Showing 1-50 of 26,849 public records3 new buildings. Block A: two storey with six industrial and office units; Block B: two storey with one industrial and office unit; Block C: three storey with ground floor café and office, first floor offices, second floor gym and ancillary areas; new perimeter wall and fence with two revised entrances and gates; surface car parking and all associated site works.
The development will consist of the omission of a permitted above ground installation (AGI) compound under Reg. Ref.: SD20A/0058, the provision of an AGI at an alternate location within the site, and the provision of a Pressure Reduction Metering System (PRMS) and a foul pumping station, along with road upgrades to the public road (R120 Peamount Road), and provision of a foul sewer connection from the site to the northeast, via Peamount Road and Old Nangor Road. The relocated AGI, PRMS compound, and foul pumping station will be located in the southeastern corner of the site. It is proposed to demolish an existing two storey vacant house (with a gross floor area of 235 sq.m.) to provide for the AGI, PRMS compound, and foul pumping station. The relocated Gas AGI and the PRMS will be located within fenced compounds and will comprise of the following buildings and gas-related infrastructure: - 2 no. AGI buildings comprising AGI Building 1 with a total area of c.18 sq.m and overall height of c. 3.4m and AGI Building 2 with a total area of c. 8 sqm and overall height of c. 3.1m; - A Boiler House Kiosk with a total area of c. 12 sq.m and overall height c. 3.5m and boiler flues with a total height c. 5.4m; - A new E&I Kiosk with a total area of c. 12 sq.m and overall height of c. 2.7m; - A new Control Room with a total area of c. 12 sq.m and overall height of c. 3m; - A new Skid House with a total area of c. 123 sq.m and overall height of c. 3.3m; - The compounds will also accommodate associated valves and pipework. A new foul water pumping station with associated chambers, meters and a 24-hour storage tank will be provided to the east of the AGI and PRMS compounds. The proposed developmbent includes all associated and ancillary works including site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site subject to an application for an EPA Industrial Emissions (IE) Directive license.
Demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of the single storey stable building on the overall site; construction of a gas powered Power Plant with all its associated elements; the part single and part two storey property of Bulmer and an agricultural building to the east of the overall site will not be demolished; The Power Plant compound of 14,475sq.m will contain 2 Power Units each with 1 25m height stack (2 overall), transformers, air intakes and electrical modules; the Power Plant compound will also contain a two storey administration and workshop building (427sq.m) and LV switchgear building (140sq.m) (567sq.m in total) plus an AGI connection, gas compressor, water tank, water treatment, firewater tank and pumps, fuel skids, fuel tank and 1 emergency diesel generator; the proposal also includes a battery energy storage system compound of 3,300sq.m containing 15 battery containers and 15 inverters that will be linked to the Power Plant; the development will be accessed from a new vehicular entrance from Peamount Road that will provide access to the Power Plant at the rear of the site; all ancillary site development works, including attenuation pond and dry swales to connect to existing infrastructural services and network as well as fencing, signage, services road entrance gate and 8 car parking spaces; the development will be enclosed with landscaping to all frontages; an EPA-Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development for a period of 10 years on a site of 8.2 hectares on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer'.
Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); 1 two storey ICT facility (building B) will be located to the north-west of Building A and centrally within the overall site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); each of the two ICT facilities will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas; 2 pump rooms of 25sq.m each (4 overall - 100sq.m) plus water storage tanks and plant as well as a separate house generator that will provide emergency power to the admin and ancillary spaces; each generator will also include a diesel belly tank with a single refuelling area to serve the proposed emergency generators; 1 temporary and single storey substation (26sq.m); ancillary site development works including attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables; other ancillary site development works will include hard and soft landscaping throughout the site, lighting, fencing, signage, central services road, security gate, sprinkler tank house and 80 car parking spaces and 17 sheltered bicycle parking spaces; the development will be enclosed with landscaping to all frontages including a wetland to the south-east and will be accessed from the Peamount Road (R120) located within the townland of Milltown on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer' as well as agricultural lands and buildings which are located to the north of the Peamount Road and the lands to the north and within the overall site are subject to a concurrent application for a Power Generation Facility under Reg. SD20A/0058; An Environmental Impact Assessment Report (EIAR) is included with the application.
Development at this site on lands that include the Aylmer Road (L6003); Baldonnel Road (L2001); and lands that include a small section to the north, but are primarily to the south, of the Aylmer Road, including part of the Griffin allotments, within the townland of Kilmactawlay and Milltown, Newcastle, Co. Dublin consisting of the widening, to its south, of the existing Aylmer Road (L6003) from its junction with the Baldonnel Road (L2001) for a distance of c. 520m to the west. The widened road will tie in with the existing road to the west of a proposed new roundabout. The new roundabout will be created by utilising lands to the north and south of Aylmer Road to facilitate access to a new internal estate road (270m in length) to its south-east with a new roundabout at its end that will provide future access to the lands to its north and south. The widening of the Aylmer Road to a 7.5m wide carriageway will be almost entirely to its south and will include a proposed new shared cycle path and pedestrian footpath along its southern side, with the existing hedgerow to be retained for large lengths, and a new hedgerow to be planted where the existing one is to be removed. The proposed new shared cycle and footpath will tie in with a proposed new footpath and cycle path that will be located either side of the new internal estate road. These works will include the provision of 2 new dry attenuation basins on the south side of the widened road. The development will include all ancillary infrastructural works, street lighting, site development and ground works, including fencing, signage, and landscaping.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Retention of 15 metre high telecommunications support structure carrying telecommunications equipment, together with existing equipment container and associated equipment within a fenced compound as previously granted under local authority reference SD12A/0045. The development will continue to form part of Meteor Mobile Communications Ltd's existing and future telecommunications and broadband network.
Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.
Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the Grange Castle South Business Park and includes the residential property of Ballybane, Old Nangor Road on land within the townlands of Milltown; Ballybane and; Aungierstown and Ballybane; and bounding Baldonnel Road to the west; both the Old and New Nangor Road to the north; and Grange Castle South Access Road to the South, Baldonnel, Dublin 22. The development will consist of the following: (1) The demolition of the existing two storey dwelling of Ballybane and associated farm buildings (565sq.m) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq.m on an overall site of 16.5hectares. (2) 1 two storey data centre (Building A) that will be located to the south-west of the site and will have a gross floor area of 28,573sq.m. and will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (Building B) which will be located to the north-west of the site, and to the immediate north of Building A and will have a gross floor area of 21,725sq.m and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (Building C) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq.m. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) Each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) The overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq.m). (8) 3 single storey MV buildings (each 249sq.m - 747sq.m in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings A and B, and to the south of the generator compound withing building C. (9) 8 prefabricated containerised electrical rooms (65sq.m each and 520sq.m overall) that are stacked in pairs to the immediate south of the temporary substation. (10) Ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under Baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq.m), security hut (30sq.m) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the Grange Castle South Access Road from the south via the Baldonnel Road. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
The development will consist of a fuel tank set down area and canopy (approx. c.279sqm and c.4.8m in height) at Microsoft Grange Castle Campus. All other site development and ancillary works.
Microsoft Ireland Operations Ltd. intend to apply for permission for development at the Microsoft Campus, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22. The development will consist of the temporary provision of 9 No. generators (fuelled with Hydrotreated Vegetable Oil (HVO)) and associated site development works for a period to run concurrently with the lifespan of the permitted development under South Dublin County Council (SDCC) Reg. Ref. SD20A/0283 and SD21A/0203. The maximum height of the flue stacks associated with the generators is c. 30.95m. The temporary works will be removed when the permission expires. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.
Amendments to a previously permitted development (Ref. SD21A/0203 which amended Ref. SD20A/0283); Amendments relate to the permitted Gas Skid Compound to provide layout details which will include the provision of a boiler house kiosk, Electrical & Instrumentation kiosk, regulators/meters kiosk, gas analyser kiosk and all associated infrastructure and site development works; The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Licence; The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.
Construction of a new Battery Energy System Storage (BESS) and Power Trunk building and all associated elements; Demolition of all existing structures on site associated with the current golf centre - including main clubhouse and a number of ancillary structures (total 1,009.84sq.m); Construction of a two storey power trunk building (maximum height 10.3m) over basement of 1,982.61sq.m containing MV switchgear; Construction of a BESS to reach a total capacity of 186.3 MWe; The facility will be within an open three storey structure (maximum height of 17.3m), totalling 18,560.9sq.m in area, containing 63 battery containers, & 63 no containers containing power invertors, step up transformers and electrical switchgear and roof level array of 1384 PV panels; 1 two storey administrative welfare buildings (298.26sq.m) associated with the BESS facility; It will be provided with a pre-cast wastewater treatment plant (up to 6 P.E.) discharging to percolation area with polishing filter for foul effluent; 1 single storey Fire Pump and Water Service Plantroom of 174.1sq.m, with associated water tank -associated with the BESS facility; 1 underground rainwater harvesting tank (volume 125 cubic meters - associated with the BESS facility of 35sq.m; 9 car parking spaces (including 3 disabled and 2 electric vehicle charging parking spaces) and 8 cycle spaces; The removal of an existing 15m high telecommunication support structure; Internal road network and new servicing access road from an entrance on Peamount Lane - with amendments to the existing entrance, comprising widening the entrance, provision of new security checkpoint, setting back of the boundary to achieve sufficient visibility splays, and reinstatement of appropriate boundary treatment along the Peamount Lane frontage; Site landscaping, planting, berms and retaining walls along site boundaries and security fencing; and all associated site services, lighting, infrastructural works and attenuation (SUDS features, underground storage and an above ground pond).
Permission for development at this site within the townland of Ballymakaily to the west of the Newcastle Road, Lucan, Co. Dublin. The development will consist of amendments to the permitted development as granted under SDCC Planning Ref. SD19A/0042 that will include: - Reduction in the number of back-up generators, flues and other related plant from 32 to 24 within the permitted generator compound located to the west of the data centre granted under SDCC Planning Ref. SD19A/0042; and - Repositioning of the 24 no. back-up generators, flues and other plant within the permitted generator compound.
Retention of single storey client control room (248.5sq.m) associated with the planned future substation that will be located to the north-east of the permitted data centre development granted under Reg. Ref. SD18A/0134/ABP Ref. ABP-302813-18; the development will form an amendment and modification of the permission granted for a single storey transformer building (125sq.m) under Reg. Ref. SD18A/0134/ABP Ref. ABP-302813-18; no other changes to the permission granted under this decision are proposed under this application on a site within the townland of Aungierstown & Ballybane.
The proposed development primarily comprises the provision of two 110kV transmission lines and a 110kV Gas Insulated Switchgear (GIS) substation compound along with associated and ancillary works and is described as follows: The proposed 110kV GIS Substation Compound is to be located on lands to the north-east of the two storey data centre facility and associated three storey office block that was permitted under SDCC Reg. Ref. SD18A/0134/An Bord Pleanála Ref. ABP-302813-18, and within an overall landholding bound to the north by the Grange Castle South Business Park access road; to the west by the Baldonnel Road and to the south by 3 residential properties and the Baldonnel Road; and to the east by the Google data centre facility within the Grange Castle South Business Park, Baldonnel, Dublin 22. The site of the proposed development has an area of c. 0.9163 hectares. The proposed 110kV Gas Insulated Switchgear (GIS) Substation Compound includes the provision of a two storey GIS Substation building (with a gross floor area of 1,307.2sqm) (known as the Aungierstown Substation), two transformers, lighting and lightning masts, car parking, associated underground services and roads within a 2.6m high fenced compound and all associated construction and ancillary works. Two proposed underground single circuit 110kV transmission lines will connect the proposed Aungierstown 110kV GIS Substation to the existing 220kV / 110kV Castlebaggot Substation to the immediate north-east. The proposed transmission lines cover a distance of approximately 120m and 140m within the townlands of Ballybane, and Aungierstown and Ballybane. The development includes the connections to the two substations (existing and proposed), changes to landscaping permitted under SDCC Reg. Ref. SD18A/0134 / An Bord Pleanála Ref. ABP-302813-18 and all associated construction and ancillary works. An Environmental Impact Assessment Report has been prepared in respect of this application. The planning application and the Environmental Impact Assessment Report may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy) during public opening hours for a period of seven weeks commencing on the 21st January 2021 at the following locations: The Offices of An Bord Pleanála, 64 Marlborough Street, Dublin 1. South Dublin County Council, County Hall, Town Centre, Tallaght, Dublin 24. The application may also be viewed/downloaded on the following website: www.aungierstown-substation.com Submissions or observations may be made only to An Bord Pleanála ('the Board'), 64 Marlborough Street, Dublin 1 during the above-mentioned period of seven weeks relating to: the implications of the proposed development for proper planning and sustainable development, and the likely effects on the environment of the proposed development, and the likely significant effects of the proposed development on a European site, if carried out. Any submissions/observations must be accompanied by a fee of €50 (except for certain prescribed bodies) and must be received by the Board not later than 5.30p.m. on the 10th March 2021. Such submissions/observations must also include the following information: The name of the person making the submission or observation, the name of the person acting on his or her behalf, if any, and the address to which any correspondence relating to the application should be sent, The subject matter of the submission or observation, and The reasons, considerations and arguments on which the submission or observation is based in full. (Article 217 of the Planning & Development Regulations refers). Any submissions or observations which do not comply with the above requirements cannot be considered by the Board. The Board may at its absolute discretion hold an oral hearing on the application. (For further details see ‘A Guide to Public Participation in Strategic Infrastructure Development' on the Board’s website www.pleanala.ie). The Board may in respect of an application for permission/ approval decide to (a) (i) grant the permission/approval, or (ii) make such modifications to the proposed development as it specifies in its decision and grant permission/approval in respect of the proposed development as so modified, or (iii) grant permission/approval in respect of part of the proposed development (with or without specified modifications of it of the foregoing kind), and any of the above decisions may be subject to or without conditions, or (b) refuse to grant the permission/approval. Any enquiries relating to the application process should be directed to the Strategic Infrastructure Development Section of a Bord Pleanála (Tel. 01- 8588100). A person may question the validity of any such decision by the Board by way of an application for judicial review, under Order 84 of the Rules of the Superior Courts (S. I. No.15 of 1986, as amended), in accordance with section 50 of the Planning and Development Act, 2000, as amended. Practical information on the review mechanism can be accessed under the heading Information on cases / Weekly lists - Judicial review of planning decisions on the Board's website www.pleanala.ie or on the Citizens Information Service website www.citizensinformation.ie.
The proposed development seeks to provide a temporary construction access road including entrance from Baldonnel Road to provide for the construction of a Regional Network Gateway (RNG) facility permitted under South Dublin County Council Reg. Ref. SD25A/0035W. The works will also involve the temporary provision of a security hut, security gate, vehicle set down area, associated fencing, lighting, civils, drainage, and landscaping works. The temporary works will be removed and lands reinstated to their former use when the construction of the RNG facility is complete.
The development of a Regional Network Gateway (RNG) facility (supporting infrastructure for the MS data centres) comprising the following: • Construction of a single storey main building (RNG Building - c.1,124.3 sq.m) with air handling units (AHUs). • External plant/equipment yards including 3 no. diesel generators; sprinkler tank and pump house; electrical plant rooms, PV panels. • MV substation & Stormwater attenuation pond. • 12 no. car parking spaces (2 of which are EV parking spaces and with 1 accessible parking space). Bike parking shelter and bin store. • New road access provided from adjoining permitted estate road (granted under SDCC Ref. SD24A/0107W) and including bridge over existing watercourse. • Internal road and footpath layout, perimeter fencing, security gates and retaining wall. • Landscaped and planted areas including riparian corridor and swale. • Temporary Construction compound and parking area (including temporary bridging of existing watercourse/field drain). • All associated site development works, site lighting, boundary treatments, services/utilities provision (including underground works), and all other ancillary works. Total gross floor area of the development c.1,384.2 sq.m
The development will consist of the amendment of Condition no. 3 (ii) and 3 (iii) of the permission granted under Reg. Ref. SO21A/0042 that related to the Gas Plant of the overall permitted development only, so that these aspects of the new condition shall read as follows: Condition no. 3(ii) Within four (4) years from the date the first Gas Plant commences operation, the applicant or operator shall undertake a review with GNI of the ability to serve the Gas Plant with green gas and / or hydrogen (or similar fuels) shall be Investigated and reported to the Planning Authority. Any ability for the Gas Plant to be operated with green gas and/ or hydrogen (or similar fuels) shall be implemented within an agreed timeline agreed with GNI. Condition no. 3(iii) If the applicant receives a firm offer from Eirgrid under which the Gas Plant is not required, and the connection has been realized with capacity onsite from Eirgrid, then the Gas Plants shall be removed from the entire site within a year of the ceasing of operation. The nature and extent of the permitted Gas Plants, or any other element of the parent permission granted under Reg. Ref. SD21A/0042 will otherwise not be amended by this application. An EPAIndustrial Emissions (IE) licence will be applied for to facilitate the operation of the Gas Plant that Is subject of this amendment application.
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
Renovation of existing detached dwelling comprising of single storey peripheral extension. Removal of existing roof structure and remodel of internal layout, comprising of 2 no. bedrooms at first floor level and living room, office, WC and utility room at ground floor level. Construction of new one and two storey extension to the side of existing dwelling, comprising of 2 no bedrooms and en-suite at first floor and open plan kitchen, living and dining space and plant room at ground floor level. Upgrading of effluent treatment system and all associated ground works
Amendments to the electrical substation compound and structures permitted under Reg. Ref. SD19A/0042 and ABP Ref. 305948-19 comprising of amendment to the layout and extent of the permitted substation compound, to include an extension of the compound area to c. 0.77 hectares; reorientation of the Gas Insulated Switchgear (GIS) substation building to a northsouth orientation, and associated amendments to the building footprint, layout, and elevations, providing for a two storey building with a gross floor area (GFA) of c. 1,456 sq.m; alterations to the permitted single storey Client Control Building to provide for the substitution of this structure with 5 single storey modular client control units, with a combined total GFA of c. 231 sq.m (GFA of c. 46.2 sq.m per module); associated amendments to the permitted substation access arrangements (3 gated access points provided), transformers, security fencing (to be 2.6 metres high in place of the 2.4 metre high fencing permitted), lighting, services, MV substation, parking, utility cabling, amendments to permitted landscaping and berms adjoining the substation compound and associated and ancillary works.
Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the construction of a circa 2,155sq.m, two storey biopharma production facility to a maximum height of circa 14.9m to be located to the south of the existing P3 building; single storey administration extension of circa 210sq.m to a maximum height of 4m to the north of the existing P3 building and internal modifications to the existing P3 building in addition to all associated site works including delivery area; courier pick up/drop off area with 5 parking spaces (including 1 accessible parking space and 1 E-car space); extension to existing external utilities yard (circa 485sq.m) for 3 heat pumps and other ancillary equipment; new internal site circulation road and re-alignment of existing circulation road; 48 additional car parking spaces (including 3 accessible parking spaces and 5 E-car spaces); 24 covered bicycle stands, hard and soft landscaping and external lighting; there will be temporary site entrance and associated temporary access road located to the south east of the site during the construction phase all on 3.68 Hectare application site located within the Takeda Ireland facility at Grange Castle Business Park; an EIAR (Environmental Impact Assessment Report) is submitted with the application and relates to development comprising of an activity which requires and Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
The installation of solar carports and a ground mounted solar PV array. The proposed development will consist of solar carports (three and five panel versions) over existing surface car park areas, solar panels on ground mounted frames, 1 no. single-storey low voltage / medium voltage transformer (skid) unit, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for carport areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via existing site entrances from the existing Grange Castle Business Park internal road network.
Retention of 1 standby diesel generator with an associated flue (15m high) within the permitted generator compound located to the east of the data centre granted under SDCC Reg. SD16A/0345 increasing the number of standby diesel generators from 5 to 6 within the permitted compound.
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.
A new part single/part two-storey dwelling, with new vehicular access off Peamount Lane, a proprietary wastewater treatment system, and all associated site and infrastructural works.
Construction of 2 adjoined single storey data centres with associated office and service areas with an overall gross floor area of 15,274sq.m comprising of the construction of 2 adjoined single storey data centres with a gross floor area of 12,859sq.m that will include a single storey goods receiving area / store and single storey office area (2,415sq.m) with PV panels above, located to the east of the data centres as well as associated water tower, sprinkler tank, pump house and other services; The data centres will also include plant at roof level; with 24 standby diesel generators with associated flues (each 25m high) that will be located within a generator yard to the west of the data centres; New internal access road and security gates to serve the proposed development that will provide access to 36 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; New attenuation ponds to the north of the proposed data centres; Green walls are proposed to the south and east that will enclose the water tower and pump house compound; The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage; The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and Ref. SD21A/0042; The site will remain enclosed by landscaping to all boundaries; The development will be accessed off the R120 via the permitted access granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and SD21A/0042; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Modifications to the existing main site entrance to comprise of minor realignment of the internal access road with adjusted road marking and roadside bollards; Removal of 3 existing security traffic arms; Installation of 3 new security traffic arms and installation of 3 underground lifting security road blockers together with associated communications and electrical services; Provision of 2 set-down only parking spaces and all associated site drainage and installation works.
The proposals will comprise of amendments to Units 2, 3 and 4, permitted under Reg. Ref.: SD23A/0301. The proposed development will consist of: Unit 2 Reconfiguration of permitted substation; Reconfiguration of car parking layout; Unit 3 Reconfiguration of the layout of the unit resulting in a reduction of floor area from 6,325 sq.m GFA (including 579 sq.m of associated office space) to 4,386 sq.m GFA(including 831 sq.m of associated office space); Reconfiguration of the car park area to provide an increase in the total number of car parking spaces from 50 no. spaces to 68 no. spaces including 14 EV charging spaces. Reconfiguration of the service yard area including: Increasing the service yard area to the east of the Unit 3 building. Relocation of the service yard entrance from east side of plot to south side of plot; Provision of 132 no. delivery van spaces with EV charging for all van spaces. Relocation of external facilities including bin store, water tank, condensers and PV battery area. Relocation of the bicycle parking area and a reduction from 32 no. spaces to 22 no. spaces; The unit will be served by 2 no. dock level loading bays and 1 no. level access loading bay; Amendments to the elevations to accommodate the changes to the layout of the unit and the provision of signage on the elevations; Omission of internal roundabout and revisions to the internal road layout; Provision of a new pedestrian crossing; Relocation of permitted substation; Amendments to the permitted attenuation ponds; Omission of the permitted fire tender access along the western boundary of the plot and; Increase in unit's finished floor level from 67.800m to 68.200m Unit 4 Relocation of permitted substation; Reconfiguration of carpark and bike parking layout (no change to permitted number of parking spaces). All associated infrastructure, road markings, totem signs, signage, Corten wayfinding, boundary treatments, landscaping and site development works.
Provision of an establishment to which to European Communities (Major Accident Hazards involving Dangerous Substances) Regulations 2006 as amended by Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 apply, constituting a change of use; The new establishment will include all the existing and permitted buildings (SD13A/0143 as amended by SD13A/0265, SD14A/0194 as amended by SD15A/0343, SD16A/0088 as amended by AD17A/0318 & SD20A/0283, SD21A/0203 & SD21A/0288, all within an existing campus; The proposal relates to the total quantum of fuel oil to be stored within existing and permitted tanks across the existing and permitted buildings; For the avoidance of doubt no works or physical development is proposed and the application relates to an existing development which comprises or is for the purpose of an activity requiring an integrated pollution prevention and control (IE) licence.
Erect 329sq.m or 67.34 KWp of photovoltaic panels on the roof of the building DUB12 in data centre; all associated site works.
The proposed development will consist of: The construction of five logistics / warehousing units (Units 1 - 5) with associated office accommodation, service yards, ancillary structures/areas, and substations. The overall floor area of the proposed logistics / warehousing units is c. 56,932 sq.m (Gross Internal Area (GIA)) with a total of c. 4,336 sq.m of office space. See following breakdown of each unit: Unit 1 will comprise GIA c. 10,432 sq.m (including c. 579 sq.m of associated office space) and measures c. 17.9m from finished floor level (FFL) to roof ridge; Unit 2 will comprise GIA c. 18,065 sq.m (including c. 1,005 sq.m of associated office space) and measures c. 18.4m from FFL to roof ridge; Unit 3 will comprise GIA c. 6,325 sq.m (including c. 579 sq.m of associated office space) and measure c. 17.4m from FFL to roof ridge; Unit 4 will comprise GIA c. 8,762 sq.m (including c. 484 sq.m of associated office space) and measures c. 17.6m from FFL to roof ridge; Unit 5 will comprise GIA c. 13,348 sq.m (including c. 1,689 sqm of associated office space) and measures c. 17.8m from FFL to roof ridge; Access to the site will be from the existing roundabout to the south of the site; Provision of no. 419 car parking spaces and 172 bicycle spaces to serve the proposed development; Associated works for the diversion of the existing foul sewer within the site; The provision of attenuation basins / wetlands across the site; Associated works for re-routing of the existing ESB overhead wires which traverse the site to underground cables within the site; The formation of plateaus on the site with surplus excavated material to allow for the future Phase 2 development and; All ancillary landscaping, boundary treatments, internal roads and roundabout, cycle / pedestrian paths, associated infrastructure, and site development works to support the development
The proposed development comprises amendments to planning permission Reg. Ref.: SD21A/0241, as previously amended by Reg. Ref.: SD23A/0035, SD23A/0203, SD23A/0291 and SD24A/0162W. The proposed amendments consist of the following: The provision of a sprinkler tank to a height of c. 11m (c. 12.8m to top of maintenance ladder) with a diameter of c. 10.1m located to the north west of the overall site; The provision of a pumphouse to the east of the sprinkler tank comprising c. 73sq.m; Security fencing and associated above ground pipework; and All associated and ancillary works.
Construction of a Volatile Organic Compound (VOC) Abatement system comprising of a thermal oxidiser (TO), associated plant equipment and scrubbers positioned on a bunded concrete plinth with a maximum single stack height of 12m along with two access platforms at 2.5 high and 5.0m high used for maintenance only; The system is set within a 489sq.m (including a bunded area of 213sq.m) concrete compound enclosed by a 2.4m high paladin weldmesh black fence to match the existing utilities perimeter fence; 135sq.m single storey utilities workshop will sit adjacent to the Volatile Organic Compound (VOC) abatement system compound with associated hardstanding area and soakpit; 55m (L) x 3.2m (W) x 5.6m (H) pipe rack extension with the addition of a second tier extension 118.6m (L) X 3.2M (W) 1.2m (H) to the existing pipe rack is required to service the new VOC abatement system compound; a contractor's compound 3,420sq.m comprising single stacked portacabins, workshops, parking for 30 contractors, materials delivery and set down area; the compound will be enclosed by a 2.4m tall paladin weldmesh black fence; modifications to the existing internal access road will include the addition of a new access road and footpath around the VOC abatement system compound and utilities workshop; a permanent pedestrian crossing including associated signage at the existing access road giving access between the contractor's compound and the voe abatement system compound; modifications to the existing site lighting, signage, surface water, foul and process wastewater drainage, hard and soft landscaping including a 3m high planted berm to the north of the contractor's compound; An EIAR (Environmental Impact Assessment Report) will be submitted with the application; this application relates to development which comprises an activity requiring an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
PERMISSION for development at this site at Grange Castle Business Park. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of revisions to parent permission SDCC Reg. Ref. SD24A/0188W to include the following: Removal of internal mezzanine floor level (175sqm). Removal of internal staircase. Introduction of external staircase to be located adjacent the south façade and enclosed in screening panels. All other developments as permitted under the SDCC Reg. Ref. SD24A/0188W: A permitted storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.
Microsoft Ireland Operations Ltd. intend to apply for PERMISSION for development at this site at Grange Castle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of a storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.
We, Vantage Data Centers DUB11 Ltd. are applying for permission for development at this site on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townland of Ballybane within Profile Park, Clondalkin, Dublin 22. The development will consist of an amendment and modification of the permitted Gas Networks Ireland (GNI compound that was granted as part of, and under SDCC Planning Ref. SD21A/0241 that will include: - Replacement of the permitted vehicular access to the GNI compound from within the data centre campus to being directly off Legacy Drive that will include a modified internal access road; - New internal layout of the GNI compound that will include the replacement of the permitted boiler kiosk (42sqm), skid kiosk (89sqm) and analyser kiosk (3sqm); with a single storey boiler house kiosk (19.7sqm); single storey regulators / meters kiosk (36.8sqm); single storey electrical kiosk (14.6sqm); as well as all associated infrastructure and ancillary works; and - 3 no. floodlighting columns (each 8.537m in height) within the GNI compound that will be surrounded by a 3m high fence and vehicle gates.
Retention and continuance of the use for a further two years of the temporary gas powered generation plant, that is located to the rear of the Takeda Ireland complex, that is sited within a walled year of 2,836sq.m containing 12 generator units with associated flues (each 15m high), which was permitted initially for a period of three years under Reg Ref. SD16A/0345 and was subsequently extended for an additional period of 2 years from the 4th February 2020 under Condition no. 2 of permission granted under SD19A/0342 Vehicular access to the generation plan will remain from the permitted service road into Edgeconnex site and Grange Castle Business Park as originally permitted.
Retention and completion of amendments to the permitted internal road layout, internal fencing and other ancillary internal layout amendments that were permitted under SDCC Planning Ref. SD18A/0298.
Ten-year planning permission is sought for the expansion of existing Google Ireland Limited operations at Grange Castle Business Park South, Dublin, including the development of a 72,400m² data storage facility which will incorporate data halls with associated support areas, a high voltage compound, offices and staff facilities, a loading area, mechanical and electrical yards, internal and external utilities, security fence and gates, landscaping including acoustic screening, 2 no. stormwater attenuation ponds, additional internal vehicle and pedestrian infrastructure, together with ancillary buildings and site infrastructure. The development also includes the creation of a new active travel thoroughfare connecting Grange Castle Business Park South and Profile Park Road.
Relocation of the temporary gas powered generation plant for a further two years from lands to the rear of the Takeda Ireland complex to the east of the site; to lands to the immediate north-west within the Edgeconnex campus and to the immediate east of the data centre granted and built under Reg. Ref. SD17A/0141 and SD17A/0392; the relocated temporary gas powered generation plant will be enclosed within a walled yard of 2,836sq.m containing 12 generator units with associated flues (each 15m high) that was permitted for a period of three years on the 15th May 2017 under condition No. 4 of permission granted under Reg. Ref. SD17A/0027; vehicular access to the generation plant will remain from the permitted service road into the Edgeconnex site and Grange Castle Business Park as originally permitted.
Amendments to planning permission Reg. Ref.: SD21A/0241, as previously amended by Reg. Ref.: SD23A/0035, SD23A/0203, SD23A/0291, SD24A/0162W and SD25A/0102W. The proposed amendments consist of the following: The provision of an underground firewater retention tank c. 840m3 located to the north of the overall site; The provision of a new entrance onto the New Nanagor Road to service this tank and for infrequent maintenance; Security fencing and associated ground pipework and planting; and All associated and ancillary works
(1) Demolition of existing single storey dwelling (c.108.5sq.m); (2) construction of a Distribution Warehouse Building comprising warehousing and ancillary areas at ground floor and support offices, staff areas and plant across two floors; (3) the development will be accessed from the existing Profile Park estate road; (4) provision of car parking, cycle parking, security gatehouse, landscaping and boundary treatments (including security fencing and gates); (5) all associated site development and services works (including diversion/culverting/reprofiling of existing stream on site); (6) total gross floor area of the development c.17,006sq.m.
Amendment and modification of SD21A/0241 including the replacement of the permitted 2 sprinkler tanks and pump room with a two storey battery energy storage system (435.56sq.m) over a single level basement that will contain a sprinkler system, water tanks and pump room that will serve the overall permitted development as granted under Ref. SD21A/0241; A single additional car parking space will be provided adjacent to the new building that will be accessed via permitted access road from Falcon Avenue within Profile Park that was granted under Ref. SD21A/0241; 2 new transformers to be located to the north of the permitted switch rooms; 1 life safety generator to be located adjacent to the permitted step up transformer compound within the site.
Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.
Planning permission is being sought by Peamount Healthcare CLG for part change of use from ancillary staff accommodation to laundry, and material alterations to include; (i) new door - front elevation (ii) new double doors - side elevation (iii) new double doors - rear elevation (iv) internal alterations and all associated site works at the Avenue Building, Peamount Hospital Campus, Newcastle, Country Dublin