeel. townlands), Centre East Parcel (D) (Cappakeel townland) and East Parcel (E) (Rossmore townland). The total site area for the proposed development is c. 249 hectares and consists of the following; c. 1,796,838sq. metres of solar photovoltaic panels on ground mounted steel frames; 44 no. hardstandings for electrical skids and storage; underground power and communication cables and ducts; c. 22,753m. of boundary security fencing; c. 12,915m. of new and existing internal access tracks including 2 no. open span bridge crossings; associated drainage infrastructure; 5 no. site entrances which include the upgrading of 2 no. access points onto the L3930, 1 no. new access point onto the L7815 local road and 2 no. new access points onto the L3930 local public road; 5 no. temporary construction compounds; landscaping and biodiversity enhancement measures and all associated site services and works. Installations of internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 7,189 metres in length along the solar farm lands including 4 no. Horizonal Directional Drilling points to traverse the Dunrally stream and the local roads L3930, L3901 and L3817. A separate planning application will be made to An Bord Pleanála as part of a Strategic Infrastructure Development (SID). This will include the provision of a 110kV substation with electrical control building and ancillary electrical infrastructure, associated compound with palisade fence which is to be located in the West Parcel (A) in the townland of Morett. The substation will connect to the national grid via. A LILO grid connection onsite. This planning application will be lodged with An Bord Pleanála in due course. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this planning application.Decision record indexed
For change of use of existing outbuilding to use as 3 no. short term letting units, to include 2 no. 1 bedroom units and 1 no. 2 bedroom unit, new wastewater treatment and percolation system and all associated ancillary site worksDecision record indexed
Construct granny flat extension to existing dwellinghouse, by converting existing outbuildings and providing new hallway link, and all associated ancillary site worksDecision record indexed
Construct a new two-storey dwelling house, domestic garage, new vehicular entrance, wastewater treatment system and polishing filter and all associated site worksDecision record indexed
For a single-storey extension to existing dwelling for the provision of a new dining, living and covered terrace. Alterations to front garden for the provision of additional car parking spaces, and all associated site works.Decision record indexed
A dormer style dwelling house, domestic garage, septic tank & percolation area, new entrance and all associated and necessary site worksGrounds not yet categorised
RETAIN ENTRANCE AS CONSTRUCTED; CHANGE OF USE OF PART OF LANDS GRANTED UNDER PLANNING FILE REG 2360141 AS STORAGE YARD FOR LANDSCAPING MATERIALS; AND ALL ASSOCIATED SITE WORKS,Decision record indexed
CONSTRUCT SINGLE STOREY DWELLINGHOUSE, GARAGE, ENTRANCE, WASTE WATER TREATMENT SYSTEM WITH POLISHING FILTER, AND ALL ASSOCIATED SITE WORKSDecision record indexed
Construct a new dwelling house with garage, treatment system with percolation area, new well, new site entrance and all associated site worksDecision record indexed
Make alterations and additions at ground floor level comprising of the demolition of rear wall and extension with a combination of flat and pitched roofs to create a new living, dining and kitchen space, to the rear of the propertyDecision record indexed
Construct 2 storey dwelling house, garage, septic tank and percolation area, new entrance and all associated and ancillary worksDecision record indexed