to
to

Planning records

Showing 1-26 of 26 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2660179Granted

    Monksland Industrial Estate, Athlone, Co. Roscommon

    Permission for development which will consist of: - Minor façade alterations to Central Utility Building (CUB), comprising of replacement of no.2 existing single open-mesh doors with no.2 double access doors and new louvered façade on the south elevation; provision of new door on west elevation; provision of extractor fans on north and south elevation; and installation of no. 3 roof extract vents. - Installation of plant comprising; 3 no. chiller units, each with a floor area of c.19.5m² and a maximum height of c. 2.8m, with associated pipe rack to a maximum height of c.5.7m and associated flues with a maximum height of c. 13.8m; 3 no. cooling towers, each with a floor area of c.24m² each and a maximum height of c. 7.3m, with associated pipe rack to a maximum height of c.7m; and 1 no. buffer tank of c.3.3m in diameter and 9.3m in height. - Provision of 1 no. heat pump comprising of a floor area of c.8m², with a maximum height of approximately 2.3m and associated pipe rack to a maximum height of c. 9.2m - Construction of a fire wall of c.2.4m high and c.41.2m in length. - All associated infrastructure including provision of drainage infrastructure, utility connection and all ancillary site and development works. This application relates to a development on a site, which comprises of an activity requiring an Industrial Emissions Licence: Licence No P0100-02, atDecision record indexed
    Decision12 June 2026View record
  2. © OpenStreetMap
    WEB5936/25Granted

    Unit 3, One Central Plaza (formerly known as The Central Bank Building), Dame Street, Dublin 2

    PROTECTED STRUCTURE: RPS: 8830: Unit 3 is located at ground level, with associated back of house located at basement -1, onto Fownes St Upper to the west and the Plaza and Dame St to the South. The proposed development relates to permission for internal signage for Unit 3, which is permitted as a restaurant, to consist of: • 1 no. banner sign, hanging internally within the unit and set back from the existing glazed facade on the southern elevation of 0.5m x 6.269m. The proposed sign is brushed stainless steel fascia panel, with low energy red LEDs for halo illumination. • 1 no. banner sign, hanging internally within the unit and set back from the existing glazed facade on the western elevation of 0.274m x 3.438m. The proposed sign is brushed stainless steel fascia panel, with low energy red LEDs for halo illumination. • 1 no. roundel sign, hanging internally within the unit and set back from the existing glazed facade on the western elevation of 1.45m x 1.45m. The proposed sign is brushed stainless steel fascia with coloured vinyl lettering and graphics, with low energy cool white LEDs for internal illumination. • 1 no. LED red light line, set back from the southern elevation and along the extent of the southern elevation profile.Decision record indexed
    Decision31 March 2026View record
  3. © OpenStreetMap
    24/6272Granted

    Corracunna, Coolnanave Garrane Mitchelstown Co. Cork

    The application site comprises an area of c. 5.61hectares. The site is primarily located in the townland of Corracunna and is surrounded by agricultural lands to the North and East, with the N73 national route to the south, and the L90813 local road to the west. The site takes in lands at Coolnanave and Garrane, on the western side of the L90813, to the west and north west of the main site area, to provide woodland planting and an underground drainage pipe and outfall. The proposed development comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured) and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 3,419.5 sq.m. Permission for the; (1) Demolition of existing single storey disused agricultural buildings, silos, and tank within the western portion of the site (total demolition gross floor area (GFA) of c. 1,781 sq.m). One single storey agricultural building (with GFA of c. 87.8 sq.m and height of c. 5.1m) will be stabilised and retained as a biodiversity building. (2) Construction of 3 no. digesters (c.15.6m in height), 2 no. digestates storage structures (c. 15.5m and 11m in height), 2 no. liquid storage tanks (c.12.2m in height) and a liquid feed tank (c. 8m in height), located in the southeast portion of the site. (3) 3 no. pasteurisation tanks (each c. 6m in height), a post-pasteurisation cooling tank (c.12.2m in height) and pre fertiliser manufacturing tank (c.12.2m in height), located in the centre of the site. (4) part single-storey and part two-storey reception hall (with a GFA of c. 2,112.6 sq.m and an overall height of c. 15.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site, to the north of the digesters. (5) a single-storey solid digestate storage and nutrient recovery building (with a GFA of c. 879.9 sq.m and a overall height of c.12.4 in height) will be located to the west of the reception hall, in the central portion of the site. (6) Odour abatement plant (with a maximum height of c. 6m in height) and equipment, a digestate offtake area, and a fuel tank (c. 1.6 in height) will be provided to the north of the solid digestate storage and nutrient recovery building. (7) Construction of an ESB substation (c. 3.4m in height) 2 no. CO2 tanks and a CO2 loading pump (c. 14.5m in height), along with associated plant structures including CO2 auxiliaries, CO2 liqueufactor, a CO2 compressor and a CO2 pre-treatment skid (with an overall height of c. 6.7m), located in the southwest portion of the site. (8) Construction of a biogas treatment skid, a biogas compression system, a biogas upgrading module (with an overall height of c. 5.1m) and a grid injection unit within a fenced compound (c. 2.8m in height), located within the southwestern portion of the site. (9) Construction of an emergency biogas flare (c. 11.3m in height) 2 no. propane tanks (c. 1.3m in height) and a grid off take skid, located further to the west of the site. (10) Construction of O2 generation unit (c. 2.6m in height), a biomethane boiler (c. 5.6m to top of flue stack), a combined heat and power (CHP) unit and panel room (with a maximum height of c. 6m to top of flue), 2 no. pump houses (c. 2.6m in height, each with a GFA of c. 29sq.m) located in the southwestern portion of the site, south of biogas upgrading structures. (11) Construction of a two-storey ancillary office and administration building (with an overall height of c. 8.6m and GFA of c. 271.5 sq.m), located within the western portion of the site, adjacent to the main site entrance. (12) A discharge pipe route extending to the northwest of the main anaerobic digestion facility site, crossing the L90813 and through agricultural lands to the River Funshion. (13) Alterations to theDecision record indexed
    Decision27 November 2025View record
  4. © OpenStreetMap
    WEB2226/25Granted

    A c. 1.7 ha site located within the ESB Inchicore substation site, specifically lands south of Kylemore Way and northwest of the existing ESB Substation, Kylemore Way, Dublin 8, D08 E398 and to the immediate west of the Kylemore BESS, Kylemore Road, Dubli

    The proposed development will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of 1. Up to 60 no. battery energy storage enclosures, split across 6 no. bays, each bay contains 2 no. rows of 5 no. enclosures. Each bay is on a concrete plinth of width c. 6.5 m and a maximum length of c. 47 m. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. 2. 6 No. Medium Voltage (MV) Skids, twin Inverter Skids (c. 12.8m x 6m x 2.4m) and associated bunds and fire walls. 3. Control building (c. 222 sq.m). 4. Ancillary plant and equipment comprising of a) A firefighting water tank (c. 9.75m high) and pumphouse (c. 17 sq.m) b) 2 no. Auxiliary Transformers (c. 2m x 2m x 2m) and associated bunds and fire walls c) 3 no. spare parts stores (20ft containers) (c. 15 sq.m each) d) 2 no. backup diesel generator plinths (c. 28.7 sq.m each) e) HV compound including 2 no. Grid step-up transformers (c. 5.7m x 3.3m x 2.8m and c. 6.6m x 5.5m x 5.1m), associated bunds and fire walls, and all other associated equipment including prefabricated electrical control room (c. 51 sq.m), linking with an underground cable and f) An underground fire water retention tank and underground attenuation tank. 5. Operation and Maintenance site offices including welfare facilities (c. 27.9 sq.m) 6. All service connections including electrical, potable water and connections to surface water drains 7. 1 no. lightning monopole (c. 18m high) and 8. All other ancillary site clearance and development works including provision of areas of hardstanding, internal access roads lighting and CCTV, laydown area, fencing and access gates (c. 3.5m in height), car parking; and connections to site services and networks. Planning permission is being sought for a duration of 10-years.Decision record indexed
    Decision28 August 2025View record
  5. © OpenStreetMap
    2460356Granted

    Former West Offaly Power (WOP) Station, in the townland of Cloniffeen Shannonbridge, Co. Offaly

    The proposed development of area 7.34 ha, will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of: Demolition of 4 no. prefabricated structures (c. 876 sq.m total); Up to 768 no. battery energy storage enclosures, organised in approx. 36 no. bays. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. The battery bays will be 5m wide x 3m high and vary in length from 23.8m to 33.7m; 11 no. Medium Voltage (MV) Skids (c. 6m x 10.2m x 2.5m); Control Building (c. 285.3 sq.m); Ancillary plant and equipment comprising of: an emergency diesel generator plinth (c. 28.7 sq.m); two spare parts containers (c. 29.7 sq.m); a fire fighting water tank and pump house (c. c. 62 sq.m); an underground oil separator and collection pit; customer transformer compound including a bunded main step-up transformer (c. 141 sq.m) and firewalls, and High Voltage (HV) switchgear, linking with an underground cable; and auxiliary transformers (c. 4m x 4m x 3m); Operation and Maintenance site office including welfare facilities (c. 27.9 sq.m); All services connections including electrical, water and wastewater and connections to existing surface water drains; 2 no. lightning monopoles (c. 18m high); A c. 135m long, c. 5m tall concrete retaining wall to the east of the site; and All other ancillary site clearance and development works including provision of biodiversity landscaping; areas of hardstanding; internal access roads; lighting; laydown area; fencing and access gates (c. 4m in height); car parking; and connections to site services networks. Planning permission is being sought for a duration of 10-years. WOP Station is licenced by the Environmental Protection Agency under an industrial emissions (IE) licence [Ref. P0611-02]. A Natura Impact Statement (NIS) is submitted with the planning application.Decision record indexed
    Decision06 November 2024View record
  6. © OpenStreetMap
    24306Refused

    Mountkennedy Demesne & Tinnapark Demesne, Co. Wicklow

    Section 42(1) on PRR 10/2123 (access road from the south western roundabout of the Ballyronan interchange to the site entrance. The road continues northward for an additional c 0.3km terminating in a cul de sac formed by bollards at its junction with the laneway located at the northern site boundaries (total road length c 1.1km). The proposed road will include a two way cycle track and a footpath and will involve restoration / modification of the existing Demesne wall; closure of the existing left in / left out access to Mountkennedy House (protected structure) off the N.11. Access will be provided to the existing laneway directly from the proposed access road, 10 no identical two storey Data Centre units each measuring c 10,915 sqm gross. The ground floor of each unit comprises plant areas, storage, workshops, reception / lobby, office space, inspection area, breakroom, internal loading areas and circulation space. The first floor of each unit comprises a net technical area, offices, ancillary plant, storage and circulation space. Each Data Centre unit will also have an ancillary service yard that will incorporate a sprinkler tank, a pump house, an MV switchroom, ESB switch rooms, electrical transformers enclosed within a post and wire mesh fence and a fuel storage tank, an auxillary cooling compound located to thee rear of each building and adjacent to the service yard, an enclosed electrical compound located centrally along the southern site boundary providing for a future step down transformer from the existing 220/110kv overhead power line, a primary dry cooling compound in area housing dry cooling units located to the west of the site; 3 no heat exchanger buildings located on site at the south west corner, north west corner and to the south of the site entrance at the eastern boundary, 250 car parking spaces including 40 electric car parking spaces and 20 disabled car parking spaces; a temporary waste water treatment plant and percolation area located centrally within the site; 1 main security hut located at the site entrance and 10 individual security huts located at the entrance to each individual Data Centre unit; landscape berming and additional planting at the site boundaries; all ancillary site developments works. The proposed development comprises or is for the purposes of an activity that may require an Integrated Pollution Prevention Control Licence and has a total gross floor area of 111,228 sqm)Grounds not yet categorised
    Decision30 July 2024View record
  7. © OpenStreetMap
    4975/23Granted

    The Pathology Block, at the National Concert Hall, Hatch Street Upper, Dublin 2

    PROTECTED STRUCTURE The development will consist of the conservation and refurbishment of the existing Pathology Block, one of the buildings included in the National Concert Hall (NCH) Complex, located on Hatch Street Upper. The development includes the change of use of the former UCD School of Medicine to the Learning and Participation function of the NCH. The total floor area of the development is approx. 1401 msq. The Pathology Block, link structure and adjacent Butler Wing (South) are designated Protected Structures within the NCH complex (Reference RPS 2425). The conservation and refurbishment works to the Pathology Block will include a new public entrance to the existing link structure on Hatch Street Upper to provide universal access, 2no. recital spaces, 5no. workshop spaces, offices, new sanitary facilities and additional ancillary support and plant accommodation. The existing sandstone facade and chimney stack to Hatch Street will be cleaned, repaired and conserved. Existing brickwork shall be repointed where necessary. Refurbishment work will include the conservation and repair of existing external windows, doors, roof lights and upgrading of the existing slate roof, including removal of some asbestos slates, and rainwater goods and all minor/repair work. The existing glazing will be retained where possible and works will include installation of slim-line glazing in the two recital rooms and percussion workshops. Secondary glazing will be installed internally to 5no. of the windows of the main recital space. 5no. casement windows will be replaced with new timber sliding sashes, to match the windows on Hatch Street Upper. New heating, ventilation and cooling plant is to be located internally in the first floor area of the West Range, with associated louvres to the roof lantern and condensers in the courtyard garden, new floor and removal of walls and staircase. 2no. window openings are to be adapted, and 2no. new opes to provide fire escape doors on the west elevation. The existing access gate will be relocated to the north. Walls and partitions to be removed to facilitate Workshops 3, 4 and 5 and office 2. Blocked up opes to be reused with new doors and windows to the courtyard. The existing flat roofed timber clad structure over the granite bridge linking the Pathology Block and the Butler Wing is to be removed and the bridge returned to its original condition. A lime render application is proposed on the east elevation facing the Butler Wing. The flat roof and north wall of the link structure to be removed and rebuilt, to accommodate new entrance space, toilet facilities. Internal steps and a platform lift will facilitate universal access to the existing ground floor of the Butler Wing South. The rear wall is to be rebuilt 2.4 meters to the north to accommodate 2 no. universally accessible toilets on the Pathology Block ground floor and the ground floor of the Butler Wing South. In order to facilitate the proposed development, the following demolitions are required: Block A - A 75sqm vacant repair workshop with a flat roof and pre cast concrete coping. Block B - A 9sqm vacant lock-up store of modern blockwork construction, partly rendered. Block C - A 33msq single storey lean-to structure and redundant plant and ducts located to the north side of the Pathology Block to re-instate two high level windows. Block D - An existing 5sqm concrete lean-to shed in the courtyard - housing redundant plant equipment. Block E - An existing 6sqm timber frame enclosure in the courtyard. Modern 1990s mezzanine 141sqm first floor and staircase housing vacant offices. 28sqm timber gallery and stairs. 109sqm Link Structure to include flat roof and rear wall. The external works will comprise hard and soft landscaping, including measures to protect the three mature lime trees, lighting, new steps and gently sloped inclines to facilitate universal access to the proposed new entrance, new folding gates to Hatch Street Upper to replace the existing section of infill railings, 4 bicycle stands (8 bicycles), replacement of existing drainage lines, provision of SUDS features and all associated ancillary drainage and site works on a site area of circa. 0.2628 hectares. The development has been screened for both Appropriate Assessment and Environmental Impact Assessment.Decision record indexed
    Decision16 February 2024View record
  8. © OpenStreetMap
    23/4602Granted

    Park South, Castleredmond & Park North Midleton Co.Cork

    The extension and expansion of the existing Midleton Distillery and all associated site development works. The proposed development includes, (A) a 2 storey over basement ‘pot still’ building with ancillary pot still tank farm and mechanical vapour recompression (MVR) building. (B) a 2-9 storey ‘column still’ building with ancillary column still tank farm and cooling tower, (C) a 3-7 storey over partial basement ‘brewhouse’ building with ancillary fermenter structures, (D) a pipe rack structure connecting the proposed pot still, column still and brewhouse buildings with the existing distillery, (E) an internal link bridge crossing the Dungourney River which traverses the site, serving as a vehicular and pedestrian connection between the existing distillery and the proposed distillery extension, (F) demolition of an existing industrial building, removal of existing hardstand areas and culverting of a section of the existing mill race, to facilitate the construction of a biogas plant comprising a series of plant and tank structures, a single storey ammonia removal building and change of use and alterations of existing workshop/warehouse no. 1 and warehouse no. 3 to accommodate associated plant and equipment, (G) other ancillary structures including the construction of a single storey 38kV substation and associated electrical compound, security buildings, staff welfare buildings and car park shelters, (H) all other ancillary site development including the diversion of existing gas and ESB lines which traverse the lands, the upgrade of existing waste water treatment plant at the distillery, attenuation basins, fire water basin, noise attenuation fencing, parking areas, planted boundary berm and signage, (I) access to proposed development will be provided via a new entrance from the Old Youghal Road (R907) to the south. The proposed development will also be accessible from the existing distillery entrances from the Dungourney Road (R627) and Distillery Walk (L-9408) to the north and west of the lands. The proposed development is for modifications to an establishment to which the Major Accident Directives applies and is for the purpose of the activity requiring an integrated pollution control license [Industrial Emissions Directive (IED) licence]. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the applicationDecision record indexed
    Decision26 January 2024View record
  9. © OpenStreetMap
    SD23A/0158Granted

    3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22

    Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.: SD19A/0185 and Reg. Ref.: SD20A/0242, and to the development permitted under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093. The proposed alterations in summary comprise the provision of an altered energy centre design and all associated development, along with minor alterations to the permitted site layout, provision of a gas AGI, and all ancillary works. The development, for which a 5-year planning permission is sought, will comprise the following: Construction of a revised energy centre in the western part of the subject site, to accommodate alternate generation technology, including 10 no. gas generation turbines (all with associated flues, 8 no. c. 33 metres (m) in height and 2 no. c. 15 m in height), 2 no. steam turbines including 2 no. steam turbine generator enclosure buildings with a gross floor area (GFA) of 219 sq.m each and a height of c. 6.2 m, associated steam turbine generator distribution and control structure with a GFA of 84 sq.m and an overall height of c. 4.2 m, and 2 no. steam turbine / air cooled condenser structures with a height of c. 25.4 m. Construction of 8 no. 33/20kV transformer bays to the southeast of the energy centre, with a further 12 no. gas / steam transformers to serve the proposed turbines to the west of the energy centre. Provision of 3 no. 13.6 m high fuel storage tanks, a fuel oil enclosure building (with a GFA of 50 sq.m and an overall height of c. 3.8m), a fire pump enclosure building (with a GFA of 65 sq.m and an overall height of c. 3.2 m) along with 3 no. c. 14.1 m high sprinkler tanks, a c. 14.5 m high water tank, and a water treatment plant building (with a GFA of 218 sq.m and a maximum height of c. 17 m including rooftop plant). Provision of 6 no. black-start / emergency generators to the south of the energy centre with an overall height of c. 5 m; Provision of a single storey over basement level powertrunk building (with a GFA of 932 sq.m and an overall height of c. 4.1 m) to the southeast of the proposed energy centre. Provision of a 3-storey over basement medium voltage / low voltage building (with a GFA of 3,161 sq.m and an overall height of c. 16.3 m) to the southwest of the proposed energy centre. Provision of 2 no. transformers adjacent to the substation constructed under Reg. Ref.: SD18A/0068, as amended by Reg. Ref.: SD19A/0185 (located to the southwest of the proposed energy centre). Provision of a guard hut with a GFA of 21 sq.m and with a height of c. 3.2m, to the west of the medium voltage / low voltage building. Provision of a Gas AGI (above-ground installation) to the southwest of the subject site within a fenced compound, accommodating a single storey control room building with a GFA of 10 sq.m and overall height of c. 3 m, a plant kiosk with a GFA of 17 sq.m and an overall height of c. 3 m, and a boiler house with a GFA of 13 sq.m and an overall height of c. 3m. Reorientation of permitted ICT Facility Building No. 4 to accommodate the revised energy centre layout (with no other change to this permitted building). Associated and ancillary alterations to the site layout relating to landscaping, parking (including 18 no. car parking spaces, and bicycle parking within a covered bicycle shelter to serve the energy centre) and roads layouts, lighting and services, boundary treatments, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development.Decision record indexed
    Decision05 December 2023View record
  10. © OpenStreetMap
    23353Granted

    A C. 14.1 HA SITE LOCATED WITHIN THE SITE OF THE FORMER WEST OFFALY POWER (WOP) STATION, IN THE TOWNLAND OF CLONIFFEEN SHANNONBRIDGE CO. OFFALY, N37 C840

    THE CONSTRUCTION & OPERATION OF A 250 MVA (ELECTRICAL RATING) SYNCHRONOUS CONDENSER LOCATED WITHIN A C. 0.8 HA FENCED & GATED COMPOUND & WILL INCLUDE: (A) A SYNC CON BUILDING (C. 962 SQ.M., C. 14 M HIGH) TO HOUSE EQUIPMENT INCLUDING THE GENERATOR, FLYWHEEL, LUBE OIL SKID, AIR COMPRESSOR & PUMPS; (B) ANCILLARY DEVELOPMENT LOCATED WITHIN THE OUTDOOR COMPOUND INCLUDING: COOLING EQUIPMENT (C. 190 SQ.M., C. 3 M HIGH); MODULAR CONTAINERS TO HOUSE ELECTRICAL & CONTROL EQUIPMENT (C. 270 SQ.M., C. 7 M HIGH); A BUNDED TRANSFORMER (C. 150 SQ.M., C. 8 M HIGH) & TWO AUXILIARY TRANSFORMERS (C. 23 SQ.M., 4 M HIGH); A MAINTENANCE CABIN (C. 78 SQ.M.) & ASSOCIATED MAINTENANCE LAYDOWN AREA; TWO SPARE PARTS STORAGE CONTAINERS (2 NO. CONTAINERS, C. 72 SQ.M. EACH); ELECTRICAL EQUIPMENT; FIREFIGHTING WATER TANK (C. 7 M DIA., C. 8 M HIGH) & PUMPS; & AN UNDER-GROUND OIL SEPARATOR & COLLECTION PIT (C. 69 SQ.M); (C) EXTERNAL LIGHTING POLES (C. 6.3 M HIGH), 2 NO. LIGHTNING MONOPOLES (C. 18M HIGH) & POLE MOUNTED CCTV (C. 8.3M HIGH); (D) CONNECTIONS TO EXISTING SITE SERVICES INCLUDING A NEW UNDERGROUND (220KV CABLE) GRID CONNECTION TO THE EXISTING 220KV SHANNONBRIDGE SUBSTATION, CONNECTIONS TO WATER WASTEWATER & SURFACE WATER SYSTEMS, ELECTRICAL CONNECTIONS BETWEEN ITEMS OF EQUIPMENT, & A 20KV RURAL SUPPLY; & (E) ALL OTHER ANCILLARY & MISCELLANEOUS SITE WORKS INCLUDING: TEMPORARY WORKS (E.G. WORKS COMPOUNDS, ACCESSWAYS & SITE SERVICES), SITE CLEARANCE, SITE ACCESS, INTERNAL ROADS & DEVELOPMENT OF AREAS OF HARD ST&ING & CAR PARKING, & A C. 2.6 M HIGH CHAINLINK OR PALISADE FENCE & ACCESS GATE LINKING WITH THE EXISTING ON-SITE STATION ROADS. FOR CLARITY, PRE-EXISTING ACCESS ROADS WILL CONTINUE TO BE USED TO SERVE THE NEW DEVELOPMENT & WILL NOT BE ALTERED. PERMISSION IS SOUGHT FOR THE CONTINUED USE OF THESE ELEMENTS. THE PROPOSED DEVELOPMENT WILL NOT ALTER OR AFFECT EXISTING ESBN NETWORK GRID INFRASTRUCTURE ON THE SITE (INCL SUBSTATIONS, OVERHEAD LINES & ASSOCIATED SUPPORT STRUCTURES) OR THE THIRD PARTY OWNED TELECOMMUNICATIONS MAST. PLANNING PERMISSION IS BEING SOUGHT FOR A DURATION OF 10 YEARS. NOTE FOR INFORMATION PURPOSES: THIS APPLICATION RELATES TO ELEMENTS PREVIOUSLY CONSENTED BY OFFALY COUNTY COUNCIL UNDER REG. REF 22/223. WOP STATION IS LICENCED BY THE ENVIRONMENTAL PROTECTION AGENCY UNDER AN INDUSTRIAL EMISSIONS (IE) LICENCE [REF. P0611-02]. THE APPLICATION INCLUDES A NATURA IMPACT STATEMENT (NIS)Decision record indexed
    Decision28 September 2023View record
  11. © OpenStreetMap
    23/5112Granted

    Coole West Carrignavar Co Cork

    Extension of duration of a) 1 no. agricultural building to include milking parlour, livestock handling facilities, ancillary rooms, partially roofed waiting yard & soiled water/parlour washings tanks, b) 1 no. agricultural building to include cubicle & straw bedded livestock housing along with slatted slurry storage tank, c) erection of meal bin & 1 no. water storage tank, along with associated site works. Planning Reference Number 18/4690.Decision record indexed
    Decision25 July 2023View record
  12. © OpenStreetMap
    SD23A/0123Granted

    Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22

    Permission for development consisting of the completion of the development granted permission under Planning Application Reg. Ref. SD16A/0236 subject to the amendments and alterations to the previously approved biopharmaceutical manufacturing facility and warehouse extension and other additional, new development not forming part of SD16A/0236, located at the Pfizer site at Grange Castle Business Park, New Nangor Road; The modifications to the approved development will consist of alterations and modifications to previously approved site buildings and infrastructure required to support the proposed development they include, (a) A 6-level biopharmaceutical manufacturing building sized approximately 30,469sq.m (previously approximately 34,650sq.m) and approximately 35 metres high (previously approximately 28.2m high), with stairwells approximately 38m high, and roof-mounted plant and equipment, including solar panels; Modifications to the existing Development and Manufacturing Facility including elevational alterations and modifications to existing plant and equipment; (b) A single-storey warehouse building extension with high-bay, sized approximately 3,200 square metres (previously approximately 1,142sq.m) and approximately 17.5m high, with roof-mounted plant and equipment, including solar panels; (c) A single-storey pedestrian and materials link sized approximately 1,687sq.m (previously approximately 750sq.m) and approximately 6.95m high; (d) A new, additional 4-level extension to the existing DS1 biopharmaceutical manufacturing building, to accommodate material lifts and storage areas, sized approximately 1,925sq.m and approximately 38.2m high, to the south elevation of the existing building; (e) A new, additional single-storey chiller building sized approximately 395 square metres and approximately 6.25m high, with roof-mounted plant and equipment; (f) A new, additional single-storey plant and utilities building sized approximately 256sq.m and approximately 6.25m high, with roof-mounted plant and equipment; (g) Provision of relocated car park from its previously permitted location at the northeast of the side to a new location to the southeast of the proposed biopharmaceutical facility; including approximately 273 additional car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the internal Grange Castle Business Park roads. Mobility parking is located adjacent and directly north of the proposed facility; (h) A relocated, single-storey security building sized approximately 60 sq.m and 6m high; (i) The proposed site infrastructure includes additional cooling towers/heat exchangers, a tank farm, pipe-bridges, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, an electric vehicle charging and solar panel substation to service photovoltaic panels over new car parking spaces, photovoltaic solar panels located over new car parking spaces, electrical generators, underground pumping facilities and internal roads and paths, fencing and site lighting, and the use of the existing Pfizer site entrance (Gate No.3) for heavy goods vehicles; (j) The development includes modifications to and the extension of, the existing internal road network within the Pfizer Campus; (k) Proposed new landscaping includes new landscaped and planted areas, replacement and reinforcement of the existing landscaping and modifications to existing berms and perimeter security fencing and gates; (l) Proposed new signage based at ground level and on the building facades on the proposed new production building; (m) The works include temporary contractor compounds, temporary car parking and the temporary use of existing site entrances during construction activities; (n) Proposed new surface water management infrastructure for the site, consisting of underground attenuation systems, rainwater harvest cisterns and distribution pipework; (o) All associated site works including sustainability features described in points (a) to (I); Planning permission for the construction of a temporary contractors car park on land to the west of the Pfizer facility with access off Grange Castle Business Park and the reinstatement of the lands to agriculture after the need for the car park expires; The application is seeking permission of 5 years for the completion of the development granted permission under PA Ref: SD16A/0236 subject to the above amendments and alterations to the previously approved Biopharmaceutical Manufacturing Facility and Warehouse and other additional, new, development not forming part of SD16A/0236; This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required; An Environmental Impact Assessment Report (EIAR) accompanies this planning application.Decision record indexed
    Decision17 July 2023View record
  13. © OpenStreetMap
    23197Granted

    Taduff West and Taduff East and Mihanboy, Athlone, Co Roscommon

    Permission for development consisting of: (i) A ten-year planning permission for the construction of a permanent Battery Energy Storage System (BESS) facility adjacent to the consented TDC Community Solar Park (Pl. Ref. 20/36 & Pl. Ref. 21/350) with capacity of c. 80MW; (ii) The provision of up to 22 no. battery storage bays, each with 8 no. containerised battery modules connected to 2 no. inverters per bay and 1 no. transformer per bay; (iii) The containerised modules will typically house battery racks with multiple battery cells, control systems, fire detection and fire suppression systems and cooling systems; (iv) The provision of a BESS switchgear / substation unit (c. 33.2 sq m), storage/office unit (c.33.2 sq. m) and a control room (c.33.2 sq. m), all provided in standard containerised units; (v) The construction of a new access track (c.1,050m) linking the proposed BESS facility to the consented TDC Community Solar Park including 1 no. water crossing point; This will facilitate both construction and operational access while the entrance to the overall TDC Community Solar Park remains via the L2026 as consented under Pl Ref. 20/36. (vi) Minor amendments to the layout of the permitted solar farm (Pl Ref. 20/36 & Pl. Ref. 21/350) comprising the removal of permitted panels to accommodate the proposed access track; (vii) The provision of 2 no. car parking spaces adjacent to the BESS substation control room and 1 no electric vehicle charging point; (viii) All associated site development works and ancillary infrastructure above and below ground including drainage, security fencing, security lighting, landscaping (including additional planting) and ancillary grid infrastructure (A Natura Impact Statement (NIS) has been submitted with the planning application) atDecision record indexed
    Decision10 July 2023View record
  14. © OpenStreetMap
    SD22A/0420Refused

    Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22

    Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.Grounds not yet categorised
    Decision29 May 2023View record
  15. © OpenStreetMap
    221203Granted

    Coolcarrigan, Timahoe West, Co. Kildare.

    For a 10-year permission, for the construction and operation of a renewable energy development within a site boundary of c. 114 ha. The proposed development will consist of a development area of circa 71.7 ha including solar on fixed on ground mounted frames with a maximum height of 3 metres, 1 No. battery storage compound, 1 No. customer switchgear container, 1 No. 110kv grid connected single storey substation, 1 No. single storey customer substation and all associated electrical plant, inverter units, electrical transformers, battery units, cooling equipment, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, upgrading of existing access road and new internal access roads and all associated ancillary activities. The proposed development will have a 35-year operational life from the date of commissioning. Revised by significant further information which consists of Provision of quantum of energy export (of up to 80MW) in the proposed development and storage capacity of proposed battery compound (of up to 80MWh). Clarification of energy export (of up to 15MW, no battery storage) of adjacent permitted development 15/1172 (extension of duration under 20/1052); Submission of details of adjacent permitted development 15/1172 (extension of duration under 20/1052); Provision of details of minor works to site entrance, construction traffic warning signage to public roadway, at proposed site entrance and also within internal haul routes; Clarification of extent of private roadway (haul roads) within the site; Provision of a fire risk assessment of hazards for on or near the solar array and battery storage compound; Provision of programme/schedule of works for proposed development and adjacent permitted development 15/1172 (extension of duration under 20/1052; Provision of amended Archaeological Impact Assessment. Provision of draft Construction Traffic Management Plan; Provision of Independent Road Safety Audit Stage 1/2; Provision of amended preliminary Construction and Environment Management Plan; Provision of Preliminary Public Liaison Engagement PlanDecision record indexed
    Decision12 May 2023View record
  16. © OpenStreetMap
    22223Granted

    35.5 HA SITE KNOWN AS 'WEST OFFALY POWER (WOP) STATION' LOCATED AT SHANNONBRIDGE IN THE TOWNLAND OF CLONIFFEEN, EIRCODE N37 C840 CO. OFFALY

    THE DEMOLITION OF THE EXISTING WOP STATION (AS APPROVED UNDER OFFALY COUNTY COUNCIL REF. 01/187 / AN BORD PLEANÁLA REF. PL 19.125575 AND ALL SUBSEQUENT PERMISSIONS); AND THE DEVELOPMENT AND OPERATION OF ELECTRICITY GRID SERVICES — NAMELY A BATTERY ENERGY STORAGE SYSTEM (BESS) AND A SYNCHRONOUS CONDENSER (SYNC CON). THE PROPOSED DEVELOPMENT COMPRISES TWO DISTINCT PHASES OF ACTIVITY. PHASE 1 COMPRISES THE DEMOLITION OF EXISTING SITE STRUCTURES (WITH A TOTAL FOOTPRINT OF C. 1 3, 124 SQ.M. AND A TOTAL GROSS FLOOR AREA OFC. 28,000 SQ.M.) INCLUDING THE FORMER WOP STATION, THE INTERMEDIATE PEAT STORAGE BUILDING AND ASSOCIATED FUEL MANAGEMENT SYSTEM; AND ANCILLARY BUILDINGS INCLUDING: ELECTRICAL TIPPLER AND ASSOCIATED CONTROL ROOM AND OFFICE, SCREENING, LORRY UNLOADING, WATER TREATMENT PLANT, OFFICES, LABORATORY, WORKSHOP AND MAINTENANCE BUILDINGS, OIL PUMPHOUSE, ELECTRICS ROOMS, RAILWAY / LOCOMOTIVE SERVICE BUILDING, COOLING WATER PUMP HOUSE AND SEWAGE / FOUL WATER TREATMENT FACILITY. ALL BUILDINGS AND STRUCTURES WILL BE DEMOLISHED TO GROUND LEVEL, AND THE SITE WILL BE REINSTATED AND SECURED WITH BOUNDARY GATES AND FENCES, ETC. ASSOCIATED WITH THE DEMOLITION ACTIVITY THERE WILL BE ON-SITE CRUSHING OF MATERIAL USING MOBILE MACHINERY, FOR THE PURPOSES OF DISPOSAL AND / OR MATERIAL RE-USE. PHASE 2 COMPRISES THE PROPOSED DEVELOPMENT OF THE BESS, SYNC CON; AND ALL ASSOCIATED DEVELOPMENT. THE BESS WILL COMPRISE A 75 MW CAPACITY BATTERY STORAGE FACILITY LOCATED WITHIN FENCED AND GATED COMPOUND AND WILL INCLUDE UP TO 22 NO. BATTERY STORAGE UNITS INCORPORATING A CONCRETE BASE, BATTERY MODULES, ASSOCIATED PLANT AND EQUIPMENT INCLUDING TRANSFORMERS AND INVERTERS A 240 SQ.M. SINGLE-STOREY CONTROL BUILDING; THE SYNC CON WILL COMPRISE A 400 MVA SYNCHRONOUS CONDENSER LOCATED WITHIN A C. 0.7 HA COMPOUND AND WILL INCLUDE A SYNC CON BUILDING (C. 962 SQ.M., C. 14 M HIGH). INCLUDING A MAINTENANCE LAYDOWN AREA; AND A CHAINLINK OR PALISADE FENCE AND ACCESS GATE LINKING WITH THE EXISTING STATION ROADS. BOTH DEVELOPMENTS WILL BE SERVED BY GRID CONNECTIONS, BOUNDARY FENCES AND GATES, AND LANDSCAPING. EXISTING ACCESS ROADS WILL CONTINUE TO BE USED TO SERVE THE NEW DEVELOPMENT AND WILL NOT BE ALTERED. SITE SERVICES —AND A 20 KV RURAL SUPPLY CIRCUIT BREAKER BUILDING (C. 18 SQ.M.), WILL CONTINUE TO BE USED TO SERVE THE NEW DEVELOPMENT. PLANNING PERMISSION IS SOUGHT FOR A DURATION OF 10 YEARS. (FULL DETAILED DESCRIPTION IN ATTACHED APPENDIX A)Decision record indexed
    Decision18 January 2023View record
  17. © OpenStreetMap
    2260286Granted

    Coole Middle Quarter, Newcastle Clonmel, Co Tipperary

    Four (4 no.) glamping pods along with an outdoor communal area, a reception hut, sauna, recycling/waste storage, as well as utilising an existing hardcore yard for parking and part of an existing building for bicycle storage, associated landscaping and an underground treatment plant for drainage. The plot is situated just off the unnamed road linking Newcastle and Goatenbridge and lies approximately 0.5 km North-West of Newcastle.Decision record indexed
    Decision04 August 2022View record
  18. © OpenStreetMap
    SD21A/0186Granted

    Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22

    Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement.Decision record indexed
    Decision24 March 2022View record
  19. © OpenStreetMap
    FW21A/0176Granted

    Former Clyde House, IDA Blanchardstown Business & Technology Park, Sn

    The development will consist of revisions to parent permission FCC Reg. Ref. FW20A/0087 and modifications permitted under FCC Reg. Ref. FW21A/0073 to include the following: • Ground floor extensions to permitted building DB6x (formerly known as Building No. 2) to include stairs and provision of a link bridge connecting with DB7x (formerly known as Building No. 1) to the north east. Alterations to existing stairs at DB6x; • Alterations to the plant/roof area of DB7x at first and roof level to include changes to the gantry platform and screen height reduction, provision of new PPRs/PCRs and a new cooling tower; • Provision of canopies at ground floor level to building DB5x, DB6x and DB7x; • Reduction in height of 9 no. permitted flues associated with the gas generators from c.18m to c.15m high and an increase in internal flue diameter from c.2.2m to c.2.5m. Reduction in height of external screening (c.8m) to the gas generator compound and estate road south of the subject site. Provision of screening to permitted switchroom building; • Removal of 1 no. permitted salt saturator tank; • Provision of a raised ramped pedestrian crossover and relocation of 2 no. permitted parking spaces. No change to the permitted quantum of car and bicycle parking; • All associated site development works, services provision, drainage works, minor amendments to boundary treatments to include a relocated fence to the east of DB7x and provision of security fencing to the gas generator compound. No works are proposed to the existing telecommunication pylon and overhead lines running diagonally through the site from south west to north east; • The total gross internal floor area of the development including data halls and ancillary structures is increased to c. 19,114sqm from c. 19,040sqm under FCC Reg. Ref. FW21A/0073; • All other development as permitted under FCC Reg. Refs. FW20A/0087 and FW21A/0073; • A permitted 110kv substation (under construction) located to the south east of this site was subject of a separate Strategic Infrastructure Development application to An Bord Pleanála (ABP Ref. 307296-20) under section 182A of the Planning and Development Act 2000 (as amended). AI Received 25/01/2022Decision record indexed
    Decision21 February 2022View record
  20. © OpenStreetMap
    211642Granted

    Coole West, Athea, Co. Limerick

    (A) the demolition of existing derelict house (B) the construction a single storey dwelling house, detached domestic garage, upgrade existing entrance and entrance walls, install a mechanical aeration unit and polishing filter system with all associated site worksDecision record indexed
    Decision01 February 2022View record
  21. © OpenStreetMap
    FW21A/0203Granted

    KFC Drive-thru Restaurant, Westend Retail Park, Snugborough Road, Cool

    The works will consist of a 9 sq metre drive-thru pod extension to the rear (north-west) elevation of the existing building; and all associated works. Areas of over cladding and redecoration to all existing elevations and associated building works. Alteration of existing building signage and additional external signs and internal illuminated window signage. Installation of replacement drive-thru menu boards and speaker post and associated siteworks.Decision record indexed
    Decision14 December 2021View record
  22. © OpenStreetMap
    211445Granted

    Crataloe West & Coole West, Athea, Co. Limerick

    Decommissioning existing septic tank system, install new mechanical aeration unit with polishing filter system with all associated site worksDecision record indexed
    Decision01 December 2021View record
  23. © OpenStreetMap
    21497Granted

    Ballygeery West, Co Clare

    To apply for a 10 year planning permission for development on a c. 1 ha at Ballygeery West, Co Clare. The development will consist of the development and operation of a 250 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare behind the existing ESB substation for the purpose of stabilising the electricity grid will consist of the following elements; Compound building, within which the synchronous condenser generator and flywheel will be located (540m2c.7m high), Synchronous condenser, with a 250-500 MVA (electrical rating); Cooling equipment (c.160sqm., c. 3m high); 6 No. modular containers to house electrical and Control equipment (total area of c. 195sqm., c. 5m high), A generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker (c.8m high); 1 No. firefighting water tank and pump, An above-ground oil separator and collection pit, Boundary fencing (c.3m high), palisade security entrance gate and CCTV, c.100m of underground cabling ducts and cable to the neighbouring ESB substation, All other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of area of hard standing including a maintenance lay-down area. Planning PERMISSION is being sought for a duration of 10 yearsDecision record indexed
    Decision29 September 2021View record
  24. © OpenStreetMap
    20/6849Granted

    Coole West Whites Cross Co. Cork

    A ground floor extension to the side (north-west) elevation of existing dwellinghouse together with alterations to include a new ground floor window to the front elevation, the demolition of the existing ground floor utility room structure to the rear, the blocking-up up of an existing external door and window and the provision of new patio doors to the rear kitchen together with all associated alterations and site works.Decision record indexed
    Decision10 February 2021View record
  25. © OpenStreetMap
    20/5611Granted

    Coole West Carrignavar Co. Cork

    Demolition of existing livestock sheds and silage pit and construction of an agricultural shed in their place to include milking facilities, straw bedded area, cubicles, feeding area and underground slatted slurry storage tanks and all associated siteworks.Decision record indexed
    Decision21 September 2020View record
  26. © OpenStreetMap
    196334Granted

    Williamstown, Coole, Co Westmeath

    Construction of an extension to the northern and western sides of the existing dwelling, internal alterations to the existing dwelling, replacement of the existing septic tank with a proprietary effluent treatment system and percolation area, demolition of the existing extensions to the north, east and west of the property, demolition of existing agricultural shed to the north of the dwelling and all ancillary site worksDecision record indexed
    Decision03 February 2020View record
Showing 1-26 of 26
PreviousPage 1 of 1Next