Planning records
Showing 1-50 of 30,664 public records2.4m and partially 3m tall security railing inside the sites northern gate, eastern and western boundary with 2 no. vehicular security entrance gates - one on the northern boundary and one on the eastern boundary - both at the site of existing entrances. 1no. pedestrian gate is proposed to the northern boundary adjacent to the existing and proposed entrance. Berming and planting to the boundaries will be partially reshaped and removed as required to allow a level surface for the construction of the fence and all associated site works. AI received 28/09/2022
The proposed development will consist of Alterations to the exterior of an existing office and telecoms operation centre building to provide additional area for the provisional upgrade of plant. An extension to an existing plant area to the south and west of the building, and a new plant area to the east of the building, will together provide 890 m2 additional plant space. The plant areas will be visually and acoustically screened by a c.5m new acoustic plant screen to match the existing screening. An extension of 13 m2 is proposed to the substation to the east of the building and an extension of 18 m2 is proposed to the transformer to the south of the building to facilitate upgrade efficiencies. The addition of the western plant will result in the removal of 9 car parking spaces reducing the provision on site from 53 to 44. And all other associated works.
The proposed development is for a centralised waste yard which comprises a bunded and fenced enclosure with vehicular entrance & exit points, pedestrian access gate, a single storey waste storage building, a separate sheltered drum wash station, and associated site works & lighting. AI received 13/07/21
Expansion of the existing Biopharmaceutical
The proposed development will comprise of: (i) Construction of a liquid waste lift station building, for process wastewater, comprising of a floor area of approximately 63 sq.m, with a maximum height of approximately 6.2m, to include underground tank approximately 5,000 litre capacity, roof extract vents with a maximum height of approximately 7.6m, and associated high level pipe racks to a maximum of height of approximately 6.8m. (ii) Construction of a tanker loading area comprising of an overground tank approximately 50,000 litres capacity and bunded concrete apron comprising of an area of approximately 106 sq.m. The tank height will be approximately 5 m above established ground level and will have a diameter of approximately 4.5m. (iii) Installation of a modular electrical building comprising of approximately 40 sq.m, with a maximum height of 3.9m to provide for battery storage and associated equipment. (iv) Provision of solar photovoltaic panel canopy structure over existing car parking, comprising of a solar panel area of approximately 340 sq.m and maximum canopy height of approximately 3.9m. (v) All associated infrastructure including alterations to existing internal access routes to allow access to truck loading yard, provision of drainage infrastructure and all ancillary site and development works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0552-03).
General upgrades of the existing external site area to include A) New entrance off private entrance to a new car park containing 18 spaces including 2 electrical spaces, bicycle & smoking shelter, B) Enhanced landscaping area of soft and hard spaces for staff, C) Demolition to existing entrance lobby to be replaced with new glazing and vestibule (7.13 sq.m), D) Change of facade colour scheme & E) Modifications to main existing entrance.
The development will consist of the change of use
The development will consist of alterations to the elevations of the existing office building, including: the replacement of all window glazing with new double glazed and full height glazing to the existing curtain walling system, including the provision of extruded pressure caps; installation of new aluminium double glazed curtain walls with tapered/flat metal spandrel panel inserts and the replacement of the existing balustrade with a new balustrade at ground floor located to the south-west and south-east of the building.
Modifications to a previously permitted development (Reg Ref. F00A/1299) to include a change of use at first floor level of 'Block 3' from restaurant to office (490 sq.m) with associated internal alterations; minor external works to the building's facade and provision of 8 no. bicycle spaces for the proposed new office use.
The development will consist of
Permission for development consisting of: The construction of 2 no. office buildings, (Block A and Block B), with a total gross floor area of c. 23,180 sq m (excluding c. 17,607 sq m basement levels). - Block A comprises 9,477 sq m approximately of office floor space in a 4 to 6 storey building over single basement level and including a ground floor level cafe (245 sq m), fourth floor roof terrace ( 167 sq m) and 1 no. plant room (393 sq m) at roof level. - Block B comprises c. 13,703 sq m of office floor space in a 4 to 9 storey building over two basement levels and including 1 no. plant room (364 sq m) at roof level. A total of 750 no. car parking spaces are provided at basement and surface levels, with 386 no. bicycle spaces provided at surface level. The development will also comprise ancillary uses including atrium, staff areas, storage rooms, and 2 no. landscaping plazas located to the front and rear of the site. Vehicular access to basement and surface level car parking is via 2 no. entrances, connecting the proposed development to the internal road network within the Blanchardstown Corporate Park. The development will also include the provision of pedestrian and cyclist access from Corduff Road; Accessible ramp from Corduff Road; 2 no. external generator enclosures (43 sq m); hard and soft landscaping; improvements to the public realm; lighting; boundary treatments; 2 no. ESB substations (67 sq m); external bin store (29 sq m); basement air vents (12 sq m); attenuation chambers; piped infrastructure and ducting and all associated site excavation and development works above and below ground. Add Info received 16th February 2021.
Permission for amendments and alterations to the approved expansion of the existing Biopharmaceutical Manufacturing Campus granted planning permission under Fingal County Council planning references FW22A/0300 and FW21A/0069 at College Business and Technology Park, Blanchardstown, Dublin 15. The proposed development will reduce the combined floor area associated with Planning References FW22A/0300 and FW21A/0069 from c. 23,234 sqm to c. 21.530 sqm, and includes: (i) alterations to the approved new 5 storey API Manufacturing Building permitted under Planning Ref. FW22A/0300, to increase the gross floor area from c. 10,315 sqm to c. 10,719 sqm and increase the maximum height from 41.225m to 42.475m and to include amended positioning of chillers and equipment, and provision of a waste staging area at the approved building's associated utility yard. (ii) Alterations to the approved new 2 storey Chemical Materials Store permitted under Planning Ref. FW22A/0300, to increase of gross floor area from c. 1,071 sqm to c. 1,220 sqm and maximum height from 15.12m to 15.645m; and amendment of the associated Chemical Material Yard to include the amended reposition of the approved nitrogen storage tank, scrubbers and thermal oxidiser abatement unit complete with c.46.0 m high flue stack; the realignment of high level pipe racks and addition of a new Pump House with floor area of c. 36 sqm and maximum height of 4.0m. (iii) Alteration to the approved new 4 storey Laboratory Building permitted under Planning Ref. FW22A/0300, to reduce the building floor area from c. 5,148 sqm to c. 4,407 sqm and increase in the maximum height from 27.35 m to 28.675 m; and to include for the provision of a gas store and 1 no. additional bunded diesel tank at the building's rear. (iv) Alteration to the approved extension to Warehouse building envelope initially permitted under Planning Ref. FW21A/0174 and later superseded under FW22A/0300, to reduce the total permitted floor area of c. 6,236 sqm to c. 4,602 sqm, and to increase the maximum height from 24.0 m to 26.43 m. (v) Relocation of the approved Bunded Solvent Tank Storage Area and the associated tanker loading and unloading yard and ISO Tank-Set permitted under Planning Ref. FW22A/0300 to include amendment of the associated Control Room building to increase of gross floor area from c. 89 sqm to c. 123 sqm and maximum height from 4.72m to 4.81m; the addition of a new Pump House with a floor area of floor area of c. 36 sqm and maximum height of 4.0m, and; realignment and extension of high level pipe racks connecting to the relocated tank storage area. (vi) Amendments to the approved medium voltage Electrical Building permitted under Planning Ref. FW22A/0300 to increase the gross floor area from c. 190 sqm to 203 sqm with maximum height of 4.72m. (vii) Amendments to the alignment and position of approved high level pipe racks permitted under Planning Ref. FW22A/0300 connecting buildings and yards. (viii) Amendment to the position of approved 2 no. Backup Generators and associated bunded diesel. storage tanks permitted under FW22A/0300 and the provision of 1 no. additional backup Generator and 1 no. additional bunded diesel tank. (ix Relocation of the approved centralised Waste Management Facility granted permission under FW21A/0069 to include a revised layout and the approved Waste Management building of c. 155 sqm with maximum height of 7.26m, and roofed drum wash station of c. 30 sqm with maximum height of 7.26m. (x) Removal and relocation of the existing pedestrian and cycle entrance to the Cruiserath Road to a revised position on the Cruiserath Road to include a security turnstile and provision of a connecting internal footpath and cycleway. (xi) Alteration of existing internal footpaths to incorporate two-way cycle lanes. (xii) All site works and modifications to internal roads, paving, services, and approved site landscaping provisions. (xiii) Amendment of planning Condition Number 19 of the grant of permission under Planning Ref. FW22A/0300 to change the working hours of construction from 8.00am to 7.00pm Monday to Friday, to the hours of 7.00am to 7.00pm Monday to Friday. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P1030). The application relates to the provision of an establishment to which the Major Accident Regulations apply.
The development will consist of amendments and alterations to previously permitted 2-storey Biopharmaceutical Development and Manufacturing Building and ancillary development under Planning Reg. Reference Number FW23A/0342. The proposed development will comprise; (i) Alterations and amendments to the permitted Biopharmaceutical Development and Manufacturing Building facades, including re-arrangement of glazing, louvers and panels, and provision of new doors on all elevations; (ii) Modifications and alterations to stairs including re-arrangement of Stair 1 with reduction in building height from 18.3m to 15.5m; relocation of lift core of Stair 2 including reduction in building height from 18.3m to 15.5m; enclosure of external Stair 4 including modification in height to 18.5m and increase of floor area of approximately 101sq.m. (iii) New mezzanine floor to provide additional floor area of approximately 517sq.m and provision of new stair (stair 5) with increase of floor area by approximately 72sq.m; and provision of additional floor area of approximately 45sq.m at first floor. (iv) Alterations to roof plan with re-positioning of roof solar panels and vents, and the provision for additional roof vents and lighting rods. (v) Associated external works including alterations for re-alignment of high level pipe racks and adjustment to pedestrian canopies links between permitted buildings to provide for uncovered paved pedestrian access. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0552-03).
Permission for construction of warehouse extension to the east of existing warehouse and associated works. The development will comprise of ground floor and two internal technical mezzanine floors split over 2 levels of total floor area 2545m ² and total building height of 12.4m. Proposed development will be constructed in 2 phases.
Permission for amendments and alterations to the approved expansion of the existing Biopharmaceutical Manufacturing Campus granted planning permission under Fingal County Council planning references FW22A/0300 and FW23A/0230 at College Business and Technology Park, Blanchardstown, Dublin 15. The proposed development will comprise: (i) An amendment to the permitted Waste Management Facility to include; An increase the floor area of the permitted Waste Management Building from approved floor area of 155 sqm to 209 sqm and maximum height of 7.5 m; An increase in the fenced yard area of the approved Waste Management Yard from approximately 1,430 sqm to approximately 1,680 sqm; Associated works including re-positioned plant/equipment, additional chemical store cabinets, an enlargement of approved surface water attenuation tank, footpath adjustments to provide for an access ramp and changes to the approved landscape plan. (ii) An amendment to the permitted Chemical Material Store to reduce its floor area from the approved floor area of 1,220 sqm to 811 sqm and maximum height of 15.65m and to include within the chemical material yard associated plant / equipment, chemical storage cabinets, repositioning of the approved Regenerative Thermal Oxidiser (RTO) abatement unit, and provision of a new Electrical Control Room for the RTO with floor area of approximately 14.4 sqm and maximum height of 2.8m and repositioning of the approved pump house. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P1030). The application relates to the provision of an establishment to which the Major Accident Regulations apply.
Planning permission to erect 8,807.00 m2 of 17.77 MV of photovoltaic panels on the roof of the following buildings of electrical, central utility, manufacturing, warehouse, utilities compound and administration in our industry with all associates site works.
We, Alexion Pharma International Operations Ltd., intend to apply for permission at the existing Biopharmaceutical Manufacturing Campus, College Business and Technology Park, Blanchardstown, Dublin 15. The proposed development will consist of: (i) Construction a new single storey ground floor kitchen extension to existing administration building, with installation of a new air handling unit on this proposed extension's roof and a new external access stairs. (ii) Installation of a new air handling unit on the third floor roof of the existing administration building, (iii) Modifications to internal roads, paving and services, and (iv) All associated and ancillary site development works.
The development will consist of the construction of a 5.51 metre high, single storey plant building with a total floor area of 214 sq./m and the provision of an extension to an existing structural steel pipe rack, part at a height of 5.95 & part at a height of 10.1 metres, located to the South of the proposed building, and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0552-03).
Permission for a permanent construction compound, located to the centre of the BMS site consisting of 4 no. single storey workshops sized 70 square metres and 4.1 meters high, 1 no. toilet facility sized 50 meters square and 3.1 meters high and office/canteen facility sized 50 square meters and 3.1 meters high, all previously granted permission under planning ref: FW17A/0097 but not constructed within the period of validity as set out under condition 2 (ii) of the Grant requiring that the life of the permission is limited to previously approved planning application, planning ref: FW15A/0043. The proposed development is for modifications to an establishment which includes an activity requiring an industrial emissions licence.
The construction of a medium voltage (MV) substation. The MV substation building will have a total gross floor area of c. 30 sq.m, and an overall height of c. 4 metres. The proposed development includes the provision of electrical connections associated with the MV substation, along with all associated hard and soft landscaping, services, and all ancillary works. All on a site with an area of 0.33 hectares. The application site is located to the south of the data storage facility permitted under An Bord Pleanála Reg. Ref. L06F.248544 / Fingal County Council Reg Ref. FW17A/0025, and within an overall landholding bound to the south by the R121/Cruiserath Road, to the west by the R121/Church Road and to the north by Cruiserath Drive.
The development will consist of a 2.4m high four stack dipole antenna on a 1.2m high existing support structure located on the roof of the existing 3 storey MPCC Building. The antenna will have an overall installed height of 27.0m off the ground. The development will be used to boost existing radio network coverage on site. The proposed development is for modifications to an establishment which includes an activity requiring an Industrial emissions licence.
Development at a c.5.19 HA site, the development will principally consist of a single storey extension of 3,767 sq.m. to the existing distribution centre which will increase its gross floor area from 17,435 sq.m to 21,202 sq.m. The maximum height of the extension will be 15.74 no. metres to match the existing height of the distribution centre. The development will also comprise elevational changes to the south-eastern frontage. Retention permission is sought for the HGV parking yard to the north-west of the site (spaces not defined). The proposed development will include the reconfiguration of this HGV parking area to provide 24 no. delineated HGV spaces and 4 no. delivery van spaces. The total number of HGV parking spaces provided to service the entire site will be 75 no. which includes existing, reconfigured and newly proposed spaces. The development will also include a reduction in car parking spaces from 206no. to 152 no. spaces: an additional 7 no. loading bays to provide a total of 41 no. loading bays; minor repositioning of an internal access road; a new portable goods trolley (859 sq.m);19 no. additional bicycle parking spaces; hard and soft landscaping; lighting; boundary treatment; PV panels and all associated site development works above and below ground.
The development will consist of: Installation of a new sprinkler water storage tank and sprinkler fire pump house enclosure to the outside south-western elevation of existing warehouse building, alterations to south-western elevation of warehouse building and associated site works.
Provision of 1 no. self-illuminated external sign, located at roof parapet level to the North-West elevation of Plaza 255, Blanchardstown Corporate Park 2, Ballycoolin, Dublin 15
The proposed development consists of the following:
The development consisting of/will consist of the retention and reconfiguration of the existing temporary car park (27 no. parking spaces ) located to the west side of the car park with associated drainage. The retention of 4 car parking spaces to the south of existing carpark. Planning permission for 2 new automated traffic barriers and removal of adjoining car spaces. planning permission to convert an existing temporary contractor's carpark to new 25 staff carpark spaces and a commercial vehicle set down area for 10 vehicles with associated landscaping lighting footpaths, and access stairs. Total car parking spaces 191 (existing car parking planning permission total 136 spaces) all on a site 5.03 hectares which forms part of a previously permitted Planning Ref. No. FW16A/0080 and FW15A/0038.
The development will consist of
Provision of a drying room and 9 additional bicycle spaces, which will necessitate the relocation of 2 no. car parking spaces and the removal of 2 no. car parking spaces at basement level.
The provision of 2 no. self-illuminated external signs, one each to the north-east and south east elevation.
EIAR NIS The development will consist of all site buildings and infrastructure required to support the new facility including; (a) A 2-storey Biopharmaceutical Development and Manufacturing Building sized approximately 11,670 square metres and approximately 15.5 metres high, with roof-mounted plant and equipment, including solar panels. (b) The refurbishment and extension of the existing 2-storey Laboratory, to include ground-mounted and roof-mounted plant and equipment, including solar panels and an extension to the existing plant room at roof level sized approximately 115 square metres and approximately 9.1 metres high. (c) A single story pedestrian and materials link sized approximately 420 square metres and approximately 7 metres high from the proposed Production Building to the existing Warehouse. (d) A single story pedestrian canopy from the proposed production building to the existing administration building, sized approximately 520 square metres and approximately 8.3 metres high. (e) A single storey pedestrian canopy from the proposed production building to the existing laboratory building, sized approximately 234 square metres and approximately 8.3 metres high. (f) Provision of new car parking spaces including an additional 185 car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the R121. (g) Proposed site infrastructure includes bunded tanks, pipe-bridges, sprinkler and water tanks, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, heat-pumps, underground pumping facilities, internal roads and paths, fencing and site lighting, and the use of the existing BMS site entrances for heavy goods vehicles. (h) The development includes modifications to the existing internal road network. (i) Proposed new landscaping includes new landscaped and planted areas, modifications, replacement and reinforcement of the existing landscaping. (i) Proposed New Signage based at ground level and on the proposed building façade. (k) The works will include temporary contractor compounds including temporary construction cabins, temporary car parking and the temporary use of existing site entrance road (currently not in use) to the north of the site from the Cruiserath Road, during construction activities. (l) Proposed new surface water management infrastructure for the site, consisting of Sustainable Drainage features including a detention basin, rainwater harvest cisterns and distribution pipework. (m) Modifications to existing buildings in the Development and Manufacturing Campus including elevational alterations and modifications to the existing satellite administration, canteen and laboratory buildings to the south of the site, adjacent to the proposed development. (n) All Associated Site Works. The proposed development will be built in 2 phases, with phase 2 comprising of approximately half of the proposed administrative floor area and the proposed pedestrian canopies to the existing administration and laboratory buildings. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application, and they will be available for inspection or purchase at the office of the Planning Authority.
The development will consist of: Modifications to a previously permitted development (Reg. Ref. FW18A/0054) to include a change of use at ground floor level of 'Block B' from office to gym (514 sq.m) and office to cafe (127 sq.m) with associated internal alterations; minor elevational changes; and the reallocation of car parking and cycle parking spaces to the proposed new uses located at basement and surface level, and all associated works above and below ground.
The development will consist of revisions to parent permission FCC Reg. Ref. FW20A/0087 and modifications permitted under FCC Reg. Ref. FW21A/0073 to include the following: • Ground floor extensions to permitted building DB6x (formerly known as Building No. 2) to include stairs and provision of a link bridge connecting with DB7x (formerly known as Building No. 1) to the north east. Alterations to existing stairs at DB6x; • Alterations to the plant/roof area of DB7x at first and roof level to include changes to the gantry platform and screen height reduction, provision of new PPRs/PCRs and a new cooling tower; • Provision of canopies at ground floor level to building DB5x, DB6x and DB7x; • Reduction in height of 9 no. permitted flues associated with the gas generators from c.18m to c.15m high and an increase in internal flue diameter from c.2.2m to c.2.5m. Reduction in height of external screening (c.8m) to the gas generator compound and estate road south of the subject site. Provision of screening to permitted switchroom building; • Removal of 1 no. permitted salt saturator tank; • Provision of a raised ramped pedestrian crossover and relocation of 2 no. permitted parking spaces. No change to the permitted quantum of car and bicycle parking; • All associated site development works, services provision, drainage works, minor amendments to boundary treatments to include a relocated fence to the east of DB7x and provision of security fencing to the gas generator compound. No works are proposed to the existing telecommunication pylon and overhead lines running diagonally through the site from south west to north east; • The total gross internal floor area of the development including data halls and ancillary structures is increased to c. 19,114sqm from c. 19,040sqm under FCC Reg. Ref. FW21A/0073; • All other development as permitted under FCC Reg. Refs. FW20A/0087 and FW21A/0073; • A permitted 110kv substation (under construction) located to the south east of this site was subject of a separate Strategic Infrastructure Development application to An Bord Pleanála (ABP Ref. 307296-20) under section 182A of the Planning and Development Act 2000 (as amended). AI Received 25/01/2022
The development will consist of revisions to parent permission FCC Reg. Ref. FW20A/0087 to include the following: Alterations to plant areas at second/third floor level of the permitted DB5x data hall (formerly known as Building No. 3). The plant areas are now located externally but remain below the permitted parapet height. No visible elevational changes to DB5X. No changes to permitted DB6x and DB7x data halls (formerly known as Building Nos. 1 and 2) and the rotunda building. Removal of the permitted MV generator building and removal of 7 no permitted car parking spaces and replacement with a proposed gas generator compound comprising 9 no. gas generators enclosed with external screening of c.11m high with 9 no associated flues 0.18m high; provision of 1 no. switchroom building comprising electrical rooms and a control station at ground floor level (c.478sqm at c.6m high) and air compressor (c.38sqm at C.4.5m high); Revisions and reduction in the number of fuel tanks from 12 no. permitted fuel tanks to 6 no. proposed fuel tanks within a fuel compound (c.12m high, c.10m from project datum) and relocation and revisions to the permitted fuel pumphouse c.41sqm; Removal of the permitted skip compactor and bin store and provision of a proposed AGI Compound comprising the following: AGI Buildings 1 and 2 (total floor area c.106sqm, c.4.5m high each) with a proposed service entrance/access from the estate road; Relocation of 2 no. permitted transformers within a concrete enclosure (without roof) at 8m high to the north of the proposed AGI Compound. Provision of 2 no. smaller transformers and load bank (c.29sqm); Increase in height of the 7 no. permitted water tanks to c.18m high; Relocation and revisions to the permitted heat recovery plant room (C.48sqm) and slight relocation of the permitted sprinkler pump room (c.32sqm). No changes to the permitted salt saturators, sprinkler tanks and water treatment room c.228sqm; Reconfiguration of the permitted car parking layout providing a total of 52 no. car spaces reduced from 59 no. car spaces previously permitted. Provision of an additional bike shelter serving 10 no. bicycle spaces. Internal access road enlarged locally at the entrance to the permitted rotunda/front of house building; All associated site development works, services provision, drainage works, minor amendments to landscaping and associated boundary treatment works. No works are proposed to the existing telecommunication pylon and overhead lines running diagonally through the site from south west to north east; The total gross internal floor area of the development including data halls and ancillary structures is reduced to C.19,040 sqm from c.25,225 sqm under FCC Reg. Ref. FW20A/0087; All other development as permitted under FCC Reg. Ref. FW20A/0087; A permitted 110kv substation located to the south east of this site was subject of a separate Strategic Infrastructure Development application to An Bord Pleanála (ABP Ref. 307296-20) under section 182A of the Planning and Development Act 2000 (as amended).
Construction of 3 no. data hall buildings with ancillary offices, staff areas, front and back of house areas, entrance lobbies, toilets, storage, associated plant throughout, photovoltaic panels and screened plant areas at roof levels. The proposed data hall buildings range from 1-3 storeys including front of house areas at a 4th floor level serving Building 3. The single storey rotunda building will be retained and reconfigured from previously permitted under (Reg. Refs. FW18A/0032 and FW19A/0176) as front of house comprising lobby, offices, meeting rooms, workshops, associated staff areas and toilets. The overall height of the data hall buildings ranges from c.5.7m to c.17.6m to roof level and c.14.4m to c.24.8m including the roof top plant. The proposed development includes the provision of a 2 storey generator building (c.1,990sqm) comprising 20 no. MV generators and generator rooms, loadbank and customer compound with 5 no. flues c.19m high; 2 no. transformers (c.88sqm each); skip compactor and bin store area (c.51sqm); fuel pump room (c.24sqm); 12 no. above ground fuel tanks (c.8.4m high) within a fuel compound; 7 no. water tanks (c.16m high); water treatment plant room (c.228sqm); 2 no. salt saturators (c.5.7m high); heat recovery plant room (c.49sqm); sprinkler pump room (c.32sqm) and 2 no. sprinkler tanks (c.13.6m high). The total gross floor area of the data halls, front of house and ancillary structures is c.25,225sqm. All associated site development works, services provision, drainage works, landscaping, boundary treatment works, access roads/service entrance, loading bays, vehicular/pedestrian access, security gates, car parking, motorcycle parking and bike stores. No works are proposed to the existing telecommunication pylon and overhead lines running diagonally through the site from south west to north east. A proposed 110kv substation located to the south east of this site is subject of a separate Strategic Infrastructure Development application to An Bord Pleanála under section 182A of the Planning and Development Act 2000 (as amended). Additional Information received 16th September 2020.
The development will consist of the provision of a 63.18 kWp ground mounted solar PV array consisting of 108 no. 585 w PV panel modules with an approximate total PV area of 285 m2, together with all associated site works and services. This application is in regard to a site subject to an EPA Industrial Emissions License P1060-01.
The construction of a new two storey extension of 1,360m2, to the east elevation of the building previously granted planning application No. FW15A/0115 ( and now constructed) for use as a pharmaceutical manufacturing building, together with the re-alignment of an existing access road. 1 no. external stairs and 1 no. external platform linking existing stairs, external ground floor plant equipment. And all ancillary and assoicated site development works. Permission for the continuation of the use of the existing single storey contractors compound (site area 1616m2), for a further period of 5 years pursuant to condition 10 of Pa Ref: FW15A/0115. The build out of the extension may be constructed in a single phase or over two phases. The application relates to a development which comprises of an activity requiring an Integrated Pollution Prevention and Control Licence. IED Licenece no. PO-117-02 The application is also accompanied by an Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report. AI received 30/3/2022 AI deemed significant ** Revised public notices received 13/4/2022
Planning permission for the provision of 1 no. self-illuminated external sign to the South-East elevation.
The provision of 1 no. self-illuminated external sign
Permission for extension to an existing sprinkler pump house and all ancillary works.
Permission is sought to maintain an existing
The development will consist of a bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Blanchardstown campus, between the Áras Croí Building and the Áras Ceangail Building; associated landscaping, site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
Permission for construct a 2 no. trailor parking bays with low level wall and guard rails, fencing and road/line marking.
The application site is located within an overall landholding bound to the south by the R121/Cruiserath Road, to the west by the R121/ Church Road and to the north by Cruiserath Drive. The proposed development comprises the provision of artificial lighting to the substation compound, transformers, and Gas Insulated Switchgear (GIS) building permitted under An Bord Pleanála ref: 30683420 and to the client control building permitted under An Bord Pleanála ref: PL06F.248544/ Fingal County Council Reg. Ref; FW17A/0025, along with all associated site and ancillary works.
The proposed development will comprise; 5 no. EV charging stations each serving 2 no. vehicle charging bays, a total of 10 no. charging points, 8 no. bays are provided under a canopy structure with integrated roof mounted solar panels circa. 74 sqm surface area. The proposed development also incorporates 1 no. ESB substation & 1 no. substation kiosk, with access and egress presented to the site and all associated directional road surface markings and above and below ground ancillary works.
Planning permission for Amendments to an Above Ground Gas
Full planning permission for an extension
The proposed development will consist of (i) installation of solar photovoltaic panels and associated fixtures and fittings on the roofs of the existing amenity building and forecourt canopy, and (ii) all other associated infrastructure and site development works.
The proposed development shall provide for the construction of a 90m3 Underground Fire Fighting Storage Tank.
Retention of development which consist of; (1) change of use of part of ground floor from light industrial warehouse use to office use, (2) creation of a new first floor area above existing ground floor light industrial warehouse floor space for office use and (3) revised office layout on first floor.
Permission for development on a site at Ballycoolin Business Park, Ballycoolin Road, Dublin 15 comprising amendments to the development permitted under Reg. Ref.: FW19A/0089 (a ten year permission), as amended under Reg. Ref.: FW20A/0181. The application site is bound to the south west by Ballycoolin Road, to the south east by an existing estate road, to the east by an existing office development, to the west by St. Philomena's Park and St. Philomena's Court, and to the north by an existing water services depot. The proposed amendments comprise the alteration of the phasing of the development, to provide for the delivery of the entire southern data storage facility building within the first phase of the development, with the entire northern data storage facility building to form part of the second phase of development.