  1. © OpenStreetMap
    2561025Granted

    Cool East, Valentia, Co. Kerry

    Retention Permission to Retain House as Being Constructed and Permission for the following 1) To complete house 2) To install two Velux type roof lights in the front elevation 3) To install an effluent treatment tank and polishing filterDecision record indexed
    Decision14 April 2026View record
  2. © OpenStreetMap
    24/6272Granted

    Corracunna, Coolnanave Garrane Mitchelstown Co. Cork

    The application site comprises an area of c. 5.61hectares. The site is primarily located in the townland of Corracunna and is surrounded by agricultural lands to the North and East, with the N73 national route to the south, and the L90813 local road to the west. The site takes in lands at Coolnanave and Garrane, on the western side of the L90813, to the west and north west of the main site area, to provide woodland planting and an underground drainage pipe and outfall. The proposed development comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured) and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 3,419.5 sq.m. Permission for the; (1) Demolition of existing single storey disused agricultural buildings, silos, and tank within the western portion of the site (total demolition gross floor area (GFA) of c. 1,781 sq.m). One single storey agricultural building (with GFA of c. 87.8 sq.m and height of c. 5.1m) will be stabilised and retained as a biodiversity building. (2) Construction of 3 no. digesters (c.15.6m in height), 2 no. digestates storage structures (c. 15.5m and 11m in height), 2 no. liquid storage tanks (c.12.2m in height) and a liquid feed tank (c. 8m in height), located in the southeast portion of the site. (3) 3 no. pasteurisation tanks (each c. 6m in height), a post-pasteurisation cooling tank (c.12.2m in height) and pre fertiliser manufacturing tank (c.12.2m in height), located in the centre of the site. (4) part single-storey and part two-storey reception hall (with a GFA of c. 2,112.6 sq.m and an overall height of c. 15.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site, to the north of the digesters. (5) a single-storey solid digestate storage and nutrient recovery building (with a GFA of c. 879.9 sq.m and a overall height of c.12.4 in height) will be located to the west of the reception hall, in the central portion of the site. (6) Odour abatement plant (with a maximum height of c. 6m in height) and equipment, a digestate offtake area, and a fuel tank (c. 1.6 in height) will be provided to the north of the solid digestate storage and nutrient recovery building. (7) Construction of an ESB substation (c. 3.4m in height) 2 no. CO2 tanks and a CO2 loading pump (c. 14.5m in height), along with associated plant structures including CO2 auxiliaries, CO2 liqueufactor, a CO2 compressor and a CO2 pre-treatment skid (with an overall height of c. 6.7m), located in the southwest portion of the site. (8) Construction of a biogas treatment skid, a biogas compression system, a biogas upgrading module (with an overall height of c. 5.1m) and a grid injection unit within a fenced compound (c. 2.8m in height), located within the southwestern portion of the site. (9) Construction of an emergency biogas flare (c. 11.3m in height) 2 no. propane tanks (c. 1.3m in height) and a grid off take skid, located further to the west of the site. (10) Construction of O2 generation unit (c. 2.6m in height), a biomethane boiler (c. 5.6m to top of flue stack), a combined heat and power (CHP) unit and panel room (with a maximum height of c. 6m to top of flue), 2 no. pump houses (c. 2.6m in height, each with a GFA of c. 29sq.m) located in the southwestern portion of the site, south of biogas upgrading structures. (11) Construction of a two-storey ancillary office and administration building (with an overall height of c. 8.6m and GFA of c. 271.5 sq.m), located within the western portion of the site, adjacent to the main site entrance. (12) A discharge pipe route extending to the northwest of the main anaerobic digestion facility site, crossing the L90813 and through agricultural lands to the River Funshion. (13) Alterations to theDecision record indexed
    Decision27 November 2025View record
  3. © OpenStreetMap
    2560244Refused

    Moneylane, Arklow, Co. Wicklow

    Construction of 3 no. digesters, 2 no. digestate storage structures, a liquid feed tank and 4 no. pump houses located in the northern section of the site. 4 no. pasteurisation tanks, a post pasteurisation cooling tank and a pre fertiliser manufacturing tank, located to the southeast of the digesters, in the centre of site. Part single-storey and part two-storey reception hall to accommodate a lab, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to reception hall, located at centre of site. Single-storey solid digestate storage & nutrient recovery building located to east of reception hall, in central portion of site. Odour abatement plant and all assoc. works. Construction of ESB substation, fuel storage tank, CNG compression unit, 2 no. CO2 tanks, CO2 loading pump, CO2 auxiliaries, CO2 liqueufactor, CO2 compressor, GFA, CO2 pre-treatment skid located in eastern portion of site. Construction of emergency biogas flare, biogas treatment skid, biogas compression system, biogas upgrading module, combined heat&power unit & panel room & H2S washing tower located in eastern part of site. Construction of grid offtake skid, biomethane boiler, grid injection unit & 2 no. propane tanks located to southeast of CO2 structures, in eastern section of site. Construction of two-storey office&admin building, located in southeast of site, adjacent to main site entrance. Associated works inc. parking, 3 no. EV, 1 no. accessible parking spaces;bike storage, access arrangements incl. new access point to site from adjacent road to south, weighbridge, provision of solar panels, wwt equipment, attenuation pond in northern portion of site, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping & all assoc & ancillary works. EIAR submitted.Grounds not yet categorised
    Decision28 May 2025View record
  4. © OpenStreetMap
    2460491Refused

    Fearmore, Coole, Co. Westmeath

    Mixed use development. The development comprises of the following: (a) 2 storey 80-bed nursing home complete with all necessary roof mounted plant and a service yard to accommodate additional plant and equipment including a sprinkler tank, an ESB sub-station with switch room and bin stores; (b) change of use for from an existing derelict chapel to a convenience store. Permission is also sought for the internal and external modifications to the existing derelict chapel and an outdoor seating area 18.6m2; (c) 44 no. residential units including (i) 22 no. 1 storey 2 bed semi-detached bungalow units; (ii) 17 no. 1 storey 1 bed detached units; (iii) 2 no. 2 storey 3 bed semi-detached units; (iv) 2 no. 2 storey 4 bed semi-detached units; (v) 1 no. 2 storey 3 bed detached unit; (d) lawn bowls green (466m2), allotments (110m2) and park areas (5,668m2); (e) all associated site works including (i) foul and surface water drainage, and water mains; (ii) vehicular/pedestrian entrance and access roads from the existing R395 road to the north and the existing laneway off the R395 road to the east of the site; (iii) bicycle parking (iv) landscaping (v) building signage; and (vi) all other associated site development works. The development is within the curtilage of a protected structure, RPS no.: 003-047, St. Joseph's Orthopaedic Hospital complex as recorded in the Westmeath County Development Plan 2021-2027Grounds not yet categorised
    Decision21 February 2025View record
  5. © OpenStreetMap
    2460356Granted

    Former West Offaly Power (WOP) Station, in the townland of Cloniffeen Shannonbridge, Co. Offaly

    The proposed development of area 7.34 ha, will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: Demolition of 4 no. prefabricated structures (c. 876 sq.m total); Up to 768 no. battery energy storage enclosures, organised in approx. 36 no. bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. The battery bays will be 5m wide x 3m high and vary in length from 23.8m to 33.7m; 11 no. Medium Voltage (MV) Skids (c. 6m x 10.2m x 2.5m); Control Building (c. 285.3 sq.m); Ancillary plant and equipment comprising of: an emergency diesel generator plinth (c. 28.7 sq.m); two spare parts containers (c. 29.7 sq.m); a fire fighting water tank and pump house (c. c. 62 sq.m); an underground oil separator and collection pit; customer transformer compound including a bunded main step-up transformer (c. 141 sq.m) and firewalls, and High Voltage (HV) switchgear, linking with an underground cable; and auxiliary transformers (c. 4m x 4m x 3m); Operation and Maintenance site office including welfare facilities (c. 27.9 sq.m); All services connections including electrical, water and wastewater and connections to existing surface water drains; 2 no. lightning monopoles (c. 18m high); A c. 135m long, c. 5m tall concrete retaining wall to the east of the site; and All other ancillary site clearance and development works including provision of biodiversity landscaping; areas of hardstanding; internal access roads; lighting; laydown area; fencing and access gates (c. 4m in height); car parking; and connections to site services networks. Planning permission is being sought for a duration of 10-years. WOP Station is licenced by the Environmental Protection Agency under an industrial emissions (IE) licence [Ref. P0611-02]. A Natura Impact Statement (NIS) is submitted with the planning application.Decision record indexed
    Decision06 November 2024View record
  6. © OpenStreetMap
    2460554Granted

    Coole East, Athea, Co. Limerick

    The construction of a single storey dwelling house with an on-site wastewater treatment system consisting of a mechanical aeration unit, intermittent filter, & soil polishing filter, a site entrance, well and all associated site worksDecision record indexed
    Decision30 August 2024View record
  7. © OpenStreetMap
    3041/24Granted

    Pigeon House Road, Dublin 4, D04 FP28

    PERMISSION & RETENTION: Permission for development consisting of the construction of plant, comprising silos and blender, compressor room, cooling tank and pump room, storage, feed conveyors, retaining walls, new palisade fencing encompassing an increased site area, incorporating both a new vehicular sliding access gate, replacing the existing vehicular swing gates and the repositioning of the existing vehicular exit gate, creating a new vehicular entrance to the east of the site, revision of car park layout, together with associated site works. Retention permission is also sought for silos, office and laboratory together with permission for the demolition of structures, both permanent and temporary to include cooling tanks, compressor room, mill feed, silo and blender, retaining wall and palisade fencing and wall.Decision record indexed
    Decision12 August 2024View record
  8. © OpenStreetMap
    2460171Granted

    Gortahilly, Dunmore East, Co. Waterford

    Erect a milk cooling tank: Silotank (External) adjacent to existing dairy and associated site works.Decision record indexed
    Decision30 May 2024View record
  9. © OpenStreetMap
    4975/23Granted

    The Pathology Block, at the National Concert Hall, Hatch Street Upper, Dublin 2

    PROTECTED STRUCTURE The development will consist of the conservation and refurbishment of the existing Pathology Block, one of the buildings included in the National Concert Hall (NCH) Complex, located on Hatch Street Upper. The development includes the change of use of the former UCD School of Medicine to the Learning and Participation function of the NCH. The total floor area of the development is approx. 1401 msq. The Pathology Block, link structure and adjacent Butler Wing (South) are designated Protected Structures within the NCH complex (Reference RPS 2425). The conservation and refurbishment works to the Pathology Block will include a new public entrance to the existing link structure on Hatch Street Upper to provide universal access, 2no. recital spaces, 5no. workshop spaces, offices, new sanitary facilities and additional ancillary support and plant accommodation. The existing sandstone facade and chimney stack to Hatch Street will be cleaned, repaired and conserved. Existing brickwork shall be repointed where necessary. Refurbishment work will include the conservation and repair of existing external windows, doors, roof lights and upgrading of the existing slate roof, including removal of some asbestos slates, and rainwater goods and all minor/repair work. The existing glazing will be retained where possible and works will include installation of slim-line glazing in the two recital rooms and percussion workshops. Secondary glazing will be installed internally to 5no. of the windows of the main recital space. 5no. casement windows will be replaced with new timber sliding sashes, to match the windows on Hatch Street Upper. New heating, ventilation and cooling plant is to be located internally in the first floor area of the West Range, with associated louvres to the roof lantern and condensers in the courtyard garden, new floor and removal of walls and staircase. 2no. window openings are to be adapted, and 2no. new opes to provide fire escape doors on the west elevation. The existing access gate will be relocated to the north. Walls and partitions to be removed to facilitate Workshops 3, 4 and 5 and office 2. Blocked up opes to be reused with new doors and windows to the courtyard. The existing flat roofed timber clad structure over the granite bridge linking the Pathology Block and the Butler Wing is to be removed and the bridge returned to its original condition. A lime render application is proposed on the east elevation facing the Butler Wing. The flat roof and north wall of the link structure to be removed and rebuilt, to accommodate new entrance space, toilet facilities. Internal steps and a platform lift will facilitate universal access to the existing ground floor of the Butler Wing South. The rear wall is to be rebuilt 2.4 meters to the north to accommodate 2 no. universally accessible toilets on the Pathology Block ground floor and the ground floor of the Butler Wing South. In order to facilitate the proposed development, the following demolitions are required: Block A - A 75sqm vacant repair workshop with a flat roof and pre cast concrete coping. Block B - A 9sqm vacant lock-up store of modern blockwork construction, partly rendered. Block C - A 33msq single storey lean-to structure and redundant plant and ducts located to the north side of the Pathology Block to re-instate two high level windows. Block D - An existing 5sqm concrete lean-to shed in the courtyard - housing redundant plant equipment. Block E - An existing 6sqm timber frame enclosure in the courtyard. Modern 1990s mezzanine 141sqm first floor and staircase housing vacant offices. 28sqm timber gallery and stairs. 109sqm Link Structure to include flat roof and rear wall. The external works will comprise hard and soft landscaping, including measures to protect the three mature lime trees, lighting, new steps and gently sloped inclines to facilitate universal access to the proposed new entrance, new folding gates to Hatch Street Upper to replace the existing section of infill railings, 4 bicycle stands (8 bicycles), replacement of existing drainage lines, provision of SUDS features and all associated ancillary drainage and site works on a site area of circa. 0.2628 hectares. The development has been screened for both Appropriate Assessment and Environmental Impact Assessment.Decision record indexed
    Decision16 February 2024View record
  10. © OpenStreetMap
    23/5742Granted

    Coole East Whites Cross Co. Cork

    Permission to construct an agricultural shed to include 2 no. stables and associated dry feed and machinery storage, upgrade existing agricultural entrance and associated site works.Decision record indexed
    Decision24 November 2023View record
  11. © OpenStreetMap
    23162Granted

    Shranakilla Road, Bellacorick, Co. Mayo

    Synchronous condenser/flywheel, located within a fenced compound of c.0.85 ha consisting of: machine building to house equipment including the synchronous condenser, flywheel, lube oil skid, air compressor and pumps. Supporting items of plant; cooling equipment, c.6m high modular containers to house electrical and control equipment, 2 auxilliary transformers and electrical plant including external circuit breaker, HV electrical compound with electrical switchgear and main step-up transformer and new c.200m underground cable grid connection to the Bellacorick 110kv substation; diesel generator, fire water tank, underground oil separator and collection pit, services connections including electrical, water and wastewater and constructed wetland connecting ot Owenmore River; 3 office/welfare buildings and 2 spare parts containers. External lighting poles c. 9m, lightning monopole and Scada communications mast,. 4 fire walls around main step up transformer c. 8m high, 2 fire walls either side of auxilliary transformers c. 5m high, 3 firewalls around cooler for main transformer, 8m high. Ancillary site clearance and developemt works including provision of areas of hardstanding, internal access roads, laydown area, car parking and connection to site services networks. The development will be bounded by one c. 3.6m high palisade fence on the east side and one 5m high palisade fence to the south side. Site access will be by means of a new c. 3.6m high palisade gate and a second 3.6m sliding gate accessed from the Shranakilla Road off the N59. Permission sought is for 10 years. NIS submitted with application.Decision record indexed
    Decision03 August 2023View record
  12. © OpenStreetMap
    23197Granted

    Taduff West and Taduff East and Mihanboy, Athlone, Co Roscommon

    Permission for development consisting of: (i) A ten-year planning permission for the construction of a permanent Battery Energy Storage System (BESS) facility adjacent to the consented TDC Community Solar Park (Pl. Ref. 20/36 & Pl. Ref. 21/350) with capacity of c. 80MW; (ii) The provision of up to 22 no. battery storage bays, each with 8 no. containerised battery modules connected to 2 no. inverters per bay and 1 no. transformer per bay; (iii) The containerised modules will typically house battery racks with multiple battery cells, control systems, fire detection and fire suppression systems and cooling systems; (iv) The provision of a BESS switchgear / substation unit (c. 33.2 sq m), storage/office unit (c.33.2 sq. m) and a control room (c.33.2 sq. m), all provided in standard containerised units; (v) The construction of a new access track (c.1,050m) linking the proposed BESS facility to the consented TDC Community Solar Park including 1 no. water crossing point; This will facilitate both construction and operational access while the entrance to the overall TDC Community Solar Park remains via the L2026 as consented under Pl Ref. 20/36. (vi) Minor amendments to the layout of the permitted solar farm (Pl Ref. 20/36 & Pl. Ref. 21/350) comprising the removal of permitted panels to accommodate the proposed access track; (vii) The provision of 2 no. car parking spaces adjacent to the BESS substation control room and 1 no electric vehicle charging point; (viii) All associated site development works and ancillary infrastructure above and below ground including drainage, security fencing, security lighting, landscaping (including additional planting) and ancillary grid infrastructure (A Natura Impact Statement (NIS) has been submitted with the planning application) atDecision record indexed
    Decision10 July 2023View record
  13. © OpenStreetMap
    SD22A/0420Refused

    Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22

    Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.Grounds not yet categorised
    Decision29 May 2023View record
  14. © OpenStreetMap
    23152Granted

    Ballycummin, The IDA Business and Technology Park, Raheen

    Development consisting of modifications and alterations to previously permitted Biopharmaceutical Manufacturing Campus(Planning Register Reference Number 22/190). The proposed development that consists of the following; (1) The relocation of the previously permitted single storey Maintenance Building, sized approximately 1,200 square metres, to the position on site of the footprint of the previously permitted Freezer Building. The previously permitted 2 storey Freezer Building, sized approximately 1,694 square metres, will not be constructed as part of this amended application. (2) The relocation of the previously permitted Tank Farm from its permitted position at the rear of the Warehouse to a revised location within the yard between the Maintenance and the Central Utilities Plant (CUP) Building including pipe bridges all located to the east of the site. The proposed Tank Farm consists of reconfigured and resized tanks. (3) The relocation of 4no. of the previously permitted Boiler Stacks and the omission of 1 no. previously permitted Boiler Stack. The 4no. relocated Boiler Stacks will be approximately 18 metres high and will be located to the north of the previously permitted Central Utilities Plant (CUP) Building. (4) The installation of 1no. additional Cooling Tower to the roof of the previously permitted Central Utilities Plant (CUP) Building, and the modification of the previously permitted acoustic screen to enclose this additional Cooling Tower and the addition of 1no. Cooling Tower at Ground Level within the Tank Farm area. (5) The construction of 1 no. new recessed Loading Dock to the north elevation of the previously permitted warehouse. (6) The relocation of 2no. previously permitted Bulk Gas Tanks from the front of the Production Facility to the position on site of the footprint of the previously permitted Maintenance Building and the installation of 1no. additional Bulk Gas Tank including local pipe bridges. (7) The proposed development also consists of minor modifications to previously permitted internal roads and footpaths, site lighting, landscaping, underground drainage system infrastructure including a reduction of roofed areas and all associated site works. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is requiredDecision record indexed
    Decision28 April 2023View record
  15. © OpenStreetMap
    221228Granted

    Coole East, Athea, Co. Limerick

    The construction of a single storey dwelling house, site entrance, with an on-site wastewater treatment system consisting of a mechanical aeration unit, intermittent filter with soil polishing filter and all associated site worksDecision record indexed
    Decision21 February 2023View record
  16. © OpenStreetMap
    4785/22Granted

    Printing House (a Protected Structure-Ref No. 2003 and a Recorded Monument -Ref No.: DU018-020508), in New Square and, at House 33-37(a Protected Structure-Ref 2003) located within the campus of Trinity College Dublin, Dublin 2

    PROTECTED STRUCTURE: The proposed development consists of the following: 1. Refurbishment and temporary fit-out works to the Printing House, and a temporary change of use for a period of five years, to allow it to operate as an exhibition space to include: A temporary fit-out, for a period of five years, to the Printing House (360m2), incorporating an exhibition room with display case relocated from the Old Library, secure storage rooms, security office, and WC at ground floor level and associated plant space at basement level. The fit-out works will include the installation of demountable reversible steel and concrete structures, steel framed metal stud partitions, timber and steel doors, fire curtain, blockwork walls, and associated services including sprinkler system, ventilation, heating, cooling, information technology and electrical systems. Internal refurbishment, including insulation of the roof, upgrading fire rating of historic floors retaining all historic elements, upgrading fire resistance of three historic doors, temporary removal and storage on site of one door leaf, redecoration of interior at ground level including the entrance hall. External refurbishment works consisting of pointing the east elevation to replace variety of non-historic finishes, cleaning of the Portland stone portico and Calp rubble side elevations, refurbishment of historic railings and replacement of non-historic boiler room door. The construction of a demountable steel temporary structure (29 sq.m) along the eastern edge of the Printing House to provide an accessible entrance through an existing doorway, involving widening of the door opening. 2. The construction of a Temporary Pavilion in New Square, for a period of five years, with a gross internal area of 900m2 comprising of an exhibition space (576m2), retail space (170m2), WCs, staff room, storage and plant space. The temporary pavilion is organised in two building volumes, ranging in height from 6.7m to 9.9m. The building will have a metal structure, and will be clad with coloured metal panels. A screened temporary external plant enclosure (72m2) will be located to the rear of the Temporary Pavilion. 3. Landscaping including temporary sloped surfaces in New Square to provide accessible entrances to the Temporary Pavilion, reseeding of lawn, temporary removal of 2 sections of chain around the perimeter of New Square. 4. The provision of a temporary sign, for a period of five years, located at the western facade of House 33-37 (a Protected Structure) of c. 1m x 9m and an exterior temporary, for a period of five years, wayfinding feature light fixed to the rear brick-faced facade of Houses 33-37. 5. Permission is also sought for all associated site development above and below ground and temporary construction operations.Decision record indexed
    Decision28 October 2022View record
  17. © OpenStreetMap
    21445Granted

    Kellistown East, Co. Carlow

    Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm. c. 3m high) 6 No. modular containers to house electrical and control equipment (total area of c. 195 sq m c. 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999Decision record indexed
    Decision17 October 2022View record
  18. © OpenStreetMap
    22/5711Granted

    No. 4 The Terrace Coole East Whites Cross Co.Cork

    The development will consist of the permission for alterations and construction of two storey extension to rear of existing dwelling and first floor extension over existing ground floor extension and associated site worksDecision record indexed
    Decision12 September 2022View record
  19. © OpenStreetMap
    21/7061Granted

    Coole East Whitecross Co. Cork

    The construction of a two storey dwelling and associated works including the installation of a waste water treatment system.Decision record indexed
    Decision10 May 2022View record
  20. © OpenStreetMap
    22303Refused

    Barrettspark,

    For a development consisting of the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare east of the existing ESB substation for the purpose of stabilizing the electricity grid will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (540sqm c. 10m high). Cooling equipment (c. 160sqm, c. 3m high); 5 no. modular containers to house electrical and control equipment (total area of c. 195sqm, c. 5m high). A generator step-up transformer, auxiliary transformer and electrical plant including and external circuit breaker (c. 8m); 1 no. firefighting water tank and pump, boundary fencing (c. 3m high) and CCTV, c. 50m of underground cabling ducts and cable to the neighbouring ESB Substation, all other ancillary site works including access roads. Planning permission is being sought for a duration of 10 years. Gross floor space of proposed works: 540sqm.Grounds not yet categorised
    Decision28 April 2022View record
  21. © OpenStreetMap
    SD21A/0186Granted

    Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22

    Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement.Decision record indexed
    Decision24 March 2022View record
  22. © OpenStreetMap
    FW21A/0176Granted

    Former Clyde House, IDA Blanchardstown Business & Technology Park, Sn

    The development will consist of revisions to parent permission FCC Reg. Ref. FW20A/0087 and modifications permitted under FCC Reg. Ref. FW21A/0073 to include the following: • Ground floor extensions to permitted building DB6x (formerly known as Building No. 2) to include stairs and provision of a link bridge connecting with DB7x (formerly known as Building No. 1) to the north east. Alterations to existing stairs at DB6x; • Alterations to the plant/roof area of DB7x at first and roof level to include changes to the gantry platform and screen height reduction, provision of new PPRs/PCRs and a new cooling tower; • Provision of canopies at ground floor level to building DB5x, DB6x and DB7x; • Reduction in height of 9 no. permitted flues associated with the gas generators from c.18m to c.15m high and an increase in internal flue diameter from c.2.2m to c.2.5m. Reduction in height of external screening (c.8m) to the gas generator compound and estate road south of the subject site. Provision of screening to permitted switchroom building; • Removal of 1 no. permitted salt saturator tank; • Provision of a raised ramped pedestrian crossover and relocation of 2 no. permitted parking spaces. No change to the permitted quantum of car and bicycle parking; • All associated site development works, services provision, drainage works, minor amendments to boundary treatments to include a relocated fence to the east of DB7x and provision of security fencing to the gas generator compound. No works are proposed to the existing telecommunication pylon and overhead lines running diagonally through the site from south west to north east; • The total gross internal floor area of the development including data halls and ancillary structures is increased to c. 19,114sqm from c. 19,040sqm under FCC Reg. Ref. FW21A/0073; • All other development as permitted under FCC Reg. Refs. FW20A/0087 and FW21A/0073; • A permitted 110kv substation (under construction) located to the south east of this site was subject of a separate Strategic Infrastructure Development application to An Bord Pleanála (ABP Ref. 307296-20) under section 182A of the Planning and Development Act 2000 (as amended). AI Received 25/01/2022Decision record indexed
    Decision21 February 2022View record
  23. © OpenStreetMap
    20/6375Granted

    Coole East White's Cross Co. Cork

    1. Demolish single storey extension to rear. 2. Construct a two storey extension to side and rear of dwellinghouse. 3. Carry out alterations to front elevation of dwellinghouse together with all associated site works development works.Decision record indexed
    Decision24 May 2021View record
  24. © OpenStreetMap
    20/5411Granted

    13 The Terrace Coole East Whites Cross Co. Cork

    Retention of rear single storey extension as constructed, permission to construct a first floor extension to front, side and rear of existing dwelling and permission to alter existing site entrance all to an existing dwellinghouse.Decision record indexed
    Decision22 October 2020View record
  25. © OpenStreetMap
    20/5788Granted

    ESB lands to the east of the R630 in the townlands located inside the Aghada Generating Station Ballincarroonig Whitegate, Co. Cork

    The development will consist of: development on a 0.8ha site of a c. 2MW capacity edge computing facility located within a secured compound, and will, subject to a detailed design, commercial and technical considerations, include: (a) 1 no. modular control building (c. 116sq.m. and c.4.1m high). (b) Electrical and computing plant and equipment comprising: (1) 20 No. IT modules (c. 45 sq.m. and c. 3.9 sq.m high with additional roof mounted cooling units), (2) 2 No. LV modules (c. 59 sq.m. and c. 3.8m high), (3) 2 No. battery modules (c.25 sq.m and c. 3.8m high), (4) 1 No. MV module containing bunded and ventilated transformer (c. 29.7 sq.m. and c. 3.8m high) and (5) 7 no. standby generator units (c. 10 sq. m. c. 2.3m high), surrounded by c. 2.6 m high palisade fencing and gates (d) Ancillary site clearance and development works including provision of areas of hard standing, car park area, covered walkway linking all modules and connections to site services networks. Licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence [Ref. P0561-05] and a Lower Tier (COMAH) site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations (COMAH) Regulations, 2015Decision record indexed
    Decision13 October 2020View record
  26. © OpenStreetMap
    20771Granted

    Ballygammane, Thurles, Co. Tipperary

    Construction of 1 no. A+-30 Mvar STATCOM transformer, 1 no. auxillary transformer, 3 no. reactors and 1 no. outdoor cooling bank, control and valve building (233m2), 1 harmonic filter, 1 HV circuit breaker (including CT and VT), 1 MV disconnector and earth switch, 2 no. cable sealing ends, 1 no. 110kV feeder bay, 1 busbar connection and underground connection to existing ESB Thurles 110 kV substation, security fencing, security gate, 7 no. 22m high lightning masts, permeable and non-permeable surfacing, additional internal access road, additional fencing to match existing 2.6 m high palisade and all other ancillary site development works and 2 temporary contractors compounds (the development is an extension to the existing substation and this extension has an overall site area (within the planning application boundary) of 1.839ha. In operation the STATCOM would be accessed through the existing gated entrance to the site via the local road to the immediate South. During construction, temporary access is proposed to the east of the existing substation. A Natural Impact Statement (NIS) has been prepared as part of this application)Decision record indexed
    Decision03 September 2020View record
  27. © OpenStreetMap
    19/6783Granted

    Belvelly Port Facility Marino Point In the townlands of Marino, Belvelly and Oldcourt Cobh, Co. Cork

    Demolition, site infrastructure improvements, and utility upgrade works to stabilise the existing site and to provide capacity for future industrial development proposals at the Belvelly Port Facility. Demolition will comprise site clearance and demolition of all existing derelict super structures, including prill tower, concrete tanks, workshops, stores and office buildings; sub structures including foundations and floorslabs; and redundant services including piperacks, sumps and sea water cooling pipe. Site infrastructure improvements will comprise; i. Infilling of the lagoon located at the north east of the site using a combination of imported material and suitable site-won demolition material; ii. Site levelling works and construction of a flood protection revetment along the northern and north western perimeter of the site; iii. Upgrade of existing main site entrance and provision of new emergency access along the north eastern frontage of the site; new internal road layout and site lighting along the new roads; iv. Development of a new railway connection along the eastern boundary and restoration of the former rail siding at the north east of the site; v. Widening of access road and bridge to the jetty; vi. Tree planting along the northern and western boundary. Utility upgrade works will comprise; vii. Provision of surface water drainage system, which includes treatment and disposal via outfalls to Cork Harbour; viii. Provision of a foul effluent drainage system, on-site treatment via a wastewater treatment plant and discharge along the path of an existing outfall into Cork Harbour; ix. Provision of fire water infrastructure along the new internal roadways and on the jetty; x. Provision of site services, including potable water supply, new electrical infrastructure including a 10kV on-site substation and ducting for extra-low voltage and low voltage connection points; xi. Diversion of natural gas, methanol and mains water pipelines. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning authority with the application. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.Decision record indexed
    Decision22 July 2020View record
  28. © OpenStreetMap
    20181Granted

    Coole East, Athea, Co. Limerick

    Construction of a single storey dwelling house with detached domestic garage, mechanical aeration unit and soil polishing filter system utilising existing access roadDecision record indexed
    Decision05 June 2020View record
  29. © OpenStreetMap
    196334Granted

    Williamstown, Coole, Co Westmeath

    Construction of an extension to the northern and western sides of the existing dwelling, internal alterations to the existing dwelling, replacement of the existing septic tank with a proprietary effluent treatment system and percolation area, demolition of the existing extensions to the north, east and west of the property, demolition of existing agricultural shed to the north of the dwelling and all ancillary site worksDecision record indexed
    Decision03 February 2020View record