to
to

Planning records

Showing 1-14 of 14 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2460293Granted

    Finisklin Business Park, Co Sligo.

    Development, located to the northeast of the existing facility, will consist of a new ESB substation and switch room to serve the existing facility. The substation measures 45.7m2 in plan area and 3.5m in height. The switchroom and a back up generator will be located on a raised gantry that will measure 121m2 and 7m in height and be situated 3.5m above ground levelDecision record indexed
    Decision30 October 2024View record
  2. © OpenStreetMap
    2360155Granted

    An Post Sligo Delivery Service Unit, Finisklin Business Park Finisklin Sligo, County Sligo

    Alterations and extensions to the existing an post Sligo Delivery Service Unit building to include for a new single storey temporary structure (10m x 30m x 5.5m tall) and temporary connecting link corridor (5m x 5m. x 5.5m tall) both located to the rear (northern) elevation of the existing building. The proposed temporary building would be in place for a period of between 7 to 10 years and consists of a hard shell marquee type structure with a double skinned pvc material, fully tensioned roof and all associated site development worksDecision record indexed
    Decision15 August 2023View record
  3. © OpenStreetMap
    2358Granted

    Finisklin Road, Finisklin Business Park, Sligo

    Development consisting of: 1.The demolition of a portion of the existing industrial units (B & C)(810SQM) to facilitate the construction, in their place, of a new portal frame unit (unit B), similar in height to the main retained unit (A). 2. The re-cladding of the retained industrial unit (A) along with new glazed openings and access doors. The building will be clad with profiled insulated metal cladding. 3. The resurfacing and upgrading of the associated service yard, the access route from Finisklin road and existing car parking to facilitate the new development and the provision of secure and sheltered bicycle parking with additional staff car parking spaces to the rear of the site. 4. All associated site and civil works including rainwater attenuation.Decision record indexed
    Decision13 July 2023View record
  4. © OpenStreetMap
    22151Granted

    Finisklin Business Park, Finisklin, Sligo

    Development consisting of a proposed two storey office building (gross floor area of 1774.4 m2), adjacent bike shelter (10.5 m2) and a car park comprising 224 parking spaces and all other associated site ancillary and infrastructure works including carpark lightingDecision record indexed
    Decision12 December 2022View record
  5. © OpenStreetMap
    21473Granted

    Finisklin Business Park, Finisklin, Sligo

    PP - development consisting of change of use from warehouse to offices and clean room, floor area 1,080 sq.m. in existing factory. The development will include alterations to the north elevation to provide glazingDecision record indexed
    Decision16 March 2022View record
  6. © OpenStreetMap
    21406Granted

    Finisklin Business & Technology Park, Finisklin, Sligo

    PP - development consisting of the following: 1. Removal of existing small store and construction of a new three-bay extension to the rear of our existing factory for Assembly Area/Storage use (floor area - 487.7m2), 2. Connection to existing foul, storm and watermain services, 3. Provision of additional carparking, landscaping and all associated site worksDecision record indexed
    Decision28 February 2022View record
  7. © OpenStreetMap
    21495Granted

    Finisklin Business Park, Finisklin, Sligo

    Development consisting of an extension and alterations to existing factory to provide a warehouse and store. Floor area of proposed extensions: 466sqm. Permission is sought for associated site works at Good4U factory premisesDecision record indexed
    Decision07 February 2022View record
  8. © OpenStreetMap
    21471Granted

    Finisklin Business Park, Sligo, F91 VY44

    Development consisting of replacement of 2 no perimeter wall mounted flood lit signs with 2 no internally illuminated free standing podium signs on landsDecision record indexed
    Decision02 February 2022View record
  9. © OpenStreetMap
    21364Granted

    Finisklin, Business Park, Sligo

    Development consisting of the proposed building extension comprising of an additional 267.08m2 of manufacturing space, the demolition of an existing substation and construction of a new relocated substation with an area of 22.49m2 including all other associated site ancillary worksDecision record indexed
    Decision06 December 2021View record
  10. © OpenStreetMap
    21403Granted

    Finisklin Business Park, Sligo, Co. Sligo

    Development consisting of the construction of a 1722 sqm single storey extension to its existing factory premises to comprise the following: (a) re-location of existing storage area to the rear (south west) of the proposed extension which will also facilitate an increase in production floor space (b) the construction of a 278 sqm single storey enclosed service link corridor lean-to structure built along the north west elevation of the main building connecting the extension with the existing production spaces (c) 43 sqm extension to existing free standing ESB MV sub/switchroom block (d) extension to the rear (south west) concrete hardstanding, relocation of rear entrance and the provision of additional car parking and associated site servicesDecision record indexed
    Decision29 November 2021View record
  11. © OpenStreetMap
    21392Granted

    Finisklin Business Park, Sligo

    Development consisting of the construction of a new Waste holding facility comprising of the construction of 2No 50,000l liquid storage tanks, 390sqm of hard standing and a new internal access route including all other associated site ancillary works and landscapingDecision record indexed
    Decision23 November 2021View record
  12. © OpenStreetMap
    21386Granted

    Unit 10 St. Colm's Centre, Finisklin Business Park, Sligo

    Development consisting of a Sub-division of a part of unit 10 and change of use from light industrial to warehouse with the inclusion of ancillary trade counters (for the sale of building related products principally to trade) the remainder of the building will remain light industrial. Proposed works are as follows: internally the mezzanine level in the rear return will be removed. There would be trade counters inserted along with a proposed new access to the south of the unit. Externally and to the north of the building new bollards on "goods in" entrance; new mechanical plant area; on the south elevation new opening and access doors to service the trade counters and some levelling works along the footpath as well as remarking parking spaces to create a " clear area" and disabled space to the south of the building; block up the entrance on the east elevation. Proposed signage on the south elevation. All other ancillary works to complete the developmentDecision record indexed
    Decision16 November 2021View record
  13. © OpenStreetMap
    2182Granted

    Finisklin Business Park, Finisklin, Sligo

    Development consisting of the demolition of an existing external waste water compound with an area of 43.35m2, a proposed waste compound with an area of 45.92m2, and a bicycle shelter with an area of 49.68m2, to construct a new 1-storey extension on the North elevation of the main building, consisting of gross ground floor manufacturing area of 208.00m2Decision record indexed
    Decision06 May 2021View record
  14. © OpenStreetMap
    2063Granted

    Finisklin Business Park, Finisklin, Sligo

    Development consisting of the construction of a new link road at the IDA Finisklin Business Park, in the townland of Finisklin, Sligo, Co. Sligo. The works will consist of the construction of a new section of road that will link two existing cul de sacs with all ancillary works including footpaths, street lighting, ducting and drainageDecision record indexed
    Decision16 June 2020View record
Showing 1-14 of 14
PreviousPage 1 of 1Next