The development will consist of the construction of a new dwelling house & domestic garage, new entrance, on-site wastewater treatment system together with ancillary site development works.Decision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE NEW ENTRANCE ON-SITE WASTEWATER TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF 1 NO. DWELLING HOUSE, DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM WITH SOIL POLISHING FILTER, INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICESDecision record indexed
DEMOLISH EXISTING DWELLING HOUSE, CONSTRUCT NEW DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND DETACHED DOMESTIC GARAGE INCLUDING ALL ANCILLARY SITE WORKSDecision record indexed
DEMOLISH EXISTING DWELLING HOUSE, CONSTRUCT NEW DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND DETACHED DOMESTIC GARAGE INCLUDING ALL ANCILLARY SITE WORKSGrounds not yet categorised
DEMOLISH EXISTING DETACHED DWELLING HOUSE, DEMOLISH EXISTING SHED, CONSTRUCT REPLACEMENT DETACHED DWELLING HOUSE, CONSTRUCT NEW DOMESTIC GARAGE AND REVISED SITE BOUNDARIES FROM PREVIOUS PLANNING P99/2011 TOGETHER WITH ALL ASSOCIATED SITE WORKSDecision record indexed
DEMOLISH EXISTING DETACHED DWELLING HOUSE, CONSTRUCT REPLACEMENT DETACHED DWELLING HOUSE, TOGETHER WITH ALL ASSOCIATED SITE WORKSDecision record indexed
(I) demolish existing detached dwelling house (2) construct replacement detached dwelling house, together with all associated site worksDecision record indexed
DEMOLISH EXISTING DETACHED DORMER BUNGALOW DWELLING HOUSE AND CONSTRUCT A REPLACEMENT TWO STOREY DWELLING HOUSE WITH ALL ASSOCIATED ANCILLARY SITE WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH EFFLUENT TREATMENT SYSTEM AND FOR ALL ASSOCIATED SITE WORKS ON THIS SITEDecision record indexed
RETENTION OF SINGLE STOREY EXTENSION TO THE REAR OF EXISTING DWELLING. DEMOLITION OF EXISTING DETACHED DWELLING HOUSE, TO EXCLUDE REAR EXTENSION, CONSTRUCTION OF REPLACEMENT DWELLING HOUSE, REVISED SITE BOUNDARIES FROM PREVIOUS PL REF 04/1510 TOGETHER WITH ALL ASSOCIATED SITE WORKSDecision record indexed
Killala Business Park, Tawnaghmore Lower, Killala Co.Mayo
Planning permission sought for (1) Installation of 2 no. proposed bulk storage silos (13.1m high) to the rear of existing building with all associated siteworks, (2) Alterations to site boundaries, (3) Retention of detached temporary prefabrication office ancillary building. (4) Retention of existing temporary smoking shelter and (5) Retention of relocation of previously approved storage container and retention of 1 no. additional storage container at Killala Business Park, Tawnaghmore Lower, Killala Co.Mayo, F26 XY18.Decision record indexed
Killala Business Park, Tawnaghmore Lower Killala, Co. Mayo
We, Schutz (Ireland) Ltd., intend to apply for permission for development at this site at Killala Business Park, Tawnaghmore Lower, Killala, Co. Mayo, F26 XY18. The proposed development will consist of the following works: (a) Demolition of part of existing adjoining building to make provision for future extension as part of this application. (b) Demolition of temporary prefabricated buildings. (c) Construction of a fully serviced extension to side of existing building which will create additional production area for the existing facility, external plant mezzanine area and the construction of a two-storey office / admin block to the front of the development. (d) Alterations to elevations of existing building to include new wall cladding and windows. (e) New vehicular entrance off the existing service road to allow for HGV access to the rear of the site. (f) Site works to consist of alterations to existing service road, car parking, EV charging spaces, landscaping, lighting, the provision of a bicycle shelter, smoking shelter, covered outdoor seating area, forklift and gas compound, flag poles, signage and boundary treatments to the site. (g) Connection to existing foul, surface water, watermain and utility services networks. (h) All ancillary and associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning authority in connection with the application. The planning application including the Natura impact statement (NIS) may be inspected at the offices of Mayo County Council during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions pr observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission.Decision record indexed
CONSTRUCT A DWELLING HOUSE, GARAGE AND SEPTIC TANK/PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESGrounds not yet categorised
CONSTRUCT A DWELLING HOUSE AND SEPTIC TANK/PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Demolish an existing house and construct a new dwelling house, garage and septic tank/proprietary effluent treatment system together with all ancillary site works (including removal of sheds/existing septic tank) and servicesDecision record indexed
Tawnaghmore Upper and Tawnaghmore Lower, Killala, Co. Mayo
A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported) as well as a small proportion of fuel oil for boiler start-up. The total site area is 19.0 ha of which approximately 7 ha will be developed. The elements of the station are: weighbridges (2 no.), scale house, roundwood storage area, log deck, enclosed wood chipper, wood chip truck dump, wood chip receiving hopper, wood chip screen, wood chip hog, wood chip bins (2 no.), wood chip storage building, wood chip reclaimer, wood chip conveyors with associated magnetic separators, fuel oil storage tank and associated pumps, fuel oil generator, boiler house, baghouse, ash silo, induced draft fan room, boiler stack, combustion air and flue gas fans, boiler additive material receiving hoppers (3 no.), boiler additive conveyors with associated magnetic separators, boiler additive silos (3 no.), boiler water treatment tanks and associated pumps, ammonia tank and associated pumps, turbine hall (existing), control room (existing), cooling tower and associated pumps, water treatment building, waste water storage tank, fire water storage tank and associated pumps, compressed air system, high voltage transfer lines (3 no.), low voltage transfer lines (3 no.), GSU transformer, switchyard, switchyard MCC room (existing), storage and maintenance building (existing), garage, car park, HGV parking, flagpoles (3 no.), external lighting, CCTV cameras, internal road system, signage, construction compound, landscaping, foul and storm water disposal systems, storm water attenuation, wheel washes, gatehouses (2 no.), entrance gates, security fencing, and all associated site works and services. (See attached Description of Proposed Development document for more details.)Decision record indexed
The Proposed Development will consist of a Hydrogen Plant and an Energy Centre. The Hydrogen Plant, to the south of the site,will consist of a Double Storey Electrolyser Building of up to 24m height; Fin Fan Coolers of up to 10.5m height; Hydrogen Storage Area of 7m height; Hydrogen Gas Tube Filling Station of up to 9m height, Gas Injection Compound and Gas Above Ground Installation Building of 4m height; Electrical Substation up to 15m height and Ancillary Equipment Building of up to 3m height; Fire Water Tank of up to 14m height; Pump House of up to 5m height; Administration/welfare building and control block building of up to 4m height. The Energy Centre, to the north of the site, will consist of 9no. Gas Engines generating up to 106MW of power, housed in a Gas Engine Building of up to 13.6m height with two stacks of up to 25m height, Distillate fuel tank of up to 11.2m height, Firewater tank of up to 10m height, associated pumps, sludge tank of 2.1m height and Pump house of 5m Height, Electrical Building of 4m Height, Gate House of up to 4m Height, Administration/Welfare building of up to 4m Height. The Proposed Development includes the demolition and removal of the existing Asahi Plant buildings, foundations, as well as decommissioning and removal of the existing overhead, above ground drainage system and underground services. The Proposed Development will also include Resurfacing, Repair and Improvement of Existing Site Entrance and new Internal Access Roads which in turn opens onto the existing entrance road to the Ballina/Killala regional road (R314). The provision for 23 no. car parking spaces, footpaths, street lighting, external lighting, CCTV cameras, signage, security fencing, construction compound, and all other associated site development plant and equipment and other works including, utilities connections, potable water, stormwater, sewage, and foul wastewater drainage infrastructure, within a total overall application boundary of 6.88ha.Decision record indexed
For the construction of a new dwelling house, effluent treatment plant with associated percolation area, new entrance onto public road, connection to existing services and all associated ancillary site worksDecision record indexed
Extend and renovate existing dwelling house including an upgrade and relocation of septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
SSE Thermal Tawnaghmore Generation Station, Tawnaghmore Upper, Kilala Co. Mayo
The development will consist of the following elements: • Battery Energy Storage System facility, consisting of battery containers with integrated HVAC (Heating, Ventilation, Air Conditioning) units, transformers, inverters, underground cabling, associated control rooms, internal access routes, lighting, CCTV, lightning masts, fencing; • Associated Electrical Compound consisting of: Low voltage operations compound including one (1) single storey control and operational building, electrical plant, cabling, lighting, CCTV, lightning masts, diesel generator and diesel tank, operations and maintenance containers and stores; • High voltage electrical yard comprising outdoor electrical plant and associated compound; • Underground high voltage electrical cable to facilitate a connection to the existing adjacent 110kV Tawnaghmore substation; • Associated landscaping, drainage, decommissioning of existing septic tank and all ancillary works necessary to facilitate the development A 10-year permission is sought in respect of the development. Certain details of the proposed development are unconfirmed in the planning application, and an opinion on unconfirmed details accompanies the application. The Tawnaghmore Power Station has an Environmental Protection Agency (EPA) issued Industrial Emissions (IE) Licence (Reg, No. P0566-02).Decision record indexed
Mullafarry and Tawnaghmore Upper, Killala, Co. Mayo
The construction of a single data centre building located to the north of the site, with an overall gross floor area of c. 29,076 sq.m across two levels and an overall maximum height of c. 22.764m at parapet level. The data centre building includes data halls and associated electrical and mechanical plant rooms (c. 23,908 sq.m), an administrative and staff services block (c. 5,052 sq.m) and circulation and stairs (c. 116 sq.m). 2 no. external terraces are proposed to the east of the building (c. 309 sq.m) and an external generator yard to the south of the building (c. 5,205 sq.m) accommodating 25. no. backup / dispatchable generators and associated flues (to a height of c. 21.164m) within an enclosed compound. The construction of a sprinkler tank and pump house to the northeast of the site, the sprinkler tank is an overall height of c. 7.2 m and the pump house is a single storey building with an overall height of c. 4.15m and area GFA of c. 40.23 sq.m. The construction of an entrance hut at the main access to the south of the site, the hut is an overall height of c. 3.225m and area GFA of c. 11.6 sq.m. Construction of 2 no. site access points from the south and internal road network and circulation areas, footpaths, cyclist infrastructure, the provision of 56 no. car parking spaces (including 12 EV charging spaces and 7 disabled spaces, 3 of them EV), 20 no. cycle parking spaces, hard and soft landscaping and planting, site lighting, PV panels and plant at roof level, foul water connection connecting to existing WWTP in Killala Business Park, boundary treatments, green walls and all associated and ancillary works including underground foul and storm water drainage network and utility cables and all ancillary works and services. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.Decision record indexed
Full planning permission for the following; (1) Demolish existing detached dwelling house, (2) Construct replacement detached dwelling house, together with all associated site worksDecision record indexed
25 YEAR PERMISSION FOR AN ENERGY STORAGE FACILITY. THE DEVELOPMENT WILL COMPRISE OF A COMPOUND CONTAINING 4 NO. ENERGY STORAGE CONTAINERS WITH A CAPACITY OF UP TO 15MV AND ASSOCIATED TRANSFORMERS, SWITCHGEAR, A PRIMARY METERING CABINET, AN AUXILIARY TRANSFORMER UNIT, ELECTRICAL CABLE DUCTING OF APPROX 112M AND COMMUNICATIONS CABLE DUCTING OF APPROX 124M TO CONNECT TO THE EXISTING 38KV SUBSTATION ON THE KILLALA COMMUNITY WIND FARM SITE AND ALL ANCILLARY DEVELOPMENTDecision record indexed
Planning Permission for Development consisting of construction of a storage shed & new slatted shed and underground slurry storage tank along with all associated site works. There will be two buildings and all effluent will be collected and stored in the proposed/existing slatted tanks. The slatted shed will be 7.067m in height and the storage shed will be 6.910m in height they are to be constructed in an existing farmyard our clients family have been farming in for years.Decision record indexed
DEMOLITION OF PART OF EXISTING DWELLING HOUSE AND OUTBUILDING, CONSTRUCTION OF EXTENSION TO REAR OF DWELLING HOUSE TO INCORPORATE EXISTING OUTBUILDING AS LIVING ACCOMMODATION, CONSTRUCTION OF A FIRST FLOOR LEVEL TO EXISTING OUTBUILDING TO ACCOMMODATE HABITABLE ROOMS TOGETHER WITH ALTERATIONS TO ALL ELEVATIONS, REPLACEMENT OF EXISTING SEPTIC TANK WITH NEW PROPRIETARY TREATMENT UNIT AND ALL ASSOCIATED SITE WORKSDecision record indexed
Construct dwelling house, proprietary effluent treatment unit, percolation area and detached domestic garage including all ancillary site worksDecision record indexed
RETENTION FOR THE ERECTION OF A PREFABRICATED STRUCTURE (84SQM) FOR USE AS A TEMPORARY CLASSROOM, FULL PLANNING PERMISSION FOR THE CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION (278SQM) CONSISTING OF 2 NO. CLASSROOMS AND 1 NO. MULTI PURPOSE RESOURCE ROOM, ALTERATIONS OF INTERNAL LAYOUT OF EXISTING SCHOOL BUILDING AND THE INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH NEW BOUNDARY TREATMENTS AND ALL ASSOCIATED SITE WORKSDecision record indexed
REPLACEMENT OF AN EXISTING 20 METRE HIGH MONOPOLE COMMUNICATIONS SUPPORT STRUCTURE AND ASSOCIATED EQUIPEMNT WITH A 24 METRE HIGH MONOPOLE COMMUNICATIONS SUPPORT STRUCTURE AND ASSOCIATED EQUIPMENT AND A DEDICATED PALISADE FENCED COMPOUNDDecision record indexed
The application will consist of planning permission to (1) Alter and extend existing dwelling house, (2) Widen existing entrance by 1.00 meter, and (2) Carry out all required ancillary works on site.Decision record indexed
Planning permission to 1) retain the existing raft foundation to the rear of the existing house and 2) to carry out alterations and new extension to existing dwelling house along with all ancillary worksDecision record indexed
Retain existing mobile home on site and construct new dwelling house, proprietary effluent treatment system, percolation area including all ancillary site worksDecision record indexed
RETENTION OF EXISTING GROUNDWORK AND COMPLETION OF DWELLING HOUSE. RETENTION OF EXISTING GRANNY FLAT WITH NEW WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER. INCLUDING RETENTION OF ALL OTHER ASSOCIATED WORKS AND SERVICES.Decision record indexed
REFURBISH EXISTING SEAVIEW HOUSE AND INSERT NEW WINDOWS ON EASTERN ELEVATION, CONSTRUCT 2 STOREY EXTENSION TO REAR OF EXISTING HOUSE, CONSTRUCT DOMESTIC GARAGE AND CARRY OUT ALL ANCILLARY SITE WORKSDecision record indexed
For permission to retain and complete the single story flat roof extension as now partially constructed to the rear of existing house and also permission to construct a single story flat roof extension to the side and the front of same existing house to include for a flat roof detail over the existing front door, also to enlarge front window on existing ground floor front elevation, and all other related site services. also retention for garden shed located in back garden.Decision record indexed
ALTERATIONS AND ADDITIONS TO AN EXISTING DWELLING HOUSE TO INCLUDE GROUND FLOOR EXTENSIONS TO THE SIDE AND REAR AND FOR ALL ASSOCIATED SITE WORKSDecision record indexed