Planning records
Showing 1-50 of 1,249 public recordsSaw enclosure(Gross Area 145 Sqm) to end of Unit 2 and all associated site works
Alterations to the development permitted under Reg. Ref. 20/1088, as amended by Reg. Ref. 23/62, and will supersede the permitted information and communications technology (ICT) facility buildings permitted on site. In summary, the development comprises the replacement of the 3 no. part one and part two storey ICT facility buildings permitted on site, with 5 no. part two and part three storey ICT facility buildings with a reduced building footprint, along with an energy centre compound. The Battery Energy Storage System permitted under Reg. Ref. 23/62 and the substation and transmission line connections permitted under ABP Ref. 315200-22 will be unaffected by the proposed alterations. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning Authority with the planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works
Amendments to the information and communication technology (ICT) facility development permitted under Reg. Ref. 20/1088. The proposed amendments comprise the following: Provision of a three-storey Battery Energy Storage System (BESS) building with a gross floor area (GFA) of c.13,787 sq.m, located to the southeast of the permitted ICT Building 3. The proposed building will accommodate battery storage rooms and circulation areas, with photovoltaic panels at roof level, and with an overall height of c.16.8 metres. Associated buildings including a single storey power trunk building (to accommodate a control room and cable rooms, with a GFA of c.539 sq.m and an overall height of c.5.3 metres), a single storey BESS switch room building (to accommodate control rooms and a relay room, with GFA of c.396 sq.m and an overall height of c.5.3 metres) and a transformer compound area to the southwest of the proposed BESS facility. Provision of a fire water storage area and a single storey fire pump house with a GFA of c.39 sq.m to the northeast of the BESS facility. All associated amendments including new amendments to the internal access routes, landscaping and planting, boundary treatments, lighting, and all associated and ancillary works
Single storey industrial unit (Gross Area 945 Sqm) and all associated site works
(i) Single storey industrial unit (Gross area 3150 Sqm) infill extension between existing buildings. (ii) New car park and timber storage compound (0.7 Ha) and all associated site works
(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site works
Proposed development, for which a ten-year permission is sought, consists of the following: Demolition of existing outbuildings on the subject site, along with all site clearance and enabling works; Construction of 3 no. part one storey, part two storey, information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of C. 22,210 sq. m (66,630 sq. m GAF in total), and with a height (to parapet level) of c. 10.4 metres; Each of the 3 no. ICT facility buildings will accommodate ICT equipment rooms, associated electrical and mechanical equipment rooms, loading bays, maintenance and storage space, office administration areas, and staff facilities; Emergency generators (20 no. for each ICT facility building), flue stacks and associated plant are provided in fenced compounds adjacent to each ICT facility; Extension of the existing road serving Kish Business Park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway on its eastern side. The proposed roadway will form part of the inner relief road planned under Objective IT7 of the Arklow Town and Environs LAP 2018-2024; Construction of internal road network and circulation areas, footpaths, provision of 180 no. car parking spaces (60 no. spaces to serve each ICT facility) and 18 no. cycle parking spaces; Landscaping and planting, boundary treatments, lighting, security fencing, gatehouse (with a GFA of 175 sq. m), and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cables, on an application site area measuring c. 24.16 hectares. Site located to the North & Northeast of the existing Kish Business Park
Single storey welfare block (Gross Area 200 Sqm) and installation of covered timber storage racks to rear of existing unit 3
Change to an approved permission Reg. Ref. 20/667 with the addition of a single storey bedroom extension to the rear of a single storey cottage
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Demolish the existing 2m2 front porch and 40m2 substandard rear extension along with all outbuildings totaling 84m2 and erect 81m2 new single storey extensions to the rear and side of the existing 45m2 cottage along with minor alterations and revisions to the elevations and internal layout of the original cottage and erect an 84m2 garage, upgrade the existing effluent disposal system to current EPA standards, improve the existing vehicle entrance along with all associated site development works
Installation of a new effluent treatment system and percolation area in full accordance with EPA Cop 2009 standards and all associated site works, together with a new bored well
Erect 14,500.77 m2 of photovoltaic panels on a ground mounted system with all associates site works at Servier (Ireland) Industries Limited. The development will comprise of a 2.0 MWp Solar PV farm on 3.36 hectares of land located to the south of our existing pharmaceutical manufacturing plant. The electricity generated will be used by Servier (Ireland) Industries Limited. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; 1 no. spare parts cabin; using all temporary ways and temporary construction compound / set-down area included on the application
Dormer type extension to existing bungalow and erect an extension to the side which will consist of the following (a) renovation and extension of the ground floor to create additional living space including the rearrangement of internal layouts with associated demolition works (b) the removal of the existing roof and replace it with a dormer roof space to accommodate bedrooms (c) renovate and extend the existing storage shed and workshop (d) ancillary works
Construction of internal estate road and all associated site works
Directional sign
Amendments to the Battery Energy Storage System (BESS) permitted on site, under WCC Reg. Ref.: 23/62 (an amendment to WCC Reg. Ref.: 20/1088, which was subsequently further amended under WCC Reg. Ref.: 24/ 88). The proposedamendments comprise the following: • The provision of a BESS compound with a total area of c. 1.2 ha which will accommodate self-contained batteries and integral fire suppression equipment, climate control equipment and associated electrical components (in place of the previously permitted three-storey BESS structure and adjacent ancillary structures). • A single storey BESS Switchroom located to the south of the BESS facility with a total gross floor area (GFA) of c. 191 sq.m and total height of c. 5.3m accommodating a control room, relay room, and cable basement. • Water Services Plant and Storage equipment located to the north-east of the BESS comprising a single-storey fire pump house with a total GFA of c. 39 sq.m and total height of c. 3.1m, and 2 no. fire hydrant and water storage tanks with a total height of c. 10.3m. • All associated amendments including amendments to internal access routes, landscaping and planting, boundary treatments, the provision of an acoustic barrier to the south of the BESS compound, lighting, and all associated ancillary works. The operation of the development on site will require an EPA Industrial Emissions Directive (IE) Licence
Construction of a new single storey industrial unit with ancillary 2 storey office accommodation (Total Floor Area 2310 sq.m) and all associated site development works
The construction of a bungalow with garage, new entrance and driveway, new effluent treatment system to EPA current standards and all ancillary site works
Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development works
- 2 no. warehouse buildings with a gross floor area (GFA) of c. 3,364 sq.m each and a total height of c. 14.1m. Each warehouse includes a warehouse area of c. 2,419 sq.m, reception area, office, staff facilities, toilets, plant and storage areas at ground floor level, and office space, meeting rooms, staff facilities, toilets, plant and storage facilities at mezzanine level (c. 581 sq.m). - The provision of a service yard with a security hut (c. 34 sq.m) located at the main entrance, HGV unloading areas and 4 no. associated loading bay docks on the eastern elevation of each warehouse building. - The provision of 68 no. car parking spaces including 4 no. accessible spaces and 10 no. EV parking spaces serving staff and visitors. - The provision of 40 no. cycle parking spaces serving staff and visitors. - The provision of a sprinkler tank, sprinkler pump house (c. 13.3 sq.m), fire hydrant tank, hydrant pump house (c. 13.3 sq.m) and ESB substation (c. 25 sq.m) - Construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 15.7 ha on ground mounted steel frames, associated power trunk building (c. 539 sq.m) and 2 no. transformer compounds, underground cabling and ducting, new internal tracks for maintenance and all associated site services works. - Site access from the permitted development to south (WCC Reg. Ref.: 20/1088 as amended WCC Reg. Ref.: 23/62 and 24/88), which is subject to a current separate amendment application under WCC Reg. Ref.: 25/60350, and extension of the permitted inner relief road through the site. - The provision of a new statcom compound including a single storey control and valve building with a GFA of c. 253 sq.m and associated equipment adjacent to the permitted inner relief road to the south of the main site area. The proposed development also includes for the provision of associated landscaping and planting, berms, boundary treatments, internal road network, pedestrian and cyclist infrastructure, signage zones, site lighting, drainage works, sustainable drainage systems (SuDS) and all ancillary site development works
Erect a 2,300m2 manufacturing & engineering industrial unit with connecting 440m2 office building along with all associated site development works including storage yard, car parking, signage and connect to the existing services
Alterations and revisions to the already approved permission granted under PRR 20/632. Retention permission is sought for (1) an additional 275m2 of floor area to the already approved 2,300m2 manufacturing & engineering industrial unit now totalling 2,575m2 with minor alterations and revisions to the elevations and (2) minor alterations and revisions to the elevations, floor plan and internal layout of the connecting office building providing an additional 200m2 of office floor area to the original 2nd floor approved storage area with an additional 60m2 fire escape stairwell to the already approved 440m2 office building, now totalling 700m2. All associated site development works including storage yard, car parking, signage, and connection to the existing services and the same as approved under PRR 20/632
To erect a 1,555m² extension to the rear and 720m² extension to the side of the existing 2,575 m² manufacturing & engineering industrial unit & 700m² office building along with all associated site development works
Construction of a single storey dwelling, new vehicular entrance and driveway, new treatment system to current EPA standards and all associated site works
Directional sign at junction of L2188-0 and L6688-0
1) construction of a single storey extension to existing office building. 2) construction of a single storey extension to existing production building and 3) all associated and ancillary works, including reconfiguration of existing external steps and footpaths and connections to existing surface water collection network, all at existing facility
1) Construction of a single storey office building with an approximate gross floor area of 339 sq. m.; 2) Provision of permeable surfaced parking area, including 8 no. car parking spaces, and 6 no. bicycle spaces; 3) Provision of permeable surfaced area to front of the proposed building; 4) Provision of surface water drainage infrastructure; and 5) All associated and ancillary works, including removal of an existing fence, provision of a footpath and provision of connections to existing facility drinking water supply and wastewater collection networks
To erect a 532m2 commercial building comprising a 432m2 manufacturing/industrial unit with an ancillary 100m2 office space along with all associated site development works including storage yard, car parking and connect to the existing services
For an extension to the side and rear of the existing house (75m2), removal of existing sheds, reconfiguration of existing internal layout, new window opens and external insulation to the existing house, widening of the existing entrance gate, new wastewater treatment system, and all associated site works
Alterations and additions to an existing two-storey semi-detached dwelling comprising the construction of a new single-storey bedroom & en-suite extension to the side (north-west) elevation at ground floor level, together with the provision of a new velux roof light to the north-west side of the existing main roof all connecting into existing services and including all associated site works
Erection of a garage and gym at ground floor level together with master bedroom and en-suite at first floor level to the side of my home. Permission is also sought for pedestrian gate from public footpath to the rear garden together with all associated site works
Construction of domestic single storey extensions to the rear of existing dwelling, the construction of a domestic garage, the construction of a home office, the construction of dog kennels, changes to existing boundary wall, changes to elevations of existing domestic dwelling with all associated works
Construction of a single storey 'Granny Flat' to the rear of existing two storey semi detached dwelling and all associated site works
Retention permission is being sought for the existing single storey front entrance porch extension to the front elevation of the existing dwelling at No.64 The Maples Arklow Co. Wicklow
Construction of a domestic two storey extension to the rear of my property
Construction of 29 no. dwellings comprising: - 16 no. 3-bedroom semi-detached 2-storey houses; 8 no. 4-bedroom semi-detached 2-storey houses; 2 no. 4-bedroom detached 2-storey houses; 1 no. 3-bedroom detached 2-storey house; 2 no. 3 bedroom detached single storey houses. Vehicular and pedestrian access from Meadowvale via a new internal access road and pedestrian link to The Rise; 60 no. car parking spaces; Demolition of section of existing wall; Public open spaces, landscaping, boundary treatments and all associated site works and services
Construction of 3No. detached houses with new access entrance and connection to existing services
Domestic garage and independent living unit on site of an existing dwelling house
Alterations to existing entrance to allow for disabled access for wheelchair. Gross floor space: 4.2m2 extension
A 7-year permission for a Large-Scale Residential Development. The proposed development will consist of the following: Construction of 476 no. residential units, Communal open space associated with the proposed apartment/duplex units will be provided in the form of landscaped areas located in the vicinity of the apartment units. Public open space in the form of 13 no. local parks. All internal residential access roads and cyclist/ pedestrian paths serving the proposed development. Provision of 930 no. car parking spaces across the development site and 400 no. bicycle parking spaces for residents of the proposed apartments/duplex units. 37 no. visitor bicycle parking spaces are provided throughout the development site. Provision of a new public park facilitating active and passive open spaces to the south of the site, including linear parks, walkways and play areas for structured and natural play, and an area for a playing pitch. Construction of a three-storey mixed use building which will consist of 2 no. Retail units at ground floor level, a community centre and office space at first floor level and the previously mentioned 2 no. two bed-bedroom apartment and 2 no. three bedroom at second floor level. 48 no. car parking spaces & 20 bicycle parking spaces are also proposed for this building. Construction of a two storey Childcare Facility. Temporary upgrade works to the existing Railway bridge to facilitate vehicular access to the proposed development. Construction of part of the Port Access Road, with a temporary junction at its Junction/connection with the proposed northern arterial route/link road including pedestrian and cycle paths, and traffic calming measures. The provision of vehicular access, internal roads, pedestrian and cycle paths to the Community and Education lands. All associated site development works, services provision, infrastructural and drainage works, surface water attenuation & natural attenuation systems, connection to public services and utilities, provision of ESB substations, bin stores, bicycle stores, car parking, public lighting, landscaping, open spaces, and boundary treatment works
Erecting an extension to existing workshop with associated site development works
As constructed single storey extension, c.21sqm, and all associated site works
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting business
Change of use from retail to retail with ancillary off licence use
2 No. existing detached single storey self-service laundry kiosk as constructed and all associated site works
Construct 38 dwellings consisting of 8-one-bed and 8-two-bed ground floor apartments, 8-two-bed and 8-three-bed duplexes and 6-two-bed bungalows with ancillary site development and connection to existing services
25 dwellings of 2 and 3 storey terrace units with ancillary site development and services
Extension to the side and rear of the existing house, replacement of door with window to front elevation and widening of existing entrance to 3.6 meters and all ancillary site works