to
to
Researching a specific site? Get a decision-ready site risk brief — €39 incl. VAT, PDF by email.Get a site risk brief

Planning records

Showing 1-50 of 52 public records
PreviousPage 1 of 2
  1. © OpenStreetMap
    2660196Granted

    227 Abbeylands, Mullingar, Co. Westmeath

    Alterations to all facades/ elevations of the existing dwelling, by installing external insulation (150mm maximum) on the existing dwelling. The front elevation will be finished with a slip brick to match the existing façade, with all remaining areas to be finished in a nap plaster and all associated site worksDecision record indexed
    Decision17 June 2026View record
  2. © OpenStreetMap
    SD26B/0199WGranted

    75 Ballytore Road, Rathfarnham, Dublin 14, D14KT97

    Demolition of rear and side single storey structures (approx. 19.5sqm) and the construction of a single storey extension to front, the construction of a double storey extension to side and the construction of a single storey extension to rear (extensions total approx. 93.7sqm). The development will also include externally insulating the retained house (render and brick slip finish), alterations to internal layouts, additional window opes and changes to selected existing window opes, proposed rooflights, widening of existing gateposts and all associated site works.Decision record indexed
    Decision15 June 2026View record
  3. © OpenStreetMap
    SD26A/0057WRefused

    Lynch Park Road, Brittas, Co. Dublin

    Construction of a single storey slipped roof design bungalow. A septic tank discharging to a subsurface trench percolation area. Upgraded existing entrance to a domestic vehicular and business entrance. A bored well. The commencement of a canine accommodation business. The construction of eighteen kennel cubicles which could accommodate up to eighteen dogs and which will be used as part of this new business. The provision of canine wastewater storage facilities (which will accommodate wastewater prior to being transported off-site by a licensed contractor. All associated site works.Grounds not yet categorised
    Decision29 April 2026View record
  4. © OpenStreetMap
    25/4589Granted

    Ballymacorcoran Clondrohid Macroom Co. Cork

    Permission for the retention of 2 no. existing temporary modular buildings which are used as dressing rooms for a duration of 10 years together with permission for retention of storage container, proprietary treatment unit and percolation area. Permission to develop a hurling ball wall with 10.4m high ball stop post and netting, control room, 6 no. floodlighting columns consisting of 6 no. 20m high poles with HFL 19S-1800WG-BR3030-757-60L-140 lights which will provide lighting to serve both the main pitch and training pitch, water harvesting tank for pitch sprinkler system, proposed new entrance slip road, proposed new boundary retaining wall, along with changes in design and layout to car park and the proposed pathway around the main pitch to that previously granted under planning reference number 19/6850, together with all other ancillary site works.Decision record indexed
    Decision23 March 2026View record
  5. © OpenStreetMap
    2660008Granted

    The Rocks, Derrycassan, Co. Longford

    The reinstatement of a portion of a worked-out quarry to prevent further land slips on adjoining field. The area to be covered is circa 1.21 hectares and it is intended to import 100,000 tonnes of inert soil and stone and C&D materials for internal haul roads. It is expected that works will be carried out over a five-year period and includes all ancillary site works and servicesDecision record indexed
    Decision10 March 2026View record
  6. © OpenStreetMap
    WEB2979/25Granted

    Junction of Grangegorman Upper/Lower and Rathdown Road, Phibsborough, Dublin 7

    The proposed development will consist of permanent works to the Grangegorman Upper, Grangegorman Lower and Rathdown Road junction and roadway. These works are similar to that previous permitted under DCC Reg. Ref. 2834/18; ABP Ref. 302066 and will make permanent the interim measures put in place under GSDZ2835/18 at this location and comprise: 1. The permanent removal of existing one-way left turn slip lane from Grangegorman Lower to Grangegorman Upper; realignment of the T-junction with Rathdown Road / Grangegorman Lower; new raised table with 2 no. pedestrian crossings on Grangegorman Upper and associated new road surface treatment and road marking; provision of a new speed ramp on Grangegorman Lower north of Ivy Avenue and the replacement of an existing speed ramp on Rathdown Road. 2. The development also includes permanent removal of parking areas previously within the junction and creation of a new public space with 2 no. parking spaces for accessible vehicles, bicycle parking spaces and all associated landscape and site works (including surface treatment, bollards, demountable bollards, lighting and feature trees and planted areas). 3. All development shall take place within a total area of c. 2,170 sq.m and is located adjacent to the existing Grangegorman boundary wall (a Protected Structure).Decision record indexed
    Decision09 February 2026View record
  7. © OpenStreetMap
    SD25A/0137WRefused

    Lynch Park Road, Brittas, CO. DUBLIN

    A single storey slipped roof design bungalow. A septic tank discharging to a subsurface trench percolation area. Upgraded existing entrance to a domestic vehicular entrance to the requirements of The Roads Department of South Dublin County Council. A bored well. All ancillary groundworks associated with the above.Grounds not yet categorised
    Decision05 August 2025View record
  8. © OpenStreetMap
    2560246Granted

    The existing walkway along the River Francis between the centre of Castlerea town and the Demesne, Castlerea, Co. Roscommon

    Permission for development that will consist of converting the existing steps between the street and the river path to a 21m long ramp that will be suitable for individuals with limited mobility thereby providing access for all. It is also proposed to construct a 29m long metal cantilever meeting area on the riverbank east of the existing steps and path and three new public benches will be provided. The planning application includes overlaying 41m of the existing path with a steel boardwalk from the foot of the ramp, enhancing the mobility for individuals with limited mobility. Approximately 148m of the riverside path will be reprofiled and finished with an anti-skid surface to prevent slip. A Natura Impact Statement (NIS) report has been completed for this development atDecision record indexed
    Decision18 July 2025View record
  9. © OpenStreetMap
    WEB1993/25Granted

    65 O'Connell Gardens, Sandymount, Dublin 4, D04 A661

    The construction of a single storey extension to the front, two storey extension to the rear and Installation of an External Wall Insulation System with brick slip finish to the entire house.Decision record indexed
    Decision26 June 2025View record
  10. © OpenStreetMap
    SD25B/0146WGranted

    82, Hermitage Road, Lucan, Co. Dublin, K78 VY73

    The development consists of adding a layer of external insulation to the elevations of the existing dwelling including brick slip finishes to match the existing brick finish on the dwelling. This is all together with associated site works.Decision record indexed
    Decision08 May 2025View record
  11. © OpenStreetMap
    24/319Granted

    16 The Coast Guard Meenvane Schull Co. Cork

    I.) The construction of a single storey extension to side and two storey extension to front (south east) of existing two storey dwelling. ii) Attic conversion to create a 'room in roof' with new dormer window and roof terrace to front (south east) of existing two storey dwelling. iii) Integration of existing single storey derelict boat house to front of existing dwelling into the curtilage of the existing dwelling for use ancillary to that of the existing dwelling iv) Proposed works to existing single storey derelict boat house to front of existing dwelling to include stabilisation / reduction in height of existing walls and new gates to east elevation to enable access to slip way together with alterations to existing dwelling and all associated site worksDecision record indexed
    Decision18 March 2025View record
  12. © OpenStreetMap
    2460574Granted

    Former Cemex site at Maudlins roundabout, Dublin Road Link with Fishery Lane, Naas

    For demolition of all existing buildings on the site (c.9,949sq.m) and north and north-western boundary wall. Provision of new Electric Vehicle Charging Hub for 36 vehicles (all under canopy measuring 3.22m high) along with 8 no. EV bus/HGV charging spaces. Construction of 8 no. buildings (total gfa 10,527.59sq.m) as follows: Distribution centre: single storey structure including offices (gross floor area 9,383.85sq.m) with a maximum height of 19.5m. It includes 13 no. loading bays, Service station – single storey building (759.5sq.m) including net retail area of 99.7sq.m, 3 no. food offers, seating area, drive-thru hatch, toilets, back of house area and external storage compound. The maximum height is 8.55m high. Drive-thru café – single storey building (256.70 sq.m) including kitchen, back of house, seating area and drive-thru hatch. The maximum height will be 6.24m. Substation (gfa 33.54sq.m). External generator (gfa 37.58sq.m) Service compound (gfa 37.58sq.m) Water pump house (gfa 12sq.m) Refuse compound (gfa 6.84sq.m) There will be signage on the distribution centre, service station and drive-thru café buildings. Free standing signage is also proposed within the site and a totem sign measuring 17.5m high and an information sign measuring 6.8m high at the perimeter of the site. All ancillary development including fuel pumps under canopy (5.6m high), underground tanks, vent pipes, HGV fuel pumps (5.6m high), modified vehicular entrance off Maudlins roundabout, replacement entrance off Johnstown Road with new slip lane, new spine road, car parking (169 – including EV parking and accessible spaces), cycle parking (46) with canopy over (3.1m high), HGV/Bus parking (16 no. – including 8 no. EV parking spaces, HGV only parking 3 no.), drainage infrastructure, boundary treatments, hard and soft landscaping (including detention basins), internal roads, footpaths and cycle lanes, outdoor exercise areas, outdoor eating/picnic areas, covered smoking area, overground tank, roof mounted solar panels, new internal roundabout junction, internal control sliding gate, underground fire water storage tank and lighting. All associate site works. The proposed development also includes works on lands in the ownership of Kildare County Council as part of the Key development Area Master Plan and Access Strategy agreed with Kildare County Council, to include: 1. Provision of a left slip lane from the R445 (Dublin Road) to the Monread Road at the Dublin Road RoundaboutDecision record indexed
    Decision07 March 2025View record
  13. © OpenStreetMap
    SD24A/0266WGranted

    4 No. sites A) Along Griffeen Road Griffeen Glen Drive, Balgaddy Road and, B) Grange Castle Road Junction Lucan Co. Dublin, C) Thomas Omer Way/Ninth Lock Road, & D) Ninth Lock Road/Neilstown Road, Clondalkin, Dublin 22.

    The development will consist of works located outside the Clonburris SDZ relating to the "Stage 2" roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) in respect of the northern part of the overall Clonburris SDZ lands comprising: A) The construction/upgrade of an underground surface water pipe from Griffeen Avenue along Griffeen Road to connect to the existing surface water pipe along with the upgrade of existing surface water pipe along Griffeen Glen Drive and adjoining open space area (for c. 450m), which will connect ultimately to the Griffeen River. B) Junction upgrade and junction tie in works to existing road layout at Balgaddy Road and Grange Castle Road, C) Junction upgrade and junction tie in works to existing road layout at Thomas Omer Way/Ninth Lock Road, Fonthill Road (R113), including slip road to the north; D) Junction upgrade and junction tie in works to existing road layout at Ninth Lock Road/Neilstown Road. E) The proposals will also entail the restoration of the open space areas and road surfaces and all associated site development and associated landscape works.Decision record indexed
    Decision10 February 2025View record
  14. © OpenStreetMap
    WEB2616/24Granted

    16, Lea Road, Sandymount, Dublin 4

    Permission is sought for alterations to a semi-detached dwelling. The development will consist of amendments to previously approved permission with Ref. No. Web 1836/24. Amendments include omission of - 1no. kitchen window to rear and external wall insulation brick slips to rear. Development will also consist of single storey extension with pitch roof to rear and associated site works.Decision record indexed
    Decision28 January 2025View record
  15. © OpenStreetMap
    2460294Granted

    Greenore Port and site of dwelling house on Shore Road (A91DD42), Greenore, Co. Louth

    Permission for a 10-year permission development at Greenore Port and site of dwelling house on Shore Road (A91DD42), Greenore, (total site area c.4.88 hectare). The development comprising of Operation and Maintenance (O&M) Facilities will serve as the support base for future offshore wind arrays in the Irish Sea. The proposed development will comprise of: (i) Three standalone buildings, each with a gross floor area (GFA) of 1,670 sqm, comprising 681 sqm warehouse floor space, 322 sqm office space and 667 sqm plant, welfare, storage, ancillary and circulation space per unit. The height of each unit ranges from 7.2m for the warehouse (single-storey / double-height space) to 13.5m max for the office 3-storey element. 76 car parking spaces are proposed distributed adjacent to the units including 6 no. disabled parking spaces and 15 no. electric vehicle (EV) charging spaces. Each building includes an internal bike storage room, with 20 spaces per building. Each building includes rooftop solar photovoltaic panels. (ii) Nearshore works including dredging of harbour sediments to -4m Chart Datum to provide navigable water depths, new quay wall (70m), a 40m anti-slip access ramp, floating pontoon for berthing crew transfer vessels (CTV’s). 9 no. berths are proposed, with an additional 2 no. layby berths and a push-on / service berth adjacent to the new quay wall. (iii) Improvement works to the quay deck including installation of a new reinforced concrete deck with surface water management system incorporating silt traps and hydrocarbon interceptors, and berth infrastructure including bollards, fenders, ladders, lifesaving equipment, power outlets and fire hydrants. (iv) Surface car park at the Residential site on Shore Road comprising 135 car parking spaces, including ducting for 30 no. EV charging spaces, relocation of existing entrance on Shore Road by c.6m to the east, new boundary wall to Shore Road and a pedestrian access route from the car park through port lands to the O&M Units crossing improved public realm at top of Euston Street. (v) Re-instatement of former Open Hydro carpark (62 spaces) until the surface car park on Shore Road is operational. (vi) Upgrade to public/private realm in the foreground of the existing Greenore Port Office building, including upgrade of existing entrance to former open hydro carpark, new pedestrian gate, new feature wall entrance, removal of 6 port car parking spaces, link to new pedestrian route from surface carpark includiDecision record indexed
    Decision19 December 2024View record
  16. © OpenStreetMap
    24/432Granted

    Slip Slip Road Bantry Co Cork

    Permission for the following works to existing dwelling house: a) Permission for alterations and extensions to said dwelling including additional roof light b) Permission sought for alterations to north road side boundary for improved entrance and curtilage within said property and for all associated site worksDecision record indexed
    Decision20 September 2024View record
  17. © OpenStreetMap
    4082/24Granted

    137 Howth Road, Clontarf, Dublin 3, D03 C6Y3

    The development will consist of the demolition of the existing ground floor kitchen, external blockwork sheds, part of the existing front entrance wall, garage wall portions of the rear external wall and the hipped portion of the roof. We intend to construct a ground floor extension to the rear of the property, a new entrance porch, convert the attic, provide a flat roof dormer to the rear of the property and internal alterations. We also intend to fit brick slips to the front facade.Decision record indexed
    Decision19 September 2024View record
  18. © OpenStreetMap
    WEB1836/24Granted

    16, Lea Road, Sandymount, Dublin 4, D04 R998

    Permission is sought for alterations to a semi-detached dwelling. The development will consist of - widening of existing vehicular entrance gate, 1no. additional window to kitchen to rear, external wall insulation with brick slips to rear, internal modifications at ground floor and site landscape works.Decision record indexed
    Decision04 September 2024View record
  19. © OpenStreetMap
    SD23A/0231Granted

    Parcel of land at Belgard Square South, within the Townlands of Tallaght, centered at approx. Irish Traverse Mercator

    Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.Decision record indexed
    Decision29 August 2024View record
  20. © OpenStreetMap
    2460105Granted

    SEEORAN, BAILIEBOROUGH, CO. CAVAN

    To demolish existing wall and construct a slatted shed with underground storage tank, and 1 no uncovered slip underground storage tank, ancillary concrete area and all ancillary site workDecision record indexed
    Decision06 June 2024View record
  21. © OpenStreetMap
    SD24A/0076Granted

    At Bus Stop No. 133951, Slip Road off N7, outside car park of An Poitín Stil, Rathcoole, Dublin

    Erection of a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the existing concrete apron outside An Poitin Stil car park with 2 No. LED illuminated advertising panels each of 2.0 square metre area.Decision record indexed
    Decision29 May 2024View record
  22. © OpenStreetMap
    2360485Granted

    “Leixlip Gate” in the townlands of Kilmacredock Upper and Castletown, Leixlip, Co Kildare

    A Large Scale Residential Development (LRD) at this site of c.8.6ha at “Leixlip Gate”, in the townlands of Kilmacredock Upper and Castletown, Leixlip, Co Kildare. The site is located to the east of the R449, north of the M4, and south of the “Harpur Lane” residential and creche development currently under construction (Reg. Ref. ABP-307223-20, and as amended by KCC Reg Ref.22/1226 and Reg. Ref. 23/606). The development will consist of: Construction of 229 no. dwellings comprising: 139 no. 2-storey houses comprising 10 no. 2-bed, 119 no. 3-bed and 10 no. 4-bed units; 54 no. apartments within 1 no. 5-storey block comprising 25 no. 1-bed and 29 no. 2-bed units; 36 no. duplex units within 3 no. 3-storey blocks comprising 18 no. 2-bed and 18 no. 3 bed units; All with associated private gardens/ balconies/ terraces to the north/south/east/west elevations. 255 no. car parking spaces (including e-charging points) and 250 no. secure bike parking spaces (with residential spaces located within dedicated bicycle stores). Vehicular accesses to the development via the Harpur Lane development to the north with pedestrian/cyclist access via Harpur Lane and the R449 to the west. This includes a second access to Harpur Lane provided via the creation of a second permanent opening in the existing boundary demesne wall. Minor amendments to the permitted Harpur Lane development (Ref. ABP-307223-20) to provide the proposed accesses/connections and for connections to services. Provision of new open spaces and landscaped areas including a new public park to the south and west of the site. All associated site development works (including reprofiling of the land), boundary treatments, acoustic fencing (along the boundary with the R449 and M4 slip road), bin stores, ESB substations, public lighting; site services, drainage works and all associated infrastructure. Temporary permission (3 years) is also sought for the erection of an advertising signage adjacent to the R449 (total area c.9.29 sq.m).Decision record indexed
    Decision05 April 2024View record
  23. © OpenStreetMap
    2360485Granted

    Southend, Blackrock, Co. Louth

    Permission for demolition of the existing garage and replacing it with new single storey outbuilding, elevational changes to the dwellinghouse as granted unde planning reference 20419 including a change of wall finish from brick slip to render, alterations to front boundary including an increase of its height and change of the finish to render and associated site worksDecision record indexed
    Decision22 February 2024View record
  24. © OpenStreetMap
    211322Granted

    ERREW HOUSE, ERREW, CASTLEHILL

    CONSTRUCTION OF ACCESS ROAD, CONCRETE SLIP WAY, JETTY AND BOAT HOUSE, INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICESDecision record indexed
    Decision30 August 2023View record
  25. © OpenStreetMap
    WEB1292/23Granted

    64, Howth Road, Dublin 3 D03 VA48

    Permission is sought for alterations of an existing semi-detached dwelling at no. 64 Howth Road, Dublin 3, D03 VA48 by Clare O'Donoghue. The development will consist of the following principal elements: 1) External wall insulation to front elevation with self-coloured off white smooth acrylic render finish and selected brick slips finish. 2) Wooden bicycle shed to front garden. 3) New pedestrian gate. 4) Alteration to existing front garden and all associated site development works.Decision record indexed
    Decision30 May 2023View record
  26. © OpenStreetMap
    22424Granted

    Mulladuff, Smithborough, Co.Monaghan

    Permission for development consisting of an all weather walking track and associated fencing and artificial lighting and alterations to existing site infrastructure as follow; alterations to existing canopy over spectator stand to south eastern side of playing pitches, relocation and extension of existing ball stop nets to the north eastern side of playing pitches, new 1.8mhigh boundary walling/fencing where indicated, covered bicycle shelter, alterations to existing vehicular entrance to include for new removable bollards to vehicular entrance, all associated site works including surface repair works, pedestrian crossings, walkway non slip markings, site signage, etc.Decision record indexed
    Decision07 November 2022View record
  27. © OpenStreetMap
    4789/22Granted

    Trident House, 60 Claremont Road, Sandymount, Dublin 4

    The development provides for the following works: 1. refurbishments works to the exterior of Trident House, including removal of all existing windows; lowering all window openings to floor level on front and rear facades and installation of new full height glazed doors with Juliette balconies at first and second floor; installation of new glazed window to stairwell on front facade; infill of 6 no. windows to each side elevation (12no. in total) and installation of new windows to remaining 12no. windows; a new external insulation system to all facades with brick slip finish to front and rear facades and render finish to side facades; re-cladding of existing entrance canopy; removal of existing roof finish and insulation and replace with new insulation and roof finish with new fascia/eaves to all sides; new low-level boundary walls to ground floor private amenity spaces; the consolidation of rainwater/soil vent pipes to the side facades; 2. a new single storey outbuilding to the rear of the existing building to house a new cold water storage tank, associated pump and below ground works to provide new water main connection and all ancillary site works.Decision record indexed
    Decision28 October 2022View record
  28. © OpenStreetMap
    22132Granted

    The Aquaskiff Boat House, Castle View, Wicklow Town

    (138msq) extension / refurbishment of the ground floor, a new concrete hardstanding & slip access, a new first floor extension (183msq), an external viewing deck all together with site and development worksDecision record indexed
    Decision21 October 2022View record
  29. © OpenStreetMap
    22619Granted

    11 Great Georges Street, Waterford, X91 VH93

    Section 254 is required for the laying of temporary non-slip grass surface (removable) the area of which will cover 14.5 m2. Six tables with 4 chairs per table in the area, which will be covered by 2 umbrellas and bounded 4 whiskey barrelsDecision record indexed
    Decision30 August 2022View record
  30. © OpenStreetMap
    3670/22Granted

    46, Rathmines Road Lower, Dublin 6

    Permission for front façade amendments/elevational changes comprising: a) Proposed selected brick slips fixed onto entire existing front/west façade with soldier coursing and all associated site works. b) Fenestration changes at ground and lower ground floors. c) Proposed railings and guarding to external steps and all associated works.Decision record indexed
    Decision04 July 2022View record
  31. © OpenStreetMap
    WEB1387/22Granted

    39, Brookwood Crescent, Artane, Dublin 5 D05 TP44

    A ground floor rear extension, and reconfiguration of existing side garage into accommodation, including the provision of 5 roof lights and external insulation with brick slip and painted render finish and all ancillary site works.Decision record indexed
    Decision23 June 2022View record
  32. © OpenStreetMap
    22272Granted

    76 Kieran Street, Kilkenny

    For a change of use from existing store area on first floor to short term residential letting, internal alterations and all associated works at first floor of 76 Kieran Street with use of existing ground floor access off Market SlipDecision record indexed
    Decision16 June 2022View record
  33. © OpenStreetMap
    SD22B/0090Granted

    51, Castleview Road, Clondalkin, Dublin 22

    Alteration to the front domestic south facing elevation consisting of 17sq.m of PV solar panels located on the existing house front roof pitch; alterations to first floor front bedroom windows ope to contain a central self-coloured acrylic render external insulated system on masonry wall to create new window elevational layout; alterations extending beyond the front building line of the domestic south facing elevation consisting of new self-coloured acrylic render external insulated system to ground and first floor level and grey brick slip finish to external insulated system to ground floor bay window walls.Decision record indexed
    Decision25 April 2022View record
  34. © OpenStreetMap
    3220/21Granted

    Dublin Port, Alexandra Road, Dublin 1

    PROTECTED STRUCTURE: Permission for development at this site which extends from North Wall Quay Extension to the Tolka Estuary, to include the western boundary to Dublin Port and pavements along East Wall Road, across the Alexandra Road junction with East Wall Road, across the Tolka Quay Road junction with East Wall Road, Bond Road, across the Promenade Road junction with Bond Road and to end of Bond Road, Dublin Port, Dublin 1 & 3 and permission to amend development permitted under Reg. Ref. 3084/16. The ESB substation (Record of Protected Structures No. 8771) is located within the subject site. The proposed development will consist of construction of a new 1.4km pedestrian walkway and a 2-way cycle lane along East Wall Road and Bond Road from the River Liffey to the Tolka Estuary and will comprise the following: • Removal of part of existing Dublin Port western boundary wall / fence; • Removal of the existing access to Terminal 3 on East Wall Road; • Modifications to layout of Terminal 3 along eastern boundary including removal of private car parking spaces; • Relocation of 3 no. existing double billboards; • Relocation of existing flagpoles, • Relocation of existing temporary office building of 15sq.m; • Closure of left turn from Alexandra Road to East Wall Road southbound; • Removal of 17 no. car parking spaces from the Dublin Port Centre car park; • Realignment of Bond Road north of the Promenade Road junction; • Construction of new boundary along sections of the Dublin Port western boundary comprising railings over plinth or wall to a height of c. 4m along East Wall Road and Bond Road or for a section along Bond Road a wall of c. 2.6m in height; • Creation of a civic space adjacent to the River Liffey at North Wall Quay Extension, • Provision of 25 no. bicycle parking spaces, • Provision of a Dublin Port Irish language installation as part of the boundary treatment adjacent the Crane 292 enclosure. • Provision of hard and soft landscaping including trees along the extent of the route, amenity, interpretation and wayfinding features including bins and seating; • Provision of an indented bus stop on the east side of East Wall Road; • Provision of pedestrian and cycle facilities to enable road crossing on the east side of East Wall Road to connect with permitted road crossings on East Wall Road by Dublin City Council; • Provision of lighting and CCTV along the proposed pedestrian and cycle route; and • Modifications to the existing maritime garden adjacent to Dublin Port Centre. In addition to the replacement of permitted pedestrian and cycle facilities and associated works along East Wall Road and Bond Road to the north of Tolka Quay Road as permitted under Reg. Ref. 3084/16 to include a bridge over Promenade Road with revised design and alignment the following proposed amendments to permission granted under Reg. Ref. 3084/16 will also comprise: • Reduction in the width of the vehicular carriageway and omission of footpath on internal roadway in Terminal 3; • Provision of a new vehicular access to Dublin Port Centre car park off the internal road network; • Amendments to the junction between the Terminal 3/4 access road and Alexandra Road to include right-out only from the proposed access road onto Alexandra Road and changing the junction from signalised to priority controlled; • Amendments to the permitted Alexandra Road / East Wall Road Junction to include the retention of the left slip lane from East Wall Road into Alexandra Road; • Relocation of the emergency access gate at the junction of Tolka Quay Road and East Wall Road; • Omission of the private secure access route for multi-modal berth between Tolka Quay Road and Alexandra Road; and • Omission of a section of the internal road to the south of Dublin Port Centre car park. The proposed development and proposed amendments include all associated ancillary works, including site clearance, demolitions, earthworks, pavement construction, drainage services, diversion and installation of utility services, installation of road markings and signs. This application is accompanied by a Natura Impact Statement.Decision record indexed
    Decision14 January 2022View record
  35. © OpenStreetMap
    SD21A/0291Granted

    Liffey Valley Shopping Centre, Fonthill Road, Clondalkin, Dublin 22

    Amendments to the permitted development previously granted under SDCC Ref. SD19A/0320 and An Bord Pleanala Ref. 306251-19; including the erection of 2 bus shelters on Fonthill Road each comprising of a bus stop sign, real time passenger Information (RTPI) unit and a two-sided internally illuminated advertising panel (c. 1.9sq.m each side); road alterations on Fonthill Road comprising of the amendment of staggered to straight Toucan crossings, the addition of a new straight Toucan crossing, the replacement of bus lay-by areas with bus islands, and the removal of a left slip lane; all associated site services and site development works.Decision record indexed
    Decision20 December 2021View record
  36. © OpenStreetMap
    218009Granted

    Cappamore Road(R506) & Dublin Road(R445) Junction, Garraunykee & Woodstown, Co. Limerick.

    Junction improvement works on the R445(Dublin Road)/R506(Cappamore Road), Limerick. The proposed works will include the construction of new footpaths, new cycle lanes, new junction slip lanes, new controlled pedestrian crossings, new public lighting scheme, new surface water drainage system, improved road markings, new traffic signal control, signage and carriageway resurfacingDecision record indexed
    Decision14 December 2021View record
  37. © OpenStreetMap
    SD20A/0262Refused

    Townland of Bushelloaf, Clondalkin, Dublin 22

    Construction of a 242 bedroom hotel in a building ranging in height from 7 to 10 storeys over ground and lower ground floor levels; the development will include the lower ground floor accommodating 202 car parking spaces; 54 bicycle parking spaces, plant, stores and ESB substation; ground floor accommodating hotel entrance and reception area; restaurant and bar; outdoor terrace and patio with canopies; function room; meeting rooms; kitchen, staff facilities; stores, toilets and plant; ground floor mezzanine accommodating meeting rooms; admin office; store and laundry facilities; 1st to 9th floor accommodating 242 hotel bedrooms including 17 suites; 10th floor accommodating gym/yoga studio; plant, storage and a roof terrace; vehicular access from both the N7 slip road and Knockmeenagh lane with link street across the site; upgrade works to Knockmeenagh lane; landscaping; boundary treatment; wastewater pumping station; associated signage and all site development works and services; the site is located between Knockmeenagh Lane to the north, St. Brigids cottages to the east, the Nass Road (N7) to the south and the Nass Road Business Park to the west.Grounds not yet categorised
    Decision19 July 2021View record
  38. © OpenStreetMap
    21590Granted

    15 Elmwood, Naas, Co. Kildare

    For construction of single-storey flat roof side and pitched roof rear extensions, construction of a new roof light to the existing roof: deep retrofit of existing house, to include external insulation with new render/brick slip finish, replacement windows and doors, and minor ancillary site works, including connections to existing drainageDecision record indexed
    Decision23 June 2021View record
  39. © OpenStreetMap
    2170Refused

    One The Waterfront, Gallwey's Hill, Tramore Co Waterford

    Retention permission for 1. Cantilevered extension to existing external licenced terrace to provide an additional 31.7m2 floor area and associated guardrails/glazed balustrades, 2. Construction of an area of raised decking over a section of the existing licenced terrace to permit wheelchair access. 3. Construction of a new 114m2 lower level external licenced terrace and associated guardrails, 4. 1 no. bar server on existing bar terrace and 1 no server on the lower terrace to be retained 5. Upgrade and improvements to existing external public side entrance including handrails. 6. Replacement steps from the original external licenced terrace to the beach and leading to Lady's Slip and associated handrails, guard rails, security gate and an access gate to the lower external licenced terrace 7. Outdoor shower stand 8. 2 no. wall mounted kitchen extractors 9. All associated worksGrounds not yet categorised
    Decision25 March 2021View record
  40. © OpenStreetMap
    FW20A/0160Granted

    Dublin Airport Long-Term Car Park, Known as the Holiday Blue Car Park,

    Permission for temporary (12 months up to the end of 2021) change of u24 conditions indexed
    Decision18 November 2020View record
  41. © OpenStreetMap
    20593Refused

    Raheen, Rosbercon, New Ross

    For development. The development will consist of (a) The proposed extension to an existing waste metal processing and storage facility to provide additional storage for processed waste metal materials and shredded rubber tyres, (b) a new weighbridge and weighbridge office, (c) a new storage shed for the storage of precious metals, (d) the change of use and refurbishment of existing manufacturing sheds to a vehicle repair shed, a depollution shed and additional storage shed for the storage of processed waste metal, (e) the installation of stormwater attenuation tanks, (f) the extension and reconfiguration of an existing access road, (g) the erection of a 1.8m high concrete wall to the north east/south east boundaries, (h) the erection of gates to the site access road to the south west, (i) the erection of a flood gate to the top of the exisiting slip way and all associated site development works. The planning application will be accompanied by an EIAR screening and Natura Impact Statement.Grounds not yet categorised
    Decision30 October 2020View record
  42. © OpenStreetMap
    2848/20Granted

    115, Amiens Street, Former Dart Station Hall, Connolly Station, Dublin 1

    PROTECTED STRUCTURE: Planning Permission for works to 115 Amiens Street, Dublin D01 NP44, a former station hall and vaults located within the curtilage of Connolly Station, a Protected Structure. The development consists of: the change of use from vacant motorcycle repair shop and emergency exit from the DART station to use as offices over two storeys; alteration of the exterior of the former station hall to include windows, a set of new entrance doors, curtain walling, external downpipes and rendered external insulation system with brick slips to base and new fascia detail.Decision record indexed
    Decision12 October 2020View record
  43. © OpenStreetMap
    2089Granted

    Annagh View, Hartley, Carrick on Shannon

    An existing harbour comprising of (a) boating channel; (b) floating jetty and ramp; (c) slip-way and (d) associated site works and servicesDecision record indexed
    Decision28 July 2020View record
  44. © OpenStreetMap
    191314Granted

    Glencormack South, Kilmacanogue, Co. Wicklow A98 XY66

    First floor extension to front of existing office building consisting of 87 sqm additional office space with alterations to front façade finishes and window / door configuration, the inclusion of additional roof lights to the rear roof elevation and replacement of the existing roof covering with insulated roof panels. Permission is also sought for additional car parking to the rear of the building including the widening of existing rear vehicular entrance onto the public road8 conditions indexed
    Decision15 May 2020View record
  45. © OpenStreetMap
    FW20A/0021Granted

    Dublin Inland Port, South of Dublin Airport Logistics Park, Off Maple

    The development will consist of storage and logistic facilities compri22 conditions indexed
    Decision07 April 2020View record
  46. © OpenStreetMap
    4091/19Granted

    Rose Cottage, Ordnance Survey Road, Phoenix Park, Dublin 15, D15 CA4T

    PROTECTED STRUCTURE: The development will consist of restoration and repairs to existing 2 storey cottage and external w.c., comprising repairs to the existing structure and fabric and the following alterations and modifications: 1) remove modern front/south elevation dormer window and replace with a conservation rooflight: 2) replace 2 no. existing modern rooflights in west elevation with conservation rooflights and replace modern dormer window in south elevation with conservation rooflight: 3) replace existing modern fibre cement roof slates and ridges with natural stone roof slates and clay ridge tiles and re-instatement of small extended sections of veranda roof either side of the front porch gable. Reinstate a decorative perforated painted timber barge panel to front porch. 4) Replace modern pvc rainwater goods with metal rainwater goods, 5) replace 6no. existing ground floor modern windows and concrete cills with 5 no. timber vertical sliding sash windows and 1 no. casement window, all with stone cills. 6) Replace modern timber front porch door and sidelights with slimline steel doubled door and sidelights. 7) Replace modern timber inner front door and side lights with timber double door and sidelights. 8) Relocating kitchen to rear western dining room. 9) Remove modern timber floor on battens in kitchen. 10) Replace all modern cementitious external wall renders with lime render and remove modern cover slips to timber framing on sides of front porch. 11) Replace modern door and architrave to bottom of stairs with sheeted door. 12) Replace all modern flush panel doors with sheeted timber doors. 13) Remove 4 no. modern reconstitute stone tile fireplace surrounds and hearths including back boiler to kitchen to ground floor, reinstating brick arched range opening and installation of 3 no. modern appropriate fireplace surrounds. 14) Modifications to first floor layout, to include a new service room, converting near inner bedroom to ensuite bathroom and timber sheeting to modern existing and new wall partitions to first floor. 15) Removal of glazed modern screen to upper part of original partition at side of stairs at first floor level. 16) Remove modern oil-fired boiler, housing, flue and pvc oil storage tank. 17) Demolition of 4 no. modern timber ruinous outbuildings (a garage and 3 no. sheds, c43sqm), and construction of a single storey garden shed (c 5sqm)18) installation of new plumbing, heating and electrical services and general repairs. 19) all associated site works.Decision record indexed
    Decision10 March 2020View record
  47. © OpenStreetMap
    SHD3ABP-305878-19Granted

    'Beechpark' and 'Maryfield', Scholarstown Road, Dublin 16

    Demolition of all existing structures on site which include a single storey dwelling known as 'Beechpark' (172sq.m), a 2 storey dwelling known as 'Maryfield' (182sq.m), with associated garage/shed (33.5sq.m) and associated outbuildings (47.1sq.m); and the construction of 590 residential units (480 Build-to-Rent apartment units and 110 Build-to-Sell duplex units and apartments), ancillary residential support facilities and commercial floorspace. The total gross floor space of the development is 51,252sq.m over a partial basement of 5,888sq.m (which principally provides car and bicycle parking, plant and bin stores). The 480 'Build-to-Rent' units will be provided in 8 blocks as follows: 7 blocks ranging in height from part 5 to part 6 storeys (Blocks B1-B5, C1 and C3) and 1 block ranging in height from part 4 to part 6 storeys (Block C2) and will comprise 246 one bed units and 234 two bed units. The 110 'Build-to-Sell' units will be provided in 9 duplex blocks which will be 3 storeys in height (Blocks A1-A9) and will comprise 55 two bed units and 55 three bed units. The development will also consist of the provision of a part 1 to part 2 storey ancillary amenity block (Block D1) (414sq.m) within the central open space which comprises a gymnasium, lobby, kitchenette and lounge at ground floor level and lounge at first floor level in addition to a roof terrace (facing north, south and west) to serve the 'Build-to-Rent' residents; a 2 storey retail/café/restaurant building(Block D2 - 657sq.m) comprising 2 retail units at ground floor level (328.5sq.m) and a café/restaurant unit at first floor level (328.5sq.m); a creche (438sq.m) within Block C2 at ground floor level; and a Management Suite (261sq.m) and café/restaurant (288sq.m) within Block C3 at ground floor level all at a 5.35 hectare site located north of Scholarstown Road incorporating dwellings known as 'Beechpark' and 'Maryfield', Scholarstown Road, Dublin 16, D16 X3X8 and D16 N6V6. Works are also proposed to Scholarstown Road and Woodfield junction including new traffic signals, the elimination of the left-turn slip-lane into Woodfield off Scholarstown Road, upgraded public lighting and upgraded cycle and pedestrian facilities on an area measuring 0.7 hectares, providing a total application site area of 6.05 hectares.Decision record indexed
    Decision09 March 2020View record
  48. © OpenStreetMap
    191328Granted

    Rear No 2 Ballinalea, Ashford, Co. Wicklow

    Dwelling with connection to services, entrance, driveway, associated works9 conditions indexed
    Decision05 February 2020View record
  49. © OpenStreetMap
    D19A/0773Granted

    Side of 96 Beech Grove Cottages, Loughlinstown, Co Dublin

    Permission for 3 bedroom detached bungalow and all12 conditions indexed
    Decision24 January 2020View record
  50. © OpenStreetMap
    3069/19Granted

    2-3, Mary's Abbey, Dublin 7, D07 X6R6

    PROTECTED STRUCTURE: The proposed development will comprise the conservation, repair and adaption of the protected structure at 2-3 Mary's Abbey, Dublin 7 to facilitate a change of use from artist studios at first, second and third floors, shop at ground floor and storage at basement level of the protected structure to museum and ancillary use at ground first second and third floors and storage at basement level of the protected structure and the demolition of existing structures to the rear of the protected structure to allow the development of new ancillary museum building on lands to the rear of the protected structure as follows: 1. Buildings to the rear of the site which are not protected structures are to be demolished, all boundary party walls to be maintained. 2. The construction of a new building on lands to the rear of the existing protected structure as the new premises of the National Leprechaun Museum, two storeys in height to an overall height of 13.5m (exclusive of roof mounted PV panels), landscaping works to internal courtyard lightwell. Roof to new building at rear to be a combination of flat semi intensive green roof with PV panels and a pitched reflective insulated metal deck roof with brick slip cladding to external perimeter walls and roof top plant with louvered enclosure. 3. Structural intervention works to stabilise the building fabric of the protected structure. 4. Alterations to rear facade of protected structure at ground, first and second floors to facilitate new escape and access stairs to facilitate access from garden, to repair and reinstate original windows, to dismantle and re-build destabilised segment of wall at top floor level, reinstatement of cast iron rain water goods. 5. Repairs to the roof, gutters, rear eaves and front parapet of the protected structure. 6. Works to the front facade of the protected structure at all levels comprising brick, stone, render and jointing cleaning and repair, removal of existing modern shopfront and installation of new shopfront and external articulated shutters, repairs to all existing metal framed windows above ground level, dismantling and re-building destabilised segment of parapet at top floor level. 7 Removal of modern interventions to the interior of the protected structure including partitions, stud walling, false ceilings and modern stairs and installation of new partitions, doors and lift shaft to facilitate proposed new museum use.Decision record indexed
    Decision17 January 2020View record
Showing 1-50 of 52
PreviousPage 1 of 2